Wilts & Berks Canal

Last updated

Wilts & Berks Canal
Wilts-and-Berks-Canal-Swindon.jpg
The canal near Rushey Platt, Swindon
Wilts & Berks Canal
Specifications
Length52 miles (84 km)
(+ branches totalling 6 miles (9.7 km))
Maximum boat length 72 ft 0 in (21.95 m)
Maximum boat beam 7 ft 0 in (2.13 m)
Locks42
(+ 3 on Calne branch)
StatusUnder restoration
History
Principal engineer Robert Whitworth
Other engineer(s)William Whitworth
Date of act1795
Construction began1796
Date completed1810
Date closed1914
Geography
Start point River Thames
End point Kennet and Avon Canal
Branch(es)
Connects toNorth Wilts Canal
Wilts & Berks Canal
BSicon ugFABZq+lr.svg
BSicon uFABZq+lr.svg
River Thames
BSicon gSTR.svg
BSicon uSTR.svg
Abingdon (proposed)
BSicon gSTR.svg
BSicon uKBHFxe.svg
New basin - Jubilee Junction (140m)
BSicon gSTR.svg
BSicon uLLock3.svg
Lock
BSicon gSTR.svg
BSicon uLSTR+FEATURE@l.svg
Pumping station
BSicon gSTR.svg
BSicon uLLock3.svg
Oday Hill Lock
BSicon gSTR.svg
BSicon uLSKRZ-Eu.svg
Oday Hill Bridge
BSicon gSTR.svg
BSicon uLLock3.svg
Stonehill Lock
BSicon gSTR.svg
BSicon uLSKRZ-Yu.svg
B4107 road bridge
BSicon gSTR.svg
BSicon uLLOCKSd.svg
New Cut Mill South Locks (4)
BSicon gSTR.svg
BSicon uLLOCKSu.svg
New Cut Mill North Locks (4)
BSicon gSTR.svg
BSicon uLSKRZ-Eu.svg
bridge
BSicon gSTR.svg
BSicon uLSTR.svg
Abingdon (historic)
BSicon ugLock3.svg
BSicon uLSTR.svg
Abingdon Lock
BSicon ugLock3.svg
BSicon uLSTR.svg
Tythe Barn Lock
BSicon uABZmg+Ll +g.svg
BSicon uLSTRr.svg
BSicon gSKRZ-Au.svg
A34 road bridge
BSicon ugLock3.svg
Drayton Lock
BSicon ugLock3.svg
Steventon Lock
BSicon ugLOCKSd.svg
Ardington Locks (2)
BSicon CONTgq.svg
BSicon gmKRZu.svg
BSicon CONTfq.svg
Great Western railway bridge
BSicon ugLock3.svg
Grove Locks (1)
BSicon gSKRZ-Au.svg
A338 road bridge
BSicon ugLOCKSd.svg
Grove Locks (5)
BSicon gSKRZ-Au.svg
A417 road bridge
BSicon gFABZgl+l.svg
BSicon gSTR+r.svg
Wantage branch
BSicon gSTR.svg
BSicon ugWHRF.svg
Wantage wharf
BSicon gSKRZ-Yu.svg
West Challow Bridge
BSicon gTEEnl.svg
Childrey Brook
BSicon gSKRZ-Eu.svg
Childrey Bridge
BSicon gSKRZ-Eu.svg
Shippery Bridge
BSicon ugddSTRl.svg
Childrey Wharf
BSicon gSKRZ-Yu.svg
B4001 New Road Bridge
BSicon CONTgq.svg
BSicon gmKRZu.svg
BSicon CONTfq.svg
Great Western railway bridge
BSicon ugLOCKSd.svg
Longcot Locks (2)
BSicon ugWHRF.svg
BSicon gSTR.svg
Longcot wharf
BSicon gSKRZ-Yu.svg
BSicon gSTR.svg
Road bridge
BSicon gSTRl.svg
BSicon gFABZgr+r.svg
Longcot branch
BSicon gSKRZ-Yu.svg
B4000 road bridge (Shrivenham)
BSicon gSKRZ-Eu.svg
Steppingstones Lane Bridge
BSicon ugLOCKSd.svg
Marston Locks (4)
BSicon gSTRl.svg
BSicon uLSTR+r.svg
route south of Swindon (proposed)
BSicon gFABZq+lr.svg
BSicon uLSTR.svg
Thames and Severn Canal
BSicon gSTR.svg
BSicon uLSTR.svg
North Wilts Branch
BSicon gHST.svg
BSicon uLSTR.svg
Latton Basin
BSicon ugLock3.svg
BSicon uLSTR.svg
Latton Lock
BSicon geuKRZo.svg
BSicon uLSTR.svg
aqueducts (2) across River Thames
BSicon gTUNNEL1.svg
BSicon uLSTR.svg
tunnel
BSicon gSKRZ-Yu.svg
BSicon uLSTR.svg
B4553 road bridge
BSicon ugLock3.svg
BSicon uLSTR.svg
Hayes Knoll Lock
BSicon ugLock3.svg
BSicon uLSTR.svg
Crosslands Lock
BSicon ugLock3.svg
BSicon uLSTR.svg
Pry Lock
BSicon geuKRZo.svg
BSicon uLSTR.svg
River Ray Aqueduct
BSicon ugLock3.svg
BSicon uLSTR.svg
Moredon Locks (2)
BSicon gSTR.svg
BSicon uLSTR.svg
Moredon Breathing Places
BSicon ugLock3.svg
BSicon uLSTR.svg
Moredon Locks (1)
BSicon ugLOCKSu.svg
BSicon uLSTR.svg
Locks (5)
BSicon uLSTRl.svg
BSicon uLSTR+r.svg
BSicon uSTR.svg
Swindon urban route (proposed)
BSicon uWHRF.svg
BSicon uLock5.svg
Kingshill wharf / E Wichel Lock
BSicon POINTERg@fq.svg
BSicon uSTR.svg
BSicon uexSTR.svg
Rushey Platt section
BSicon uLSTR+l.svg
BSicon uexFABZqlr.svg
BSicon gSTR.svg
BSicon uexSTRr.svg
Mid Wichel section (in progress)
BSicon utSKRZ-B.svg
BSicon RBq.svg
BSicon gSTR.svg
UK-Motorway-icon.svg M4 tunnel (proposed)
BSicon uLSTRl.svg
BSicon uLSTR+r.svg
BSicon gSTR.svg
BSicon gSKRZ-Yu.svg
Hay Lane Bridge
BSicon uSTR.svg
Studley Grange section
BSicon uexSKRZ-Yu.svg
Chaddington Lane Bridge (culvert)
BSicon uWEIRr.svg
Chaddington Lane spill weir
BSicon uexLock5.svg
Chaddington Lock
BSicon uexSKRZ-Eu.svg
BSicon ugLock5.svg
Woodshaw Lock
BSicon uSTR.svg
Templar Firs section (1150m)
BSicon uWEIRr.svg
spill weir
BSicon uSKRZ-Eu.svg
Buxton Bridge
BSicon uSKRZ-Eu.svg
Noremarsh Bridge
BSicon gSKRZ-Yu.svg
Marlborough Road bridge
BSicon ugLOCKSu.svg
Dunnington Locks (2)
BSicon geuKRZo.svg
Dunnington aqueduct (Brinkworth Brook)
BSicon gSKRZ-Yu.svg
Breach Lane Bridge
BSicon gSKRZ-Au.svg
A3102 road bridge
BSicon gTEEnl.svg
BSicon uRESRr.svg
Tockenham Reservoir
BSicon gSKRZ-Yu.svg
Tockenham Bridge
BSicon gSKRZ-Yu.svg
Trow Lane Bridge
BSicon ugLOCKSu.svg
Seven Locks, Lyneham (7)
BSicon gSKRZ-Yu.svg
Bowd's Lane Bridge
BSicon gSKRZ-Yu.svg
Sodom Lane Bridge
BSicon uexLock5.svg
Dauntsey Lock
BSicon uexSKRZ-Yu.svg
B4069 road bridge
BSicon uexSTR.svg
Dauntsey section (700m)
BSicon gSKRZ-Yu.svg
City Bridge (Dauntsey)
BSicon ugLock5.svg
Wood Common Lock
BSicon uSTR.svg
Foxham section (700m)
BSicon ugLOCKSu.svg
Foxham Locks (2)
BSicon gSKRZ-Yu.svg
Foxham Road Bridge
BSicon gSKRZ-Yu.svg
Charlcutt Hill Bridge
BSicon gSKRZ-Yu.svg
Wick Bridge
BSicon gSKRZ-Yu.svg
Bencroft Hill Bridge
BSicon gFABZgl+l.svg
BSicon gSTR+r.svg
Stanley Junction
BSicon gSTR.svg
BSicon gSTR.svg
Calne Branch
BSicon gSTR.svg
BSicon gSKRZ-Eu.svg
Carpenters Bridge
BSicon gSTR.svg
BSicon gSKRZ-Yu.svg
Hazeland Bridge
BSicon gSTR.svg
BSicon geuKRZo.svg
Fisher's Brook aqueduct
BSicon gSTR.svg
BSicon ugLOCKSu.svg
Conigre Locks (2)
BSicon gSTR.svg
BSicon gTUNNEL1.svg
Conigre Tunnel (under A4)
BSicon gSTR.svg
BSicon uSKRZ-Eu.svg
Chaveywell Bridge
BSicon gSTR.svg
BSicon ugLock5.svg
Calne Lock
BSicon gSTR.svg
BSicon uWHRF.svg
Calne wharf
BSicon ugLOCKSu.svg
Stanley Locks (2)
BSicon geuKRZo.svg
Stanley aqueduct
BSicon gSKRZ-Yu.svg
Studley Hill Road Bridge
BSicon ugLock5.svg
Forest Gate Lock
BSicon gSKRZ-Au.svg
A4 Forest Gate bridge
BSicon gSTR+l.svg
BSicon gFABZgr+r.svg
Chippenham Branch (historic)
BSicon gSTR.svg
BSicon gSTR.svg
Branch (now under Pewsham Way)
BSicon gtSTRa.svg
BSicon gSTR.svg
Tunnel (intact but buried under
BSicon gtSTRe.svg
BSicon gSTR.svg
  Burlands Rd and Little Englands)
BSicon ugWHRF.svg
BSicon gSTR.svg
Chippenham Wharf (now Bus Station)
BSicon ugLock5.svg
Pewsham Top Lock
BSicon gSKRZ-Eu.svg
Pewsham Top Lock Bridge
BSicon gSTR.svg
BSicon gSTRl.svg
BSicon gSTR+r.svg
BSicon ugLock5.svg
BSicon ugDRYg.svg
Pewsham Middle Lock and dry dock
BSicon ugLock5.svg
Pewsham Bottom Lock
BSicon uWEIRl.svg
Cocklemore Brook spill weir
BSicon uWEIRl.svg
Triangle Wood spill weir
BSicon uKRZuw.svg
Double Bridge
BSicon uSTR.svg
Naish Hill section (1.8 km)
BSicon gSKRZ-Yu.svg
Bell Inn Bridge
BSicon ugLock5.svg
Lacock Lock
BSicon ugLock5.svg
Queenfield Lock
BSicon uLSTR+l.svg
BSicon uABZmgLr +g.svg
Melksham (proposed)
BSicon uLLOCKSu.svg
BSicon gSTR.svg
Melksham Locks (3)
BSicon uLLock3.svg
BSicon gSTR.svg
Melksham Town Lock
BSicon uSTR.svg
BSicon gSTR.svg
River Avon
BSicon uLLOCKSd.svg
BSicon gSTR.svg
River Locks (2)
BSicon uLLock3.svg
BSicon gSTR.svg
Berryfield Lock
BSicon uLSTR.svg
BSicon gSTR.svg
Melksham (historic)
BSicon uLSTR.svg
BSicon ugLock5.svg
Melksham Forest Lock
BSicon uLSTR.svg
BSicon gSKRZ-Au.svg
A3102 road bridge
BSicon uLSTR.svg
BSicon gSKRZ-Au.svg
A365 road bridge
BSicon uLSTR.svg
BSicon ugLock5.svg
Semington Lock
BSicon ueFABZqlr.svg
BSicon ugFABZqlr.svg
Kennet and Avon Canal

The Wilts & Berks Canal is a canal in the historic counties of Wiltshire and Berkshire, England, linking the Kennet and Avon Canal at Semington near Melksham, to the River Thames at Abingdon. The North Wilts Canal merged with it to become a branch to the Thames and Severn Canal at Latton near Cricklade. Among professional trades boatmen, the canal was nicknamed the Ippey Cut, possibly short for Chippenham.

Contents

The 52-mile (84 km) canal was opened in 1810, but abandoned in 1914 – a fate hastened by a breach at Stanley aqueduct in 1901. Much of the canal subsequently became unnavigable: many of the structures were deliberately damaged by army demolition exercises; parts of the route were filled in and in some cases built over. In 1977 the Wilts & Berks Canal Amenity Group was formed with a view to full restoration of the canal. Several locks and bridges have since been restored, and over 8 miles (13 km) of the canal have been rewatered.

Name

The official name of the canal is the "Wilts & Berks Canal" as cited in the local acts of Parliament that authorised its building and abandonment. [1] The "Wiltshire and Berkshire Canal" is incorrect. Neither is it correct to refer to the "North Wilts Canal" [2] as the "North Wiltshire Canal".

The canal's original name is retained for historical reasons despite local council boundary changes in 1973 that transferred part of Berkshire through which the canal passes (mostly the Vale of White Horse) to Oxfordshire.

History

Abingdon to Trowbridge Canal Act 1795
Act of Parliament
Coat of Arms of Great Britain (1714-1801).svg
Long title An Act for making and maintaining a navigable canal from the river Thames or Isis, at or near the town of Abingdon, in the county of Berks, to join or communicate with the Kennet and Avon canal, at or near the town of Trowbridge, in the county of Wilts; and also certain navigable cuts therein described.
Citation 35 Geo. 3. c. 52
Dates
Royal assent 30 April 1795
Wilts. and Berks. Canal Act 1801
Act of Parliament
Coat of Arms of the United Kingdom (1801-1816).svg
Long title An Act for enabling the Company of Proprietors of the Wilts and Berks Canal Navigation, to raise Money for completing the said Canal; and to alter, explain, and amend the Act, passed in the Thirty-fifth Year of the Reign of His present Majesty, for making the said Canal.
Citation 41 Geo. 3. (U.K.) c. lxviii
Dates
Royal assent 20 June 1801
Other legislation
Repealed by Wilts. and Berks. Canal Navigation Act 1821
Text of statute as originally enacted

The idea for the Wilts & Berks Canal grew from a proposal to construct a canal between Lechlade on the Thames and Severn Canal and Abingdon-on-Thames on the River Thames. A meeting was held at Abingdon in 1784, and the proposal gained support among local landowners. Subsequently, Frederick Page suggested a canal suitable for Thames barges to run between a junction with the Thames and Severn at Kempsford and Wantage, passing through Highworth near Swindon and Longcot. At Wantage, it would split into two, with one branch going to Abingdon and the other to Wallingford, further downstream on the Thames. The Kennet and Avon Canal had also surveyed a route through Calne and Chippenham, which had been discarded in favour of the route through Bradford-on-Avon and Devizes. A meeting to promote the ideas was held at Swindon on 12 November 1793, but presentation of a bill to Parliament was postponed until the plans were more mature. [3]

James Black, representing the Thames and Severn Canal, asked William Whitworth the engineer for his canal to survey the route, including a link to his canal. By 22 February 1794, plans were sufficiently advanced that they were approved by a committee meeting at Swindon. The Earl of Peterborough chaired the meeting, which also heard that agreement had been reached with the Kennet and Avon Canal, although the junction with the Thames was still not finalised. By the meeting held on 16 May, Abingdon had been chosen as the connection to the Thames. [3]

A bill for a canal from Trowbridge on the Kennet and Avon Canal, running through Melksham, Dauntsey, Wootton Bassett, Swindon, Shrivenham, and Charlow to terminate on the Thames at Abingdon, was submitted to Parliament. It faced opposition from the city of Oxford, who maintained that trade on the Thames above Abingdon and to the city would be considerably damaged, but despite their stance, the bill passed into law on 30 April 1795, when the Abingdon to Trowbridge Canal Act 1795 (35 Geo. 3. c. 52) received royal assent. The length of the canal was initially 55.25 miles (88.9 km), but provision was made for developments at the Trowbridge end. The Kennet and Avon Canal were proposing to alter their route, and the Act allowed the proprietors to give the section from Trowbridge to Semington to the Kennet and Avon Company if their new route was authorised within three years and built within seven. The deviation was authorised, and the Kennet and Avon built the length from Trowbridge to Semington, from where their main line continued on to Devizes. The length of the Wilts & Berks was thus reduced to 51 miles (82 km). [4]

As well as the main line, the Act authorised three branch canals, to Calne, Chippenham and Wantage. It allowed the company to raise £111,900 through 1,119 shares at a cost of £100 each for the construction of the canal, with powers to raise an extra £150,000 if required. Although the plans submitted to Parliament had been signed by both Robert Whitworth Snr. and his son William, the younger Whitworth worked with John Ralph on costings for the work. This was estimated at £103,603 for the original main line and £8,350 for the branches. [5] Robert Whitworth was contracted as engineer for the construction, on a similar basis as he had worked for the Ashby Canal. He would be responsible for design work and setting out, and would arrange to be on site for around three months each year. His son William would be on site as resident engineer, handling the day-to-day supervision of the project. [6]

Work started at the westen end, in the hope that once the canal reached Chippenham and Calne, they could generate revenue from the transport of coal, although this depended on the Somerset Coal Canal and the western end of the Kennet and Avon being completed. There were problems with cash flow, as the sale of shares had only raised £61,512 by 1801, all of which had been spent, leaving a shortfall of £85,199. They could not use the powers of the 1795 Act to borrow money until all of the original shares had been bought, [5] and so another Act of Parliament, the Wilts. and Berks. Canal Act 1801 (41 Geo. 3. (U.K.) c. lxviii), was obtained allowing the company to raise a further £200,000 from shares to complete the canal. [7] Having failed to sell all the £100 shares, new shares were issued at steadily decreasing values, to attract new classes of investors. The shares were issued at £65, £60, £40, £25 and finally £12 10s. A total of 7,436 shares were eventually sold, raising £224,393. This was supplemented by £22,200 from optional notes and by the company running up debts. [8]

The canal was cut during the years 1796 to 1810. Robert Whitworth Snr. remained as an engineer on the canal from 1796 until he died in 1799, making regular progress reports to the company. William Whitworth was resident engineer during this period and subsequently became engineer until the canal's completion. [9] The company hoped that construction would be completed in 1805, but it was not, and the canal opened in stages as it was finished. Swindon was reached in June 1804, South Marston in July 1805, and it opened to near Longcot in December 1805. A branch to Longcot was constructed in 1807, although it was not authorised, and this was resolved by an addition to an act obtained in 1835. Abingdon was reached on 22 September 1810. A boat carrying the proprietors passed through the final lock into the Thames at 2:30pm, who then departed to the Council Chamber for a celebration that went on late into the evening. The final cost of the project was £255,262. [10]

Wilts. and Berks. Canal Act 1810
Act of Parliament
Coat of Arms of the United Kingdom (1801-1816).svg
Citation 50 Geo. 3. c. cxlviii
Dates
Royal assent 2 June 1810
Other legislation
Repealed by Wilts. and Berks. Canal Navigation Act 1821
Status: Repealed
Text of statute as originally enacted
Wilts. and Berks. Canal Navigation Act 1813
Act of Parliament
Coat of Arms of the United Kingdom (1801-1816).svg
Long title An Act for explaining and amending an Act of His present Majesty, for making a Navigable Canal from the River Thames or Isis, near Abingdon in the County of Berks, to join the Kennet and Avon Canal, near Trowbridge in the County of Wilts; and certain Navigable Cuts.
Citation 53 Geo. 3. c. cxx
Dates
Royal assent 3 June 1813
Other legislation
Repealed by Wilts. and Berks. Canal Navigation Act 1821
Status: Repealed
Text of statute as originally enacted
Wilts. and Berks. Canal Navigation Act 1815
Act of Parliament
Coat of Arms of the United Kingdom (1801-1816).svg
Long title An Act to enable the Company of Proprietors of the Wilts and Berks Canal Navigation to raise Money for discharging the Debts of the said Company.
Citation 55 Geo. 3. c. vi
Dates
Royal assent 23 March 1815
Other legislation
Repealed by Wilts. and Berks. Canal Navigation Act 1821
Text of statute as originally enacted
Wilts and Berks Canal Navigation Act 1835
Act of Parliament
Coat of Arms of the United Kingdom (1816-1837).svg
Long title An Act for consolidating the Shares in the Wilts and Berks Canal Navigation, and for extending the Powers of the Act of Incorporation of the Company of Proprietors of the said Canal.
Citation 5 & 6 Will. 4. c. lix
Dates
Royal assent 3 July 1835
Text of statute as originally enacted

The main canal was 51 miles (82 km) long, with branches totalling a little over 6 miles (10 km) to Chippenham, Calne, Wantage and Longcot. Although initial plans were for a canal suitable for Thames barges, it was cut as a narrow canal to take narrowboats 72 feet (22 m) long and 7 feet (2.1 m) wide. From Semington, the canal passed through 24 locks, which raised the level by 189 feet 3 inches (57.7 m) to the summit pound between Wootton Bassett and South Marston. A further 18 locks enabled the canal to descend 163 feet 9 inches (49.9 m) to Abingdon. There were also three locks on the Calne branch. [8] There were three short tunnels.

Expansion

Before the canal was completed, the proprietors were already thinking about how the canal could become part of a larger network. In 1809, they proposed a Western Junction canal, which would have crossed the Thames on an aqueduct and continued for a further 36.5 miles (58.7 km) by way of Thame and Aylesbury to join the Grand Junction Canal at Marsworth. Both canal companies agreed to contribute £100,000 to fund the project, but opposition from the Thames Commissioners, the Kennet and Avon Canal, the Oxford Canal and the Warwick and Napton Canal resulted in the bill being defeated in Parliament on 25 February 1811. A branch from the Grand Junction to Aylesbury was completed in 1815, and the two canals looked again at completing the link between Aylesbury and Abingdon in 1813 and 1817. They made a joint survey for the route in 1819, and the plan was reconsidered in 1828, but no further action occurred. [11]

Their next plan was for a Bristol Junction Canal in 1810, running from Wootton Bassett via the Gloucestershire coalfield to Bristol. An initial survey was made by William Whitworth, and a bill presented to Parliament in 1811, but it was withdrawn amidst opposition from the Thames Commissioners, landowners and the Oxford Canal. A Central Junction Canal was the next proposal, running over 59 miles (95 km) from Abingdon to the Stratford-upon-Avon Canal. John Rennie oversaw a survey of its route, and the cost was estimated at £470,000, but no further action ensued when there was opposition from the Grand Junction Canal, the Oxford Canal and the Warwick and Napton Canal. [12]

Throughout construction of their own canal, the Wilts & Berks company had considered a link to the Thames and Severn Canal, and in 1810 they wrote to the Thames and Severn to say that William Whitworth had surveyed a route from Wootton Bassett to Yeoing (now known as Ewen), near Kemble in Gloucestershire. The project, named the Severn Junction Canal, was altered to run from Swindon to Latton junction on the Thames and Severn, and was presented to Parliament in early 1811, but was withdrawn because it would probably have been defeated. By 1812, it had become the North Wilts Canal, and authority to build it was obtained in 1813. Of the many plans, this was the only one to reach completion when it opened on 2 April 1819. [13]

The North Wilts Canal was originally formed as a separate company. The branch was 9 miles (14 km) long and included 11 locks, an aqueduct over the River Thames and a small tunnel near Crichlade. Having borrowed £!5,000 from the Exchequer Bill Loan Commissioners to help finance its construction, the company could not meet Government demands for repayment of that loan, and after only two years of independence, proposed that it should merge with the Wilts & Berks, whose shareholders had also contributed £15,000 to its construction costs. [14] The merger was authorised by the passing of the Wilts. and Berks. Canal Navigation Act 1821 (2 Geo. 4. c. xcvii). [1] The Wilts & Berks took over the debt with the Exchequer Bill Loan Commission, North Wilts shareholders received £100 shares in the parent company for their existing shares, and the act also consolidated all of the previous legislation for both companies, with earlier acts being repealed. [15]

Operation

Following completion, further acts were obtained. The Wilts. and Berks. Canal Act 1810 (50 Geo. 3. c. cxlviii) contained a small number of clauses concerning money, and a much more important clause altering conditions for the carriage of coal on the River Thames. [7] When the 1795 Act was passed, there had been opposition from merchants who brought coal by sea to London, and they had instigated a clause in the Act banning the carriage of coal which had been conveyed by canal boats below Reading. The new Act repealed this ban, moving the City coal limits to Staines, despite serious opposition from ship owners and the proprietors of collieries in the north-east of England. [16] The Wilts. and Berks. Canal Navigation Act 1813 (53 Geo. 3. c. cxx), sought to resolve issues with water supply. When the canal opened, the main water supply was a deep well near Swindon, but this could not supply sufficient water for the canal's operation. [8] The proprietors had constructed a feeder from the Ashbury Brook, but this had caused consternation among landowners, and the Act was passed to prevent them extracting water from the Beckett Estate at Shrivenham, and to ensure that the feeder was filled in. [17] A third act, the Wilts. and Berks. Canal Navigation Act 1815 (55 Geo. 3. c. vi), was passed in 1815 to allow the company to raise £100,000, which they used to pay off debts collected during the construction of the canal and to construct a reservoir. [18] The Act also allowed them to invest in the North Wilts Canal. [19]

Outgoing traffic consisted of corn and agricultural products, collected from the rural communities bordering the canal and taken westwards to Bristol and Bath via the Kennet and Avon Canal. This amounted to 11,740 long tons (11,930 tonnes) in 1843. In the reverse direction, coal came from the Radstock and Paulton mines in the Somerset coalfield by way of the Somersetshire Coal Canal, which joined the Kennet and Avon Canal near the Dundas Aqueduct. In 1837, 43,642 long tons (44,342 tonnes) of coal were transported via the Wilts & Berks from the Somerset coalfield, with 10,669 long tons (10,840 tonnes) being handled at Abingdon wharf. [20] The Wilts & Berks thus became a link in the chain of canals providing a transport route between the West Country and the Midlands. Water supply was always a problem and a reservoir was constructed near Swindon to supply the canal, now known as Coate Water. [21] From the reservoir, a feeder meandered northwards and eastwards, to feed water into the canal near Marston Locks. [22]

Income from tolls rose from £5,523 for the first year of operation to £12,877 in 1837, after which they were affected by railway building. The company paid a dividend to shareholders in 1812, but decided to forego any further payments until debts had been repaid, improvements made, and issues with water supply resolved. This was achieved by 1831, when dividend payments resumed. A total of £7,000 in dividends was paid in 1837, which only represented a return of about two per cent for the shareholders. Other major outgoings were repayments to the Exchequer Bill Loan Commissioners, for money borrowed to finance the construction of the North Wilts Canal. The final payment was made in 1839. [23] Income rose significantly after 1838, as they canal carried materials for building railways, but decreased again from 1842 onwards. The company used the unexpected windfall to build hoses, buy a wharf at Oxford, construct Tockenham Reservoir, pay off loans, and retained the rest as reserves. [24]

Decline

Although the canal company had initially been dismissive of the threat from railway competition, and had benefitted from carrying materials for its construction, the Great Western Railway ran close to the canal from Abingdon to Swindon and Chippenham. When the railway opened in 1841, traffic fell sharply, apart from coal from the Somerset Coal Canal. Coal traffic on the western end of the canal rose between 1837 and 1847, but declined on the canal to the east of Swindon. [25] Further rail competition occurred from 1848 with the opening of Wilts, Somerset and Weymouth Railway, which affected traffic on the western half of the canal. Traffic on the North Wilts branch also declined. [26] A final dividend of £561 was paid in 1870, and in 1873 the canal made a loss; by that time all traffic to the east of Wantage had ceased. The Great Western Railway owned the Kennet and Avon Canal, and increased tolls for traffic to and from the Wilts and Berks, increasing the cost of coal carried on the canal. The company failed to interest the railway in buying the canal, and decided to close it. [26]

Despite the decline, a group of shareholders were optimistic that matters could improve, and called a meeting on 4 September 1874. The meeting decided that closure was the best option, and drew up a bill in November to close or sell the canal. Bristol Chamber of Commerce objected to the proposal, and in late 1875 seven merchants formed a new company to buy the canal. The Wilts & Berks Canal Co Ltd obtained an Act of Parliament in June 1876, and paid £13,466 for the canal. They took control in early 1877, but in 1882 leased the canal to another group of merchants from Bristol for £1,250 per year. They experimented with sectional boats – similar to the Tom Pudding boats used on the Aire and Calder Canal – but they found them too difficult to manage, and narrow boats continued to be used. The new group failed to make a profit and in 1887 forfeited their lease. The 1876 company made another attempt at operating the canal. [27]

Swindon Corporation (Wilts and Berks Canal Abandonment) Act 1914
Act of Parliament
Coat of arms of the United Kingdom (1901-1952).svg
Citation 4 & 5 Geo. 5. c. cviii
Dates
Royal assent 31 July 1914
Other legislation
Amended by
Status: Amended
Text of statute as originally enacted

Another group, the United Commercial Syndicate, took over the canal in 1891, and by 1896 had spent £16,000 putting the canal back into order. They decided that it could not be made profitable, and with support from the Swindon Traders Association, who thought the canal was an eyesore, attempted to abandon it. The Thames and Severn Canal were keen to take over the North Wilts branch, to allow them to access Swindon. There was opposition from landowners for whom the canal supplied water for cattle, and the abandonment failed on a technicality. A second attempt at abandonment was made in 1900, but an enquiry at Swindon by the Board of Trade resulted in the proposal being withdrawn. [28] In 1901, one arch of Stanley Aqueduct, which carried the canal over the River Marden, collapsed, severing the canal. [29] Swindon Corporation attempted to obtain an act to cut off the water supply to Coate Reservoir in 1904, but this failed. There was no traffic on the canal after 1906, and Swindon finally obtained an act to close the canal in 1914. [30]

Overgrown section of the canal, west of Wantage, in 2006 Wilts & Berks Canal.JPG
Overgrown section of the canal, west of Wantage, in 2006

The Swindon Corporation (Wilts and Berks Canal Abandonment) Act 1914 (4 & 5 Geo. 5. c. cviii) [31] enabled the corporation to take over Coate Reservoir, now known as Coate Water, for recreational purposes, as it had been used for recreation since the 1870s, and they also obtained land for public purposes. They paid £8,000 to the canal company, who also sold what land they could to meet their debts. [30]

From the early 1930s, much of the canal was filled in and generally used for dumping rubbish. Chippenham Wharf, once home to Brinkworth's Coal Depot, was used by residents as a refuse tip, and council minutes from 1926 show a decision to dump pig offal in the disused waterway. A bus station was built on the site, the buried wharf being uncovered briefly during redevelopment in 2006. [32]

During the Second World War, many of the locks and other canal structures were used for army exercises and damaged by explosives.

Very little of the old canal survived in usable form, but long rural stretches are clearly delineated.

Restoration

The new link to the Thames under construction Wilts and Berks Canal link to Thames.JPG
The new link to the Thames under construction
The canal near Grove frozen in December 2010 Wilts & Berks Canal Grove.JPG
The canal near Grove frozen in December 2010

In 1977 the Wilts & Berks Canal Amenity Group was formed to protect what remained of the canal, and to restore short sections for their amenity value. Their first projects included the clearing of sections at Kingshill, Shrivenham, Dauntsey and Wootton Bassett. [33] Between 1977 and 1987, there was a significant increase in public awareness of derelict canals and enthusiasm for their restoration. The aims of the Amenity Group therefore changed, from limited conservation to full restoration of the canal. [34]

The Wilts & Berks Canal Trust was formed in 1997 as a partnership between the Amenity Group and the district and county councils covering the route of the canal, namely the district councils of North Wilts, West Wilts and Vale of White Horse, the county councils of Oxfordshire and Wiltshire, and Swindon Borough Council. The aims of the trust were to protect, conserve and improve the canal and its branches, with the ultimate aim of restoring the whole canal to navigable status. However, the legal structure of the group was unsuitable for accessing some of the grants available for canal restoration, and so it was reformed into the Wilts & Berks Canal Partnership in 2001. [35] In 2012 it was renamed as The Wiltshire, Swindon and Oxfordshire Canal Partnership, to reflect the local authority areas through which the canal runs. [36]

While much of the line of the canal is still traceable in the rural areas, significant sections of it have been built over where it passed through towns. With all of the local authorities participating in the Wiltshire, Swindon and Oxfordshire Canal Partnership, the "line" of the canal has been preserved in Local Development Plans, ensuring that no new building or development should take place on the former route. [37] Following closure, large sections of the route have passed into private ownership with no rights of public access. [38]

Since 1988, the trust have worked on restoring small sections of the route as access has become available, or permissive access has been granted by landowners. A significant event was the organisation of a "Big Dig" in 1991 by the Waterway Recovery Group to celebrate their twenty-first year of involvement in canal restoration. Over 1,000 navvies arrived for a weekend of work, and they cleared nearly two miles of canal bed near Wantage, raising local awareness of plans for the canal. [39] One of the first sections to be rewatered was at Templars Firs on the southern edge of Royal Wootton Bassett, where a 0.75-mile (1.2 km) section was restored in 1995; the reopened section was used for a trail boat festival in 1996. [40] Further progress was hampered by a sewage pipe crossing the waterway, which was re-routed below the canal in 1988 by Wessex Water. The pound was extended to 1 mile (1.6 km) and another trail boat festival in 1988 was attended by 50 boats. [41] East of here, after a short unrestored section where the towpath is a public right of way but the canal bed is owned by a farmer, the Studley Grange section was opened in 2018 after agreement was reached with Biffa, the waste disposal company, who agreed to a 125-year lease. Funding to remove the refuse from the canal came from a Town and Country Planning Act 1990 section 106 agreement. [42]

The connection of the canal with the River Thames at Abingdon had been lost to development. A new connection with the river further downstream near Culham Lock was created on 30 August 2006, when Jubilee Junction was completed. [43] The cut initially runs for about 150 yards (140 m) to a winding hole, but will eventually link to the historic route of the canal to the west of Abingdon. [44] Final decisions on the route in this area have not been made, pending a decision on whether or not a new water-supply reservoir will be built near Abingdon, which would cover further sections of the original route to the south west of the town. [45]

A stretch near Chippenham (Pewsham section) CanalPix 1.jpg
A stretch near Chippenham (Pewsham section)

On 26 May 2009, Double Bridge and a short section of rewatered canal to the south of Pewsham was officially opened by the Trust's patron, Camilla, Duchess of Cornwall. [46] With a grant from the Gannett Foundation and voluntary labour, working parties extended this section to the foot of Pewsham Locks in 2012. [47]

At Swindon the canal used to run northwards to the town centre, where the North Wilts Canal continued running northwards and the main line ran eastwards towards Shrivenham. The route to the east has been built over, and a new route which runs parallel to the M4 motorway along the southern edge of Swindon and then turns northwards along its eastern edge has been proposed. The council have found a route for the North Wilts branch which runs close to or re-uses the original route. [45] In 2007, a feasibility study suggested that the proposal to construct a canal through Swindon would cost £50m. [48] [49] Despite some objections, [50] [51] Swindon Borough Council gave approval in 2008 for further investigation of the scheme. [52] The Thames Valley Chamber of Commerce Group also welcomed the project "as a key element in transforming Swindon's town centre into a leisure and visitor attraction, disposing of its dreary reputation." [53]

750 acres (300 ha) of land between the town and the M4 motorway were designated as the site of a new housing development in 2006, and the project to build some 4,500 homes known collectively as Wichelstowe is a joint venture between the council, Barrett Homes and David Wilson Homes. The architect for the whole scheme was John Simpson, who also worked on Poundbury near Dorchester. The first stage at East Wichel, providing some 800 houses as well as a new lock and length of canal, was completed in 2009. A second length of canal known as the Rushey Platt section, restored in the 1990s, is part of the canalside development. It runs southwards from Cross Kingshill Road, part of the A4289 near the centre of Swindon, to a Waitrose supermarket and a waterways-themed Hall & Woodhouse pub, the interior of which was designed by the archaeologist Mark Horton. [54] In addition to building housing and the canal, the developers by 2024 had planted 376 trees in urban streets and 34,336 in open areas. They had also installed 307 bird boxes and 89 bat boxes. [55]

There were problems with leakage on the East Wichel section, which were largely resolved in 2022, but work was ongoing in 2023 to locate the final leaks. [56] Planning permission for further development in Middle Wichel and West Wichel was granted in late 2022. This included the construction of another length of canal to join the Rushey Platt and East Wichel sections. It will include a swing bridge to carry the towpath from the west side of the Rushey Platt section to the north side of the section to East Wichel. [57] Progress southwards from the swing bridge junction is blocked by the M4 motorway, but spurred on by the award of £4 million to the Stroudwater Navigation for two bridges under the A38 road from Highways England, the Partnership applied to Highways England, and were awarded £42,000 for a Stage 1 feasibility study. They were hopeful that this would lead to full funding for a new bridge under the motorway further to the west, to link up with the Studley Grange section, [45] but were notified in November 2022 that they had not been awarded a Stage 2 grant of £870,000 to fund a detailed feasibility study and planning permission application. [58]

Swindon is also expanding to the east, in a development called the New Eastern Villages. The planned new route of the canal runs through the development area, and it is probable that creation of further sections of the canal will be included in the project. [45] Elsewhere, in the early 1990s, the Wilts and Berks Canal Company was formed and bought two miles of the canal spanning Dauntsey Lock. Their primary objective was to refurbish a row of derelict cottages beside the canal, which they did, but they also restored the canal and the lock, helped by volunteers from the Canal Trust. [39] In 2017, the Wessex Waterways Restoration Trust was formed, with similar aims to the Canal Trust. [54] They aim to complement the Canal Trust, working on parts of the canal restoration where the Canal Trust are not active. [59]

In Melksham, where much of the route has been lost to housing, [60] Melksham Town Council agreed in 2012 to support plans to route the canal through the River Avon in the centre of town, [61] involving construction of 2 miles (3.2 km) of new waterway, with a towpath and cycleway which would create recreational opportunities. [62] The plans were submitted to Wiltshire Council in August 2012, but the Trust were required to produce supporting documentation. The environmental statement ran to 350,000 words and was published in five volumes in 2015, but the Environment Agency required further information, and supplementary reports were produced in March 2018 and January 2019. After delays caused by the COVID-19 pandemic, communication with the Environment Agency resumed, and agreement on the final two obstacles to the plan was reached. Details were submitted for planning approval in early 2022. [63]

Restoration issues

There is some controversy about the restoration of the canal, in particular the felling of trees and the corresponding short-term disruption of wildlife habitats that have evolved in the 100 or so years since the canal was abandoned, and this has been addressed in the North Wiltshire Local Plan. [64] For the Melksham link, planning documents indicate that there will be a net gain in habitat, including standing water, marginal wetland habitat and the planting of new lengths of hedgerow. Where trees have to be removed, new trees will be planted to replace them. [65]

Objections to a canal route through Swindon town centre prior to 2010 were believed to arise from a misconception that canals contained "stagnant water". However canals are permanently moving water slowly downstream, and are thus not stagnant. The passage of boats keeps the water stirred up making it muddy-looking, but this is required to prevent the growth of weeds. In January 2008 Swindon Council considered a report, prepared by their consultants, on the feasibility and implications of restoring the town centre route. They endorsed the proposal, and set up a task group to make further progress. [66]

There was concern in south Oxfordshire about the risk of flooding, and it can be argued that the canal will act as a drainage system, helping to take excess water and move it away to the Thames. The Environment Agency expressed concerns about the proposed route of the canal at Melksham, and its effect on the floodplain, and there were calls from local landowners to ensure that a town-centre route was re-established. [67]

Map of route

Point Coordinates
(Links to map resources)
OS Grid Ref Notes
Jubilee Junction 51°39′04″N1°16′55″W / 51.651°N 1.282°W / 51.651; -1.282 (Jubilee Junction) SU496949junction with River Thames
Wantage 51°35′46″N1°26′17″W / 51.596°N 1.438°W / 51.596; -1.438 (Wantage) SU384887
Shrivenham 51°35′24″N1°39′43″W / 51.590°N 1.662°W / 51.590; -1.662 (Shrivenham) SU234880
Cricklade 51°39′25″N1°52′34″W / 51.657°N 1.876°W / 51.657; -1.876 (Cricklade) SU104945junction with Thames and Severn Canal
approximate midpoint 51°32′56″N1°48′18″W / 51.549°N 1.805°W / 51.549; -1.805 (approximate midpoint) SU135834junction with North Wilts Canal
Seven Locks 51°31′34″N1°58′16″W / 51.526°N 1.971°W / 51.526; -1.971 (Seven Locks) SU201808
Stanley Junction 51°27′07″N2°03′29″W / 51.452°N 2.058°W / 51.452; -2.058 (Stanley Junction) ST959726junction with Calne branch
Semington Junction 51°20′53″N2°08′46″W / 51.348°N 2.146°W / 51.348; -2.146 (Semington Junction) ST898610junction with Kennet & Avon Canal

See also

Related Research Articles

<span class="mw-page-title-main">Wiltshire</span> County of England

Wiltshire is a ceremonial county in South West England. It borders Gloucestershire to the north, Oxfordshire to the north-east, Berkshire to the east, Hampshire to the south-east, Dorset to the south, and Somerset to the west. The largest settlement is Swindon, and Trowbridge is the county town.

<span class="mw-page-title-main">Waterway restoration</span> Activity of restoring a canal or river

Waterway restoration is the activity of restoring a canal or river, including special features such as warehouse buildings, locks, boat lifts, and boats.

<span class="mw-page-title-main">Kennet and Avon Canal</span> Canal in southern England

The Kennet and Avon Canal is a waterway in southern England with an overall length of 87 miles (140 km), made up of two lengths of navigable river linked by a canal. The name is used to refer to the entire length of the navigation rather than solely to the central canal section. From Bristol to Bath the waterway follows the natural course of the River Avon before the canal links it to the River Kennet at Newbury, and from there to Reading on the River Thames. In all, the waterway incorporates 105 locks.

<span class="mw-page-title-main">Stratford-upon-Avon Canal</span> United Kingdom legislation

The Stratford-upon-Avon Canal is a canal in the south Midlands of England. The canal, which was built between 1793 and 1816, runs for 25.5 miles (41.0 km) in total, and consists of two sections. The dividing line is at Kingswood Junction, which gives access to the Grand Union Canal. Following acquisition by a railway company in 1856, it gradually declined, the southern section being un-navigable by 1945, and the northern section little better.

<span class="mw-page-title-main">Thames and Severn Canal</span> Canal in Gloucestershire in the south-west of England

The Thames and Severn Canal is a canal in Gloucestershire in the south-west of England, which was completed in 1789. It was conceived as part of a cargo route from Bristol and the Midlands to London, linking England's two largest rivers for better trade. The route climbs the steep Cotswold escarpment through the Golden Valley, tunnels underneath the summit of the Cotswold Edge, and emerges near the source of the Thames.

<span class="mw-page-title-main">History of the British canal system</span> Building, use, decline and restoration of artificial waterways in the United Kingdom

The canal network of the United Kingdom played a vital role in the Industrial Revolution. The UK was the first country to develop a nationwide canal network which, at its peak, expanded to nearly 4,000 miles in length. The canals allowed raw materials to be transported to a place of manufacture, and finished goods to be transported to consumers, more quickly and cheaply than by a land based route. The canal network was extensive and included feats of civil engineering such as the Anderton Boat Lift, the Manchester Ship Canal, the Worsley Navigable Levels and the Pontcysyllte Aqueduct.

<span class="mw-page-title-main">Melksham Without</span> Human settlement in England

Melksham Without is a civil parish in the county of Wiltshire, England. It surrounds, but does not include, the town of Melksham and is the largest rural parish in Wiltshire, with a population of 7,230 and an area of 29 square kilometres. The parish includes the villages of Beanacre, Berryfield, Shaw and Whitley, and the hamlets of Outmarsh and Redstocks. It also includes the outer Melksham suburbs of Bowerhill and The Spa, and the dispersed settlement of Sandridge which includes Sandridge Common.

<span class="mw-page-title-main">Claverton Pumping Station</span> Pumping station in Somerset, England

Claverton Pumping Station in the village of Claverton, in the English county of Somerset, pumps water from the River Avon to the Kennet and Avon Canal using power from the flow of the river. It is a Grade I listed building, having been upgraded from Grade II in 2019.

A canal ring is the name given to a series of canals that make a complete loop.

<span class="mw-page-title-main">Semington Locks</span>

The Semington Locks are situated at Semington, Wiltshire on the Kennet and Avon Canal, England.

<span class="mw-page-title-main">Dundas Aqueduct</span> Bridge in Limpley Stoke

Dundas Aqueduct is an aqueduct in England which carries the Kennet and Avon Canal over the River Avon and the Wessex Main Line railway. The aqueduct is near Monkton Combe, Somerset, and is about 2+12 miles (4 km) south-east of the city of Bath.

<span class="mw-page-title-main">Semington</span> Human settlement in England

Semington is a village and civil parish in Wiltshire, England. The village is about 2 miles (3 km) south of Melksham and about 3 miles (5 km) northeast of Trowbridge. The parish includes the hamlets of Little Marsh and Littleton.

<span class="mw-page-title-main">History of Swindon</span>

Swindon is a town in Wiltshire in the South West of England. People have lived in the town since the Bronze Age and the town's location, being approximately halfway between Bristol and London, made it an ideal location for the Locomotive Factories of the Great Western Railway in the 19th century.

Transport in Swindon, England, and the surroundings has directly contributed to the town's growth and the ingress of businesses and industries.

The Wilts, Somerset and Weymouth Railway (WS&WR) was an early railway company in south-western England. It obtained Parliamentary powers in 1845 to build a railway from near Chippenham in Wiltshire, southward to Salisbury and Weymouth in Dorset. It opened the first part of the network but found it impossible to raise further money and sold its line to the Great Western Railway (GWR) in 1850.

<span class="mw-page-title-main">Stroudwater Navigation</span> Canal in Gloucestershire, England

The Stroudwater Navigation is a canal in Gloucestershire, England which linked Stroud to the River Severn. It was authorised in 1776, although part had already been built, as the proprietors believed that an Act of Parliament obtained in 1730 gave them the necessary powers. Opened in 1779, it was a commercial success, its main cargo being coal. It was 8 miles (13 km) in length and had a rise of 102 ft 5 in (31.22 m) through 12 locks. Following the opening of the Thames and Severn Canal in 1789, it formed part of a through route from Bristol to London, although much of its trade vanished when the Kennet and Avon Canal provided a more direct route in 1810. Despite competition from the railways, the canal continued to pay dividends to shareholders until 1922, and was not finally abandoned until 1954.

<span class="mw-page-title-main">Berryfield</span> Village in Wiltshire, England

Berryfield is a small village to the south of the town of Melksham, in Wiltshire, England. The village is separated from the southwestern outskirts of Melksham by the A350 road and about 500 metres of farmland; it falls within the civil parish of Melksham Without. The Bristol Avon is about 0.6 miles (1 km) west of the village. Although close to Melksham town, Berryfield remains a separate community.

<span class="mw-page-title-main">Semington Aqueduct</span> Bridge in Semington

Semington Aqueduct is an aqueduct at Semington, Wiltshire, England, UK. It carries the Kennet and Avon Canal over the Semington Brook.

<span class="mw-page-title-main">Wilts & Berks Canal Trust</span>

The Wilts & Berks Canal Trust is a registered charity no. 299595, and a waterway society based in Wiltshire, England, concerned with the restoration of the Wilts & Berks Canal.

<span class="mw-page-title-main">Cassington Canal</span> Canal in Oxfordshire

The Cassington Canal was an early 19th-century canal near Eynsham, Oxfordshire. The canal was built by the 4th Duke of Marlborough to provide a link between the River Thames and Cassington Mill; it later provided alternative wharfage to that at Eynsham. The 0.75-mile (1.21 km) canal was in operation for less than 70 years, its use declining with the advent of rail transport.

References

  1. 1 2 Priestley 1831, p. 678.
  2. Priestley 1831, p. 680.
  3. 1 2 Hadfield 1969, p. 276.
  4. Hadfield 1969, pp. 276–277.
  5. 1 2 Hadfield 1969, p. 277.
  6. Skempton 2002, p. 781.
  7. 1 2 Priestley 1831, p. 679.
  8. 1 2 3 Hadfield 1969, p. 280.
  9. Skempton 2002, p. 791.
  10. Hadfield 1969, pp. 278, 280.
  11. Hadfield 1969, p. 281.
  12. Hadfield 1969, p. 282.
  13. Hadfield 1969, pp. 282–284.
  14. Hadfield 1969, pp. 284–285.
  15. Hadfield 1969, p. 285.
  16. Hadfield 1969, pp. 277, 281.
  17. "Text of the 1813 Act" (PDF). legislation.gov.uk.
  18. Priestley 1831, pp. 679–680.
  19. "Text of the 1815 Act" (PDF). legislation.gov.uk.
  20. Clew 1970.
  21. Child 2002.
  22. Hadfield 1969, p. 279.
  23. Hadfield 1969, pp. 285–286.
  24. Hadfield 1969, p. 289.
  25. Hadfield 1969, p. 288.
  26. 1 2 Hadfield 1969, p. 290.
  27. Hadfield 1969, pp. 291–292.
  28. Hadfield 1969, pp. 292, 294.
  29. Dalby 2000, p. 100.
  30. 1 2 Hadfield 1969, p. 294.
  31. "Swindon Corporation (Wilts and Berks Canal Abandonment) Act, 1914" (PDF). The London Gazette. 31 July 1914. Retrieved 25 August 2009.
  32. Parkes, Benjamin (9 November 2006). "Last glimpse of canal". The Wiltshire Gazette and Herald. Retrieved 25 January 2020.
  33. Squires, Dr. Roger (1983). The New Navvies. Chichester, Sussex: Phillimore. pp.  123–124. ISBN   0-85033-364-4.
  34. "Wilts & Berks Canal Melksham River Route Study" (PDF). Black and Veatch. May 2007. p. 6. Archived (PDF) from the original on 4 October 2024.
  35. "About the Trust". Wilts and Berks Canal Trust. Archived from the original on 19 July 2016. Retrieved 21 November 2010.
  36. "The Partnership". Wilts and Berks Canal. 2012. Archived from the original on 14 April 2016.
  37. Cumberlidge 2009, p. 334.
  38. "Wilts and Berks Canal Towpath". Long Distance Walkers Association. 2024. Archived from the original on 25 February 2024.
  39. 1 2 Dalby 2000, p. 107.
  40. Denny 2019, p. 88.
  41. Dalby 2000, p. 106.
  42. Denny 2019, p. 89.
  43. "Campaign Briefing" (PDF). CPRE Oxfordshire. 5 September 2006. Archived from the original (PDF) on 15 February 2010.
  44. "Grand Opening of Jubilee Junction". abingdon.gentle-highway.info. 30 August 2006. Archived from the original on 1 February 2016.
  45. 1 2 3 4 Ludgate 2021.
  46. "The Duchess opens a new bridge as Patron of the Wilts and Berks Canal Trust". (Double Bridge, Lacock). The Prince of Wales website. 26 May 2009. Archived from the original on 14 June 2011. Retrieved 5 June 2009.
  47. "Restoration reaches Pewsham Locks". Waterways World. July 2012. p. 40. ISSN   0309-1422.
  48. "Town centre canal will cost £50m". BBC. 10 October 2007. Retrieved 7 November 2008.
  49. Halcrow Group Ltd (2008). "Swindon Central Canal Route Study" (PDF). Archived (PDF) from the original on 11 January 2023. Retrieved 25 April 2020.
  50. Wallin, James (20 April 2008). "Bid to ditch canal project". Swindon Advertiser. Archived from the original on 10 June 2015. Retrieved 10 November 2008.
  51. "You, the readers, are against canal idea". Swindon Advertiser. 27 March 2008. Archived from the original on 10 June 2015. Retrieved 10 November 2008.
  52. "More support for town canal plan". BBC. 24 January 2008. Retrieved 7 November 2008.
  53. Wallin, James (6 May 2008). "Canal would give town a big boost". Swindon Advertiser. Archived from the original on 10 June 2015. Retrieved 10 November 2008.
  54. 1 2 Denny 2019, p. 91.
  55. "Development Dashboard". Wichelstowe LLP. 2024. Archived from the original on 9 October 2024.
  56. "East Wichel Canal – March 2023 Update" (PDF). Wichelstowe LLP. March 2023. Archived (PDF) from the original on 7 May 2023.
  57. "Plans for canal extension lodged". Wichelstowe LLP. 2022. Archived from the original on 30 May 2024.
  58. "Getting Under the M4". Wilts & Berks Canal Trust. November 2022.
  59. "Wessex Waterways Restoration Trust". Wessex Waterways. Archived from the original on 13 August 2024.
  60. "Plans to route canal through town". BBC News. 4 July 2007. Retrieved 11 November 2008.
  61. Morgan, Charley (18 December 2007). "Council backs canal plan". Swindon Advertiser. Archived from the original on 10 June 2015. Retrieved 10 November 2008.
  62. "Melksham Canal-River link gets go-ahead". Waterways World: 36. December 2012. ISSN   0309-1422.
  63. "Melksham Link". Wilts and Berks Canal Trust. 5 December 2023. Archived from the original on 1 July 2022.
  64. "North Wiltshire Local Plan 2011. Written Statement June 2006" (PDF). Wiltshire County Council. Retrieved 9 October 2023.
  65. Oliver, Ken (1 August 2012). "Environmental Statement in support of an Application for Planning Permission" (PDF). Wiltshire Council for Canal Partnership.
  66. "Canal Feasibility Study – Review". Swindon Borough Council. Retrieved 19 December 2008.[ dead link ]
  67. "Landowners back town route for canal". Swindon Advertiser. 5 April 2002. Retrieved 19 December 2008.[ dead link ]

Bibliography

Next confluence upstream River Thames Next confluence downstream
River Ock (south)Wilts & Berks Canal River Thame (north)

51°32′56″N1°48′18″W / 51.549°N 1.805°W / 51.549; -1.805 (Wilts & Berks Canal (mid point))