The Vine (bus rapid transit)

Last updated

The Vine
The Vine BRT logo.svg
Bus at Washington & 12th Vine station in 2017.jpg
A Vine bus in downtown Vancouver, 2017
Overview
Locale Vancouver, Washington, U.S.
Transit type Bus rapid transit
Number of lines2 (1 planned)
Number of stations71
Website catchthevine.com
Operation
Began operationJanuary 8, 2017 (2017-01-08)
Operator(s) C-Tran
Number of vehicles18 articulated buses
Headway 10–15 minutes
Technical
System length16 miles (26 km)

The Vine is a bus rapid transit (BRT) system operated by C-Tran in Vancouver, Washington, United States. As of 2023, it has two lines and a third planned for future construction. The Green Line runs along Fourth Plain Boulevard from downtown Vancouver to the Vancouver Mall and opened on January 8, 2017. The Red Line runs along Mill Plain Boulevard from downtown Vancouver to the eastern suburbs of the city; it opened on October 1, 2023. Both lines replaced existing bus routes and operate with articulated buses. A third line is planned to serve the Old Highway 99 corridor between downtown Vancouver and the Washington State University Vancouver campus in Salmon Creek.

Contents

Lines

Green Line

The Green Line, also known as The Vine on Fourth Plain, serves a 6-mile (9.7 km) route with 34 stations and runs primarily in mixed traffic on Fourth Plain Boulevard. [1] It travels from its western terminus at Turtle Place in downtown Vancouver to the Vancouver Mall Transit Center. [2] The line opened on January 8, 2017, following a community celebration; the first day of service with The Vine's articulated buses was on January 9 due to a winter storm. [3] [4] In its first year of service, The Vine carried 45 percent more riders than Route 4 and operating costs decreased by 21 percent. [2]

Red Line

The Red Line, also known as The Vine on Mill Plain, serves 37 stations on a 10-mile (16 km) section of Mill Plain Boulevard between downtown Vancouver and the Clark College Columbia Tech Center campus. [5] It opened on October 1, 2023, and is the second line in The Vine system. [6] Planning for the line began in 2018 and construction on the $50 million project began in 2021. [7] [8]

Stations

A Vine bus pulling into the Marshall Community Center station in 2017 Vine station on McLoughlin Blvd with bus arriving (2017).jpg
A Vine bus pulling into the Marshall Community Center station in 2017

The system serves 71 stations [5] in the city of Vancouver, Washington that are generally spaced 13 mile (0.54 km) apart. [1] [9] The Vine's stations consist of a 50-foot-long (15 m) platform that is raised for level boarding, and includes shelters and windscreens, ticket vending machines, real-time arrival signs. [10]

Service and fares

A Hop Fastpass reader and ticket vending machine at a Vine station Hop reader and TVM at Broadway & 13th Vine station (2017).jpg
A Hop Fastpass reader and ticket vending machine at a Vine station

The Vine runs every 10 minutes during peak hours and 15 minutes during off-peak periods and on weekends. [11] Buses run from 4:30 a.m. to 12:40 am on weekdays and from 6:00 am to 12:25 am on weekends and holidays. [12] A $1 adult fare, the same as existing local C-Tran service, is charged to ride The Vine. [13] [14] Fares are paid prior to boarding at stations, which feature ticket vending machines, and are enforced by fare compliance officers at random times. [4]

The Vine accepts the Hop Fastpass contactless smart card fare system, available throughout the Portland–Vancouver metropolitan area in coordination with TriMet and the Portland Streetcar. [15] The system launched for the general public on July 1, 2017, on TriMet, the Portland Streetcar, and C-Tran. [16] Hop card readers were installed at all Vine stations and used for the beta testing period prior to the public launch. [17]

C-Tran also runs a shuttle bus, route 60, from Downtown Vancouver to Jantzen Beach, Hayden Island and the Delta Park/Vanport light rail station to cross the Columbia River like former routes 4 and 44. [18] [19] [20]

Fleet

The Vine uses a fleet of New Flyer Xcelsior XDE60 diesel-electric hybrid buses that measure 60 feet (18 m) long and carry up to 100 people. [21] The articulated buses are low-floor, have three doors, and include three interior bicycle racks. The first of 10 buses for the Green Line were delivered in April 2016 and were given commemorative names. [22] [23] An additional eight articulated uses were ordered for the Red Line. [24] [ failed verification ]

History

The Southwest Washington Regional Transportation Council (RTC) began studying high-capacity transit for Vancouver and Clark County in 2008, and determined that bus rapid transit would be viable on four main corridors: Highway 99, Fourth Plain Boulevard, Interstate 205, and Mill Plain Boulevard. [25] C-Tran, the county's transit agency, adopted a 20-year long-range plan in 2010 that recommended building the first bus rapid transit line on Fourth Plain. [26] The Fourth Plain corridor had been served by local routes 4 and 44, the two busiest in the C-Tran system, which continued to northern Portland, Oregon. [18]

Design concepts for a Fourth Plan bus rapid transit service were presented in 2011 and 2012, [27] and a locally-preferred alternative was adopted by C-Tran, the Vancouver City Council, and RTC in 2012. [28] On November 6, 2012, C-Tran placed a 0.1 percent sales tax increase on the general election ballot to fund a light rail extension from Portland to Downtown Vancouver via a new bridge, as well as operating costs of the Fourth Plain bus rapid transit project. While the ballot measure was rejected, [29] the bus rapid transit project moved forward and was granted Federal Transit Administration (FTA) funding in 2014. [30] [1]

The project was named "The Vine" after a public naming contest in 2014, beating out other candidates by "evoking greenery, leaves and branches". [31] A groundbreaking ceremony was held on August 24, 2015, kicking off construction of the $53 million project. [32] Service began on January 8, 2017, using 40-foot (12 m) buses in place of the service's articulated buses, and stopping at route 4 stops rather than stations, due to a winter storm. [33] [34] The articulated buses, which lack drop-down tire chains that would allow for operations in winter conditions, debuted the following day instead. Fares are paid prior to boarding at stations, which feature ticket vending machines, and are enforced by fare compliance officers at random times. [4] In its first year of service, The Vine carried 45 percent more riders than Route 4 and operating costs decreased by 21 percent. [35]

The Vine was the first bus rapid transit system to open in the Portland metropolitan area, and was followed in 2022 by the Frequent Express service between Portland and Gresham. [36]

System expansion

The Vine was the first bus rapid transit system to open in the Portland metropolitan area, and was followed in 2022 by the Frequent Express service between Portland and Gresham. [36] In February 2018, the C-Tran Board of Directors approved a design contract for a potential bus rapid transit project on Mill Plain Boulevard, an east–west corridor to the south of The Vine's Fourth Plain Boulevard. [37] Preliminary plans for the project was approved in 2019 and was followed by agreements with the city government on property acquisition and upgrading fiber optic lines along the corridor. [38] [39]

The Mill Plain line, covering 9.9 miles (15.9 km) from the shared terminus at Turtle Place in Downtown Vancouver to Clark College's Columbia Tech Center near Southeast 192nd Avenue, will have 37 stations and is anticipated to cost $50 million. [7] [8] Half of the anticipated costs will be covered by a grant from the Federal Transit Administration that was announced in May 2020. [40] Project construction began in September 2021 and the line began service on October 1, 2023. [7] [41]

Future expansion

A third line in The Vine system, provisionally designated as the Blue Line, [5] is planned to follow Main Street and Old Highway 99 between downtown Vancouver, Hazel Dell, and Salmon Creek. Its northern terminus would be at the Washington State University Vancouver campus northeast of Salmon Creek. The 10-mile (16 km) line is scheduled to be completed in 2026 at a cost of $52 million. [42] The Green Line is also planned to be extended east into Orchards and south along Northeast 162nd Avenue to Fisher's Landing Transit Center, a major regional hub near the Columbia River, by 2026. [43]

Related Research Articles

<span class="mw-page-title-main">SkyTrain (Vancouver)</span> Automated rapid transit system in Metro Vancouver, Canada

SkyTrain is the medium-capacity rapid transit system serving the Metro Vancouver region in British Columbia, Canada. SkyTrain has 79.6 km (49.5 mi) of track and uses fully automated trains on grade-separated tracks running on underground and elevated guideways, allowing SkyTrain to hold consistently high on-time reliability. In 2022, the system had a ridership of 116,569,000, or about 447,000 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">TransLink (British Columbia)</span> Transportation authority in Metro Vancouver, Canada

TransLink, formally the South Coast British Columbia Transportation Authority and previously the Greater Vancouver Transportation Authority, is the statutory authority responsible for the regional transportation network of Metro Vancouver in British Columbia, Canada, including public transport, major roads and bridges. Its main operating facilities are located in the city of New Westminster.

<span class="mw-page-title-main">C-Tran (Washington)</span>

C-Tran, more formally the Clark County Public Transit Benefit Area Authority, is a public transit agency serving Clark County, Washington, United States, including the cities of Battle Ground, Camas, Vancouver, Washougal, and Yacolt. Founded in 1981, C-Tran operates fixed route bus services within Clark County, as well as paratransit services for qualified persons with disabilities (C-Van) and a dial-a-ride service in Camas, Ridgefield, and La Center. C-Tran also provides express commuter services between Clark County and Downtown Portland, Oregon and regional services to the Parkrose/Sumner and Delta Park MAX Light Rail stations, and Oregon Health and Science University. In 2022, the system had a ridership of 4,088,200, or about 15,000 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">Canada Line</span> Rapid transit line in Metro Vancouver, Canada

The Canada Line is a rapid transit line in Greater Vancouver, British Columbia, Canada, that is part of the SkyTrain system. The line is owned by TransLink and InTransitBC and is operated by ProTrans BC. Coloured turquoise on route maps, it operates as an airport rail link between Vancouver, Richmond, and the Vancouver International Airport (YVR). The line comprises 16 stations and 19.2 kilometres (11.9 mi) of track; the main line runs from Vancouver to Richmond while a 4-kilometre (2.5 mi) spur line from Bridgeport station connects to the airport. It opened on August 17, 2009, ahead of the 2010 Winter Olympics.

<span class="mw-page-title-main">King George station</span> Metro Vancouver SkyTrain station

King George is an elevated station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. The station is located in the south end of the Surrey City Centre district of Surrey, British Columbia, Canada, and is one of the outbound termini of the Expo Line, the other being Production Way–University station. The station is located at the corner of King George Boulevard and 100 Avenue, just north of Fraser Highway.

<span class="mw-page-title-main">Interstate Bridge</span> Highway bridge crossing the Columbia River between Portland, Oregon and Vancouver, Washington

The Interstate Bridge is a pair of nearly identical steel vertical-lift, Parker through-truss bridges that carry Interstate 5 traffic over the Columbia River between Vancouver, Washington and Portland, Oregon in the United States.

<span class="mw-page-title-main">Metrotown station</span> Metro Vancouver SkyTrain station

Metrotown is an elevated station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system, and is located along Central Boulevard, directly across from the Metropolis at Metrotown shopping centre, in Burnaby, British Columbia, Canada. As of 2022, it is the second-busiest station in the SkyTrain system.

<span class="mw-page-title-main">Patterson station (SkyTrain)</span> Metro Vancouver SkyTrain station

Patterson is an elevated station on the Expo Line of Metro Vancouver's SkyTrain rapid transit system. The station is located at the intersection of Central Boulevard and Patterson Avenue in Burnaby, British Columbia, Canada. It is the westernmost Expo Line station in Burnaby.

<span class="mw-page-title-main">Coast Mountain Bus Company</span> Bus transit services operator in Metro Vancouver

Coast Mountain Bus Company (CMBC) is the contract operator for bus transit services in Metro Vancouver and is a wholly owned subsidiary of the South Coast British Columbia Transportation Authority, known locally as TransLink, the entity responsible for public transit in the region. The buses form part of the integrated transit network of the Lower Mainland.

<span class="mw-page-title-main">Delta Park/Vanport station</span>

Delta Park/Vanport is a light rail station on the MAX Yellow Line in Portland, Oregon. It is the 9th stop northbound on the Interstate MAX extension and is in the area of Delta Park, formerly the site of the city of Vanport. It is located between Portland International Raceway on the west and Interstate 5 on the east and is at the north end of the Vanport Bridge, which spans the Columbia Slough and an industrial area.

<span class="mw-page-title-main">Washington State Route 500</span> Highway in Washington

State Route 500 (SR 500) is a state highway in Clark County, Washington, United States. The east–west highway runs through Vancouver as an expressway and its eastern suburbs as a country road, connecting Interstate 5 (I-5) to I-205 in eastern Vancouver and SR 14 in Camas. SR 500 runs concurrent to SR 503 within Orchards and also uses a section of the county-built Padden Parkway.

<span class="mw-page-title-main">Vancouver, Washington</span> City in US State of Washington

Vancouver is a city on the north bank of the Columbia River in the U.S. state of Washington, located in Clark County. Founded in 1825 and incorporated in 1857, Vancouver had a population of 190,915 as of the 2020 census, making it the fourth-largest city in Washington state. Vancouver is the seat of government of Clark County and forms part of the Portland-Vancouver metropolitan area, the 25th-largest metropolitan area in the United States. Originally established in 1825 around Fort Vancouver, a fur-trading outpost, the city is located on the Washington–Oregon border along the Columbia River, directly north of Portland, and is considered a suburb of the city along with its surrounding areas.

<span class="mw-page-title-main">R4 41st Ave</span> Express bus service in Metro Vancouver, Canada

The R4 41st Ave is an express bus route with bus rapid transit elements in Metro Vancouver, British Columbia, Canada. Part of TransLink's RapidBus network, it replaced the 43 Express that travelled along 41st Avenue, a major east–west route that connects the University of British Columbia (UBC) to the SkyTrain system's Oakridge–41st Avenue station on the Canada Line and Joyce–Collingwood station on the Expo Line.

<span class="mw-page-title-main">Commercial–Broadway station</span> Metro Vancouver SkyTrain station

Commercial–Broadway is a rapid transit station complex in Metro Vancouver's SkyTrain system in Vancouver, British Columbia, Canada. It serves an elevated portion of the Expo Line and a below-grade portion of the Millennium Line. It is a major transit hub, with the third-highest number of boardings of any SkyTrain station, and a terminus of the region's busiest bus route, the 99 B-Line.

<span class="mw-page-title-main">Hop Fastpass</span> Public transit smart card used in Portland, Oregon and Vancouver, Washington

Hop Fastpass is a contactless smart card for public transit fare payment on most transit modes in the Portland, Oregon, metropolitan area including MAX Light Rail, WES commuter rail, Portland Streetcar, The Vine, and all TriMet and C-TRAN buses. An initial release to the general public began on July 5, 2017, with the official launch on July 17. The program is managed by TriMet.

<span class="mw-page-title-main">Green Line (The Vine)</span> Bus rapid transit service in Vancouver, Washington

The Green Line, also known as The Vine on Fourth Plain, is a bus rapid transit (BRT) route in Vancouver, Washington, that is operated by C-Tran as part of The Vine system. The 6-mile-long (9.7 km) line runs from downtown Vancouver to the Vancouver Mall, serving 34 stations primarily on Fourth Plain Boulevard. It opened on January 8, 2017, becoming the first bus rapid transit line in the Portland metropolitan area.

<span class="mw-page-title-main">KXRW-LP</span> Community radio station in Vancouver, Washington, United States

KXRW-LP 99.9 FM Community Radio is a low-power FM non-commercial radio station broadcasting in Vancouver, Washington. The station is licensed to the Media Institute for Social Change, an Oregon-based nonprofit organization. As of March 2017, KXRW-LP relays programming from KXRY, branded as XRAY.FM in Portland, Oregon.

<span class="mw-page-title-main">Frequent Express</span> Bus rapid transit route in Portland, Oregon, U.S.

Frequent Express (FX) is a high-capacity bus service operated by TriMet in Portland, Oregon, United States. Operating as FX2–Division, the 15-mile (24 km) route runs east–west from 5th & Hoyt on the Portland Transit Mall in downtown Portland to Cleveland Avenue Park and Ride in Gresham via Division Street. It connects Portland City Center, Portland State University (PSU), South Waterfront, Southeast Portland, and central Gresham, with transfers to MAX Light Rail and the Portland Streetcar.

<span class="mw-page-title-main">RapidBus (TransLink)</span> Express bus service in Metro Vancouver, Canada

RapidBus is an express bus network with bus rapid transit elements in Metro Vancouver, British Columbia, Canada.

<span class="mw-page-title-main">Red Line (The Vine)</span> Bus rapid transit route in Vancouver, Washington, U.S.

The Red Line, also known as The Vine on Mill Plain, is a bus rapid transit (BRT) line in Vancouver, Washington, United States, operated by C-Tran as part of The Vine. The 10-mile (16 km) route runs from 7th Street at Turtle Place in downtown Vancouver to Mill Plain Transit Center via Mill Plain Boulevard.

References

  1. 1 2 3 Quintana, Jim (July 9, 2014). "C-TRAN Board Gives Green Light to Fourth Plain BRT" (Press release). C-TRAN. Archived from the original on August 26, 2015. Retrieved October 17, 2016.
  2. 1 2 Pesanti, Dameon (January 9, 2018). "The Vine: 1 year old and going strong". The Columbian. Archived from the original on January 10, 2018. Retrieved January 10, 2018.
  3. Pesanti, Dameon (January 8, 2017). "Wind, freezing rain cut power for thousands". The Columbian. Archived from the original on January 10, 2017. Retrieved January 9, 2017.
  4. 1 2 3 Pesanti, Dameon (January 9, 2017). "C-Tran's The Vine begins rolling in Vancouver". The Columbian. Archived from the original on January 13, 2017. Retrieved January 23, 2017.
  5. 1 2 3 Seekamp, William (June 15, 2023). "Mill Plain Vine on track to finish early, under budget, says C-Tran board" . The Columbian. Retrieved September 27, 2023.
  6. Seekamp, William (September 30, 2023). "Community celebrates C-Tran's new 'Red Vine' service". The Columbian. Archived from the original on October 1, 2023. Retrieved October 1, 2023.
  7. 1 2 3 Macuk, Anthony (September 28, 2021). "C-Tran breaks ground on Vancouver's second bus rapid transit line". The Columbian. Retrieved September 30, 2021.
  8. 1 2 "Mill Plain Vine Fact Sheet" (PDF). C-Tran. June 2020. Retrieved September 30, 2021.
  9. Green, Susan (July 10, 2014). "Fourth Plain Bus Rapid Transit project gets $6.7 million in C-TRAN funding". The Oregonian. Archived from the original on March 4, 2016. Retrieved October 17, 2016.
  10. "The Vine Interactive Map". C-TRAN. Archived from the original on October 17, 2016. Retrieved October 17, 2016.
  11. "The Vine Fact Sheet" (PDF). C-TRAN. January 27, 2016. Archived from the original (PDF) on February 26, 2016. Retrieved October 17, 2016.
  12. "The Vine Schedule" (PDF). C-TRAN. January 2017. Archived from the original (PDF) on July 13, 2017. Retrieved January 8, 2017.
  13. "Fares and ID Cards". C-Tran. Retrieved September 27, 2023.
  14. Florip, Eric (April 7, 2015). "5 things to know about The Vine: Vancouver's bus rapid transit system". The Columbian. Archived from the original on May 16, 2015. Retrieved October 17, 2016.
  15. Pesanti, Dameon (March 8, 2017). "C-Tran, other agencies beta testing efare system using smart card". The Columbian. Archived from the original on March 12, 2017. Retrieved June 26, 2017.
  16. Njus, Elliot (July 10, 2017). "Hop Fastpass: The pros and cons of TriMet's new e-fare system". The Oregonian. Retrieved September 27, 2023.
  17. Pesanti, Dameon (March 8, 2017). "C-Tran, other agencies beta testing efare system using smart card" . The Columbian. Retrieved September 27, 2023.
  18. 1 2 "Frequently Asked Questions (FAQs)". C-TRAN. Archived from the original on October 13, 2016. Retrieved October 17, 2016.
  19. "Route 60: Delta Park Limited" (PDF). C-Tran. November 2016. Retrieved July 2, 2017.
  20. Pesanti, Dameon (June 20, 2017). "C-Tran says changes positive, more work to do". The Columbian. Archived from the original on June 21, 2017. Retrieved July 2, 2017.
  21. "Clark County in Vancouver, Washington Awards New Flyer a Contract for 10 Xcelsior® Articulated Buses" (Press release). Winnipeg, Manitoba: New Flyer Industries. May 20, 2015. Retrieved October 17, 2016.
  22. Pesanti, Dameon (April 4, 2016). "First two of C-Tran's biggest buses roll into town". The Columbian. Archived from the original on October 17, 2016. Retrieved October 17, 2016.
  23. "Getting to Know The Vine's Buses (by name)". Transit Matters. C-Tran. June 15, 2017. Retrieved September 27, 2023.
  24. "C-Tran 2021–2026 Transit Development Plan" (PDF). C-Tran. September 2021. p. 10. Retrieved September 27, 2023 via Washington State Department of Transportation.
  25. Clark County High Capacity Transit System Study: Final Report (PDF) (Report). Southwest Washington Regional Transportation Council. December 2008. Archived (PDF) from the original on November 18, 2016. Retrieved October 17, 2016.
  26. "C-TRAN 2030: Board of Directors Adopt C-TRAN 2030". C-TRAN. July 2010. Archived from the original on October 17, 2016. Retrieved October 17, 2016.
  27. "Fourth Plain Transit Improvement Project Evaluated Alternatives". C-TRAN. Archived from the original on August 26, 2016. Retrieved October 17, 2016.
  28. Damewood, Andrea (May 21, 2012). "Council approves 4th Plain bus plan". The Columbian. Archived from the original on November 3, 2012. Retrieved October 17, 2016.
  29. "Clark County election results: C-Tran sales tax measure failing". The Oregonian. November 6, 2012. Archived from the original on May 7, 2015. Retrieved October 17, 2016.
  30. Baker, Dean (April 30, 2013). "Bus rapid transit still on track in Vancouver". The Oregonian . Archived from the original on March 30, 2016. Retrieved October 17, 2016.
  31. Florip, Eric (July 15, 2014). "Survey says: The Vine wins BRT name game". The Columbian. Archived from the original on November 22, 2016. Retrieved October 17, 2016.
  32. Florip, Eric (August 24, 2015). "C-Tran head: The Vine milestone 'historic'". The Columbian. Archived from the original on October 25, 2016. Retrieved October 17, 2016.
  33. Flanigan, Pheobe (January 8, 2017). "After 6 Year Battle, C-Tran's Bus Rapid Transit System Ready To Launch". KUOW. Archived from the original on January 9, 2017. Retrieved January 8, 2017.
  34. Pesanti, Dameon (January 8, 2017). "Wind, freezing rain cut power for thousands". The Columbian. Archived from the original on January 10, 2017. Retrieved January 9, 2017.
  35. Pesanti, Dameon (January 9, 2018). "The Vine: 1 year old and going strong". The Columbian. Archived from the original on January 10, 2018. Retrieved January 10, 2018.
  36. 1 2 Njus, Elliot (December 4, 2015). "Portland's next ride: super-sized buses that act like light rail". The Oregonian. Archived from the original on November 14, 2016. Retrieved October 17, 2016.
  37. Pesanti, Dameon (February 16, 2018). "C-Tran gets rolling on design of Mill Plain rapid transit line". The Columbian. Archived from the original on February 17, 2018. Retrieved February 19, 2018.
  38. Hair, Calley (February 1, 2021). "Vancouver advances plan for new Vine route on Mill Plain". The Columbian. Retrieved March 29, 2021.
  39. Matarrese, Andy (March 15, 2019). "C-Tran approves basic outline for new bus rapid transit line". The Columbian. Retrieved May 3, 2019.
  40. Macuk, Anthony (May 29, 2020). "C-Tran's Mill Plain Vine project secures federal funding". The Columbian. Retrieved May 29, 2020.
  41. "C-TRAN's rapid bus transit system launches expansion to Mill Plain Boulevard in Vancouver". KGW. October 1, 2023. Archived from the original on October 2, 2023. Retrieved October 1, 2023.
  42. Seekamp, William (March 29, 2023). "C-Tran ready to roll The Vine along Highway 99 from Vancouver waterfront to WSU Vancouver" . The Columbian. Retrieved September 27, 2023.
  43. "Growing the Vine: Fourth Plain Extension" (PDF). C-Tran. February 2023. Retrieved September 27, 2023.