MAX Red Line

Last updated

MAX Red Line
MAX Red Line icon.svg
Red Line train approaching Portland Airport station, September 2024.jpg
A Red Line train at Portland International Airport
Overview
Other name(s)Airport MAX [1]
Owner TriMet
Locale Portland, Oregon, U.S.
Termini
Stations37
Website MAX Red Line
Service
Type Light rail
System MAX Light Rail
Operator(s)TriMet
Daily ridership17,390 (Weekday, September 2024) [2]
History
OpenedSeptember 10, 2001 (2001-09-10)
Technical
Line length5.5 mi (8.9 km) [a]
Number of tracks2
Character At-grade, elevated, and underground
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification Overhead line,  750 V DC
Route diagram

Contents

BSicon uCONTg.svg
BSicon uHST.svg
Hillsboro Airport/​Fairgrounds
BSicon FLUG.svg BSicon PARKING.svg
BSicon uHST.svg
Hawthorn Farm
BSicon uHST.svg
Orenco
BSicon PARKING.svg
BSicon uHST.svg
Quatama
BSicon PARKING.svg
BSicon uBHF.svg
Willow Creek/SE 185th Avenue Transit Center
BSicon PARKING.svg
BSicon uHST.svg
Elmonica/​Southwest 170th Avenue
BSicon PARKING.svg
BSicon uHST.svg
Merlo Road/​Southwest 158th Avenue
BSicon uHST.svg
Beaverton Creek
BSicon PARKING.svg
BSicon uHST.svg
Millikan Way
BSicon PARKING.svg
BSicon uHST.svg
Beaverton Central
BSicon uINT.svg
Beaverton Transit Center
Aiga railtransportation 25.svg
BSicon uSKRZ-G4u.svg
BSicon PORTALf.svg
BSicon uBHF.svg
Sunset Transit Center
BSicon PARKING.svg
BSicon utHST.svg
Washington Park
BSicon PORTALg.svg
BSicon uHST.svg
Goose Hollow/​Southwest Jefferson Street
BSicon uBS2+l.svg
BSicon uBS2+r.svg
BSicon uBHF(L)f.svg
BSicon uBHF(R)g.svg
Providence Park
Stadium - The Noun Project.svg
BSicon uSKRZ-G4o.svg
BSicon uSKRZ-G4o.svg
BSicon uedABZg+l.svg
BSicon uexdSTRq.svg
BSicon uedABZg+r.svg
BSicon uCONTgq.svg
BSicon uKRZ.svg
BSicon uKRZ.svg
BSicon uCONTgeq.svg
B NS (SW 11th Ave)
BSicon uCONTfaq.svg
BSicon uKRZ.svg
BSicon uKRZxl.svg
BSicon uCONTfq.svg
A NS (SW 10th Ave)
BSicon uSTRf.svg
BSicon uINT(R)g.svg
Galleria/​Southwest 10th Avenue
BSicon TRAM.svg
BSicon uINT(L)f.svg
BSicon uSTRg.svg
Library/​Southwest 9th Avenue
BSicon TRAM.svg
BSicon uSTRf.svg
BSicon uBHF(R)g.svg
Pioneer Square North
BSicon uBHF(L)f.svg
BSicon uSTRg.svg
Pioneer Square South
BSicon uCONTfaq.svg
BSicon uKRZ.svg
BSicon uKRZ.svg
BSicon uSTR+r.svg
MAX Green Line icon.svg MAX Yellow Line icon.svg Portland Transit Mall (SW 6th Ave)
BSicon uCONTgq.svg
BSicon uKRZ.svg
BSicon uKRZ.svg
BSicon uLABZg+r.svg
MAX Green Line icon.svg MAX Orange Line icon.svg Portland Transit Mall (SW 5th Ave)
BSicon uSTRf.svg
BSicon uBHF(R)g.svg
BSicon uLSTRe.svg
Morrison/​Southwest 3rd Avenue
BSicon uBHF(L)f.svg
BSicon uSTRg.svg
Yamhill District
BSicon uBS2l.svg
BSicon uBS2r.svg
BSicon uHST.svg
Oak Street/​Southwest 1st Avenue
BSicon uHST.svg
Skidmore Fountain
BSicon uHST.svg
BSicon uLSTRa.svg
Old Town/​Chinatown
BSicon uABZg+l.svg
BSicon udSTRq.svg
BSicon uLSTRr.svg
MAX Green Line icon.svg MAX Yellow Line icon.svg MAX Orange Line icon.svg Portland Transit Mall (NW Glisan St)
BSicon dWASSERq.svg
BSicon MSTR.svg
BSicon uLFT.svg
BSicon WASSERq.svg
BSicon dWASSERq.svg
BSicon uABZgl.svg
BSicon uCONTfq.svg
BSicon uBHF.svg
Rose Quarter Transit Center
Stadium - The Noun Project.svg
BSicon uSKRZ-G4u.svg
I-5.svg I-5
BSicon uINT.svg
Convention Center
BSicon TRAM.svg
BSicon uCONTfaq.svg
BSicon uKRZ.svg
BSicon uCONTfq.svg
B (NE Grand Ave)
BSicon uCONTgq.svg
BSicon uKRZ.svg
BSicon uCONTgeq.svg
A (NE 7th Ave)
BSicon uINT.svg
Northeast 7th Avenue
BSicon TRAM.svg
BSicon uHST.svg
Lloyd Center/​Northeast 11th Avenue
BSicon uHST.svg
Hollywood/​Northeast 42nd Avenue
BSicon uHST.svg
Northeast 60th Avenue
BSicon uHST.svg
Northeast 82nd Avenue
BSicon uSKRZ-G4o.svg
I-84.svgI-205.svg I-84  / I-205
BSicon uBHF.svg
Gateway/​Northeast 99th Avenue Transit Center
BSicon PARKING.svg
BSicon uCONTgq.svg
BSicon uABZgr.svg
BSicon uSKRZ-G4u.svg
I-84.svgI-205.svg I-84  /
I-205
northbound
BSicon uBHF.svg
Parkrose/​Sumner Transit Center
BSicon PARKING.svg
BSicon uSKRZ-G4o.svg
I-205.svg
I-205
southbound
BSicon uHST.svg
Cascades
BSicon uHST.svg
Mount Hood Avenue
BSicon uKHSTe.svg
Portland Airport
BSicon FLUG.svg

The MAX Red Line is a light rail line serving the Portland metropolitan area in the U.S. state of Oregon. Operated by TriMet as part of the MAX Light Rail system, it is an airport rail link connecting Hillsboro, Beaverton, Portland City Center, and Northeast Portland to Portland International Airport. The Red Line serves 37 stations; it interlines with the Blue Line and partially with the Green Line from Hillsboro Airport/Fairgrounds station to Gateway Transit Center and then branches off to Portland Airport station. Service runs for 22 hours per day with headways of up to 15 minutes. The Red Line carried an average 17,390 passengers per weekday in September 2024, the second busiest after the Blue Line.

Plans for light rail service to Portland International Airport surfaced in the 1980s, and efforts were accelerated during the airport's expansion in the 1990s. The Airport MAX project was conceived from an unsolicited proposal by Bechtel in 1997, and it was designed and built under a public–private partnership between a consortium of Bechtel and Trammell Crow, the Port of Portland, and local governments. Construction of the four-station, 5.5-mile (8.9 km) branch line began in 1999 and was completed in under two years due to the use of local and private financing and existing public right-of-way.

The Red Line began operating between the airport and downtown Portland on September 10, 2001. It was extended west along existing MAX tracks to Beaverton Transit Center in 2003. In 2024, the A Better Red project eliminated two single-track segments along the Airport MAX and extended Red Line service farther west to Hillsboro Airport and Westside Commons, formerly Washington County Fairgrounds, in Hillsboro.

History

Background

In 1975, Multnomah County leaders negotiated reducing the number of car lanes along a future nine-mile (14 km) section of the controversial Interstate 205 (I-205) freeway. [3] A separated transit bus right-of-way was proposed instead, [4] [5] and that segment was realized as the I-205 busway, [6] [7] but it was never utilized by buses. [3] [8] In 1985, the Portland metropolitan area's regional government, Metro, began a study for the Port of Portland and Clackamas County, who proposed a light rail line using the I-205 busway. They envisioned the line running from Portland International Airport to Clackamas Town Center and connecting with the then-nearly completed Metropolitan Area Express (MAX) line, which traveled perpendicularly between Portland and Gresham. [9] [10] Metro had recommended construction by 1995, [11] [12] but in 1987, the Joint Policy Advisory Committee on Transportation (JPACT) separately identified the Westside Corridor from downtown Portland to Washington County as the "next priority corridor for major investment". [13] [14] [15]

Metro and the regional transit agency, TriMet, subsequently called on local governments and businesses in Clackamas County to pursue alternative funding sources for the I-205 line, [16] which Clackamas County officials disputed. [17] As a compromise, Metro published a transit plan in 1989 that reasserted the Westside Corridor's priority and commissioned preliminary work for the I-205 proposal. [18] [19] Ensuing alternatives analyses eventually caused Metro planners to shift light rail plans away from the I-205 corridor in favor of another north–south route farther west closer to downtown Portland; [20] this route, between Hazel Dell, Washington and Clackamas Town Center, became known as the "South/North Corridor". [21] :80 Voters rejected local funding proposals for the South/North project in 1995 and 1996. In December 1996, Metro proposed combining the South/North project with a locally and privately funded airport light rail extension, as doing so would allow Metro to ask for more federal matching funds. [22] [23] TriMet, however, opted to ask Portland-area voters for funding instead, who declined in a 1998 ballot measure. [24]

Airport expansion and partnership agreement

Cascade Station shopping center, which Bechtel developed in exchange for building the Airport MAX Cascade Station shopping center entrance - Portland, Oregon.JPG
Cascade Station shopping center, which Bechtel developed in exchange for building the Airport MAX

In 1991, the Port approved a master plan for Portland International Airport—a 20-year, $300 million phased expansion of the passenger terminal—to serve predicted passenger traffic growth through 2010. The plan included a long-term goal for an extension of light rail to the airport. [25] Improvements to the southern portion of the terminal were announced in 1995 in response to unanticipated growth. [26] Designed by Zimmer Gunsul Frasca (ZGF), [27] Terminal Expansion South included a light rail station between the airport access road and the south concourse, 150 feet (46 m) from the baggage claim area. [28] [29]

In 1997, engineering firm Bechtel, wanting to acquire property near the airport, submitted an unsolicited proposal to develop the airport light rail line. [21] :82 The Port expressed its support of the proposal, [30] and a preliminary engineering study commenced in December. [31] After long deliberations, agreements were made between Bechtel, the Port, TriMet, and local governments and agencies in October 1998. [32] [33] A part of the agreements authorized Bechtel to design and build a 5.5-mile-long (8.9 km) light rail extension to the airport in exchange for development rights to the 120-acre (48.6 ha), commercially zoned Portland International Center situated east of the airport. Bechtel later developed this property and renamed it Cascade Station. [34] The following month, the Associated Builders and Contractors filed a petition in Multnomah County Circuit Court claiming that the contract awarded to Bechtel may have violated Oregon procurement laws. [35] The court ruled in favor of TriMet with the judge declaring that the contract was awarded fairly. [36]

Funding and construction

The south portal of the tunnel that was built in the late 1970s as part of the I-205 busway and was first brought into use by the Red Line South portal of MAX Red Line's I-205 tunnel with southbound train (2015).jpg
The south portal of the tunnel that was built in the late 1970s as part of the I-205 busway and was first brought into use by the Red Line

The Airport MAX project's timeline was accelerated with the formation of a public–private partnership, which excluded Federal Transit Administration (FTA) funding and thus eliminated a requirement for FTA approval. [21] :82 [37] TriMet had estimated the extension would cost $125 million, but additional costs to purchase train sets and build related infrastructure raised the total to $182.7 million. [38] U.S. federal regulations and an authorization from the Federal Aviation Administration (FAA) limited the Port to funding only a 1.2-mile (1.9 km) stretch within airport property. [33] To ensure funding for the entire project, the Port divided financing into three parts and assumed responsibility for that segment. The next 1.4 miles (2.3 km) of track, which ran through Cascade Station, in turn went to private funding, while the final 2.9 miles (4.7 km) along I-205 was covered by TriMet, Metro, and the City of Portland. [39] [40]

The Port contributed $28.3 million for construction and $20 million for terminal and road improvements; these funds were drawn from a $3 ticket fee levied on travelers. [1] [38] Delta Air Lines, Reno Air, and United Airlines had opposed the use of ticket fees, arguing that the extension would serve few airline passengers, [41] but the FAA approved it in May 1999. [42] Additional funds came from Cascade Station Development, a private consortium of Bechtel and real estate developer Trammell Crow, who provided $28.2 million for the project and $13.1 million for the construction of an interchange over I-205 and Airport Way. [43] TriMet released $27.5 million for construction, which was funded by $30 million in bonds, [1] [38] and procured six new rail cars for $6 million each. [43] [44] Metro allocated $18 million from a regional transportation fund, [1] [38] and $23 million came from tax increment bonds issued by the City of Portland. [1] [21] :82

David Evans and Associates served as the prime engineer and lead designer. [45] Much of the Airport MAX extension used public right-of-way already owned either by the Oregon Department of Transportation, the Port, or TriMet. This avoided displacing private property owners and limited the project's impact only to parking spaces at Gateway Transit Center and along Airport Way. [37] [43] Bechtel began construction in June 1999 on a segment next to I-205 near the Columbia Slough. [43] Bridgework over the freeway commenced the following December. [46] To minimize lane closures, workers used a cast-in-place concrete pouring method to extend the bridges' spans in 16-foot (4.9 m) increments. [47] Work progressed quickly along the freeway segment due to the existing I-205 busway right-of-way, which came with a tunnel from Gateway Transit Center to the freeway median. [47] Bechtel contracted track installation to Stacy and Witbeck, [48] whose workers placed 3,200 feet (975.4 m) of rail per day to meet the project's deadline; tracks from Gateway Transit Center to the bridge over southbound I-205 were laid by July 2000. [49] Hoffman Construction built the $8.4 million Portland Airport station, [48] and local architecture firm Zimmer Gunsul Frasca (ZGF) designed the station's glass-roofed shelter to complement the airport terminal's drop-off canopy, which ZGF also designed. [50] [51] Bechtel began the end-to-end testing of the power, trains, and signals in March 2001, and TriMet took over the project that July to continue system testing and verify scheduling. [48]

Opening and extension to Beaverton

A Red Line train at Beaverton Transit Center in 2004 Beaverton Transit Center 8204809868.jpg
A Red Line train at Beaverton Transit Center in 2004

In 2000, TriMet named the new MAX service to the airport the "Red Line" to differentiate it from the established service between Hillsboro and Gresham, which it renamed the "Blue Line". [52] [21] :83 The Airport MAX extension opened on September 10, 2001. [53] [54] Celebrations scheduled for September 15–16 were canceled in the aftermath of the September 11 attacks, [55] [56] with the airport itself closed for three days due to a nationwide ground stop. [57] Upon opening, the Red Line operated from the airport to the Library and Galleria stations in downtown Portland, where its trains turned around at the 11th Avenue loop tracks. [58] It replaced bus route 12–Sandy Boulevard as TriMet's only service to and from the airport, [55] [59] while the transit agency for Clark County, Washington, C-Tran, rerouted its bus service from its connection at Gateway Transit Center to Parkrose/Sumner Transit Center. [55] Although tested during trial runs, [48] TriMet opted to omit luggage racks from Red Line trains to maximize rider capacity. [60] By November 2001, ridership had averaged 2,300 riders and peaked at 3,800 riders a day before the Thanksgiving holiday weekend. At the time, service had been using single light rail cars, [61] but the influx of riders prompted TriMet to temporarily deploy two-car consists, which it had not planned to do until 2006. [62]

On September 1, 2003, TriMet extended Red Line service farther west via the Westside MAX segment to Beaverton Transit Center. This was done in an effort to increase capacity between Gateway Transit Center and Beaverton and to provide a one-seat ride to the airport for the west side. [63] Regular use of two-car trains on the line began in September 2005, when overcrowding prompted TriMet to change most Yellow Line service from two-car consists to single cars in order to convert the Red Line to two-car trains. [64] In March 2008, three trips in each direction during the morning and evening rush hours began operating between the Hatfield Government Center and Portland Airport stations to provide further capacity on the Blue Line. [65]

Track improvements and extension to Hillsboro

Red Line track and I-205 bike path, February 2018.jpg
A single-track segment of the Airport MAX along I-205 in 2018. Since January 2024, this formerly bidirectional section of track is used solely by Portland Airport-bound trains.
Gateway North MAX station on its first day of service, March 2024.jpg
Gateway North station on opening day, March 2024

In October 2017, [66] TriMet, citing system-wide delays caused by two single-track segments on the Airport MAX, announced the MAX Red Line Improvements Project, [67] later renamed "A Better Red". [68] A Better Red proposed double-tracking a 2,800-foot (850 m) section of track north of Gateway Transit Center and another 3,800-foot (1,200 m) section next to Northeast Airport Way, just before the airport terminal. [69] To qualify the project for federal funding, TriMet also announced extending Red Line service west to Fair Complex/Hillsboro Airport station in Hillsboro, again using the Westside MAX segment; [66] this would create a one-seat option from 10 additional stations to Portland International Airport. Additionally, TriMet had announced it would procure up to eight new light rail vehicles to accommodate the improvements, [67] but later purchased 30 new trains overall; four were part of A Better Red, while the remaining 26 were replacements for the original MAX fleet, which are gradually being retired. [70]

Preliminary design work began in February 2018, [71] and TriMet adopted a locally preferred alternative in April 2019. [72] Final design was completed by engineering firm Parametrix in early 2021. [73] [74] The design included two new bridges north of Gateway Transit Center to accommodate the second track and a new MAX platform just north of Gateway Transit Center called "Gateway North". [68] The project cost $215 million. [75] In May 2020, the FTA announced $99.99 million for the project through the Capital Investment Grants program. [76] [77] $104 million from TriMet, $8.9 million from Metro, and $2.2 million from the Port covered the local-matching funds. [75]

The project broke ground on September 28, 2021. [78] From April 2–9, 2022, [79] [80] Red Line service was suspended to make way for construction, and shuttle buses operated between Gateway Transit Center and Portland International Airport. [81] [82] The project was completed in March 2024. [83] [84]

From June 18 to October 21, 2023, TriMet suspended MAX service between Gateway Transit Center and the airport to allow for construction of the second track between the airport and Mount Hood Avenue. [85] [86]

From January 14 to March 3, 2024, TriMet suspended MAX Red, Blue and Green Line service between NE 7th and Gateway Transit Center. [87] Inbound Red Line trains from PDX began serving Gateway North on March 4, 2024. [88] These projects eliminated the last bidirectional single-track sections on the MAX system. [89]

The Red Line extension to Hillsboro began service on August 25, 2024 with a soft launch, with the full launch beginning on August 28. Fair Complex/Hillsboro Airport station was also renamed to Hillsboro Airport/Fairgrounds station. [90] [91] On the destination signs of westbound trains, where space is limited, the new destination is shown as "HIO/Fairgnd", HIO being the International Air Transport Association code for Hillsboro Airport. [92] The opposite end of the Red Line continues to be shown simply as "Airport" (referring to Portland International) on the trains' destination signs. [92]

Route

An airport-bound MAX train running above I-205, pictured in 2011 MAX Around The Curve (6161753154).jpg
An airport-bound MAX train running above I-205, pictured in 2011

The Red Line serves the 5.5-mile-long (8.9 km) Airport MAX segment. [a] This segment begins just south of Gateway Transit Center where it branches from the Eastside MAX segment, makes a 180-degree loop, and heads north along the east side of the I-205 freeway. [1] Near Rocky Butte, it enters a tunnel beneath the northbound lanes of the freeway and emerges along the median. [43] The line then crosses over the southbound lanes of I-205 just south of the Columbia Slough and proceeds northwest along the south side of Cascade Parkway. [93] It follows this road then crosses it just before Mount Hood Avenue station. [94] The line then continues northwest along the south side of Airport Way until it reaches its terminus at Portland Airport station. [95]

Beyond the Airport MAX, the Red Line serves parts of the Westside and Eastside MAX segments, where it interlines with the Blue Line from Hillsboro Airport/Fairgrounds station to Gateway Transit Center and the Green Line from Rose Quarter Transit Center to Gateway Transit Center. [96]

MAX Red Line
A geographic map of the MAX Red Line (in red) relative to the rest of the network (in black) with icons marking the line's termini.'"`UNIQ--ref-000000E9-QINU`"'

Stations

Portland Airport station, the Red Line's eastern terminus, pictured in 2024 Portland Airport MAX station May 2024.jpg
Portland Airport station, the Red Line's eastern terminus, pictured in 2024

The Airport MAX project added four stations to the MAX system: Portland Airport, Mount Hood Avenue, Cascades, and Parkrose/Sumner Transit Center. [1] In March 2024, Gateway North station was added as part of A Better Red. [97] The Red Line serves these five stations in addition to 32 others, a total of 37 stations. It shares the 32 stations, from Hillsboro Airport/Fairgrounds station to Gateway Transit Center, with the Blue Line, of which eight stations, from Rose Quarter Transit Center to Gateway Transit Center, are additionally shared with the Green Line.

Riders can transfer to the Green, Orange, and Yellow lines at the Pioneer Courthouse and Pioneer Place stations from the Pioneer Square stations. Riders can also transfer to the Yellow Line at Interstate/Rose Quarter station from Rose Quarter Transit Center. [98] The Library, Galleria, Convention Center, and Northeast 7th Avenue stations connect with the Portland Streetcar, [99] and Beaverton Transit Center connects with WES Commuter Rail. [100] Some stations connect to local and intercity bus services. [98]

Key
IconPurpose
Terminus
Portland Airport-bound travel only
Hillsboro-bound travel only
List of MAX Red Line stations
StationLocationBegan serviceLine transfers [98] Notes [98] [101] [b]
Hillsboro Airport/Fairgrounds Hillsboro August 25, 2024 [90] [91] MAX Blue Line icon.svg Blue Line continues to Hatfield Government Center in downtown Hillsboro
Hawthorn Farm MAX Blue Line icon.svg
Orenco MAX Blue Line icon.svg Connects with North Hillsboro Link
Quatama MAX Blue Line icon.svg
Willow Creek/Southwest 185th Avenue Transit Center MAX Blue Line icon.svg Connects with CC Rider, North Hillsboro Link
Elmonica/Southwest 170th Avenue Beaverton MAX Blue Line icon.svg Adjacent to Elmonica maintenance facility
Merlo Road/Southwest 158th Avenue MAX Blue Line icon.svg
Beaverton Creek MAX Blue Line icon.svg
Millikan Way MAX Blue Line icon.svg
Beaverton Central MAX Blue Line icon.svg
Beaverton Transit Center September 1, 2003 MAX Blue Line icon.svg Connects with WES Commuter Rail
Sunset Transit Center MAX Blue Line icon.svg Connects with POINT, TCTD
Washington Park Portland MAX Blue Line icon.svg Connects with Washington Park Free Shuttle
Goose Hollow/Southwest Jefferson Street MAX Blue Line icon.svg
Kings Hill/Southwest Salmon Street MAX Blue Line icon.svg Closed on March 1, 2020 [102]
Providence Park MAX Blue Line icon.svg
Library/Southwest 9th Avenue September 10, 2001 MAX Blue Line icon.svg Connects with Portland Streetcar
Galleria/Southwest 10th Avenue MAX Blue Line icon.svg
Pioneer Square South MAX Blue Line icon.svg   MAX Green Line icon.svg   MAX Orange Line icon.svg   MAX Yellow Line icon.svg Connects with Portland Transit Mall
Pioneer Square North MAX Blue Line icon.svg   MAX Green Line icon.svg   MAX Orange Line icon.svg   MAX Yellow Line icon.svg
Mall/Southwest 4th Avenue MAX Blue Line icon.svg   MAX Green Line icon.svg   MAX Orange Line icon.svg   MAX Yellow Line icon.svg Closed on March 1, 2020 [102]
Mall/Southwest 5th Avenue MAX Blue Line icon.svg   MAX Green Line icon.svg   MAX Orange Line icon.svg   MAX Yellow Line icon.svg
Yamhill District MAX Blue Line icon.svg
Morrison/Southwest 3rd Avenue MAX Blue Line icon.svg
Oak Street/Southwest 1st Avenue MAX Blue Line icon.svg
Skidmore Fountain MAX Blue Line icon.svg Closing August 2025 [103]
Old Town/Chinatown MAX Blue Line icon.svg
Rose Quarter Transit Center MAX Blue Line icon.svg   MAX Green Line icon.svg   MAX Yellow Line icon.svg Green Line continues to PSU South stations on the Portland Transit Mall; connects with C-Tran
Convention Center MAX Blue Line icon.svg   MAX Green Line icon.svg Connects with Portland Streetcar
Northeast 7th Avenue MAX Blue Line icon.svg   MAX Green Line icon.svg Connects with Portland Streetcar
Lloyd Center/Northeast 11th Avenue MAX Blue Line icon.svg   MAX Green Line icon.svg
Hollywood/Northeast 42nd Avenue MAX Blue Line icon.svg   MAX Green Line icon.svg
Northeast 60th Avenue MAX Blue Line icon.svg   MAX Green Line icon.svg
Northeast 82nd Avenue MAX Blue Line icon.svg   MAX Green Line icon.svg
Gateway/Northeast 99th Avenue Transit Center MAX Blue Line icon.svg   MAX Green Line icon.svg Blue Line continues to Cleveland Avenue in Gresham; Green Line continues to Clackamas Town Center Transit Center; connects with Columbia Area Transit; [104]
Gateway NorthMarch 4, 2024 MAX Blue Line icon.svg   MAX Green Line icon.svg
Parkrose/Sumner Transit Center September 10, 2001Connects with C-Tran
Cascades
Mount Hood Avenue
Portland Airport Connects with C-Tran

Service

TriMet designates the Red Line as a "Frequent Service" route. [105] Red Line trains operate from 3:20 am to 1:40 am the next day with headways ranging from 30 minutes during the early mornings and late evenings to 15 minutes during peak hours. End-to-end travel from Hillsboro Airport/Fairgrounds station to Portland Airport station takes just over one hour. [106]

On September 2, 2018, TriMet reintroduced bus service to the airport, which had been replaced by the Red Line in 2001, with route 272–PDX Night Bus. Service ran in the late night and early morning hours when the Red Line was not operating. It traveled from the airport via Airport Way and 82nd Avenue to a local bus stop near Southeast 80th and Washington streets. [107] [108] Route 272 was suspended on April 5, 2020, as a result of the COVID-19 pandemic. [109] It was reinstated on August 25, 2024, as 292–Red Bus. [110] [111] Route 292 travels a longer route than its predecessor with service through Southeast Portland and downtown, terminating at Goose Hollow/Southwest Jefferson Street station. [112]

Ridership

The Red Line averaged 17,390 riders on weekdays in September 2024, the second busiest after the Blue Line. [2] One year after opening, the line averaged 2,800 daily riders at the airport, ahead of TriMet's first-year projections of 2,300. [113] The Red Line's extension to Beaverton Transit Center in 2003 increased weekday ridership by 49 percent along the Westside MAX corridor and six percent systemwide. [114]

IKEA's opening in July 2007 helped attract more riders to Cascade Station shopping center, which had been considered a failed planned development following the economic recession caused by the September 11 attacks. [115] In 2008, Cascades MAX station recorded an eight-fold increase in traffic, from 250 passengers per week to 2,000, [116] and this figure had further grown to 6,000 by 2010. [117] The Red Line's annual ridership peaked at just over nine million passengers in 2009, [118] and it continued to fall over the next decade as part of a system-wide decline attributed to crime and rising housing costs in the Portland area. [119] [120] From 8.2 million boardings in 2012, 7.4 million boardings were recorded in 2015. [1] [121]

The COVID-19 pandemic, which impacted public transit ridership globally, further exacerbated the line's—and TriMet's overall—ridership decline. From an average 22,530 weekday riders in September 2019, [122] TriMet recorded just 6,500 riders in April 2020 following local stay-at-home orders. [123]

Explanatory notes

  1. 1 2 TriMet publications only provide the total length of the Airport MAX extension, i.e., the 5.5-mile (8.9 km) section that was newly built. The total length of Red Line service, which includes segments of the Eastside MAX and the Westside MAX, has not been published. [1]
  2. This list of service connections excludes TriMet bus connections. For a complete list that includes all transfers, see: List of MAX Light Rail stations.

Related Research Articles

<span class="mw-page-title-main">MAX Light Rail</span> Light rail system serving Portland, Oregon

The Metropolitan Area Express (MAX) is a light rail system serving the Portland metropolitan area in the U.S. state of Oregon. Owned and operated by TriMet, it consists of five lines connecting the six sections of Portland; the communities of Beaverton, Clackamas, Gresham, Hillsboro, Milwaukie, and Oak Grove; and Portland International Airport to Portland City Center. Trains run seven days a week with headways between 30 minutes off-peak and three minutes during rush hours. In 2023, MAX recorded an annual ridership of 23,446,700.

<span class="mw-page-title-main">TriMet</span> Oregon government-owned corporation responsible for public transit in the Portland area

The Tri-County Metropolitan Transportation District of Oregon (TriMet) is a transit agency that serves most of the Oregon part of the Portland metropolitan area. Created in 1969 by the Oregon legislature, the district replaced five private bus companies that operated in the three counties: Multnomah, Washington, and Clackamas. TriMet began operating a light rail system, MAX, in 1986, which has since been expanded to five lines that now cover 59.7 miles (96.1 km). It also operates the WES Commuter Rail line since 2009. It also provides the operators and maintenance personnel for the city of Portland-owned Portland Streetcar system. In 2023, the system had a ridership of 62,055,600, or about 206,400 per weekday as of the third quarter of 2024.

<span class="mw-page-title-main">MAX Blue Line</span> Light rail line in Portland, Oregon

The MAX Blue Line is a light rail line serving the Portland metropolitan area in the U.S. state of Oregon. Operated by TriMet as part of the MAX Light Rail system, it connects Hillsboro, Beaverton, Portland, and Gresham. The Blue Line is the longest in the network; it travels approximately 33 miles (53 km) and serves 48 stations from Hatfield Government Center to Cleveland Avenue. It is the busiest of the five MAX lines, having carried an average 55,370 riders each day on weekdays in September 2018. Service runs for 2212 hours per day from Monday to Thursday, with headways of between 30 minutes off-peak and five minutes during rush hour. It runs later in the evening on Fridays and Saturdays and ends earlier on Sundays.

<span class="mw-page-title-main">MAX Yellow Line</span> Light rail line in Portland, Oregon

The MAX Yellow Line is a light rail line serving Portland, Oregon, United States. Operated by TriMet as part of the MAX Light Rail system, it connects North Portland, Portland City Center, and Portland State University (PSU). The line serves 17 stations; it runs north–south from Expo Center station to PSU South/Southwest 6th and College station, interlining with the Green and Orange lines within the Portland Transit Mall. Service runs for 21 hours per day with headways of up to 15 minutes. The Yellow Line is the fourth-busiest service in the MAX system; it carried an average 12,960 riders per weekday in September 2019.

<span class="mw-page-title-main">Gateway Transit Center (TriMet)</span> Public transportation hub in Portland, Oregon

Gateway Transit Center is a multimodal transport hub in Portland, Oregon, United States. Owned and operated by TriMet, it comprises Gateway/Northeast 99th Avenue Transit Center, a bus transit center and light rail station serving the MAX Green and Blue Lines and eastbound Red Line trains, and Gateway North, a separate station served by westbound Red Line trains. The complex is where the three lines split, with the Blue Line proceeding east to Gresham, the Green Line proceeding south to Clackamas, and the Red Line proceeding north to Portland International Airport. It is TriMet's second-busiest transit center after Beaverton Transit Center, with 4,847 average weekday boardings for all modes in spring 2023.

<span class="mw-page-title-main">Hollywood/Northeast 42nd Avenue station</span>

Hollywood/Northeast 42nd Avenue, until 2024 also known as Hollywood Transit Center, is a light rail station in the MAX Light Rail system and a bus transit center, located in the Hollywood District of Portland, Oregon. Hollywood/NE 42nd Ave is the 11th stop eastbound on the eastside MAX main line, and is served by the Blue, Green and Red Lines. The transit center's bus area, served by three routes, is temporarily closed for construction.

<span class="mw-page-title-main">Mall/Southwest 4th Avenue and Mall/Southwest 5th Avenue stations</span> Light rail stations in Portland, US

Mall/Southwest 4th Avenue and Mall/Southwest 5th Avenue were a pair of light rail stations in Portland, Oregon, United States, served by TriMet as part of the MAX Light Rail system. Built into the sidewalk at Southwest Yamhill and Morrison streets between 4th and 5th avenues in downtown Portland, the Mall stations were served by the Blue and Red lines upon closing. They had also been served by the Yellow Line from May 2004 to August 2009.

<span class="mw-page-title-main">Pioneer Square South and Pioneer Square North stations</span> Pair of light rail stations in Portland, Oregon

Pioneer Square South and Pioneer Square North are a pair of light rail stations in Portland, Oregon, United States, served by TriMet as part of the MAX Light Rail system. Situated directly west of the Portland Transit Mall at Pioneer Courthouse Square in downtown Portland, they occupy the sidewalk on Yamhill and Morrison streets between Broadway and 6th Avenue. The stations consist of one side platform each; trains traveling eastbound stop at Pioneer Square South while trains traveling westbound stop at Pioneer Square North.

<span class="mw-page-title-main">Transportation in Portland, Oregon</span> Overview of movement of goods and passengers in Portland

Like transportation in the rest of the United States, the primary mode of local transportation in Portland, Oregon is the automobile. Metro, the metropolitan area's regional government, has a regional master plan in which transit-oriented development plays a major role. This approach, part of the new urbanism, promotes mixed-use and high-density development around light rail stops and transit centers, and the investment of the metropolitan area's share of federal tax dollars into multiple modes of transportation. In the United States, this focus is atypical in an era when automobile use led many areas to neglect their core cities in favor of development along interstate highways, in suburbs, and satellite cities.

Portland is "an international pioneer in transit orientated developments."

<span class="mw-page-title-main">Beaverton Transit Center</span> Transport hub located in Beaverton, Oregon, U.S.

Beaverton Transit Center is a multimodal transport hub in Beaverton, Oregon, United States. Owned and operated by TriMet, it is served by bus, commuter rail, and light rail. The transit center is MAX Light Rail's 15th station eastbound on the Blue Line and 11th station eastbound on the Red Line. It is also the northern terminus of WES Commuter Rail and a hub for bus routes mostly serving the westside communities of the Portland metropolitan area. Beaverton Transit Center is situated on Southwest Lombard Avenue, just north of Southwest Canyon Road in central Beaverton, connected by walkway to Canyon Place Shopping Center. It recorded 9,709 average weekday boardings for all modes in fall 2018, making it TriMet's busiest transit center.

<span class="mw-page-title-main">Hatfield Government Center station</span> Light rail station in Hillsboro, US

Hatfield Government Center is a light rail station in downtown Hillsboro, Oregon, United States, owned and operated by TriMet. The station is the western terminus of the MAX Blue Line. Opened in 1998, it is located in the same block as the Hillsboro Post Office and adjacent to the Washington County Courthouse and the Hillsboro Civic Center. The block is bounded by First and Adams streets on the east and west and Washington and Main streets on the south and north. The station is named in honor of Mark O. Hatfield, a former United States Senator from Oregon and light rail proponent. It is the furthest west light rail station in the Continental United States.

<span class="mw-page-title-main">Hillsboro Central/Southeast 3rd Avenue Transit Center</span> Light rail station in Hillsboro, US

Hillsboro Central/Southeast 3rd Avenue Transit Center, also known as Hillsboro Transit Center, is a light rail station and transit center on the MAX Blue Line in Hillsboro, Oregon. Opened in 1998, the red-brick station is the 19th stop westbound on the Westside MAX, one stop from the western terminus of the line. Physically the largest station on the line, it is located at a former stop of the Oregon Electric Railway and includes artwork honoring the history of the community.

<span class="mw-page-title-main">Hillsboro Airport/Fairgrounds station</span> Light rail station on the Portland-area MAX Blue Line in northwest Oregon

Hillsboro Airport/Fairgrounds, formerly Fair Complex/Hillsboro Airport, is a light rail station on the MAX Blue and Red lines in Hillsboro, Oregon, United States. It is the 16th stop westbound on the Westside MAX, and the last westbound stop prior to crossing the Main Street Bridge. The station is located close to the Westside Commons – the 2019-adopted new name for the Washington County Fair Complex – and Hillsboro Airport, a major general-aviation facility in Hillsboro, and the location of the Oregon International Airshow in the summer. Bus line 46-North Hillsboro serves the station.

<span class="mw-page-title-main">Willow Creek/Southwest 185th Avenue Transit Center</span> Railway station in Hillsboro, Oregon, US

Willow Creek/Southwest 185th Avenue Transit Center is a multimodal transport hub in Hillsboro, Oregon, United States. Owned and operated by TriMet, it is served by bus and light rail. The transit center is the ninth station eastbound on the Blue Line, the fifth station eastbound on the Red Line, and a hub for bus routes mostly serving Washington County in the Portland metropolitan area. It is located by the intersection of Southwest Baseline Road and 185th Avenue near the city's boundary with Beaverton.

<span class="mw-page-title-main">Orenco station (TriMet)</span> Light rail station in Hillsboro, Oregon, United States

Orenco is a light rail station in Hillsboro, Oregon, United States, served by TriMet as part of the MAX Light Rail system. It is the seventh station eastbound on the Blue Line and the third station eastbound on the Red Line, situated between the Quatama and Hawthorn Farm stations. The two-track, island platform station serves the Orenco Station neighborhood, which is considered a model for smart growth and transit-oriented development. It features a 125-space park and ride, a bike and ride, and connections to TriMet bus route 47–Baseline/Evergreen and Ride Connection's North Hillsboro Link.

<span class="mw-page-title-main">Portland Airport station</span> Light rail station in Portland, Oregon, United States

Portland Airport is a light rail station in Portland, Oregon, United States, served by TriMet as part of the MAX Light Rail system. Situated at Portland International Airport, it is the eastern terminus of the Red Line, which connects the airport, Portland City Center, Beaverton, and Hillsboro. The station is located on the ground floor of the airport's main passenger terminal near the southern end of the arrivals hall and baggage claim area.

<span class="mw-page-title-main">MAX Green Line</span> Light rail line in Portland, Oregon

The MAX Green Line is a light rail line serving the Portland metropolitan area in the U.S. state of Oregon. Operated by TriMet as part of the MAX Light Rail system, it connects Portland State University (PSU), Portland City Center, Northeast Portland, Southeast Portland, and Clackamas. The Green Line travels 15 miles (24.1 km) from the PSU South stations to Clackamas Town Center Transit Center and serves 30 stations. It is the only service that interlines with all of the other MAX services, sharing the Portland Transit Mall segment with the Orange and Yellow lines and part of the Eastside MAX segment with the Blue and Red lines. South of Gateway Transit Center, the Green Line branches off to Clackamas Town Center. Service runs for 21 hours on weekdays and 20 hours on weekends with headways of up to 15 minutes. It is the third-busiest line in the system with an average of 13,030 riders per day on weekdays in September 2024.

<span class="mw-page-title-main">MAX Orange Line</span> Light rail line in Portland, Oregon

The MAX Orange Line is a light rail line serving the Portland metropolitan area in the U.S. state of Oregon. Operated by TriMet as part of the MAX Light Rail system, it connects Portland City Center, Portland State University (PSU), Southeast Portland, Milwaukie, and Oak Grove. The line serves 17 stations and runs for 2012 hours per day with headways of up to 15 minutes. It averaged 3,480 daily weekday riders in September 2020.

<span class="mw-page-title-main">I-205 busway</span> Abandoned transit project in Portland, Oregon, now used for light rail

The I-205 busway was a partially built busway along the right-of-way of the Interstate 205 freeway in Portland, Oregon. Although it never opened as a busway, its right-of-way has been in use by light rail lines partially since 2001 and fully since 2009.

References

  1. 1 2 3 4 5 6 7 8 9 "Airport MAX Red Line" (PDF). TriMet. July 2016. Archived from the original (PDF) on August 28, 2018. Retrieved August 24, 2018.
  2. 1 2 "September 2024 Monthly Performance Report" (PDF). TriMet . Retrieved November 20, 2024.
  3. 1 2 Kramer, George (May 2004). The Interstate Highway System in Oregon, A Historic Overview (Report). Oregon Department of Transportation. p. 60. OCLC   57183445. Archived from the original on August 31, 2018. Retrieved August 31, 2018 via State Library of Oregon Digital Collections.
  4. "Council backs I-205 if modified" . The Oregonian . April 24, 1975. p. B4. Archived from the original on September 15, 2023. Retrieved May 22, 2021 via NewsBank.
  5. "Agreement on I-205 plans cited" . The Oregonian. July 30, 1975. p. F4. Archived from the original on September 15, 2023. Retrieved May 22, 2021 via NewsBank.
  6. "Tri-Met board okays I-205 busway concept" . The Oregonian. February 3, 1976. p. A8. Archived from the original on September 15, 2023. Retrieved May 22, 2021 via NewsBank.
  7. Hortsch, Dan (October 7, 1976). "I-205 section passes tests for final approval" . The Oregonian. p. E12. Archived from the original on September 15, 2023. Retrieved May 22, 2021 via NewsBank.
  8. Redden, Jim (September 10, 2009). "After 35 years of waiting, TriMet's Green Line hits all the parties: Thousands ride new I-205 line that was born of a '70s freeway rebellion". Portland Tribune . Archived from the original on June 8, 2011. Retrieved May 13, 2014.
  9. Cochran, Wanda; Kohler, Vince (December 14, 1984). "Light-rail study gets approval" . The Oregonian. p. C7. Archived from the original on September 15, 2023. Retrieved April 8, 2022 via NewsBank.
  10. Kohler, Vince (July 11, 1985). "Light-rail line study under way" . The Oregonian. p. D4. Archived from the original on September 15, 2023. Retrieved April 8, 2022 via NewsBank.
  11. Kohler, Vince (April 23, 1987). "Panel calls for study of proposed I-205 light-rail link" . The Oregonian. p. D19. Archived from the original on September 15, 2023. Retrieved April 9, 2022 via NewsBank.
  12. Kohler, Vince (May 17, 1987). "Metro committee seeks funds to build I-205 light-rail link" . The Oregonian. p. E2. Archived from the original on September 15, 2023. Retrieved April 9, 2022 via NewsBank.
  13. Bodine, Harry (September 30, 1987). "Light-rail expansion backed by officials" . The Oregonian. p. B12. Archived from the original on September 15, 2023. Retrieved March 22, 2022 via NewsBank.
  14. Bodine, Harry (October 27, 1987). "Mass transit, major highway projects given priority" . The Oregonian. p. B4. Archived from the original on September 15, 2023. Retrieved April 9, 2022 via NewsBank.
  15. United States. Department of Transportation; United States. Urban Mass Transportation Administration (March 1982). Westside Corridor Project Draft Environmental Impact Statement Alternatives Analysis (Report). pp. 2.1-3, 2.1-4. Archived from the original on September 15, 2023. Retrieved December 14, 2020 via Google Books.
  16. Kohler, Vince (May 23, 1988). "Joint efforts of business, government could spur rail line; both groups need to finance, back line along I-205, panel says". The Oregonian. p. B5.
  17. Green, Ashbel S. (October 6, 1988). "County officials debate light-rail routes". The Oregonian. p. W1.
  18. Bodine, Harry (January 14, 1989). "Metro OKs $1.5 billion transit plan". The Oregonian. p. D1.
  19. Mayer, James (April 9, 1989). "Tri-Met looks to the future: The success of MAX sparks dreams of expanding". The Oregonian. p. A1.
  20. McCarthy, Dennis (September 15, 1994). "Light-rail service? On to Oregon City!". The Oregonian. p. D2.
  21. 1 2 3 4 5 Selinger, Philip (2019). "Making History: 50 Years of TriMet and Transit in the Portland Region" (PDF). TriMet. Archived (PDF) from the original on February 25, 2020. Retrieved April 25, 2020.
  22. Oliver, Gordon; Hunsberger, Brent (December 9, 1996). "Holding the line on light rail". The Oregonian.
  23. Oliver, Gordon (January 29, 1997). "Cost cuts map way to extend light rail". The Oregonian.
  24. Oliver, Gordon (November 7, 1998). "South–North Line backers find themselves at a loss after election day defeat". The Oregonian. p. B1.
  25. Mayes, Steve (April 11, 1991). "Portland's airport for the future only needs a $300 million ticket". The Oregonian. p. A1.
  26. Barnett, Jim (January 12, 1995). "Port sees airport expansion" . The Oregonian. p. E1. Retrieved December 23, 2024.
  27. Dietsch, Deborah K. (2003). The Evolution of the Portland International Airport. New York: Edizioni Press, Inc. p. 14-16. ISBN   1-931536-09-0. LCCN   2002101359.
  28. Lynch, Jim (March 12, 1998). "Airport lands help from airlines for south concourse expansion" . The Oregonian. Retrieved December 23, 2024.
  29. Nichols, Chrissy Mancini (March 26, 2012). "Value Capture Case Studies: Portland's Cascade Station and Light Rail to PDX". Metropolitan Planning Council. Archived from the original on February 10, 2022. Retrieved February 10, 2022.
  30. Oliver, Gordon (January 22, 1997). "Port wants MAX to run to airport". The Oregonian. p. A1.
  31. Christ, Janet (January 1, 1998). "Portland to help pay for study of airport rail line". The Oregonian. p. D2.
  32. Oliver, Gordon (September 24, 1998). "Tri-Met OKs rail line of 5.5 miles to airport". The Oregonian. p. B1.
  33. 1 2 Oliver, Gordon (October 9, 1998). "Port of Portland OKs light-rail agreement". The Oregonian. p. C1.
  34. Rose, Michael (December 19, 1997). "PDX light rail may lead to south-north line". Portland Business Journal. p. 1.
  35. Bjorhus, Jennifer (November 26, 1998). "Contractors battle Tri-Met on bid laws". The Oregonian. p. C1.
  36. Bjorhus, Jennifer (December 5, 1998). "Court tosses out suit against Tri-Met, Bechtel". The Oregonian. p. B1.
  37. 1 2 Oliver, Gordon (September 10, 1998). "Light rail to airport gets closer to reality". The Oregonian. p. B1.
  38. 1 2 3 4 Oliver, Gordon (July 17, 1998). "Tri-Met puts price tag on airport line". The Oregonian. p. C1.
  39. Ernico, Sheri (2012). Considering and Evaluating Airport Privatization (Report). Vol. 66. Transportation Research Board. p. 36. ISSN   1935-9802. Archived from the original on January 31, 2021. Retrieved August 23, 2018.
  40. Airport Max: A Case Study (PDF) (Report). BATIC Institute. Archived from the original (PDF) on August 28, 2018. Retrieved August 26, 2018.
  41. Oliver, Gordon (December 12, 1998). "3 airlines oppose light-rail money". The Oregonian. p. C1.
  42. Stewart, Bill (May 29, 1999). "Ruling: Port ticket fees can finance 'Air MAX'". The Oregonian. p. B1.
  43. 1 2 3 4 5 Stewart, Bill (June 17, 1999). "Light-rail line to PDX starting to take shape". The Oregonian. p. B1.
  44. "TriMet's Rail Vehicle Fleet" (PDF). TriMet. July 2016. Archived from the original (PDF) on December 20, 2018. Retrieved December 19, 2018.
  45. Yee, Roger (2005). Public Transportation: On the Move. Vol. 1. Visual Reference Publications. p. 43. ISBN   1584710373. Archived from the original on January 31, 2021. Retrieved November 10, 2018.
  46. Tomlinson, Stuart (December 3, 1999). "Construction detours bottleneck I-84 traffic". The Oregonian. p. C3.
  47. 1 2 Stewart, Bill (December 17, 1999). "Don't look up, but MAX bridge going in over I-205; strict safety measures are in place to protect motorists, and as the span is built, tracks will start going in on Airport Way". The Oregonian. p. A1.
  48. 1 2 3 4 Stewart, Bill (July 10, 2000). "Airport's MAX station will be special". The Oregonian. p. E4.
  49. Stewart, Bill (June 12, 2000). "Workers are busy making tracks toward Airport MAX 2001 deadline". The Oregonian. p. E4.
  50. Gragg, Randy (May 28, 2000). "Airport canopy works, but not as it could; the structure signals an end to the worst phase of construction but it could – and should – have been done better". The Oregonian. p. F4.
  51. "Portland International Airport, MAX Light Rail Line and Station, Portland, Oregon". ZGF Architects LLP. Archived from the original on January 11, 2019. Retrieved January 11, 2019.
  52. "Systems News [regular news section]". Tramways & Urban Transit . Ian Allan Publishing. December 2000. p. 471. ISSN   1460-8324. With the light rail system due to expand to two services in September 2001, and three in 2004 (with all three using the same routing and stops in the city centre), Tri-Met has decided to assign route colours as follows ...
  53. Oliver, Gordon (September 11, 2001). "Portland now 'the city that moves', mayor says [opening of MAX Red Line]". The Oregonian. p. 1.
  54. Oliver, Gordon (September 21, 2001). "Unknowns cloud PDX's future". The Oregonian. p. D1.
  55. 1 2 3 Stewart, Bill (August 31, 2001). "Most Tri-Met fares rise Saturday, while route switches start Sept. 9". The Oregonian. p. B1.
  56. "History cancels PDX party". The Oregonian. September 15, 2001. p. D8.
  57. Rose, Joseph (September 17, 2001). "Even anti-noise advocates happy to hear airplanes again". The Oregonian. p. E6.
  58. Stewart, Bill (September 7, 2001). "Airport MAX rolls out Monday". The Oregonian. p. B1.
  59. "September 9th – Big Service Improvements". TriMet. September 11, 2001. Archived from the original on October 7, 2001. Retrieved November 26, 2018.
  60. "MAX Red Line runs: Every 15 minutes, seven days a week". The Oregonian. September 11, 2001. p. A12.
  61. "Systems News". Tramways & Urban Transit. Ian Allan Publishing. November 2001. p. 430. ISSN   1460-8324.
  62. "About town: Riders keep Airport MAX busy Thanksgiving weekend". The Oregonian. November 27, 2001. p. D2.
  63. Leeson, Fred (August 27, 2003). "MAX fares increase, direct service from Beaverton to PDX starts". The Oregonian. p. D2.
  64. "Systems News". Tramways & Urban Transit. Ian Allan Publishing. July 2006. p. 276. ISSN   1460-8324.
  65. "TriMet extends rush-hour MAX trains between Hillsboro, PDX". Beaverton Valley Times . March 3, 2008. Archived from the original on May 11, 2008. Retrieved November 1, 2015.
  66. 1 2 Howard, John William (October 25, 2017). "TriMet considering expansion of MAX Red Line to county fairgrounds". Hillsboro Tribune . Archived from the original on October 10, 2018. Retrieved August 22, 2018.
  67. 1 2 "MAX Red Line Improvements Project" (PDF). TriMet. Archived from the original (PDF) on March 2, 2019. Retrieved March 2, 2019.
  68. 1 2 "A Better Red" (PDF). TriMet. Archived from the original (PDF) on September 28, 2021. Retrieved September 28, 2021.
  69. "MAX Red Line Extension and Reliability Improvements Project, Project Briefing to JPACT" (PDF). TriMet. January 18, 2017. Archived (PDF) from the original on October 23, 2021. Retrieved June 11, 2024.
  70. "Meet the New MAX". TriMet. Archived from the original on June 6, 2024. Retrieved June 27, 2024.
  71. "Parametrix to complete preliminary design for MAX Red Line extension". Parametrix. February 18, 2018. Archived from the original on September 13, 2018. Retrieved September 6, 2018.
  72. "TriMet moves forward with plan to extend MAX Red Line into Hillsboro". KPTV. April 24, 2019. Archived from the original on April 25, 2019.
  73. Corselli, Andrew (February 13, 2020). "TriMet Selects Parametrix to Finish 'A Better Red'". Railway Age. Archived from the original on March 10, 2020. Retrieved February 13, 2020.
  74. "Design – A Better Red". TriMet. Archived from the original on May 26, 2021. Retrieved May 26, 2021.
  75. 1 2 Altstadt, Roberta (August 28, 2024). "TriMet, FTA and partners celebrate a new era for the MAX Red Line". TriMet. Archived from the original on September 6, 2024. Retrieved October 7, 2024.
  76. Corselli, Andrew (May 29, 2020). "FTA Announces $891MM in Funding". Railway Age . Archived from the original on May 29, 2020. Retrieved May 29, 2020.
  77. Danko, Pete (May 29, 2020). "TriMet gets $100M from feds for MAX Red Line project". Portland Business Journal. Archived from the original on May 29, 2020. Retrieved May 29, 2020.
  78. Altstadt, Roberta (September 29, 2021). "(VIDEO) FTA, TriMet and partners officially break ground on 'A Better Red' MAX extension and improvement project". TriMet. Archived from the original on June 7, 2023. Retrieved June 27, 2024.
  79. "A Better Red MAX disruption April 2–9". TriMet. Archived from the original on April 5, 2022. Retrieved April 4, 2022.
  80. TriMet [@trimet] (April 10, 2022). "MAX Red Line has resumed normal service. Thank you for your patience while we completed this necessary work for the Better Red project. Here are some photos from our work over the past week" (Tweet). Retrieved April 10, 2022 via Twitter.
  81. Campbell, Sam (April 1, 2022). "MAX Red Line service halted during weeklong construction". KOIN. Archived from the original on April 3, 2022. Retrieved April 3, 2022.
  82. Villanueva, Mia (April 1, 2022). "Temporary MAX Red Line closure starts Saturday". KPTV. Archived from the original on April 1, 2022. Retrieved April 3, 2022.
  83. Luczak, Marybeth (September 27, 2021). "TriMet's 'A Better Red' Receiving $99.1MM CIG Grant". Railway Age. Archived from the original on September 29, 2021. Retrieved December 22, 2021.
  84. "FTA, TriMet and partners officially break ground on 'A Better Red' MAX extension and improvement project". Mass Transit. September 29, 2021. Archived from the original on September 30, 2021. Retrieved December 22, 2021.
  85. Stein, Rosemarie (June 14, 2023). "TriMet shuts down MAX Red Line to PDX for more than 4 months beginning Sunday". The Oregonian. Archived from the original on June 14, 2023. Retrieved June 14, 2023.
  86. Graf, Tyler (June 12, 2023). "TriMet's A Better Red project requires 126-day shutdown of MAX Red Line starting this weekend". TriMet. Archived from the original on June 14, 2023. Retrieved June 14, 2023.
  87. "MAX Improvements Project". trimet.org. Archived from the original on February 25, 2024. Retrieved February 25, 2024.
  88. McLawhorn, Jennifer (February 16, 2024). "TriMet Gateway North MAX Station Opens in March". Railway Track & Structures. Archived from the original on February 25, 2024. Retrieved February 25, 2024.
  89. McKinney, Kevin (May 2024). "Rush Hour [transit news section]". Passenger Train Journal . Vol. 48, no. 2 – Second quarter 2024. White River Productions, Inc. pp. 68–69. ISSN   0160-6913.
  90. 1 2 Plante, Amiee; Salk, Ariel (August 26, 2024). "Major changes coming to MAX, bus service as TriMet completes Hillsboro Airport expansion". KOIN. Archived from the original on August 27, 2024. Retrieved August 28, 2024.
  91. 1 2 Anderson, Luisa (August 28, 2024). "TriMet's MAX Red Line from PDX airport to Hillsboro officially opens". KGW . Retrieved August 28, 2024.
  92. 1 2 McKinney, Kevin (November 2024). "Rush Hour [transit news section]". Passenger Train Journal . Vol. 48, no. 4 – Fourth quarter 2024. White River Productions, Inc. pp. 67–68. ISSN   0160-6913.
  93. "Stop ID 10575 – Cascades MAX Station". TriMet. Archived from the original on September 7, 2018. Retrieved September 7, 2018.
  94. "Stop ID 10577 – Mt Hood MAX Station". TriMet. Archived from the original on May 9, 2018. Retrieved September 7, 2018.
  95. "Stop ID 10579 – Portland Int'l Airport MAX Station". TriMet. Archived from the original on May 9, 2018. Retrieved September 7, 2018.
  96. TriMet System map (PDF) (Map). TriMet. Archived from the original (PDF) on February 10, 2019. Retrieved July 25, 2018.
  97. Graf, Tyler (March 4, 2024). "TriMet celebrates first new MAX station in 9 years following A Better Red construction near Gateway". TriMet. Retrieved July 2, 2024.
  98. 1 2 3 4
  99. "Maps + Schedules – Portland Streetcar". Portland Streetcar. Archived from the original on February 10, 2019. Retrieved October 11, 2018.
  100. "WES Commuter Rail". TriMet. Archived from the original on February 10, 2019. Retrieved September 5, 2018.
  101. Portland City Center and Transit Mall (PDF) (Map). TriMet. Archived from the original (PDF) on March 28, 2020. Retrieved July 30, 2018.
  102. 1 2 Altstadt, Roberta (July 24, 2019). "TriMet to make MAX service more efficient with closure of three stations in Downtown Portland in March 2020". TriMet. Archived from the original on July 24, 2019. Retrieved July 24, 2019.
  103. "Speeding Up MAX Through Downtown: Skidmore Fountain MAX Station closing August 2025". TriMet. May 2024. Archived from the original on August 26, 2024. Retrieved August 26, 2024.
  104. "Cascade Locks & Portland – CAT". Columbia Area Transit. Archived from the original on September 16, 2018. Retrieved February 14, 2019.
  105. "Frequent Service". TriMet. Archived from the original on January 9, 2019. Retrieved August 6, 2018.
  106. MAX Red Line schedules:
  107. Theen, Andrew (August 30, 2018). "New TriMet bus, MAX additions create all-night service to PDX". The Oregonian. Archived from the original on September 16, 2018.
  108. "272–PDX Night Bus". TriMet. Archived from the original on January 11, 2019. Retrieved January 11, 2019.
  109. Hanson, Nate (March 27, 2020). "TriMet to alter schedules for buses, trains after ridership drops 47% during coronavirus pandemic". KGW. Archived from the original on April 25, 2021. Retrieved April 25, 2021.
  110. Kish, Matthew (August 26, 2024). "TriMet announces sweeping changes to light rail, bus service". The Oregonian. Retrieved November 2, 2024.
  111. "August '24 Transit Service Changes". TriMet. Archived from the original on August 28, 2024. Retrieved August 28, 2024.
  112. "292–Red Bus". TriMet. Archived from the original on October 4, 2024. Retrieved November 20, 2024.
  113. Leeson, Fred (September 9, 2002). "Air travelers find MAX a deal". The Oregonian. p. E1.
  114. Rivera, Dylan (September 6, 2009). "MAX: More than the sum of its parts". The Oregonian.
  115. Mayer, James (July 19, 2007). "Portland blinked and Ikea came". The Oregonian. p. B1.
  116. Ballenger, Tara (July 27, 2008). "Cascade Station: Ikea to the rescue". The Oregonian. p. S5.
  117. Griffin, Anna (May 19, 2010). "At Cascade Station, it takes a mall, not a village, to thrive". The Oregonian.
  118. "Infrastructure Case Study: Portland Airport MAX Red Line" (PDF). Bipartisan Policy Center. October 2016. Archived from the original (PDF) on September 13, 2018. Retrieved September 13, 2018.
  119. Keizur, Christopher (June 12, 2017). "Safe travels?". Portland Tribune. Archived from the original on August 4, 2018. Retrieved August 3, 2018.
  120. Zielinski, Alex (May 18, 2018). "You Know Portland's Transportation Woes Have Reached a Breaking Point When..." Portland Mercury . Archived from the original on August 4, 2018. Retrieved August 3, 2018.
  121. "Airport MAX: Red Line" (PDF). TriMet. August 2012. Archived from the original (PDF) on September 14, 2018. Retrieved September 13, 2018.
  122. "September 2019 Monthly Performance Report" (PDF). TriMet. Archived (PDF) from the original on April 26, 2020. Retrieved January 9, 2020.
  123. "April 2020 Monthly Performance Report" (PDF). TriMet . Retrieved November 20, 2024.