Bangladesh Power Development Board

Last updated

Bangladesh Power Development Board
বাংলাদেশ বিদ্যুৎ উন্নয়ন বোর্ড
Bānlādēśa bidyuṯ unnaẏana bōrḍa
Bangladesh Power Development Board Logo.svg
Seal of Bangladesh Power Development Board
Agency overview
Formed1972;52 years ago (1972)
Jurisdiction Government of Bangladesh
HeadquartersWapda Building, Motijheel C/A, Dhaka, Bangladesh
Agency executive
Parent department Ministry of Power, Energy and Mineral Resources
Website www.bpdb.gov.bd

The Bangladesh Power Development Board (BPDB) is a government agency operating under the Ministry of Power, Energy and Mineral Resources, Government of the People's Republic of Bangladesh. It was created as a public-sector organization to boost the country's power sector after the emergence of Bangladesh as an independent state in 1972. This government organization is responsible for planning and developing the nation's power infrastructure and for operating much of its power generation facilities. The BPDB is responsible for the major portion of generation and distribution of electricity mainly in urban areas of the country.

Contents

Engr. Md. Rezaul Karim is the present chairman of the board. The board holds Members and Directors from Bangladesh Administrative Service and from different cadres of government services.

History

After the creation of Pakistan, the then Pakistan government formed Electricity directorate to develop the power sector of the country. In 1957, the electricity directorate acquired all the private power stations and transmission lines in the country. In the year of 1958, East Pakistan Water and Power Development Authority (EPWAPDA) was formed to effectively manage the power sector in the then East Pakistan. In 1960, the electricity directorate with all its assets was merged with EPWAPDA. Chattogram, Khulna and Shiddhirganj power stations was constructed at that time of which Shiddhirganj power station was the largest with 10MW installed capacity. In 1962, the Karnafuli Hydropower Station at Kaptai became operational. With two units of 40MW installed capacity each, it became the largest power plant in the country. The first long range transmission line was built connecting Kaptai with Shiddhirganj via 273 km long 132kV transmission line in 1962.

After the independence of Bangladesh, WAPDA was separated by presidential order 59 (PO-59) and Bangladesh Power Development Board (BPDB) was formed with an installed generation capacity of 500MW. [1] Subsequently, the Rural Electrification Board (REB) and the Dhaka Electric Supply Authority (DESA) was formed dividing the BPDB. [1] [2] In 2000, the transmission lines were handed over to the newly formed Power Grid Company of Bangladesh. BPDB is now the parent company of Ashuganj Power Station Company Ltd, Coal Power Generation Company Bangladesh Limited, Power Grid Company of Bangladesh, Electricity Generation Company of Bangladesh, North West Power Generation Company Limited, North West Zone Power Distribution Company Limited, and West Zone Power Distribution Company Limited.

On 4 October 2022 70-80% of the countries 168 million residence were hit with blackouts and only 45% of residences were restored with power by nightfall. There was a shortage of natural gas because of the 2021–present global energy crisis where 77 natural gas power plants had insufficient fuel to meet demand. The electricity sector in Bangladesh is heavily reliant on natural gas. [3] The government stopped buying spot price Liquefied natural gas in June 2022, they were importing 30% of their LNG on the spot market this year down from 40% last year. They are still importing LNG on futures exchange markets. [4]

Operations

BPDB is responsible for generation and distribution of a large part of country's total electricity demand. As of January 2020, BPDB had a total installed capacity of 5613 MW at its own power plants located in different parts of the country. The main fuel used for power generation in BPDB plants is indigenous natural gas. BPDP operations also include projects that utilize renewable power sources including offshore wind power generation. [5] The maximum demand served during peak hours was 16,477 MW on 30 April 2024. The total distribution network length under BPDB is 30,051 km, including 33kV, 11kV and 0.4kV lines.

See also

Related Research Articles

<span class="mw-page-title-main">Electric power industry</span> Industry that provides the production and delivery of electric energy

The electric power industry covers the generation, transmission, distribution and sale of electric power to the general public and industry. The commercial distribution of electric power started in 1882 when electricity was produced for electric lighting. In the 1880s and 1890s, growing economic and safety concerns lead to the regulation of the industry. What was once an expensive novelty limited to the most densely populated areas, reliable and economical electric power has become an essential aspect for normal operation of all elements of developed economies.

India is the third largest producer of electricity in the world. During the fiscal year (FY) 2023–24, the total electricity generation in the country was 1,949 TWh, of which 1,734 TWh was generated by utilities.

The energy policy of India is to increase the locally produced energy in India and reduce energy poverty, with more focus on developing alternative sources of energy, particularly nuclear, solar and wind energy. Net energy import dependency was 40.9% in 2021-22. The primary energy consumption in India grew by 13.3% in FY2022-23 and is the third biggest with 6% global share after China and USA. The total primary energy consumption from coal, crude oil, natural gas, nuclear energy, hydroelectricity and renewable power is 809.2 Mtoe in the calendar year 2018. In 2018, India's net imports are nearly 205.3 million tons of crude oil and its products, 26.3 Mtoe of LNG and 141.7 Mtoe coal totaling to 373.3 Mtoe of primary energy which is equal to 46.13% of total primary energy consumption. India is largely dependent on fossil fuel imports to meet its energy demands – by 2030, India's dependence on energy imports is expected to exceed 53% of the country's total energy consumption.

The electricity sector in Peru has experienced large improvements in the past 15 years. Access to electricity has increased from 45% in 1990 to 96.4% in 2018, while service quality and efficiency of service provision improved. These improvements were made possible through privatizations following reforms initiated in 1992. At the same time, electricity tariffs have remained in line with the average for Latin America.

<span class="mw-page-title-main">Electricity sector in El Salvador</span>

El Salvador's energy sector is largerly focused on renewables. El Salvador is the largest producer of geothermal energy in Central America. Except for hydroelectric generation, which is almost totally owned and operated by the public company CEL, the rest of the generation capacity is in private hands. With demand expected to grow at a rate of 5% in the coming years, the Government's 2007 National Energy Strategy identified several hydroelectric and geothermal projects as the best option to meet demand in the future and to diversify the country's energy mix.

<span class="mw-page-title-main">Electricity sector in the Dominican Republic</span>

The power sector in the Dominican Republic has traditionally been, and still is, a bottleneck to the country's economic growth. A prolonged electricity crisis and ineffective remedial measures have led to a vicious cycle of regular blackouts, high operating costs of the distribution companies, large losses including electricity theft through illegal connections, high retail tariffs to cover these inefficiencies, low bill collection rates, a significant fiscal burden for the government through direct and indirect subsidies, and very high costs for consumers as many of them have to rely on expensive alternative self-generated electricity. According to the World Bank, the revitalization of the Dominican economy depends greatly on a sound reform of the sector.

Availability Based Tariff (ABT) is a frequency based pricing mechanism applicable in India for unscheduled electric power transactions. The ABT falls under electricity market mechanisms to charge and regulate power to achieve short term and long term network stability as well as incentives and dis-incentives to grid participants against deviations in committed supplies as the case may be.

Brazil has the largest electricity sector in Latin America. Its capacity at the end of 2021 was 181,532 MW. The installed capacity grew from 11,000 MW in 1970 with an average yearly growth of 5.8% per year. Brazil has the largest capacity for water storage in the world, being dependent on hydroelectricity generation capacity, which meets over 60% of its electricity demand. The national grid runs at 60 Hz and is powered 83% from renewable sources. This dependence on hydropower makes Brazil vulnerable to power supply shortages in drought years, as was demonstrated by the 2001–2002 energy crisis.

Electricity in Pakistan is generated, transmitted and distributed by two vertically integrated public sector companies, first one being Water and Power Development Authority (WAPDA) responsible for the production of hydroelectricity and its supply to the consumers by electricity distribution companies (DISCOS) under the Pakistan Electric Power Company (PEPCO) being the other integrated company. Currently, there are 12 distribution companies and a National Transmission And Dispatch Company (NTDC) which are all in the public sector except Karachi Electric in the city of Karachi and its surrounding areas. There are around 42 independent power producers (IPPs) that contribute significantly in electricity generation in Pakistan.

<span class="mw-page-title-main">Electricity sector in Bangladesh</span>

The utility electricity sector in Bangladesh has one national grid operated by Power Grid Company of Bangladesh with an installed capacity of 25,700 MW as of June 2022. Bangladesh's energy sector is not up to the mark. However, per capita energy consumption in Bangladesh is considered higher than the production. Electricity was introduced to the country on 7 December 1901.

Power Grid Bangladesh PLC abbreviated as Power Grid is the sole organization of Government of Bangladesh entrusted with transmission of power throughout the country. It is a government owned Public Limited Company which is listed at the Dhaka and Chittagong Stock Exchange. It was previously known as Power Grid Company of Bangladesh Ltd and was abbreviated as PGCB.

<span class="mw-page-title-main">Electricity sector in Hong Kong</span> Electricity sector in Hong Kong, China

Electricity sector in Hong Kong ranges from generation, transmission, distribution and sales of electricity covering Hong Kong. The combustion of coal, natural gas and oil are the main sources of electricity in Hong Kong. The electricity sector contributes 60.4% of Hong Kong's total greenhouse gas emissions.

<span class="mw-page-title-main">Renewable energy in Bangladesh</span>

Renewable energy in Bangladesh refers to the use of renewable energy to generate electricity in Bangladesh. The current renewable energy comes from biogas that is originated from biomass, hydro power, solar and wind. According to National database of Renewable Energy total renewable energy capacity installed in Bangladesh 1374.68 MW.

Bangladesh suffers with heavy energy crisis with the gradual expansion of economic activities of the country. The estimations and reserves of energy resources show future potentials but a small fraction of them are being utilized which proved to be insufficient. Moreover, the impact of climate change and environment pollution has also been significantly felt. As a result, the successive governments have aimed at formulating an effective energy policy which would address these concerns. The energy policies have also received extensive criticisms especially on the questions of energy export and methods of extraction.

<span class="mw-page-title-main">Dhaka Electric Supply Company Limited</span> Electric utility in Dhaka, Bangladesh

Dhaka Electric Supply Company Limited (DESCO) is a public limited company which distributes electricity at the northern parts of Dhaka City and Tongi Town of Gazipur District. The company was created in November 1996 under the Companies Act 1994 as a Public Limited Company. The company is now under the Power Division of the Bangladesh Ministry of Power, Energy and Mineral Resources and serving a total number of 604,304 consumers as of 31 December 2013. Md. Selim Uddin, rank of additional secretary, is the chairperson of DESCO and Engr. Md. Kausar Ameer Ali is the managing director.

Dhaka Power Distribution Company Limited (DPDC) is a Public Limited Company under the Power Division of the Ministry of Power, Energy and Mineral Resources, Government of Bangladesh, that manages the distribution of electricity to the customers of the Dhaka City Corporation area. The company, created as a part of the Power Sector Reform Programme, was registered on 25 October 2005 under the Companies Act, 1994. The government owns 100% share of the company. DPDC started commercial operation on 1 July 2008 taking over from Dhaka Electric Supply Authority (DESA). All the assets and liabilities of DESA were transferred to DPDC through an agreement signed in September 2008.

<span class="mw-page-title-main">Ministry of Power, Energy and Mineral Resources</span> Government ministry of Bangladesh

The Ministry of Power, Energy and Mineral Resources or Ministry of Energy is a ministry of the Government of Bangladesh. It is mainly responsible for all policies and matters relating to electricity generation, transmission, and distribution from conventional and non-conventional energy sources including hydro electricity. It also deals with the Import, Distribution, Exploration, Extraction, Pricing, and other policy related details of the primary fuels.

<span class="mw-page-title-main">Electricity sector in Israel</span>

The electricity sector in Israel encompasses the production, transmission, and distribution of electricity within the State of Israel and territories under its control. The supply of electricity is entirely regulated by the government of Israel, with every operation requiring approval from the Ministry of Energy and Water Resources and the Electricity Authority.

<span class="mw-page-title-main">Government agencies in Bangladesh</span>

The Government agencies in Bangladesh are state controlled organizations that act independently to carry out the policies of the Government of Bangladesh. The Government Ministries are relatively small and merely policy-making organizations, allowed to control agencies by policy decisions. Some of the work of the government is carried out through state enterprises or limited companies.

Mozambique has abundant energy sources available for exploitation. As of 2021, the country was ranked first in energy potential of all the countries in the Southern African Power Pool (SAPP), with an estimated energy capacity of 187,000 MW. Available energy sources include coal, hydroelectricity, natural gas, solar energy and wind power. As of September 2021, the largest proportion of the power currently generated is from hydroelectric sources. However the energy mix in the country is changing. Natural gas powered energy stations are expected to provide 44 percent of total energy generation from 2020 to 2030.

References

  1. 1 2 History of BPDB, archived from the original on 4 August 2016, retrieved 10 June 2016
  2. "Power Development Board". Banglapedia. Retrieved 3 October 2016.
  3. Paul, Ruma; Varadhan, Sudarshan (4 October 2022). "Bangladesh plunged into darkness by national grid failure". Reuters.
  4. "Bangladesh Plans Staggered Factory Holidays to Ease Power Crunch". Bloomberg.com. 8 August 2022.
  5. "Offshore Wind Farm". 8 May 2010. Retrieved 10 July 2012.