Class overview | |
---|---|
Name | Talwar class |
Builders | |
Operators | Indian Navy |
Preceded by | Brahmaputra class |
Succeeded by | Shivalik class |
Subclasses | Admiral Grigorovich class |
Cost | $1.9 billion for 4 ships (2024 estimate, $475 million per ship) [1] |
Planned | 10 |
Building | 2 |
Completed | 8 |
Active | 7 |
General characteristics | |
Type | Guided missile frigate |
Displacement | 3,850 t (4,240 short tons) standard load [2] 4,035 t (4,448 short tons) full load [3] |
Length | 124.8 m (409 ft 5 in) |
Beam | 15.2 m (49 ft 10 in) |
Draught | 4.2 m (13 ft 9 in) |
Propulsion |
|
Speed | 32 knots (59 km/h; 37 mph) |
Range |
|
Endurance | 30 days |
Complement | 180 (18 officers) [5] |
Sensors and processing systems |
|
Electronic warfare & decoys |
|
Armament |
|
Aircraft carried | 1 × Ka-28 (or) Ka-31 (or) HAL Dhruv [5] |
The Talwar-class frigates or Project 11356 are a class of stealth guided missile frigates designed and built by Russia for the Indian Navy. The Talwar-class guided missile frigates are the improved versions of the Krivak III-class (Project 1135) frigates used by the Russian Coast Guard. The design has been further developed as the Admiral Grigorovich-class frigate for the Russian Navy. Six ships were built in two batches between 1999 and 2013.
Designed by Severnoye Design Bureau, the first batch of ships were built by Baltic Shipyard and the second batch by Yantar Shipyard. Preceded by the Brahmaputra-class frigates, the Talwar-class frigates are said to have semi-stealth features and better armament. The Indian Navy currently seven of these ships and 3 more are under construction including 2 in an Indian shipyard, for which Goa Shipyard was selected. [7] [8]
On 17 November 1997, Russia and India signed a $1 billion contract, for three Krivak III-class multi-purpose frigates. The Indian Navy wanted to fill the gap created by the decommissioning of the Leander-class frigates until the Project 17-class frigates entered service.
After the signing of the contract, Severnoye Design Bureau began a detail design layout and the shipbuilder, Baltisky Zavod of St. Petersburg, began preparations for their construction. The project involved around 130 suppliers from Russia, India, Britain, Germany, Denmark, Belarus, Ukraine and other countries including over 30 St. Petersburg-based naval design organizations and institutes.
The first frigate, INS Talwar was delivered in May 2002. The second, INS Trishul, was delivered in November 2002 and the third, INS Tabar, in May 2003. The Russian firm delayed the delivery of three frigates by 13 months, 7 months and 11 months respectively. The contract stipulated the levy of liquidated damages for the delays and the same worked out to the equivalent of US$38.5 million. This was yet to be recovered as of December 2005.
The Government of India signed a follow-on contract for the purchase of three additional frigates on 14 July 2006. These ships will be built at Yantar Shipyard in Kaliningrad. The first frigate was scheduled for delivery in April 2011. These ships will feature BrahMos supersonic anti-ship cruise missile instead of the Klub-N/3M54TE missile system which was provided to the Talwar, Trishul and Tabar frigates.
In July 2012, India Today reported the start of talks about purchasing three additional Talwar-class frigates (No.7 to No.9). [9] In March 2016, it was reported that India and Russia are still negotiating the purchase of the additional ships. [10] [11]
In September 2016, it was reported that India would acquire two Admiral Grigorovich-class frigates from Russia and remaining two will be built in India. [12] These frigates are based on the Talwar class and were to be commissioned into the Russian Navy, but after the Ukrainian Conflict, Ukraine refused to supply any more engines for the Russian ships. As of then, only two of the six have been commissioned by Russia. [13] In August 2017, the Indian Defence Acquisition Council (DAC) cleared a proposal of ₹ 490 crore (equivalent to ₹687 croreorUS$82 million in 2023) to buy two gas turbines from Zorya-Mashproekt in Ukraine for the Admiral Grigorovich-class frigates being built in Russia. [14] [15] Each M7N1 system includes two DT59 top speed (boost) gas turbines, two DS71 cruise turbines, two R063, one R1063 reduction gears and its control system. It can provide a total power output of 44,000 hp (33,000 kW). The powerplants were delivered to Kaliningrad Shipyard in late 2020 to early 2021. [16]
In October 2018, Indian Ministry of Defence signed a deal for ₹ 8,000 crore (equivalent to ₹110 billionorUS$1.3 billion in 2023) for procuring two Admiral Grigorovich-class frigates, Admiral Butakov (renamed INS Tushil) and Admiral Istomin (renamed INS Tamala). [17] [18] [19] [20] The two frigates was scheduled to be delivered to Indian Navy by 2022. [21] [22] The last frigate, the former Admiral Kornilov, is to be sold abroad. (Total: 3 ships built for the Russian Navy, 3 ships under construction for sale abroad). [23]
On 11 March 2024, reports emerged that INS Tushil, being built by Yantar Shipyard has started sea trials. The initial Pennant number is 435. [7] [24] In April 2024, a report suggested that INS Tushil will be delivered to India in September 2024 whereas INS Tamala will be handed over in February 2025. The timeline is on track as of July 2024. [25] [26] [27] As of July 2024, to conduct acceptance trials for the two frigates being built in Yantar shipyard, a team of around 200 personnel of the Indian Navy are in Russia. [28]
It was reported in September 2024 that INS Tushil is to be commissioned by 2024-end. [29] As of 11 November 2024, INS Tushil is to be delivered to India by the end of the month. The frigate is to be handed over to the Indian crew of over 200 officers and sailors at Kaliningrad Shipyard. The ship will later be commissioned by Indian Defence Minister Rajnath Singh in early December 2024 during a formal visit to Russia. The latter INS Tamal is to be delivered in early 2025. [20]
INS Tushil was commissioned on 9 December 2024 by Rajnath Singh. [8]
A contract, worth ₹ 13,000 crore (equivalent to ₹170 billionorUS$2.1 billion in 2023), was signed between Rosoboronexport and Goa Shipyard for the construction of 2 frigates under license on 20 November 2018. The two frigates will be armed with BrahMos missile system and will include a host of Indian equipment and will be delivered by 2027. [19] [20] The contract for the two ships was awarded to Goa Shipyard Limited by the Government of India on 30 January 2019. [30] The two frigates being built at Goa Shipyard will boast much higher indigenous content and will be named Triput class frigate. The new class of ship will feature BHEL-manufactured OTO Melara 76 mm gun instead of its Russian counterpart, along with other Indian weapon and sensors. [31]
In September 2021, India ordered two sets of modified M7N2E units for Batch-4 frigates at the coast of $100 million which has upgrades like microprocessor control system and a power output of 58,000 hp (43,000 kW), higher than previous subclasses. The powerplants are scheduled to be delivered by December 2022 and July 2023, respectively. [32] [16]
On 23 July 2024, INS Triput was launched by GSL shipyard. [33] As of then, the delivery of INS Triput is expected in 2026 and the next ship shall be delivered after 6 months of the former. [25] [26]
The Severnoye Design Bureau developed the Project 1135.6 vessel using an earlier Project 1135.1 design, which dated back to the early 1980s. The ship's redesigned topside and hull has a considerably reduced radar cross-section. While the superstructure sides are sloped and relatively clean, the very cluttered topside of the ship cannot be remotely described as having any signature reducing features. These frigates will be the first Indian Navy warships to incorporate some stealth features. The ship's hull is characterized by outward flare and tumblehome, while the superstructure (which forms a continuous junction with the hull) has a large fixed tumblehome angle.
The Talwars features the Zorya designed and Mashproekt (Ukraine) manufactured M7N.1E gas turbine plant which comprises two DS-71 cruise turbines and two DT-59 boost turbines in two engine rooms. The cruising component consists of two DS-71 gas-turbine engines, each rated at 9,000 horsepower (6,700 kW) in forward running, and 1,500 hp (1,100 kW) in reverse. Two cruising RO63 two-speed gearboxes and one cruising R1063 auxiliary gearbox which makes it possible to use any of the cruising engines to drive both propeller shafts. A boost component with two DT-59.1 gas-turbine engines, each rated at 19,500 hp (14,500 kW) forward running, 4,500 hp (3,400 kW) in reverse and two RO58 single-speed reduction gearboxes. The four gas turbines are mounted on isolated cradles which minimize their contact with the hull and thereby considerably reduce the transmission of her vibration and sound. [4] [34]
Electrical power is provided by four 1 MW Wärtsilä WCM-1000 generator sets with Cummins KTA50G3 engines and Kirloskar 1 MV AC generators. The contract for the generators was signed with Wärtsilä Denmark.
The Talwar class can accommodate one Ka-28 Helix-A antisubmarine helicopter or one Ka-31 Helix-B airborne early warning helicopter which can provide over-the-horizon targeting. The vessel can also embark the navalised variant of the indigenous HAL Dhruv.
The frigates are armed with a new 3M-54 Klub anti-ship system with a vertical missile launcher, Shtil-1 multi-channel medium-range surface-to-air missile system (an export version of the SA-N-12 "Grizzly"), a Kashtan anti-aircraft missile and artillery system, a RBU-6000 depth charge launcher and Puma-Universal artillery system. These ships are designed to carry and operate one heavy duty helicopter.
In the main strike role, an eight-cell 3S14E vertical missile launcher is fitted, which accommodates the 3M-54E Klub-N anti-ship missile developed by the Novator Design Bureau. The Agat Research and Production Enterprise has supplied the 3R14N-11356 shipborne fire-control system associated with the Klub-N. The 3M-54E Klub is an 8.22 metres (27.0 ft) long missile using active radar guidance with a range of 220 kilometres (140 mi). It is a three-stage missile in which the terminal stage reaches supersonic velocity (Mach 2.9) when it is approximately 20 km (12 mi) from its target. [35]
The later batches of 7 ships (Teg onwards) are fitted with the BrahMos supersonic cruise missile, which has a range of 300 kilometres (190 mi) and moves with the velocity of Mach 3 throughout its flight. [36] [37] [38]
The Shtil-1 SAM system with a 3S-90 missile launcher is fitted forward of the bridge and is armed with the 9M317 (SA-N-12 "Grizzly", navalised SA-17) missile. 24 missiles are carried in a magazine located below deck. Guidance and target illumination for these missiles is provided by four MR-90 Orekh (NATO: Front Dome) radars, which are connected to a command and control post. The SA-N-12 missile uses a combination of inertial guidance and semi-active radar homing to its maximum range of 45 km (28 mi). The 70 kg (150 lb) blast-fragmentation warhead is triggered by a radar proximity fuze. The missile's control system and warhead can be adjusted to a specific target following target recognition, which increases hit probability. Eight Igla-1E (SA-16) portable air defence missiles are also carried.
For the CIWS role, two Kashtan air defence gun and missile systems are used. Each system consists of two GSh-30k (AO-18K) six-barreled 30 mm Gatling guns, fed by a link-less mechanism, and two SA-N-11 (navalised variant of the 9M311, SA-19) SAM clusters. The system also includes a storing and reloading system to keep 32 SAMs in container-launchers in the vessel's under-deck spaces. The later batches of 7 ships (Teg onwards) are fitted with the AK-630 system, replacing the Kashtan system in the earlier ships. [39] After her mid-life refit, Trishul has also been fitted with the AK-630 in place of the Kashtan system.
One 100 mm A-190E gun is fitted forward for use against ship and shore based targets The A-190(E) uses a lightweight gun mount with an automatic gun and fuze setter. Fire control is provided by the 5P-10E Puma FCS. The gun can fire 60 rounds a minute out to a range of 8.2 nautical miles (15.2 km). The weight of each shell is 16 kilograms (35 lb).
INS Trishul had her 100mm gun replaced by a OTO Melara 76 mm SRGM (Super Rapid Gun Mount) naval gun after her refit. The other ships of the class may be similarly modified.
The gun features higher automation of fire preparation and control and employs advanced guided and rocket-assisted long-range and enhanced-lethality projectiles fitted with dual-mode impact/proximity fuzes. Together with the use of the muzzle velocity meter, it is designed to produce increased combat capability. In addition, the gun turret features stealth technology to minimize the radar signature of a ship.
The ships carry the RPK-8 system, which uses a 12-barrelled RBU-6000 ASW rocket launcher [40] to fire the 212 mm 90R anti-submarine rocket or RGB-60 depth charges. The firing range is from 600 to 4,300 metres (2,000 to 14,100 ft), and the depth of engagement is up to 1,000 metres (3,300 ft).
Two twin 533 mm DTA-53-11356 fixed torpedo tube launchers are fitted amidships and fire the SET-65E/53-65KE torpedoes. The Purga anti-submarine fire-control system provides control for both the RBU-6000 and DTA-53 launchers.
According to some reports, the APSOH (Advanced Panoramic Sonar Hull) hull-mounted sonar is fitted on the vessels. The APSOH sonar performs active ranging, passive listening, auto tracking of targets and classification. Other reports indicate that the BEL HUMSA (Hull Mounted Sonar Array) sonar is fitted. The HUMSA is a panoramic medium-range active/passive sonar system developed by the Naval Physical and Oceanographic Laboratory (NPOL). [6]
Information released from the Severnoye Design Bureau (SDB) indicate that French towed array sonars (TAS) are also fitted. This is very plausible given that many Indian Navy ships now use French TAS, however INS Talwar shows no signs of such a system. The vessel may also have a Russian SSN-137 Variable Depth Sonar (VDS) with NATO reporting name Steer Hide, providing active search with medium frequency, and the sonar might be license produced in India with Indian designation SSSN-113. [41]
The frigate features the Russian-made TK-25E-5 integrated electronic warfare suite, which comprises a wideband electronic support measures system that has antenna arrays mounted in the superstructure and a multimode jammer. Four KT-216 decoy launchers, forming part of the PK-10 system, are fitted for soft-kill defence. A total of 120 120mm chaff and infrared decoy rounds are carried on board.
Some ships of the class including INS Tabar have had their TK-25E-5 ESM suites replaced with BEL manufactured Varuna ESM systems with their distinctive circular housing located above the Fregat radar.
Name | Pennant | Builder | Laid Down | Launched | Commissioned | Homeport | Status |
---|---|---|---|---|---|---|---|
Batch 1 | |||||||
Talwar | F40 | Baltiysky Zavod | 10 March 1999 | 12 May 2000 | 18 June 2003 | Mumbai | Active |
Trishul | F43 | 24 September 1999 | 24 November 2000 | 25 June 2003 | |||
Tabar | F44 | 26 May 2000 | 25 May 2001 | 19 April 2004 | |||
Batch 2 | |||||||
Teg | F45 | Yantar Shipyard | July 2007 | 27 November 2009 | 27 April 2012 [42] | Mumbai | Active |
Tarkash | F50 | November 2007 | 23 June 2010 | 9 November 2012 [43] | |||
Trikand | F51 | 11 June 2008 | 25 May 2011 [44] [45] | 29 June 2013 [46] | |||
Batch 3 | |||||||
Tushil (ex-Butakov) | F70 | Yantar Shipyard | 13 July 2013 | 28 October 2021 [47] | 9 December 2024 [48] | Active [8] | |
Tamala (ex-Istomin) | 15 November 2013 | 2025 (exp.) [49] | Under Construction | ||||
Batch 4 | |||||||
Triput [31] | Goa Shipyard | 29 January 2021 [50] | 23 July 2024 [51] | October 2026 (exp.) [52] | Launched [51] | ||
TBD | 18 June 2021 [50] | 2027 (exp.) [52] | Under Construction [53] |
The Delhi-class destroyers, also known Project 15 are a class guided-missile destroyers of the Indian Navy. Three ships of this class are in active service. The Delhi-class vessels were the largest vessels to be built in India at the time of their commissioning. The ships were built by Mazagon Dock Limited (MDL) at a cost of ₹750 crore each.
INS Trishul (F43) is the second frigate of the Talwar class of the Indian Navy. Trishul, the guided missile frigate, joined the arsenal of Indian Navy in 2003. The ship was commissioned by the then Flag Officer Commanding-in-Chief, Western Naval Command Vice Admiral Arun Prakash at St. Petersburg, Russia on 25 June 2003. It has a complement of 32 officers and 228 sailors. In contrast to the lead ship INS Talwar, the sea trials of Trishul were considerably shortened as the ship performed well. Trishul arrived in Mumbai on 23 September 2003.
The Brahmaputra-class frigates are guided-missile frigates of the Indian Navy, designed and built in India. They are an enhancement of the Godavari class, with a displacement of 3850 tons and a length of 126 metres (413 ft). Although of similar hull and dimension, internally, the Brahmaputra and Godavari classes have different configurations, armaments and capabilities. 3 ships of this class serve in the Indian Navy.
The Krivak class, Soviet designation Project 1135 Burevestnik, are a series of frigates and patrol ships built in the Soviet Union primarily for the Soviet Navy since 1970. Later some sub-branches, like the Nerey (Nereus) were designed for coastal patrol by the KGB Border Troops. Until 1977, the ships in the class were considered to be large anti-submarine warfare vessels.
The Godavari-class frigates were guided-missile frigates of the Indian Navy. The Godavari class was the first significant indigenous warship design and development initiative of the Indian Navy. Its design is a modification of the Nilgiri class with a focus on indigenous content of 72%, a larger hull and updated armaments. The class and the lead ship, INS Godavari were named after the Godavari River. Subsequent ships in the class, INS Ganga and INS Gomati also took their names from Indian rivers.
INS Tabar (F44) is the third of the Talwar-class frigate of the Indian Navy. The frigate was built by Baltiyskiy Zavod in St. Petersburg, Russia. The frigate was commissioned on 19 April 2004 in Kaliningrad, Russia with Captain Biswajit Dasgupta. As of August 2024, the current Commanding Officer (CO) of INS Tabar is Captain MR Harish.
Mazagon Dock Shipbuilders Limited (MDL), formerly called Mazagon Dock Limited, is a company with shipyards situated in Mazagaon, Mumbai. It manufactures warships and submarines for the Indian Navy and offshore platforms and associated support vessels for offshore oil drilling. It also builds tankers, cargo bulk carriers, passenger ships and ferries.
The Shivalik class or Project 17 class is a class of multi-role frigates in service with the Indian Navy. They are the first warships designed with low observability features built in India. They were designed to have better stealth features and land-attack capabilities than the preceding Talwar-class frigates. A total of three ships were built between 2000 and 2010, and all three were in commission by 2012.
The Petya class was the NATO reporting name for a class of light frigates designed in the 1950s and built for the Soviet Navy in the 1960s. The Soviet designation was "Storozhevoi Korabl`" Project 159.
The Kamorta-class corvettes or Project 28 are a class of anti-submarine warfare corvettes currently in service with the Indian Navy. Built at Garden Reach Shipbuilders & Engineers (GRSE), Kolkata, they are the first anti-submarine warfare stealth corvettes to be built in India. Project 28 was approved in 2003, with construction of the lead ship, INS Kamorta commencing on 12 August 2005. All of the four corvettes, INS Kamorta, INS Kadmatt, INS Kiltan and INS Kavaratti were commissioned in 2014, 2016, 2017 and 2020 respectively.
The Nilgiri-class frigates, formally classified as the Project-17 Alpha frigates (P-17A), are a series of stealth guided-missile frigates currently being built by Mazagon Dock Shipbuilders (MDL) and Garden Reach Shipbuilders & Engineers (GRSE) for the Indian Navy (IN).
INS Teg (F45) is the fourth Talwar-class frigate constructed for the Indian Navy. She was built by the Yantar shipyard in Kaliningrad, Russia, and was commissioned to Navy service on 27 April 2012. She is the first of the second batch of Talwar-class frigates to be completed.
INS Tarkash (F50) is the second Talwar-class frigate constructed for the Indian Navy. She is part of the second batch of Talwar-class frigates ordered by the Indian Navy. She was built at the Yantar shipyard in Kaliningrad, Russia. She was commissioned to Navy service on 9 November 2012 at Kaliningrad and joined the Western Naval Command on 27 December 2012.
INS Trikand (F51) is a Talwar-class frigate of the Indian Navy. She is the third and final ship of the second batch of Talwar-class frigates ordered by the Indian Navy. She was built by the Yantar shipyard in Kaliningrad, Russia. She was commissioned to Indian Navy service on 29 June 2013.
The Admiral Grigorovich class, Russian designation Project 11356R, is a class of frigates built by the Yantar Shipyard in Kaliningrad for the Russian Navy and Indian Navy, with a cost of $450-500 million. Based on the Talwar class, six ships were ordered for the Russian Black Sea Fleet under two contracts in 2010 and 2011 as a complement to the Admiral Gorshkov-class frigates.
INS Talwar (F40) is the lead ship of the Talwar-class frigates of the Indian Navy. Its name means "Sword" in Hindi. She was built in Russia, and commissioned into the Indian Navy on 18 June 2003.
The Visakhapatnam-class destroyers, also classified as the P-15 Bravo class, or simply P-15B, is a class of guided-missile destroyers currently being built for the Indian Navy. The Visakhapatnam class is an upgraded derivative of its predecessor, the Kolkata class, with improved features of stealth, automation and ordnance.
INS Nilgiri is the lead ship of the Nilgiri-class stealth guided missile frigates being built by Mazagon Shipyard Dock Limited for the Indian Navy. The ship was laid down on 28 December 2017 and it was launched on 28 September 2019. The ship is expected to be delivered to the Navy by November 2022. The ship embarked for its maiden sea trials on 25 August 2024. Nilgiri will be commissioned in December 2024.
INS Tushil (F70) is a Talwar-class frigate of the Indian Navy. It is the seventh ship of the Talwar-class frigates and the first of the third batch of the class frigates ordered by the Indian Navy. She was built by the Yantar shipyard in Kaliningrad, Russia. The ship was commissioned into the Indian Navy on 9 December 2024. The ship is to be assigned to Western Fleet.