Company type | Public |
---|---|
DSE: DESCO CSE: DESCO | |
Industry | Electricity Distribution |
Founded | (November 3, 1996 ) in Dhaka, Bangladesh |
Headquarters | Nikunja-2, Dhaka , Bangladesh |
Area served | Parts of Northern Dhaka, Purbachal, and Tongi [1] |
Revenue | 2013: US$ 311.1279 million [2] |
2014: US$ 14.508 million [2] | |
2013: US$ 10.349 million [2] | |
Total assets | 2013: US$ 435.479 million [2] |
Total equity | 2013: US$ 138.471 million [2] |
Number of employees | 1573 (2013) [3] |
Parent | Bangladesh Ministry of Power, Energy and Mineral Resources [4] |
Website | desco |
Dhaka Electric Supply Company Limited (DESCO) is a public limited company which distributes electricity at the northern parts of Dhaka City and Tongi Town of Gazipur District. The company was created in November 1996 under the Companies Act 1994 as a Public Limited Company. The company is now under the Power Division of the Bangladesh Ministry of Power, Energy and Mineral Resources [4] and serving a total number of 604,304 consumers as of 31 December 2013. [5] Md. Selim Uddin, rank of additional secretary, is the chairperson of DESCO and Engr. Md. Kausar Ameer Ali is the managing director. [6]
Year | Events |
---|---|
2013 | Online application for recruitment. |
2012 | Online application for new connection. |
2010 | Launching online bill payment system. |
2008 | Inauguration of Data Acquisition System. |
2007 | Takeover of Tongi Pourashava and distribution licence from BERC. |
2006 | Company goes public. |
2005 | Inauguration of prepaid metering system. |
2004 | Establishment of sales & distribution divisions. |
2003 | Takeover of Gulshan area. |
1998 | Takeover of Mirpur area from DESA. |
1996 | Certificate of incorporation. |
In 1972, the first Government of Bangladesh, in an effort to speed up the investment in the sector issued an ordinance, [7] creating the Bangladesh Power Development Board (BPDB). BPDB, from 1972 to 1995, has increased the generation capacity in the country from 475 MW to 2818 MW, and the length of its 230 kV and 132 kV transmission networks to 419 km and 2469 km respectively. For the first time in December 1982, the eastern and western halves of the country were electrically connected through the commissioning of double circuit 230 kV transmission line across the Jamuna River energized at 132 kV between Ishurdi and Tongi called the first East-West Inter-connector. Thus 230 kV and 132 kV inter-ties linked the distribution networks of all major towns and cities had been through.
But from 1986 onwards, the commercial performance of the BPDB deteriorated and in 1991, BPDB's average gross systems loss was about 42 percent and accounts receivables in excess of 6.5 months of billing. This performance was not found reasonable to the covenants agreed by the Government and BPDB with the Asian Development Bank and the World Bank.
So in 1990, another ordinance was issued, which was subsequently enacted as an Act transferring the 132 kV, 33 kV transmission and distribution system in the Greater Dhaka Area including the Metropolitan City to a newly created Government agency called the Dhaka Electric Supply Authority (DESA). This was done to lessen the administrative burden on BPDB's management by relieving it of the burden of managing about 50 percent of the energy distribution of the entire country.
With the economy performing very well during 1992–95, the demand for electricity grew substantially. Faced with a grim possibility of serious electricity shortages during the next few years and to enable the sector to be financially self-sustaining and also attract private capital, the cabinet approved in principle, the inter-ministerial committee report named "Power Sector Reforms in Bangladesh (PSRB)". [8] [9]
In the meanwhile, the performance of BPDB and DESA have slowly but steadily improved, although they are by no means near international levels of performance. In view of this Improvement and the restructuring effort announced by the Government, the development partners have agreed to resume funding to the sector based on the principle of "Reforms Fundina Linkaaes" i.e. every project funded by these partners would have components addressing the reforms decided upon by the Government. The Project has been linked to redefining the franchise area of DESA and handing over of distribution networks outside Metropolitan Dhaka City to Rural Electrification Board (REB), and formation of a corporatized Dhaka Electric Supply Company (DESCO) which will initially take over part of the distribution network of DESA and ultimately take over all its assets. The formation of this company is seen as an essential step towards " Corporatization and Commercialization" of the sector and to reduce the excessive inefficiently in the distribution network in the capital.
Name of zone | Name of S&D division |
---|---|
Gulshan | Badda |
Baridhara | |
Joarshahara | |
Gulshan | |
Mirpur | Agargaon |
Kafrul | |
Monipur | |
Pallabi | |
Rupnagar | |
Shah Ali | |
Uttara | Dakshinkhan |
Tongi (East) | |
Tongi (West) | |
Uttara (East) | |
Uttara (West) | |
Uttarkhan |
The company's formal organizational structure involves a hierarchical system. The chairman and the board of directors make up the top of this structure. The executive head of the organization is the managing director, under whom five executive directors, two general managers, two chief engineers, twelve superintending engineers, two deputy general managers and one company secretary operate the executive duties.
To increase effectiveness in its field activities, DESCO has established 16 sales and distribution (S&D) divisions under 3 operational zones.
The superintending engineer is in charge of a zone who supervises the executive engineers, the key responsible person of each S&D Division. Each executive engineer accomplishes his duties by two sub-divisional engineers, one for system related activities and another for commercial-related activities. Two assistant engineers act as assisting body under each sub-divisional engineer.
System related activities include scheduled maintenance, troubleshooting and breakdown maintenance of substation and switching stations, troubleshooting of customer complaints, line and equipment maintenance etc. Commercial-related activities include meter reading, distribution of monthly electricity bills, service disconnection of the defaulter consumer, customers' house wiring inspection, new electric connection, meter installation, change of old or unserviceable meter etc.
DESCO has outsourced a group of experienced workers for field level activities, including other logistic support services like security service, cleaning service and partial transport service. To this end, DESCO engaged in several experienced contractors through competitive bidding process. With the proper maintenance of the distribution system, service complaints from consumers have been reduced significantly.
The procedure for new connection has been simplified to achieve greater consumer satisfaction and efforts are on to further reduce the average time now taken. DESCO team tries their best to give a new connection within 21 working days. To make it more simple and quick DESCO has launched "Online Application" on 23 February 2012 for new connection [11] and DESCO is the first distribution company in the country which has started it.
The company has a group of IT experts for management information systems (MIS) and for developing new software on demand. "E-Governance" is such software developed by the DESCO IT team which has simplified the new connection-related job in a very smart way. This team is also continuously working for better complaint management, monthly bill process and collection, miscellaneous bill collection and correction, maintaining the DESCO website and E-mail Communication, and setting up inter-office Wide Area Network (WAN) Connectivity. DESCO website is Secure Sockets Layer (SSL) protected and a consumer can pay their monthly bill easily online using debit or credit cards. [11]
Name of zone | Name of control center |
---|---|
Mirpur | Mirpur Control (Kafrul) |
Agargaon Control | |
Uttara | Uttara Control |
Tongi Control | |
Gulshan | Gulshan Control |
Baridhara Control |
DESCO has 26 33/11 kV substations and it has a separate division named Substation & Network to maintain these substations. The division has an Superintending Engineer under the Chief Engineer, Network Operation. This division is divided into two departments: Medium Voltage Substation Maintenance & Commissioning (MVSSMC) and Grid & Protection (G & P). Services including electric power substation inspection, troubleshooting of any equipment operation, testing of any substation relay for proper operation, testing and commissioning, test reporting are done by these two departments.
DESCO's Central Control, located at Gulshan, is under the Substation & Network division for optimal scheduling and dispatch of electricity among the 6 divisional control centers. To enable this, the control centre is equipped with a reliable communication network, an accurate data acquisition system (DAS) and a visual display system for live data received from various locations. It was also proposed that a fully equipped supervisory control and data acquisition (SCADA) system was established, for a more reliable and faster data processing and data formatting system.
Electricity is a constantly developing technology and to be consistent with this development DESCO has two separate division for Development & Project and Planning & Design. A project is typically managed by the project division in the five following steps:
DESCO has completed a study to ascertain load demand and consumer growth in the area up to the year 2030 with 5 years phasing. The report shows that the load demand of DESCO will increase to 1,129 MVA by the year 2015, to 1,910 MVA by the year 2020, to 3,489 MVA by the year 2025 and to 6,288 MVA by the year 2030. Accordingly, DESCO has prepared a plan to cater this increasing load demand. For this purpose, 117 new 33/11 kV substations and 28 new 132/33 kV grid substations will be required along with upgrades of some existing substations. Presently a number of projects are in an implementation stage under the "Sustainable Power Sector Development Program" (SPSDP) [12] and on turnkey basis by DESCO's own fund. [2] In partnership with others, the Planning & Design division supports to plan and implement these projects in a disciplined way.
On 24 January 2000, three senior officials including the managing director of DESCO were fired for failure to perform their duty. [13] In 2008, Senior Special Judge Mohammad Azizul Haque issued arrest warrants against the managing director of DESCO Saleh Ahmed, former Chairman of Dhaka Electricity Supply Authority (the predecessor of DESCO) Towhidul Islam, and thirteen others. [14]
In 2016, the Government plan to replace all electric meters with prepaid ones ran into trouble due to lack of skilled manpower and corruption. The low-level DESCO employees also feared being laid off after the installation of prepaid meters. [15] On 13 January 2020, Bangladesh Anti Corruption Commission raided the office of DESCO over the alleged purchase of substandard prepaid electricity meters. [16]
In March 2017, three employees of DESCO, Director General AHM Nurul Huda executive director Rafiuddin, and manager Khandaker Nazibul Alam, were suspended on allegations of embezzling 9.1 million taka from the company. [17]
Following the Covid-19 Pandemic in Bangladesh DESCO meter readers could not read the electric meters in-person during the lock down so DESCO made bills based on estimates leading to "exorbitant bills" for consumers. [18]
Electric power distribution is the final stage in the delivery of electricity. Electricity is carried from the transmission system to individual consumers. Distribution substations connect to the transmission system and lower the transmission voltage to medium voltage ranging between 2 kV and 33 kV with the use of transformers. Primary distribution lines carry this medium voltage power to distribution transformers located near the customer's premises. Distribution transformers again lower the voltage to the utilization voltage used by lighting, industrial equipment and household appliances. Often several customers are supplied from one transformer through secondary distribution lines. Commercial and residential customers are connected to the secondary distribution lines through service drops. Customers demanding a much larger amount of power may be connected directly to the primary distribution level or the subtransmission level.
The electric power industry covers the generation, transmission, distribution and sale of electric power to the general public and industry. The commercial distribution of electric power started in 1882 when electricity was produced for electric lighting. In the 1880s and 1890s, growing economic and safety concerns lead to the regulation of the industry. What was once an expensive novelty limited to the most densely populated areas, reliable and economical electric power has become an essential aspect for normal operation of all elements of developed economies.
Transpower New Zealand Limited (TPNZ) is the state-owned enterprise responsible for electric power transmission in New Zealand. It performs two major functions in the New Zealand electricity market. As the owner of the National Grid it provides the infrastructure of electric power transmission that allows consumers to have access to generation from a wide range of sources, and enables competition in the wholesale electricity market; as system operator it manages the real-time operation of the grid and the physical operation of the electricity market.
Vector Limited is a New Zealand energy company, which runs a portfolio of businesses delivering energy and communication services across Australasia and the Pacific. Its primary business is electricity distribution, along with distributing piped gas. It also has a bottled gas business, owns a fibre optic cable network, deploys electricity and gas meters, manages solar infrastructure projects and offers cybersecurity services and a data platform. It is also the parent company of HRV ventilation solutions.
The Tanzania Electric Supply Company Limited (TANESCO) is a Tanzanian parastatal organisation established in 1964. It is wholly owned by the government of Tanzania. The Ministry of Energy and Minerals regulates the operations of TANESCO.
Kerala State Electricity Board (KSEB) is an Indian public sector undertaking under the Government of Kerala that generates, transmits and distributes electricity in the state under government monopoly. Established in 1957, the agency comes under the authority of the Department of Power. It has been registered under Indian Companies Act 1956 during January 2011.
The smart grid is an enhancement of the 20th century electrical grid, using two-way communications and distributed so-called intelligent devices. Two-way flows of electricity and information could improve the delivery network. Research is mainly focused on three systems of a smart grid – the infrastructure system, the management system, and the protection system. Electronic power conditioning and control of the production and distribution of electricity are important aspects of the smart grid.
The electricity sector in New Zealand uses mainly renewable energy, such as hydropower, geothermal power and increasingly wind energy. As of 2021, the country generated 81.2% of its electricity from renewable sources. The strategy of electrification is being pursued to enhance the penetration of renewable energy sources and to reduce greenhouse gas (GHG) emissions across all sectors of the economy. In 2021, electricity consumption reached 40 terawatt-hours (TW⋅h), representing a 0.2% increase compared to the consumption levels in 2010.
An electrical grid is an interconnected network for electricity delivery from producers to consumers. Electrical grids consist of power stations, electrical substations to step voltage up or down, electric power transmission to carry power over long distances, and finally electric power distribution to customers. In that last step, voltage is stepped down again to the required service voltage. Power stations are typically built close to energy sources and far from densely populated areas. Electrical grids vary in size and can cover whole countries or continents. From small to large there are microgrids, wide area synchronous grids, and super grids.
Mahavitaran or Mahadiscom or MSEDCL (Maharashtra State Electricity Distribution Company Limited) is a wholly-owned subsidiary of the Maharashtra State Electricity Board. It is the largest electricity distribution utility in India (2nd largest in the World after SGCC). MSEDCL distributes electricity to the entire state of Maharashtra except for some parts of Mumbai city where Brihanmumbai Electric Supply and Transport, Tata Power and Adani Electricity Mumbai Limited are electricity distributors.
Mahapareshan or Mahatransco is a wholly owned by government of Maharashtra and the major electricity transmission company in the state of Maharashtra, India.after 2003 it is converted to state-owned Electricity Companies.
The utility electricity sector in Bangladesh has one national grid operated by Power Grid Company of Bangladesh with an installed capacity of 25,700 MW as of June 2022. Bangladesh's energy sector is not up to the mark. However, per capita energy consumption in Bangladesh is considered higher than the production. Electricity was introduced to the country on 7 December 1901.
Power Grid Company of Bangladesh Ltd. (PGCB) is the sole organization of Government of Bangladesh entrusted with transmission of power throughout the country. It is a government owned Public Limited Company which is listed at the Dhaka and Chittagong Stock Exchange.
The Bangladesh Power Development Board (BPDB) is a government agency operating under the Ministry of Power, Energy and Mineral Resources, Government of the People's Republic of Bangladesh. It was created as a public-sector organization to boost the country's power sector after the emergence of Bangladesh as an independent state in 1972. This government organization is responsible for planning and developing the nation's power infrastructure and for operating much of its power generation facilities. The BPDB is responsible for the major portion of generation and distribution of electricity mainly in urban areas of the country.
Marlborough Lines Limited is an electricity distribution company, based in Blenheim, New Zealand. Marlborough Lines is responsible for subtransmission and distribution of electricity to approximately 26,000 customers in the Marlborough Region over a service area of 11,330 km2 (4,370 sq mi). The network includes approximately 3,400 km (2,100 mi) of power lines extending to some very isolated areas across the region, including the extremities of the Marlborough Sounds, which can only be reached by boat or helicopter.
Electricity Ashburton Limited, trading as EA Networks is a co-operatively-owned electricity distribution company, based in Ashburton, New Zealand.
Central Training Institute, popularly known as CTI Jabalpur, is located in Nayagaon, Jabalpur, Madhya Pradesh, India. It is an apex engineering and civil service training institute of the Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Ltd (MPPKVVCL), wholly owned by the Government of Madhya Pradesh. The institute provides technical and managerial training to assistant engineers, junior engineers, accounts officers, HR managers, office assistants, line men, and testing assistants.
The electricity sector in Macau ranges from generation, transmission, distribution and sales of electricity in Macau, China.
Dhaka Power Distribution Company Limited (DPDC) is a Public Limited Company under the Power Division of the Ministry of Power, Energy and Mineral Resources, Government of Bangladesh, that manages the distribution of electricity to the customers of the Dhaka City Corporation area. The company, created as a part of the Power Sector Reform Programme, was registered on 25 October 2005 under the Companies Act, 1994. The government owns 100% share of the company. DPDC started commercial operation on 1 July 2008 taking over from Dhaka Electric Supply Authority (DESA). All the assets and liabilities of DESA were transferred to DPDC through an agreement signed in September 2008.
West Zone Power Distribution Company Limited (WZPDCL) is a state-owned utility and electricity distribution company in Bangladesh and is located in Khulna, Bangladesh.