MAX Red Line

Last updated

MAX Red Line
MAX Red Line icon.svg
Portland July 2017 01 (Portland International Airport MAX Station).jpg
A Red Line train at Portland International Airport
Overview
Other name(s)Airport MAX [1]
Owner TriMet
Locale Portland, Oregon, U.S.
Termini
Stations27
Website MAX Red Line
Service
Type Light rail
System MAX Light Rail
Operator(s)TriMet
Daily ridership10,310 (Weekday, September 2021) [2]
History
OpenedSeptember 10, 2001 (2001-09-10)
Technical
Line length5.5 mi (8.9 km) [lower-alpha 1]
Number of tracks1–2
Character At-grade, elevated, and underground
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification Overhead line,  750 V DC
Route diagram

Contents

BSicon uCONTg.svg
BSicon uINT.svg
Beaverton Transit Center
Aiga railtransportation 25.svg
BSicon uSKRZ-G4u.svg
BSicon PORTALf.svg
BSicon uBHF.svg
Sunset Transit Center
BSicon PARKING.svg
BSicon utHST.svg
Washington Park
BSicon PORTALg.svg
BSicon uHST.svg
Goose Hollow/​Southwest Jefferson Street
BSicon uBS2+l.svg
BSicon uBS2+r.svg
BSicon uBHF(L)f.svg
BSicon uBHF(R)g.svg
Providence Park
Stadium - The Noun Project.svg
BSicon uSKRZ-G4o.svg
BSicon uSKRZ-G4o.svg
BSicon uedABZg+l.svg
BSicon uexdSTRq.svg
BSicon uedABZg+r.svg
BSicon uCONTgq.svg
BSicon uKRZ.svg
BSicon uKRZ.svg
BSicon uCONTgeq.svg
B NS (SW 11th Ave)
BSicon uCONTfaq.svg
BSicon uKRZ.svg
BSicon uKRZxl.svg
BSicon uCONTfq.svg
A NS (SW 10th Ave)
BSicon uSTRf.svg
BSicon uINT(R)g.svg
Galleria/​Southwest 10th Avenue
BSicon TRAM.svg
BSicon uINT(L)f.svg
BSicon uSTRg.svg
Library/​Southwest 9th Avenue
BSicon TRAM.svg
BSicon uSTRf.svg
BSicon uBHF(R)g.svg
Pioneer Square North
BSicon uBHF(L)f.svg
BSicon uSTRg.svg
Pioneer Square South
BSicon uCONTfaq.svg
BSicon uKRZ.svg
BSicon uKRZ.svg
BSicon uSTR+r.svg
MAX Green Line icon.svg MAX Yellow Line icon.svg Portland Transit Mall (SW 6th Ave)
BSicon uCONTgq.svg
BSicon uKRZ.svg
BSicon uKRZ.svg
BSicon uLABZg+r.svg
MAX Green Line icon.svg MAX Orange Line icon.svg Portland Transit Mall (SW 5th Ave)
BSicon uSTRf.svg
BSicon uBHF(R)g.svg
BSicon uLSTRe.svg
Morrison/​Southwest 3rd Avenue
BSicon uBHF(L)f.svg
BSicon uSTRg.svg
Yamhill District
BSicon uBS2l.svg
BSicon uBS2r.svg
BSicon uHST.svg
Oak Street/​Southwest 1st Avenue
BSicon uHST.svg
Skidmore Fountain
BSicon uHST.svg
BSicon uLSTRa.svg
Old Town/​Chinatown
BSicon uABZg+l.svg
BSicon udSTRq.svg
BSicon uLSTRr.svg
MAX Green Line icon.svg MAX Yellow Line icon.svg MAX Orange Line icon.svg Portland Transit Mall (NW Glisan St)
BSicon dWASSERq.svg
BSicon MSTR.svg
BSicon uLFT.svg
BSicon WASSERq.svg
BSicon dWASSERq.svg
BSicon uABZgl.svg
BSicon uCONTfq.svg
BSicon uBHF.svg
Rose Quarter Transit Center
Stadium - The Noun Project.svg
BSicon uSKRZ-G4u.svg
I-5.svg I-5
BSicon uINT.svg
Convention Center
BSicon TRAM.svg
BSicon uCONTfaq.svg
BSicon uKRZ.svg
BSicon uCONTfq.svg
B (NE Grand Ave)
BSicon uCONTgq.svg
BSicon uKRZ.svg
BSicon uCONTgeq.svg
A (NE 7th Ave)
BSicon uINT.svg
Northeast 7th Avenue
BSicon TRAM.svg
BSicon uHST.svg
Lloyd Center/​Northeast 11th Avenue
BSicon uBHF.svg
Hollywood/​Northeast 42nd Avenue Transit Center
BSicon uHST.svg
Northeast 60th Avenue
BSicon uHST.svg
Northeast 82nd Avenue
BSicon uSKRZ-G4o.svg
I-84.svgI-205.svg I-84  / I-205
BSicon uBHF.svg
Gateway/​Northeast 99th Avenue Transit Center
BSicon PARKING.svg
BSicon uCONTgq.svg
BSicon uABZgr.svg
BSicon uSKRZ-G4u.svg
I-84.svgI-205.svg I-84  /
I-205
northbound
BSicon uBHF.svg
Parkrose/​Sumner Transit Center
BSicon PARKING.svg
BSicon uSKRZ-G4o.svg
I-205.svg
I-205
southbound
BSicon uHST.svg
Cascades
BSicon uHST.svg
Mount Hood Avenue
BSicon uKHSTe.svg
Portland Airport
BSicon FLUG.svg

The MAX Red Line is a light rail line serving the Portland metropolitan area in the U.S. state of Oregon. Operated by TriMet as part of the MAX Light Rail system, it is an airport rail link connecting Beaverton, Portland City Center, and Northeast Portland to Portland International Airport. The line serves 27 stations; it interlines with the Blue Line and partially with the Green Line from Beaverton Transit Center to Gateway/Northeast 99th Avenue Transit Center and then branches off to Portland Airport station. Service runs for 22 hours per day with headways of up to 15 minutes. The Red Line carried an average 10,310 passengers per weekday in September 2021, the second-busiest after the Blue Line.

Plans for light rail service to Portland International Airport surfaced in the 1980s, and efforts were accelerated during the airport's expansion in the 1990s. The Airport MAX project was conceived from an unsolicited proposal by Bechtel in 1997, and it was designed and built under a public–private partnership between a consortium of Bechtel and Trammell Crow, the Port of Portland, and local governments. Construction of the four-station, 5.5-mile (8.9 km) branch line began in 1999 and was completed in under two years due to the use of local and private financing and existing public right-of-way.

The Red Line began operating between the airport and downtown Portland on September 10, 2001. It was extended west along existing MAX tracks to Beaverton Transit Center in 2003. Track improvements as part of the A Better Red project are scheduled for completion in 2024; this project adds a second track to single-track segments along the Airport MAX and extends Red Line service farther west to Fair Complex/Hillsboro Airport station in Hillsboro.

History

Background and partnership agreement

Cascade Station shopping center, which Bechtel developed in exchange for building the Airport MAX Cascade Station shopping center entrance - Portland, Oregon.JPG
Cascade Station shopping center, which Bechtel developed in exchange for building the Airport MAX

During construction of the controversial Interstate 205 (I-205) freeway in 1975, [3] Multnomah County leaders negotiated reducing the number of car lanes along a nine-mile (14 km) section of the freeway and adding a separated transit bus right-of-way; [4] [5] this right-of-way was realized as the I-205 busway, [6] [7] but it was never utilized by buses. [3] [8] In 1985, the Portland metropolitan area's regional government, Metro, began a study for the Port of Portland and Clackamas County, who proposed a light rail line using the I-205 busway. They envisioned the line running from Portland International Airport to Clackamas Town Center and connecting with the then-nearly completed Portland–Gresham Metropolitan Area Express (MAX) line. [9] [10] Metro had recommended construction by 1995, [11] [12] but in 1987, the Joint Policy Advisory Committee on Transportation (JPACT) separately identified the Westside Corridor from downtown Portland to Washington County as the "next priority corridor for major investment". [13] [14] [15] Metro and the regional transit agency, TriMet, subsequently called on local governments and businesses in Clackamas County to pursue alternative funding sources for the I-205 line, [16] which Clackamas County officials disputed. [17] As a compromise, Metro published a transit plan in 1989 that reasserted the Westside Corridor's priority and commissioned preliminary work for the I-205 proposal. [18] [19]

In April 1991, the Port of Portland approved a master plan for Portland International Airport—a 20-year, $300 million phased expansion of the passenger terminal—to serve predicted passenger traffic growth through 2010. [20] [21] The plan included a long-term goal for an extension of light rail to the airport and thus reserved space for a light rail station near the southern end of the terminal's arrivals hall and baggage claim area. [20] [22] By 1993, however, the airport had already served 8.5 million annual passengers—a growth rate of 18 percent, which exceeded the Port's projection for the year 1997. [23] [24] Meanwhile, environmental studies conducted in the early 1990s caused Metro planners to shift plans away from the I-205 corridor in favor of a north–south route farther west and closer to downtown Portland; [25] this route, between Hazel Dell, Washington and Clackamas Town Center, became known as the "South/North Corridor". [26] :80 Voters rejected local funding proposals for the South/North project in 1995 and 1996. Seeking alternative sources of funding, Metro proposed combining the South/North project with a locally and privately funded airport light rail extension, as doing so would allow Metro to ask for more federal matching funds. [27] [28] TriMet, however, opted to ask Portland-area voters for funding instead, who declined in a 1998 ballot measure. [29]

In 1997, engineering firm Bechtel, wanting to acquire property near the airport, submitted an unsolicited proposal to develop the airport light rail line. [26] :82 The Port expressed its support of the proposal, [23] and a preliminary engineering study commenced in December. [30] After long deliberations, agreements were made between Bechtel, the Port, TriMet, and local governments and agencies in October 1998. [31] [32] A part of the agreements authorized Bechtel to design and build a 5.5-mile-long (8.9 km) light rail extension to the airport in exchange for development rights to the 120-acre (48.6 ha), commercially zoned Portland International Center situated east of the airport. Bechtel later developed this property and renamed it Cascade Station. [33] The following month, the Associated Builders and Contractors filed a petition in Multnomah County Circuit Court claiming that the contract awarded to Bechtel may have violated Oregon procurement laws. [34] The court ruled in favor of TriMet with the judge declaring that the contract was awarded fairly. [35]

Funding and construction

The south portal of the tunnel that was built in the late 1970s as part of the I-205 busway and was first brought into use by the Red Line South portal of MAX Red Line's I-205 tunnel with southbound train (2015).jpg
The south portal of the tunnel that was built in the late 1970s as part of the I-205 busway and was first brought into use by the Red Line

TriMet estimated the cost of the Airport MAX extension to be $125 million, but additional costs to purchase train sets and build related infrastructure raised this total to $182.7 million. [36] The project's timeline was accelerated with the formation of a public–private partnership, which excluded Federal Transit Administration (FTA) funding and thus eliminated a requirement for FTA approval. [26] :82 [37] Under U.S. federal regulations along with authorization from the Federal Aviation Administration (FAA), the Port was only able to fund a 1.2-mile (1.9 km) stretch within airport property. [32] To ensure funding for the entire project, the Port divided financing into three parts and assumed responsibility for that segment. The next 1.4 miles (2.3 km) of track, which ran through Cascade Station, in turn went to private funding, while the final 2.9 miles (4.7 km) along I-205 was covered by TriMet, Metro, and the City of Portland. [38]

The Port contributed $28.3 million for construction and $20 million for terminal and road improvements; these funds were drawn from a $3 ticket fee levied on travelers. [1] [36] Delta Air Lines, Reno Air, and United Airlines had opposed the use of ticket fees, arguing that the extension would serve few airline passengers, [39] but the FAA approved it in May 1999. [40] Additional funds came from Cascade Station Development, a private consortium of Bechtel and real estate developer Trammell Crow, who provided $28.2 million for the project and $13.1 million for the construction of an interchange over I-205 and Airport Way. [41] TriMet released $27.5 million for construction, which was funded by $30 million in bonds, [1] [36] and procured six new rail cars for $6 million each. [41] [42] Metro allocated $18 million from a regional transportation fund, [1] [36] and $23 million came from tax increment bonds issued by the City of Portland. [1] [26] :82

David Evans and Associates served as the prime engineer and lead designer. [43] Much of the Airport MAX extension used public right-of-way already owned either by the Oregon Department of Transportation, the Port, or TriMet. This avoided displacing private property owners and limited the project's impact only to parking spaces at Gateway Transit Center and along Airport Way. [37] [41] Bechtel began construction in June 1999 on a segment next to I-205 near the Columbia Slough. [41] Bridgework over the freeway commenced the following December. [44] To minimize lane closures, workers used a cast-in-place concrete pouring method to extend the bridges' spans in 16-foot (4.9 m) increments. [45] Work progressed quickly along the freeway segment due to the existing I-205 busway right-of-way, which came with a tunnel from Gateway Transit Center to the freeway median. [45] Bechtel contracted track installation to Stacy and Witbeck, [46] whose workers placed 3,200 feet (975.4 m) of rail per day to meet the project's deadline; tracks from Gateway Transit Center to the bridge over southbound I-205 were laid by July 2000. [47] Hoffman Construction built the $8.4 million Portland Airport station, [46] and local architecture firm Zimmer Gunsul Frasca (ZGF) designed the station's glass-roofed shelter to complement the airport terminal's drop-off canopy, which ZGF also designed. [48] [49] Bechtel began the end-to-end testing of the power, trains, and signals in March 2001, and TriMet took over the project that July to continue system testing and verify scheduling. [46]

Opening and extension to Beaverton

A Red Line train at Beaverton Transit Center in 2004 Beaverton Transit Center 8204809868.jpg
A Red Line train at Beaverton Transit Center in 2004

In 2000, TriMet named the new MAX service to the airport the "Red Line" to differentiate it from the established service between Hillsboro and Gresham, which it renamed the "Blue Line". [50] [26] :83 The Airport MAX extension opened on September 10, 2001. [51] [52] Celebrations scheduled for September 15–16 were canceled in the aftermath of the September 11 attacks, [53] [54] with the airport itself closed for three days due to a nationwide ground stop. [55] Upon opening, the Red Line operated from the airport to the Library and Galleria stations in downtown Portland, where its trains turned around at the 11th Avenue loop tracks. [56] It replaced bus route 12–Sandy Boulevard as TriMet's only service to and from the airport, [53] [57] while C-Tran, the transit agency serving Clark County, Washington, rerouted its bus service from its connection at Gateway Transit Center to Parkrose/Sumner Transit Center. [53] Although tested during trial runs, [46] TriMet opted to omit luggage racks from Red Line trains to maximize rider capacity. [58] By November 2001, ridership had averaged 2,300 riders and peaked at 3,800 riders a day before the Thanksgiving holiday weekend. At the time, service had been using single light rail cars, [59] but the influx of riders prompted TriMet to temporarily deploy two-car consists, which it had not planned to do until 2006. [60]

On September 1, 2003, TriMet extended Red Line service farther west using the existing Westside MAX tracks to Beaverton Transit Center. This was done in an effort to increase capacity between Gateway Transit Center and Beaverton, and to provide a one-seat ride to the airport for westside riders. [61] Regular use of two-car trains on the line began in September 2005, when overcrowding prompted TriMet to change most Yellow Line service from two-car consists to single cars in order to convert the Red Line to two-car trains. [62] On March 2, 2008, three trips in each direction during the morning and evening rush hours began operating between the Hatfield Government Center and Portland Airport stations to provide further additional capacity on the Blue Line amid growing ridership. [63]

Track improvements and extension to Hillsboro

A single-track segment of the Airport MAX along I-205 in 2018 Red Line track and I-205 bike path, February 2018.jpg
A single-track segment of the Airport MAX along I-205 in 2018

In October 2017, [64] TriMet, citing system-wide delays caused by the single-track segments along the Airport MAX, announced the MAX Red Line Improvements Project, [65] later renamed "A Better Red". [66] The project proposed adding a second track to existing single-track segments between Gateway Transit Center and Portland Airport station to allow trains to pass one another. To qualify for federal funding, TriMet included extending Red Line service farther west along existing Westside MAX tracks from Beaverton Transit Center to Fair Complex/Hillsboro Airport station in Hillsboro and creating a one-seat option from ten existing stations to Portland International Airport. [64] Preliminary design work began in February 2018. [67] TriMet adopted a locally preferred alternative in April 2019 and submitted the plan to the FTA to request funding. [68] In May 2020, the FTA announced $99.99 million for the project through the Capital Investment Grants program. [69] [70] Final design was completed by engineering firm Parametrix in early 2021. [71] [72] The design includes two new bridges north of Gateway Transit Center to accommodate the second track and a new MAX platform called "Gateway North". [66] TriMet received the FTA grant and broke ground on September 29, 2021.

From April 2–9, 2022, [73] [74] Red Line service was suspended to make way for construction, and shuttle buses operated between Gateway Transit Center and Portland International Airport. [75] [76] The project is expected to be completed in 2024. [77] [78]

From June 18 to October 21, 2023, TriMet suspended MAX service between Gateway Transit Center and the airport. [79] [80]

From January 14 to March 3, 2024, TriMet suspended MAX Red Line service along with Blue and Green Lines between NE 7th and Gateway Transit Center. [81] Inbound Red Line service from PDX will serve Gateway North beginning March 4th, 2024. [82]

Route

An airport-bound MAX train running above I-205 MAX Around The Curve (6161753154).jpg
An airport-bound MAX train running above I-205

The Red Line serves the Airport MAX extension, which is 5.5 miles (8.9 km) long. [lower-alpha 1] The extension begins just south of Gateway Transit Center where it branches from the Eastside MAX segment, makes a 180-degree loop, and heads north along the east side of I-205. [1] Near Rocky Butte, it enters a tunnel beneath the northbound lanes of the freeway and emerges along the median. [41] Just south of the Columbia Slough, the route crosses over the southbound lanes as I-205 towards Cascade Station and proceeds northwest along the south side of Cascade Parkway. [83] It follows this road then crosses it just before Mount Hood Avenue station. [84] The line continues northwest along the south side of Airport Way until it reaches its terminus at Portland Airport station. [85] Beyond the Airport MAX, Red Line trains serve parts of the Westside and Eastside MAX segments; it interlines with the Blue Line from Beaverton Transit Center to Gateway Transit Center and the Green Line from Rose Quarter Transit Center to Gateway Transit Center. [86]

Although much of the Red Line runs along a double-track railway, two segments of the Airport MAX extension are single-tracked. The first segment starts near Gateway Transit Center and ends just north of Northeast Halsey Street. The other segment runs from south of the Northeast Airport Way and Northeast Airport Way Frontage Road intersection to just before the airport terminus. [87] TriMet is adding a second track to both segments by 2024 as part of the A Better Red project. [66]

MAX Red Line
A geographic map of the MAX Red Line (in red) and its future extension (in green) relative to the rest of the network (in black) with icons marking the line's termini. The official system schematic can be viewed on the TriMet website.

Stations

Portland Airport station, the Red Line's eastern terminus MAX trains at Portland International Airport station, February 2018.JPG
Portland Airport station, the Red Line's eastern terminus

The Airport MAX extension consists of four stations; from north to south they are: Portland Airport, Mount Hood Avenue, Cascades, and Parkrose/Sumner Transit Center. [1] Red Line service runs from Portland Airport station to Beaverton Transit Center, a total of 27 stations. The Red Line interlines with the Blue and Green lines along the Eastside and Westside MAX segments; it shares 22 stations, from Beaverton Transit Center to Gateway Transit Center, with the Blue Line, of which eight stations, from Rose Quarter Transit Center to Gateway Transit Center, are additionally shared with the Green Line. Transfers to the Green (beyond the interline segment), Orange, and Yellow lines, via the Pioneer Courthouse and Pioneer Place stations along the Portland Transit Mall, can be made by detraining at the Pioneer Square stations. Another transfer to the Yellow Line, via Interstate/Rose Quarter station, can be made at Rose Quarter Transit Center. [88] The Red Line also provides connections to local and intercity bus services at various stops across the line, the Portland Streetcar at four stops within Portland's Central City, [89] and WES Commuter Rail at Beaverton Transit Center. [90] A Better Red will extend Red Line service to Fair Complex/Hillsboro Airport station in 2024 using the existing Westside MAX alignment, as well as construct an infill station north of Gateway Transit Center called "Gateway North". [66]

Key
IconPurpose
Future terminus
Current terminus
Eastbound travel only
Westbound travel only
List of MAX Red Line stations
StationLocationBegan servingLine transfers [88] Notes [88] [91] [lower-alpha 2]
Fair Complex/Hillsboro Airport Hillsboro 2024 MAX Blue Line icon.svg
Hawthorn Farm MAX Blue Line icon.svg
Orenco MAX Blue Line icon.svg Connects to North Hillsboro Link
Quatama MAX Blue Line icon.svg
Willow Creek/Southwest 185th Avenue Transit Center MAX Blue Line icon.svg Connects to CC Rider, North Hillsboro Link
Elmonica/Southwest 170th Avenue Beaverton MAX Blue Line icon.svg Near Elmonica maintenance facility
Merlo Road/Southwest 158th Avenue MAX Blue Line icon.svg
Beaverton Creek MAX Blue Line icon.svg
Millikan Way MAX Blue Line icon.svg
Beaverton Central MAX Blue Line icon.svg
Beaverton Transit Center September 1, 2003 MAX Blue Line icon.svg Connects to WES Commuter Rail
Sunset Transit Center MAX Blue Line icon.svg Connects to POINT, TCTD
Washington Park Portland MAX Blue Line icon.svg Connects to Washington Park Free Shuttle
Goose Hollow/Southwest Jefferson Street MAX Blue Line icon.svg
Providence Park MAX Blue Line icon.svg
Library/Southwest 9th Avenue September 10, 2001 MAX Blue Line icon.svg Connects to Portland Streetcar
Galleria/Southwest 10th Avenue MAX Blue Line icon.svg
Pioneer Square South MAX Blue Line icon.svg   MAX Green Line icon.svg   MAX Orange Line icon.svg   MAX Yellow Line icon.svg Connects to Portland Transit Mall
Pioneer Square North MAX Blue Line icon.svg   MAX Green Line icon.svg   MAX Orange Line icon.svg   MAX Yellow Line icon.svg
Yamhill District MAX Blue Line icon.svg
Morrison/Southwest 3rd Avenue MAX Blue Line icon.svg
Oak Street/Southwest 1st Avenue MAX Blue Line icon.svg
Skidmore Fountain MAX Blue Line icon.svg
Old Town/Chinatown MAX Blue Line icon.svg
Rose Quarter Transit Center MAX Blue Line icon.svg   MAX Green Line icon.svg   MAX Yellow Line icon.svg Connects to C-Tran
Convention Center MAX Blue Line icon.svg   MAX Green Line icon.svg Connects to Portland Streetcar
Northeast 7th Avenue MAX Blue Line icon.svg   MAX Green Line icon.svg Connects to Portland Streetcar
Lloyd Center/Northeast 11th Avenue MAX Blue Line icon.svg   MAX Green Line icon.svg
Hollywood/Northeast 42nd Avenue Transit Center MAX Blue Line icon.svg   MAX Green Line icon.svg
Northeast 60th Avenue MAX Blue Line icon.svg   MAX Green Line icon.svg
Northeast 82nd Avenue MAX Blue Line icon.svg   MAX Green Line icon.svg
Gateway/Northeast 99th Avenue Transit Center MAX Blue Line icon.svg   MAX Green Line icon.svg Connects to Columbia Area Transit [92]
Gateway NorthMarch 4, 2024 [93] MAX Blue Line icon.svg   MAX Green Line icon.svg
Parkrose/Sumner Transit Center September 10, 2001Connects to C-Tran
Cascades
Mount Hood Avenue
Portland Airport Connects to C-Tran

Service

TriMet designates the Red Line as a "Frequent Service" route; its trains operate for approximately 22 hours per day with headways ranging from 30 minutes during the early mornings and late evenings to as frequently as 15 minutes for most of the day. [94] Each day, the first train begins service at approximately 3:30 am going eastbound from Beaverton Transit Center to Portland Airport station. Travel between the termini takes approximately 65 minutes and the first westbound service departs Portland Airport station at approximately 4:55 am. In the evenings, select westbound trains travel beyond the line's terminus at Beaverton Transit Center to Hatfield Government Center station in Hillsboro; these trains operate as through services of the Blue Line upon arriving at Gateway/Northeast 99th Avenue Transit Center. The Red Line's last three trips turn into eastbound Blue Line trains at Gateway Transit Center and terminate at Ruby Junction/East 197th Avenue station. The last westbound service departs from Portland Airport station at approximately 12:30 am and the last Red Line service, which travels eastbound, departs from Portland Airport station at approximately 1:40 am. [95]

On September 2, 2018, TriMet reintroduced bus service to the airport, which had been replaced by the Red Line in 2001, with the 272–PDX Night Bus. The bus route ran in the late night and early morning hours when the Red Line was not operating. [96] [97] It was indefinitely suspended on April 5, 2020, amid the COVID-19 pandemic. [98]

Ridership

The Red Line averaged 10,310 riders on weekdays in September 2021. [2] Prior to the COVID-19 pandemic, which impacted public transit ridership globally, the Red Line was the second-busiest service on the MAX network, having averaged 22,530 weekday riders in September 2019. [99] In September 2002, it averaged 2,800 daily riders at the airport, ahead of TriMet's first-year projections of 2,300. [100] The line's extension to Beaverton Transit Center in 2003 increased weekday ridership by 49 percent along the westside corridor and six percent systemwide. [101] IKEA's opening in July 2007 helped to attract more riders to Cascade Station, which had been considered a failed planned development amid the economic recession that followed the September 11 attacks. [102] In 2008, Cascades station recorded an eight-fold increase in traffic, from 250 passengers per week to 2,000; [103] this number increased to 6,000 by 2010. [104] The Red Line's yearly ridership peaked at just over nine million passengers in 2009; [105] it has continued to fall as part of a system-wide decline attributed to crime and rising housing costs in the Portland area. [106] [107] From 8.2 million boardings in 2012, 7.4 million boardings were recorded in 2015. [1] [108]

Explanatory notes

  1. 1 2 TriMet publications only provide the total length of the Airport MAX extension, i.e., the 5.5-mile (8.9 km) section that was newly built. The total length of Red Line service, which includes segments of the Eastside MAX and the Westside MAX, is undetermined. [1]
  2. This list of service connections excludes TriMet bus connections. For a complete list that includes all transfers, see: List of MAX Light Rail stations.

Related Research Articles

<span class="mw-page-title-main">MAX Light Rail</span> Light rail system serving Portland, Oregon

The Metropolitan Area Express (MAX) is a light rail system serving the Portland metropolitan area in the U.S. state of Oregon. Owned and operated by TriMet, it consists of five lines connecting the six sections of Portland; the communities of Beaverton, Clackamas, Gresham, Hillsboro, Milwaukie, and Oak Grove; and Portland International Airport to Portland City Center. Trains run seven days a week with headways of between 30 minutes off-peak and three minutes during rush hours. In 2019, MAX had an average daily ridership of 120,900, or 38.8 million annually. Due to the COVID-19 pandemic, which impacted public transit use globally, annual ridership plummeted, with only 14.8 million riders recorded in 2021.

<span class="mw-page-title-main">Portland International Airport</span> Largest airport of the U.S. state of Oregon

Portland International Airport is a joint civil–military airport and the largest airport in the U.S. state of Oregon, accounting for 90% of the state's passenger air travel and more than 95% of its air cargo. It is within Portland's city limits just south of the Columbia River in Multnomah County, 6 miles by air and 12 mi (19 km) by highway northeast of downtown Portland. Portland International Airport is often referred to by its IATA airport code, PDX. The airport covers 3,000 acres of land.

<span class="mw-page-title-main">TriMet</span> Oregon government-owned corporation responsible for public transit in the Portland area

The Tri-County Metropolitan Transportation District of Oregon (TriMet) is a public agency that operates mass transit in a region that spans most of the Portland metropolitan area in the U.S. state of Oregon. Created in 1969 by the Oregon legislature, the district replaced five private bus companies that operated in the three counties: Multnomah, Washington, and Clackamas. TriMet started operating a light rail system, MAX, in 1986, which has since been expanded to five lines that now cover 59.7 miles (96.1 km), as well as the WES Commuter Rail line in 2009. It also provides the operators and maintenance personnel for the city of Portland-owned Portland Streetcar system. In 2023, the system had a ridership of 62,055,600, or about 196,900 per weekday as of the fourth quarter of 2023.

<span class="mw-page-title-main">MAX Blue Line</span> Light rail line in Portland, Oregon

The MAX Blue Line is a light rail service in Portland, Oregon, United States, operated by TriMet as part of the MAX Light Rail system. It travels east–west for approximately 33 miles (53 km)—the longest in the network—between Hillsboro, Beaverton, Portland, and Gresham and serves 48 stations from Hatfield Government Center to Cleveland Avenue. The line carried an average 55,370 riders each day on weekdays in September 2018, the busiest of the five MAX lines. It runs for 2212 hours per day from Monday to Thursday, with headways of between 30 minutes off-peak and five minutes during rush hour. Service runs later in the evening on Fridays and Saturdays and ends earlier on Sundays.

<span class="mw-page-title-main">MAX Yellow Line</span> Light rail line in Portland, Oregon

The MAX Yellow Line is a light rail line serving Portland, Oregon, United States. Operated by TriMet as part of the MAX Light Rail system, it connects North Portland, Portland City Center, and Portland State University (PSU). The line serves 17 stations; it runs north–south from Expo Center station to PSU South/Southwest 6th and College station, interlining with the Green and Orange lines within the Portland Transit Mall. Service runs for 21 hours per day with headways of up to 15 minutes. The Yellow Line is the fourth-busiest service in the MAX system; it carried an average 12,960 riders per weekday in September 2019.

<span class="mw-page-title-main">Gateway Transit Center (TriMet)</span>

Gateway Transit Center is a multimodal transport hub in Portland, Oregon, United States. Owned and operated by TriMet, it comprises Gateway/Northeast 99th Avenue Transit Center, a bus transit center and light rail station, and Gateway North, another light rail station. The complex is where three lines of MAX Light Rail split, with the Blue Line proceeding east to Gresham, the Green Line proceeding south to Clackamas, and the Red Line proceeding north to Portland International Airport. It is TriMet's second-busiest transit center after Beaverton Transit Center, with 4,847 average weekday boardings for all modes in spring 2023.

<span class="mw-page-title-main">Mall/Southwest 4th Avenue and Mall/Southwest 5th Avenue stations</span> Light rail stations in Portland, US

Mall/Southwest 4th Avenue and Mall/Southwest 5th Avenue were a pair of light rail stations in Portland, Oregon, United States, served by TriMet as part of the MAX Light Rail system. Built into the sidewalk at Southwest Yamhill and Morrison streets between 4th and 5th avenues in downtown Portland, the Mall stations were served by the Blue and Red lines upon closing. They had also been served by the Yellow Line from May 2004 to August 2009.

<span class="mw-page-title-main">Pioneer Square South and Pioneer Square North stations</span> Pair of light rail stations in Portland, Oregon

Pioneer Square South and Pioneer Square North are a pair of light rail stations in Portland, Oregon, United States, served by TriMet as part of the MAX Light Rail system. Situated directly west of the Portland Transit Mall at Pioneer Courthouse Square in downtown Portland, they occupy the sidewalk on Yamhill and Morrison streets between Broadway and 6th Avenue. The stations consist of one side platform each; trains traveling eastbound stop at Pioneer Square South while trains traveling westbound stop at Pioneer Square North.

<span class="mw-page-title-main">Transportation in Portland, Oregon</span> Overview of movement of goods and passengers in Portland

Like transportation in the rest of the United States, the primary mode of local transportation in Portland, Oregon is the automobile. Metro, the metropolitan area's regional government, has a regional master plan in which transit-oriented development plays a major role. This approach, part of the new urbanism, promotes mixed-use and high-density development around light rail stops and transit centers, and the investment of the metropolitan area's share of federal tax dollars into multiple modes of transportation. In the United States, this focus is atypical in an era when automobile use led many areas to neglect their core cities in favor of development along interstate highways, in suburbs, and satellite cities.

Portland is "an international pioneer in transit orientated developments."

<span class="mw-page-title-main">Beaverton Transit Center</span> Transport hub located in Beaverton, Oregon, U.S.

Beaverton Transit Center is a multimodal transport hub in Beaverton, Oregon, United States. Owned and operated by TriMet, it is served by bus, commuter rail, and light rail. The transit center is MAX Light Rail's 15th station eastbound on the Blue Line and western terminus on the Red Line. It is also the northern terminus of WES Commuter Rail and a hub for bus routes mostly serving the westside communities of the Portland metropolitan area. Beaverton Transit Center is situated on Southwest Lombard Avenue, just north of Southwest Canyon Road in central Beaverton, connected by walkway to Canyon Place Shopping Center. It recorded 9,709 average weekday boardings for all modes in fall 2018, making it TriMet's busiest transit center.

<span class="mw-page-title-main">Hatfield Government Center station</span> Light rail station in Hillsboro, US

Hatfield Government Center is a light rail station on the in downtown Hillsboro, Oregon, United States, owned and operated by TriMet. The station is the western terminus of the MAX Blue Line. Opened in 1998, it is located in the same block as the Hillsboro Post Office and adjacent to the Washington County Courthouse and the Hillsboro Civic Center. The block is bounded by First and Adams streets on the east and west and Washington and Main streets on the south and north. The station is named in honor of Mark O. Hatfield, a former United States Senator from Oregon and light rail proponent. It is the furthest west light rail station in the Continental United States.

<span class="mw-page-title-main">Willow Creek/Southwest 185th Avenue Transit Center</span> Light rail station and transit center on the MAX Blue Line in Hillsboro, Oregon, United States

Willow Creek/Southwest 185th Avenue Transit Center is a multimodal transport hub in Hillsboro, Oregon, United States. Owned and operated by TriMet, it is served by bus and light rail. The transit center is the ninth station eastbound on the Blue Line and a hub for bus routes mostly serving Washington County in the Portland metropolitan area. It is located by the intersection of Southwest Baseline Road and 185th Avenue near the city's boundary with Beaverton.

<span class="mw-page-title-main">Portland Airport station</span> Light rail station in Portland, Oregon, United States

Portland Airport, formerly just Airport, is a light rail station in Portland, Oregon, United States, served by TriMet as part of the MAX Light Rail system. Serving Portland International Airport, it is the eastern terminus of the Red Line, which connects the airport, downtown Portland, and Beaverton. The station is located at the ground floor of the airport's main passenger terminal near the southern end of the arrivals hall and baggage claim area.

<span class="mw-page-title-main">MAX Green Line</span> Light rail line in Portland, Oregon

The MAX Green Line is a light rail service in Portland, Oregon, United States, operated by TriMet as part of the MAX Light Rail system. It is 15 miles (24.1 km) long and serves 30 stations from the PSU South stations to Clackamas Town Center Transit Center; it connects Portland State University (PSU), Portland City Center, Northeast Portland, Southeast Portland, and Clackamas. The Green Line is the only service that shares parts of its route with the four other MAX services, sharing the Portland Transit Mall with the Orange and Yellow lines and the Banfield segment of the Eastside MAX with the Blue and Red lines. Southbound from Gateway/Northeast 99th Avenue Transit Center, it operates the Interstate 205 (I-205) segment through to Clackamas Town Center. Service runs for approximately 2112 hours daily with a headway of 15 minutes during most of the day. It is the third-busiest line in the system, carrying an average of 19,160 riders per day on weekdays in September 2019.

<span class="mw-page-title-main">MAX Orange Line</span> Light rail line in Portland, Oregon

The MAX Orange Line is a light rail line serving the Portland metropolitan area in the U.S. state of Oregon. Operated by TriMet as part of the MAX Light Rail system, it connects Portland City Center, Portland State University (PSU), Southeast Portland, Milwaukie, and Oak Grove. The line serves 17 stations and runs for 2012 hours per day with headways of up to 15 minutes. It averaged 3,480 daily weekday riders in September 2020.

<span class="mw-page-title-main">I-205 busway</span> Abandoned transit project in Portland, Oregon, now used for light rail

The I-205 busway was a partially built busway along the right-of-way of the Interstate 205 freeway in Portland, Oregon. Although it never opened as a busway, its right-of-way has been in use by light rail lines partially since 2001 and fully since 2009.

<span class="mw-page-title-main">WES Commuter Rail</span> Commuter train system serving northwest Oregon

The Westside Express Service (WES) is a commuter rail line in the U.S. state of Oregon serving parts of Washington and Clackamas counties in the Portland metropolitan area. Owned by TriMet and operated by Portland & Western Railroad (P&W), the line is 14.7 miles (23.7 km) long and travels north–south from Beaverton to Wilsonville along a route just west of Oregon Highway 217 and Interstate 5 (I-5). WES consists of five stations and connects with MAX Light Rail at Beaverton Transit Center. Service operates on a 45-minute headway on weekdays during the morning and evening rush hours. In Spring 2022, WES saw a daily ridership of 420 passengers or about 109,000 riders annually.

<span class="mw-page-title-main">Tualatin station</span> Train station in Tualatin, Oregon, US

Tualatin is a train station in Tualatin, Oregon, United States, served by TriMet as part of WES Commuter Rail. Situated next to Hedges Green Shopping Center on Southwest Boones Ferry Road, it is the fourth station southbound on the commuter rail line, which operates between Beaverton and Wilsonville in the Portland metropolitan area's Washington County. The station was approved in 2004 as part of the Washington County Commuter Rail Project, but construction was delayed following a dispute with its location and the amount of available parking. A compromise was eventually reached, and it was completed in time for the line's opening in 2009. The station includes a 129-space park and ride and connections to the Tualatin Shuttle and TriMet bus routes 76–Hall/Greenburg and 97–Tualatin–Sherwood Rd. WES connects with the Blue and Red lines of MAX Light Rail at Beaverton Transit Center.

<span class="mw-page-title-main">Hall/Nimbus station</span> Train station in Beaverton, Oregon

Hall/Nimbus is a train station in Beaverton, Oregon, United States, served by TriMet as part of WES Commuter Rail. It is the second station southbound on the commuter rail line, which runs between Beaverton and Wilsonville in the Portland metropolitan area's Washington County. Opened in February 2009, the TriMet-owned station is located west of Oregon Route 217 near the Washington Square shopping mall on Hall Boulevard. It includes a 50-car park and ride and connections to TriMet bus routes 76–Hall/Greenburg and 78–Beaverton/Lake Oswego. WES connects with the Blue and Red lines of MAX Light Rail at Beaverton Transit Center.

References

  1. 1 2 3 4 5 6 7 8 9 "Airport MAX Red Line" (PDF). TriMet. July 2016. Archived from the original (PDF) on August 28, 2018. Retrieved August 24, 2018.
  2. 1 2 "September 2021 Monthly Performance Report" (PDF). TriMet. Archived (PDF) from the original on December 28, 2021. Retrieved December 27, 2021.
  3. 1 2 Kramer, George (May 2004). The Interstate Highway System in Oregon, A Historic Overview (Report). Oregon Department of Transportation. p. 60. OCLC   57183445. Archived from the original on August 31, 2018. Retrieved August 31, 2018 via State Library of Oregon Digital Collections.
  4. "Council backs I-205 if modified" . The Oregonian . April 24, 1975. p. B4. Archived from the original on September 15, 2023. Retrieved May 22, 2021 via NewsBank.
  5. "Agreement on I-205 plans cited" . The Oregonian. July 30, 1975. p. F4. Archived from the original on September 15, 2023. Retrieved May 22, 2021 via NewsBank.
  6. "Tri-Met board okays I-205 busway concept" . The Oregonian. February 3, 1976. p. A8. Archived from the original on September 15, 2023. Retrieved May 22, 2021 via NewsBank.
  7. Hortsch, Dan (October 7, 1976). "I-205 section passes tests for final approval" . The Oregonian. p. E12. Archived from the original on September 15, 2023. Retrieved May 22, 2021 via NewsBank.
  8. Redden, Jim (September 10, 2009). "After 35 years of waiting, TriMet's Green Line hits all the parties: Thousands ride new I-205 line that was born of a '70s freeway rebellion". Portland Tribune . Archived from the original on June 8, 2011. Retrieved May 13, 2014.
  9. Cochran, Wanda; Kohler, Vince (December 14, 1984). "Light-rail study gets approval" . The Oregonian. p. C7. Archived from the original on September 15, 2023. Retrieved April 8, 2022 via NewsBank.
  10. Kohler, Vince (July 11, 1985). "Light-rail line study under way" . The Oregonian. p. D4. Archived from the original on September 15, 2023. Retrieved April 8, 2022 via NewsBank.
  11. Kohler, Vince (April 23, 1987). "Panel calls for study of proposed I-205 light-rail link" . The Oregonian. p. D19. Archived from the original on September 15, 2023. Retrieved April 9, 2022 via NewsBank.
  12. Kohler, Vince (May 17, 1987). "Metro committee seeks funds to build I-205 light-rail link" . The Oregonian. p. E2. Archived from the original on September 15, 2023. Retrieved April 9, 2022 via NewsBank.
  13. Bodine, Harry (September 30, 1987). "Light-rail expansion backed by officials" . The Oregonian. p. B12. Archived from the original on September 15, 2023. Retrieved March 22, 2022 via NewsBank.
  14. Bodine, Harry (October 27, 1987). "Mass transit, major highway projects given priority" . The Oregonian. p. B4. Archived from the original on September 15, 2023. Retrieved April 9, 2022 via NewsBank.
  15. United States. Department of Transportation; United States. Urban Mass Transportation Administration (March 1982). Westside Corridor Project Draft Environmental Impact Statement Alternatives Analysis (Report). pp. 2.1-3, 2.1-4. Archived from the original on September 15, 2023. Retrieved December 14, 2020 via Google Books.
  16. Kohler, Vince (May 23, 1988). "Joint efforts of business, government could spur rail line; both groups need to finance, back line along I-205, panel says". The Oregonian. p. B5.
  17. Green, Ashbel S. (October 6, 1988). "County officials debate light-rail routes". The Oregonian. p. W1.
  18. Bodine, Harry (January 14, 1989). "Metro OKs $1.5 billion transit plan". The Oregonian. p. D1.
  19. Mayer, James (April 9, 1989). "Tri-Met looks to the future: The success of MAX sparks dreams of expanding". The Oregonian. p. A1.
  20. 1 2 Mayes, Steve (April 11, 1991). "Portland's airport for the future only needs a $300 million ticket". The Oregonian. p. A1.
  21. Hamburg, Ken (December 10, 1992). "Port of Portland speeds pace of airport terminal expansion". The Oregonian. p. E10.
  22. Airport Max: A Case Study (PDF) (Report). BATIC Institute. Archived from the original (PDF) on August 28, 2018. Retrieved August 26, 2018.
  23. 1 2 Oliver, Gordon (January 22, 1997). "Port wants MAX to run to airport". The Oregonian. p. A1.
  24. Nichols, Chrissy Mancini (March 26, 2012). "Value Capture Case Studies: Portland's Cascade Station and Light Rail to PDX". Metropolitan Planning Council. Archived from the original on February 10, 2022. Retrieved February 10, 2022.
  25. McCarthy, Dennis (September 15, 1994). "Light-rail service? On to Oregon City!". The Oregonian. p. D2.
  26. 1 2 3 4 5 Selinger, Philip (2019). "Making History: 50 Years of TriMet and Transit in the Portland Region" (PDF). TriMet. Archived (PDF) from the original on February 25, 2020. Retrieved April 25, 2020.
  27. Oliver, Gordon; Hunsberger, Brent (December 9, 1996). "Holding the line on light rail". The Oregonian.
  28. Oliver, Gordon (January 29, 1997). "Cost cuts map way to extend light rail". The Oregonian.
  29. Oliver, Gordon (November 7, 1998). "South–North Line backers find themselves at a loss after election day defeat". The Oregonian. p. B1.
  30. Christ, Janet (January 1, 1998). "Portland to help pay for study of airport rail line". The Oregonian. p. D2.
  31. Oliver, Gordon (September 24, 1998). "Tri-Met OKs rail line of 5.5 miles to airport". The Oregonian. p. B1.
  32. 1 2 Oliver, Gordon (October 9, 1998). "Port of Portland OKs light-rail agreement". The Oregonian. p. C1.
  33. Rose, Michael (December 19, 1997). "PDX light rail may lead to south-north line". Portland Business Journal. p. 1.
  34. Bjorhus, Jennifer (November 26, 1998). "Contractors battle Tri-Met on bid laws". The Oregonian. p. C1.
  35. Bjorhus, Jennifer (December 5, 1998). "Court tosses out suit against Tri-Met, Bechtel". The Oregonian. p. B1.
  36. 1 2 3 4 Oliver, Gordon (July 17, 1998). "Tri-Met puts price tag on airport line". The Oregonian. p. C1.
  37. 1 2 Oliver, Gordon (September 10, 1998). "Light rail to airport gets closer to reality". The Oregonian. p. B1.
  38. Ernico, Sheri (2012). Considering and Evaluating Airport Privatization (Report). Vol. 66. Transportation Research Board. p. 36. ISSN   1935-9802. Archived from the original on January 31, 2021. Retrieved August 23, 2018.
  39. Oliver, Gordon (December 12, 1998). "3 airlines oppose light-rail money". The Oregonian. p. C1.
  40. Stewart, Bill (May 29, 1999). "Ruling: Port ticket fees can finance 'Air MAX'". The Oregonian. p. B1.
  41. 1 2 3 4 5 Stewart, Bill (June 17, 1999). "Light-rail line to PDX starting to take shape". The Oregonian. p. B1.
  42. "TriMet's Rail Vehicle Fleet" (PDF). TriMet. July 2016. Archived from the original (PDF) on December 20, 2018. Retrieved December 19, 2018.
  43. Yee, Roger (2005). Public Transportation: On the Move. Vol. 1. Visual Reference Publications. p. 43. ISBN   1584710373. Archived from the original on January 31, 2021. Retrieved November 10, 2018.
  44. Tomlinson, Stuart (December 3, 1999). "Construction detours bottleneck I-84 traffic". The Oregonian. p. C3.
  45. 1 2 Stewart, Bill (December 17, 1999). "Don't look up, but MAX bridge going in over I-205; strict safety measures are in place to protect motorists, and as the span is built, tracks will start going in on Airport Way". The Oregonian. p. A1.
  46. 1 2 3 4 Stewart, Bill (July 10, 2000). "Airport's MAX station will be special". The Oregonian. p. E4.
  47. Stewart, Bill (June 12, 2000). "Workers are busy making tracks toward Airport MAX 2001 deadline". The Oregonian. p. E4.
  48. Gragg, Randy (May 28, 2000). "Airport canopy works, but not as it could; the structure signals an end to the worst phase of construction but it could – and should – have been done better". The Oregonian. p. F4.
  49. "Portland International Airport, MAX Light Rail Line and Station, Portland, Oregon". ZGF Architects LLP. Archived from the original on January 11, 2019. Retrieved January 11, 2019.
  50. "Systems News [regular news section]". Tramways & Urban Transit . Ian Allan Publishing. December 2000. p. 471. ISSN   1460-8324. With the light rail system due to expand to two services in September 2001, and three in 2004 (with all three using the same routing and stops in the city centre), Tri-Met has decided to assign route colours as follows ...
  51. Oliver, Gordon (September 11, 2001). "Portland now 'the city that moves', mayor says [opening of MAX Red Line]". The Oregonian. p. 1.
  52. Oliver, Gordon (September 21, 2001). "Unknowns cloud PDX's future". The Oregonian. p. D1.
  53. 1 2 3 Stewart, Bill (August 31, 2001). "Most Tri-Met fares rise Saturday, while route switches start Sept. 9". The Oregonian. p. B1.
  54. "History cancels PDX party". The Oregonian. September 15, 2001. p. D8.
  55. Rose, Joseph (September 17, 2001). "Even anti-noise advocates happy to hear airplanes again". The Oregonian. p. E6.
  56. Stewart, Bill (September 7, 2001). "Airport MAX rolls out Monday". The Oregonian. p. B1.
  57. "September 9th – Big Service Improvements". TriMet. September 11, 2001. Archived from the original on October 7, 2001. Retrieved November 26, 2018.
  58. "MAX Red Line runs: Every 15 minutes, seven days a week". The Oregonian. September 11, 2001. p. A12.
  59. "Systems News". Tramways & Urban Transit. Ian Allan Publishing. November 2001. p. 430. ISSN   1460-8324.
  60. "About town: Riders keep Airport MAX busy Thanksgiving weekend". The Oregonian. November 27, 2001. p. D2.
  61. Leeson, Fred (August 27, 2003). "MAX fares increase, direct service from Beaverton to PDX starts". The Oregonian. p. D2.
  62. "Systems News". Tramways & Urban Transit. Ian Allan Publishing. July 2006. p. 276. ISSN   1460-8324.
  63. "TriMet extends rush-hour MAX trains between Hillsboro, PDX". Beaverton Valley Times . March 3, 2008. Archived from the original on May 11, 2008. Retrieved November 1, 2015.
  64. 1 2 Howard, John William (October 25, 2017). "TriMet considering expansion of MAX Red Line to county fairgrounds". Hillsboro Tribune . Archived from the original on October 10, 2018. Retrieved August 22, 2018.
  65. "MAX Red Line Improvements Project" (PDF). TriMet. Archived from the original (PDF) on March 2, 2019. Retrieved March 2, 2019.
  66. 1 2 3 4 "A Better Red" (PDF). TriMet. Archived from the original (PDF) on September 28, 2021. Retrieved September 28, 2021.
  67. "Parametrix to complete preliminary design for MAX Red Line extension". Parametrix. February 18, 2018. Archived from the original on September 13, 2018. Retrieved September 6, 2018.
  68. "TriMet moves forward with plan to extend MAX Red Line into Hillsboro". KPTV. April 24, 2019. Archived from the original on April 25, 2019.
  69. Corselli, Andrew (May 29, 2020). "FTA Announces $891MM in Funding". Railway Age . Archived from the original on May 29, 2020. Retrieved May 29, 2020.
  70. Danko, Pete (May 29, 2020). "TriMet gets $100M from feds for MAX Red Line project". Portland Business Journal. Archived from the original on May 29, 2020. Retrieved May 29, 2020.
  71. Corselli, Andrew (February 13, 2020). "TriMet Selects Parametrix to Finish 'A Better Red'". Railway Age. Archived from the original on March 10, 2020. Retrieved February 13, 2020.
  72. "Design – A Better Red". TriMet. Archived from the original on May 26, 2021. Retrieved May 26, 2021.
  73. "A Better Red MAX disruption April 2–9". TriMet. Archived from the original on April 5, 2022. Retrieved April 4, 2022.
  74. TriMet [@trimet] (April 10, 2022). "MAX Red Line has resumed normal service. Thank you for your patience while we completed this necessary work for the Better Red project. Here are some photos from our work over the past week" (Tweet). Retrieved April 10, 2022 via Twitter.
  75. Campbell, Sam (April 1, 2022). "MAX Red Line service halted during weeklong construction". KOIN. Archived from the original on April 3, 2022. Retrieved April 3, 2022.
  76. Villanueva, Mia (April 1, 2022). "Temporary MAX Red Line closure starts Saturday". KPTV. Archived from the original on April 1, 2022. Retrieved April 3, 2022.
  77. Luczak, Marybeth (September 27, 2021). "TriMet's 'A Better Red' Receiving $99.1MM CIG Grant". Railway Age. Archived from the original on September 29, 2021. Retrieved December 22, 2021.
  78. "FTA, TriMet and partners officially break ground on 'A Better Red' MAX extension and improvement project". Mass Transit. September 29, 2021. Archived from the original on September 30, 2021. Retrieved December 22, 2021.
  79. Stein, Rosemarie (June 14, 2023). "TriMet shuts down MAX Red Line to PDX for more than 4 months beginning Sunday". The Oregonian. Archived from the original on June 14, 2023. Retrieved June 14, 2023.
  80. Graf, Tyler (June 12, 2023). "TriMet's A Better Red project requires 126-day shutdown of MAX Red Line starting this weekend". TriMet. Archived from the original on June 14, 2023. Retrieved June 14, 2023.
  81. "MAX Improvements Project". trimet.org. Retrieved February 25, 2024.
  82. McLawhorn, Jennifer (February 16, 2024). "TriMet Gateway North MAX Station Opens in March". Railway Track & Structures. Retrieved February 25, 2024.
  83. "Stop ID 10575 – Cascades MAX Station". TriMet. Archived from the original on September 7, 2018. Retrieved September 7, 2018.
  84. "Stop ID 10577 – Mt Hood MAX Station". TriMet. Archived from the original on May 9, 2018. Retrieved September 7, 2018.
  85. "Stop ID 10579 – Portland Int'l Airport MAX Station". TriMet. Archived from the original on May 9, 2018. Retrieved September 7, 2018.
  86. TriMet System map (PDF) (Map). TriMet. Archived from the original (PDF) on February 10, 2019. Retrieved July 25, 2018.
  87. Google Maps coordinates:
  88. 1 2 3 Rail System Map with transfers (PDF) (Map). TriMet. Archived from the original (PDF) on March 28, 2020. Retrieved July 25, 2018.
  89. "Maps + Schedules – Portland Streetcar". Portland Streetcar. Archived from the original on February 10, 2019. Retrieved October 11, 2018.
  90. "WES Commuter Rail". TriMet. Archived from the original on February 10, 2019. Retrieved September 5, 2018.
  91. Portland City Center and Transit Mall (PDF) (Map). TriMet. Archived from the original (PDF) on March 28, 2020. Retrieved July 30, 2018.
  92. "Cascade Locks & Portland – CAT". Columbia Area Transit. Archived from the original on September 16, 2018. Retrieved February 14, 2019.
  93. Plante, Aimee (February 15, 2024). "Gateway North will be Portland's first new MAX station in 9 years". KOIN. Retrieved February 17, 2024.
  94. "Frequent Service". TriMet. Archived from the original on January 9, 2019. Retrieved August 6, 2018.
  95. MAX Red Line schedules:
  96. Theen, Andrew (August 30, 2018). "New TriMet bus, MAX additions create all-night service to PDX". The Oregonian. Archived from the original on September 16, 2018.
  97. "272–PDX Night Bus". TriMet. Archived from the original on January 11, 2019. Retrieved January 11, 2019.
  98. Hanson, Nate (March 27, 2020). "TriMet to alter schedules for buses, trains after ridership drops 47% during coronavirus pandemic". KGW. Archived from the original on April 25, 2021. Retrieved April 25, 2021.
  99. "September 2019 Monthly Performance Report" (PDF). TriMet. Archived (PDF) from the original on April 26, 2020. Retrieved January 9, 2020.
  100. Leeson, Fred (September 9, 2002). "Air travelers find MAX a deal". The Oregonian. p. E1.
  101. Rivera, Dylan (September 6, 2009). "MAX: More than the sum of its parts". The Oregonian.
  102. Mayer, James (July 19, 2007). "Portland blinked and Ikea came". The Oregonian. p. B1.
  103. Ballenger, Tara (July 27, 2008). "Cascade Station: Ikea to the rescue". The Oregonian. p. S5.
  104. Griffin, Anna (May 19, 2010). "At Cascade Station, it takes a mall, not a village, to thrive". The Oregonian.
  105. "Infrastructure Case Study: Portland Airport MAX Red Line" (PDF). Bipartisan Policy Center. October 2016. Archived from the original (PDF) on September 13, 2018. Retrieved September 13, 2018.
  106. Keizur, Christopher (June 12, 2017). "Safe travels?". Portland Tribune. Archived from the original on August 4, 2018. Retrieved August 3, 2018.
  107. Zielinski, Alex (May 18, 2018). "You Know Portland's Transportation Woes Have Reached a Breaking Point When..." Portland Mercury . Archived from the original on August 4, 2018. Retrieved August 3, 2018.
  108. "Airport MAX: Red Line" (PDF). TriMet. August 2012. Archived from the original (PDF) on September 14, 2018. Retrieved September 13, 2018.