IRS Class LSAM 18 launched by Suryadipta Projects | |
Class overview | |
---|---|
Builders | Suryadipta Projects Pvt Ltd., SECON Engineering Projects Pvt. Ltd. |
Operators | Indian Navy |
Planned | 19 |
Completed | 12 |
Active | 12 |
General characteristics | |
Length | 16.5 m (54 ft 2 in) |
Beam | 6 m (19 ft 8 in) |
Height | 3.1 m (10 ft 2 in) |
Draught | 2 m (6 ft 7 in) |
Capacity | 100 tonnes (98 long tons) full load |
Crew | 7 (1 officer, 6 civilian) |
The IRS-class ACTCM barge is a series of 19 ammunition barge being built by M/s Suryadipta Projects Pvt Ltd, and SECON Engineering Projects Pvt. Ltd.; MSMEs under a contract for the Indian Navy signed on 5 March 2021 and 19 February 2021 respectively. While Suryadipta Projects is from Thane, Maharashtra; and SECON Engineering Projects is from Visakhapatnam, Andhra Pradesh. As per the contract, Suryadipta Projects will build 11 Ammunition cum Torpedp cum Missile (ACTCM) barge and SECON Engineering Projects will build 8 Missile cum Ammunition (MCA) barge, respectively. [1] [2] [3]
The model testing of the barge during design stage was undertaken at NSTL, Visakhapatnam, Andhra Pradesh under relevant Naval Rules and Regulation of Indian Register of Shipping. [4] [5] The barges are being built under Atmanirbhar Bharat and Make in India initiative of the government of India. [1] [5] [6]
IRS-class Ammunition-Cum-Torpedo-Cum-Missile (ACTCM) barge are to be inducted in the Indian Navy to undertake the mission needs for transport, embarking or disembarking of ammunition, torpedo, missile, articles, etc. on the IN ships, thereby providing impetus to operational commitments of the navy both alongside jetties and outer harbors boosting operational readiness and effectiveness. The ACTCM barges are also referred to MCA (Missile Cum Ammunition) barges, but all are designated as Large Scale Additive Manufacturing (LSAM). [6] All major and auxiliary equipment/systems on the barge, which is set to have a service life of 30 years have been sourced from indigenous manufacturers. [7]
Delivery of the first barge LSAM 15 (Yard 125) by Suryadipta Projects to Indian Navy was done on 9 June 2023. [8] LSAM 7 to 14 is being built by SECON Engineering and LSAM 15 to 25 is being built by Suryadipta Projects. Currently, 12 ACTCM barges have been launched and inducted into the Indian Navy, with Suryadipta Projects delivering 7 barges and SECON Engineering delivering 5 barges. [9] [10] The barge has a cargo hold of 100 tonnes. The barge has ample facilities for fire fighting, power generation, and crew accommodation. [11] [12] [13]
Pennant Number | Builder | Yard number | Launched | Delivered |
---|---|---|---|---|
LSAM 7 | SECON Engineering Projects Pvt. Ltd., Visakhapatnam (under Missile Cum Ammunition (MCA) Barge project) | 75 | Feb 24 2023 [14] | 18 July 2023 [15] |
LSAM 8 | 76 | 18 August 2023 [16] | 19 October 2023 [17] | |
LSAM 9 | 77 | 23 September 2023 [18] | 22 November 2023 [19] | |
LSAM 10 | 78 | 20 November 2023 [20] | 28 December 2023 [21] | |
LSAM 11 | 79 | |||
LSAM 12 | 80 | |||
LSAM 13 | 81 | 10 June 2024 [22] | ||
LSAM 14 | ||||
LSAM 15 | Suryadipta Projects Pvt Ltd., Thane (under Ammunition cum Torpedp cum Missile (ACTCM) Barge project) | 125 | 10 February 2023 [23] | 9 June 2023 [24] |
LSAM 16 | 126 | 20 July 2023 [25] | 7 September 2023 [26] | |
LSAM 17 | 127 | 27 October 2023 [27] | 30 November 2023 [28] | |
LSAM 18 | 128 | 28 February 2024 [29] | 29 March 2024 [30] | |
LSAM 19 | 129 | 24 January 2024 [31] | 5 March 2024 [32] | |
LSAM 20 | 130 | 29 April 2024 [33] | 29 May 2024 [34] | |
LSAM 21 | 131 | 5 September 2024 [35] | ||
LSAM 22 | ||||
LSAM 23 | ||||
LSAM 24 | ||||
LSAM 25 |
The Delhi-class destroyers, also known Project 15 are a class guided-missile destroyers of the Indian Navy. Three ships of this class are in active service. The Delhi-class vessels were the largest vessels to be built in India at the time of their commissioning. The ships were built by Mazagon Dock Limited (MDL) at a cost of ₹750 crore each.
The Talwar-class frigates or Project 11356 are a class of stealth guided missile frigates designed and built by Russia for the Indian Navy. The Talwar-class guided missile frigates are the improved versions of the Krivak III-class frigates used by the Russian Coast Guard. The design has been further developed as the Admiral Grigorovich-class frigate for the Russian Navy. Six ships were built in two batches between 1999 and 2013.
The Brahmaputra-class frigates are guided-missile frigates of the Indian Navy, designed and built in India. They are an enhancement of the Godavari class, with a displacement of 3850 tons and a length of 126 metres (413 ft). Although of similar hull and dimension, internally, the Brahmaputra and Godavari classes have different configurations, armaments and capabilities. 3 ships of this class serve in the Indian Navy.
Bharat Electronics Limited (BEL) is an Indian public sector aerospace and defence electronics company. It primarily manufactures advanced electronic products for ground and aerospace applications. BEL is one of sixteen PSUs under the administration of Ministry of Defence of India. It has been granted Navratna status by the Government of India.
Kora-class corvettes are guided missile corvettes, in active service with the Indian Navy and the National Coast Guard of Mauritius. Four vessels were built at Garden Reach Shipbuilders and Engineers (GRSE) and outfitted at Mazagon Dock Limited (MDL).
The Nilgiri-class frigates, formally classified as the Project-17 Alpha frigates (P-17A), are a series of stealth guided-missile frigates currently being built by Mazagon Dock Shipbuilders (MDL) and Garden Reach Shipbuilders & Engineers (GRSE) for the Indian Navy (IN).
The Kalvari-class submarines, formally classified as the Project-75 submarines (P-75), is a class of diesel-electric attack submarines operated by the Indian Navy (IN). Currently being constructed by a syndicate of French and Indian shipyards, namely, Naval Group and Mazagon Dock Limited (MDL) respectively, the class is an export derivative of the French-origin Scorpène-class submarine, originally designed by Naval Group.
INS Chennai (D65) is the third and last ship of the Kolkata-class stealth guided missile destroyers of the Indian Navy. She was constructed by the Mazagon Dock Limited (MDL) at Mumbai. On 17 April 2017, INS Chennai was dedicated to the city of Chennai in presence of then Chief Minister of Tamil Nadu, K. Palaniswamy.
INS Kadmatt (P29) is the second of four anti-submarine warfare corvettes built for the Indian Navy by the Garden Reach Shipbuilders and Engineers, of Kolkata, under Project 28. She was inducted into the Eastern Naval Command of the Indian Navy.
The Indian Navy has been focusing on developing indigenous platforms, systems, sensors and weapons as part of the nation's modernisation and expansion of its maritime forces. As of November 2023, the Indian Navy had 67 vessels of various types under construction including destroyers, frigates, corvettes, conventional-powered and nuclear-powered submarines and various other ships. It plans to build up to a total of 200 vessels and 500 aircraft by 2050. According to the Chief of the Naval Staff's statement in December 2020, India has transformed from a buyer's navy to a builder's navy.
The Visakhapatnam-class destroyers, also classified as the P-15 Bravo class, or simply P-15B, is a class of guided-missile destroyers currently being built for the Indian Navy. The Visakhapatnam class is an upgraded derivative of its predecessor, the Kolkata class, with improved features of stealth, automation and ordnance.
INS Visakhapatnam is the lead ship and the first of the Visakhapatnam-class stealth guided-missile destroyers of the Indian Navy. The ship, commissioned on 21 November 2021, is one of the largest destroyers in service with the Indian Navy.
The Indian Navy Swimmer Delivery Vehicle (SDV), also known as Special Operations Vessels (SOV) is a planned class of midget submarine for the Indian Navy. Under this programme the Indian Navy will acquire at least 5 midget submarines for use as Swimmer Delivery Vehicles. These submarines will be used for conducting underwater special operations by MARCOS.
INS Mormugao is the second ship of the Visakhapatnam-class stealth guided-missile destroyers of the Indian Navy. She was built at Mazagon Dock Limited (MDL), and was launched on 17 September 2016. The ship was commissioned on 18 December 2022. She is named after the port city of Mormugao in Goa.
INS Imphal is the third ship of the Visakhapatnam-class stealth guided missile destroyer of the Indian Navy. She was being constructed at Mazagon Dock Limited (MDL) and has been launched on 20 April 2019. The ship started sea trials on 28 April 2023, and was delivered to the Indian Navy on 20 October 2023. It was commissioned on 26 December 2023.
The Vertical Launch – Short Range Surface to Air Missile, or VL-SRSAM is a quick reaction surface-to-air missile developed by the Indian Defence Research and Development Organisation (DRDO).
INS Vagsheer (S26) is the sixth submarine of the first batch of six Kalvari-class submarines for the Indian Navy. It is a diesel-electric attack submarine based on the Scorpène class, designed by French naval defence and energy group Naval Group and manufactured by Mazagon Dock Limited, an Indian shipyard in Mumbai, Maharashtra. The ship was launched on 20 April 2022.
The Nistar class is a series of two diving support vessels being built by Hindustan Shipyard (HSL) for the Indian Navy. The deal was signed on 20 September 2018 with the delivery of the ships is scheduled to commence from July 2023. The primary role of the vessels to support the Indian Navy's submarine fleet and meet various operational requirements such as submarine rescue, deep sea diving operations, sustained patrolling, non combatant evacuation operations and search and rescue (SAR).