The Bangladesh Power Development Board (BPDB) is a government agency operating under the Ministry of Power, Energy and Mineral Resources, Government of the People's Republic of Bangladesh. It was created as a public-sector organization to boost the country's power sector after the emergence of Bangladesh as an independent state in 1972. This government organization is responsible for planning and developing the nation's power infrastructure and for operating much of its power generation facilities. The BPDB is responsible for the major portion of generation and distribution of electricity mainly in urban areas of the country.

Contents

Engr. Md Mahbubur Rahman is the present chairman of the board. The board holds Members and Directors from Bangladesh Administrative Service and from different cadres of government services.

History

After the creation of Pakistan, the then Pakistan government formed Electricity directorate to develop the power sector of the country. In 1957, the electricity directorate acquired all the private power stations and transmission lines in the country. In the year of 1958, East Pakistan Water and Power Development Authority (EPWAPDA) was formed to effectively manage the power sector in the then East Pakistan. In 1960, the electricity directorate with all its assets was merged with EPWAPDA. Chattogram, Khulna and Shiddhirganj power stations was constructed at that time of which Shiddhirganj power station was the largest with 10MW installed capacity. In 1962, the Karnafuli Hydropower Station at Kaptai became operational. With two units of 40MW installed capacity each, it became the largest power plant in the country. The first long range transmission line was built connecting Kaptai with Shiddhirganj via 273 km long 132kV transmission line in 1962.

After the independence of Bangladesh, WAPDA was separated by presidential order 59 (PO-59) and Bangladesh Power Development Board (BPDB) was formed with an installed generation capacity of 500MW. [1] Subsequently, the Rural Electrification Board (REB) and the Dhaka Electric Supply Authority (DESA) was formed dividing the BPDB. [1] [2] In 2000, the transmission lines were handed over to the newly formed Power Grid Company of Bangladesh. BPDB is now the parent company of Ashuganj Power Station Company Ltd, Coal Power Generation Company Bangladesh Limited, Power Grid Company of Bangladesh, Electricity Generation Company of Bangladesh, North West Power Generation Company Limited, North West Zone Power Distribution Company Limited, and West Zone Power Distribution Company Limited.

On 4 October 2022 70-80% of the countries 168 million residence were hit with blackouts and only 45% of residences were restored with power by nightfall. There was a shortage of natural gas because of the 2021–present global energy crisis where 77 natural gas power plants had insufficient fuel to meet demand. The electricity sector in Bangladesh is heavily reliant on natural gas. [3] The government stopped buying spot price Liquefied natural gas in June 2022, they were importing 30% of their LNG on the spot market this year down from 40% last year. They are still importing LNG on futures exchange markets. [4]

Operations

BPDB is responsible for generation and distribution of a large part of country's total electricity demand. As of January 2020, BPDB had a total installed capacity of 5613 MW at its own power plants located in different parts of the country. The main fuel used for power generation in BPDB plants is indigenous natural gas. BPDP operations also include projects that utilize renewable power sources including offshore wind power generation. [5] The maximum demand served during peak hours was 12,893 MW on 29 May 2019. The total distribution network length under BPDB is 30,051 km, including 33kV, 11kV and 0.4kV lines.

See also

Related Research Articles

<span class="mw-page-title-main">Electricity sector in India</span> Power generation and distribution

India is the third largest producer of electricity in the world. During the fiscal year (FY) 2022–23, the total electricity generation in the country was 1,844 TWh, of which 1,618 TWh was generated by utilities.

The East–West Interconnector is a 500 MW high-voltage direct current submarine and subsoil power cable which connects the Irish and British electricity markets. The project was developed by the Irish national grid operator EirGrid.

The energy policy of India is to increase the locally produced energy in India and reduce energy poverty, with more focus on developing alternative sources of energy, particularly nuclear, solar and wind energy. Net energy import dependency was 40.9% in 2021-22.

The electricity sector in Argentina constitutes the third largest power market in Latin America. It relies mostly on thermal generation and hydropower generation (36%). The prevailing natural gas-fired thermal generation is at risk due to the uncertainty about future gas supply.

The electricity sector in Peru has experienced large improvements in the past 15 years. Access to electricity has increased from 45% in 1990 to 96.4% in 2018, while service quality and efficiency of service provision improved. These improvements were made possible through privatizations following reforms initiated in 1992. At the same time, electricity tariffs have remained in line with the average for Latin America.

<span class="mw-page-title-main">Electricity sector in El Salvador</span>

El Salvador's energy sector is largerly focused on renewables. El Salvador is the largest producer of geothermal energy in Central America. Except for hydroelectric generation, which is almost totally owned and operated by the public company CEL, the rest of the generation capacity is in private hands. With demand expected to grow at a rate of 5% in the coming years, the Government's 2007 National Energy Strategy identified several hydroelectric and geothermal projects as the best option to meet demand in the future and to diversify the country's energy mix.

<span class="mw-page-title-main">Electricity sector in the Dominican Republic</span>

The power sector in the Dominican Republic has traditionally been, and still is, a bottleneck to the country's economic growth. A prolonged electricity crisis and ineffective remedial measures have led to a vicious cycle of regular blackouts, high operating costs of the distribution companies, large losses including electricity theft through illegal connections, high retail tariffs to cover these inefficiencies, low bill collection rates, a significant fiscal burden for the government through direct and indirect subsidies, and very high costs for consumers as many of them have to rely on expensive alternative self-generated electricity. According to the World Bank, the revitalization of the Dominican economy depends greatly on a sound reform of the sector.

<span class="mw-page-title-main">Availability-based tariff</span> Pricing system used in India for unscheduled electric power transactions

Availability Based Tariff (ABT) is a frequency based pricing mechanism applicable in India for unscheduled electric power transactions. The ABT falls under electricity market mechanisms to charge and regulate power to achieve short term and long term network stability as well as incentives and dis-incentives to grid participants against deviations in committed supplies as the case may be.

<span class="mw-page-title-main">Electricity sector in Ghana</span> Government of Ghana sponsored electricity supply

Ghana generates electric power from hydropower, fossil-fuel, and renewable energy sources such as wind and solar energy. Electricity generation is one of the key factors in order to achieve the development of the Ghanaian national economy, with aggressive and rapid industrialization; Ghana's national electric energy consumption was 265 kilowatt hours per each one in 2009.

Brazil has the largest electricity sector in Latin America. Its capacity at the end of 2021 was 181,532 MW. The installed capacity grew from 11,000 MW in 1970 with an average yearly growth of 5.8% per year. Brazil has the largest capacity for water storage in the world, being dependent on hydroelectricity generation capacity, which meets over 60% of its electricity demand. The national grid runs at 60 Hz and is powered 83% from renewable sources. This dependence on hydropower makes Brazil vulnerable to power supply shortages in drought years, as was demonstrated by the 2001–2002 energy crisis.

Electricity in Pakistan is generated, transmitted, distributed, and retail supplied by two vertically integrated public sector companies, Water and Power Development Authority (WAPDA) responsible for the production of hydroelectricity and supplied to the consumers by the power distribution companies (DISCOS) under the Pakistan Electric Power Company (PEPCO). Currently, there are 11 distribution companies and one National Transmission And Dispatch Company (NTDC) all in the public sector, and the Karachi Electric (K-Electric) for the city of Karachi and its surrounding areas. There are around 42 independent power producers (IPPs) that contribute significantly in electricity generation in Pakistan.

<span class="mw-page-title-main">Raozan Power Station</span>

Raozan Power Station is a gas-fired thermal power station in Bangladesh. It is located in Raozan Upazila of Chattogram District 25 kilometres (16 mi) north-east from Chattogram on the south side of the Chattogram–Kaptai Highway. It is owned and operated by the Bangladesh Power Development Board, Government of the People's Republic of Bangladesh.

<span class="mw-page-title-main">Electricity sector in Bangladesh</span>

The utility electricity sector in Bangladesh has one national grid with an installed capacity of 25,700 MW as of June 2022. Bangladesh's energy sector is not up to the mark. However, per capita energy consumption in Bangladesh is considered higher than the production. Electricity was introduced to the country on 7 December 1901 under British rule.

Power Grid Company of Bangladesh Ltd. (PGCB) is the sole organization of Government of Bangladesh entrusted with transmission of power throughout the country. It is a government owned Public Limited Company which is listed at the Dhaka and Chittagong Stock Exchange.

<span class="mw-page-title-main">NTPC Limited</span> National Thermal Power Corporation, Central Public Sector Undertaking

NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.

<span class="mw-page-title-main">Electricity sector in Hong Kong</span> Electricity sector in Hong Kong, China

Electricity sector in Hong Kong ranges from generation, transmission, distribution and sales of electricity covering Hong Kong. The combustion of coal, natural gas and oil are the main sources of electricity in Hong Kong. The electricity sector contributes 60.4% of Hong Kong's total greenhouse gas emissions.

<span class="mw-page-title-main">Dhaka Electric Supply Company Limited</span> Electric utility in Dhaka, Bangladesh

Dhaka Electric Supply Company Limited (DESCO) is a public limited company which distributes electricity at the Northern parts of Dhaka City and Tongi Town of Gazipur District. The company was created in November 1996 under the Companies Act 1994 as a Public Limited Company. The company is now under the Power Division of the Bangladesh Ministry of Power, Energy and Mineral Resources and serving a total number of 604,304 consumers as of 31 December 2013. Md. Selim Uddin, rank of additional secretary, is the chairperson of DESCO and Engr. Md. Kausar Ameer Ali is the managing director.

The Ministry of Power, Energy and Mineral Resources or Ministry of Energy is a ministry of the Government of Bangladesh. It is mainly responsible for all policies and matters relating to electricity generation, transmission, and distribution from conventional and non-conventional energy sources including hydro electricity. It also deals with the Import, Distribution, Exploration, Extraction, Pricing, and other policy related details of the primary fuels.

Sylhet power plant popularly known as Kumargaon Power Plant also known as Kumargaon Power Station is a gas turbine power station in Sylhet Sadar Upazila, Sylhet District of Bangladesh. This plant is operated by Bangladesh Power Development Board (BPDB). It has connected Sylhet district and some parts of Moulvibazar, Sunamganj, and Habiganj.

Mozambique has abundant energy sources available for exploitation. As of 2021, the country was ranked first in energy potential of all the countries in the Southern African Power Pool (SAPP), with an estimated energy capacity of 187,000 MW. Available energy sources include coal, hydroelectricity, natural gas, solar energy and wind power. As of September 2021, the largest proportion of the power currently generated is from hydroelectric sources. However the energy mix in the country is changing. Natural gas powered energy stations are expected to provide 44 percent of total energy generation from 2020 to 2030.

References

  1. 1 2 History of BPDB, archived from the original on 4 August 2016, retrieved 10 June 2016
  2. "Power Development Board". Banglapedia. Retrieved 3 October 2016.
  3. Paul, Ruma; Varadhan, Sudarshan (4 October 2022). "Bangladesh plunged into darkness by national grid failure". Reuters.
  4. "Bangladesh Plans Staggered Factory Holidays to Ease Power Crunch". Bloomberg.com. 8 August 2022.