Payra Power Station | |
---|---|
Country | Bangladesh |
Coordinates | 21°59′50.86″N90°18′13.31″E / 21.9974611°N 90.3036972°E |
Status | Operational |
Commission date | 2020 |
Construction cost | $2.48 billion |
Owner | Bangladesh-China Power Company Limited (BCPCL) |
Operator | BCPCL |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Units operational | 2 x 660 MW |
Nameplate capacity | 1,320 MW |
The Payra 1320 MW thermal power plant is a 1,320 megawatt coal-fired power station built in Kalapara Upazila of Patuakhali District in southern Bangladesh. [1] [2] It is a joint venture between the North-West Power Generation Company Bangladesh Limited (NWPGCL) and China National Machinery Import and Export Corporation (CMC). [3] Till May 2023, this plant was producing 700 to 1000 megawatts of electricity every day.
On 19 March 2015, a deal was signed between NWPGCL and the CMC to set up the Payra Power Plant. [4] The joint venture was named Bangladesh-China Power Company Limited (BCPCL). [4] On 29 March 2016, BCPCL signed an engineering, procurement and construction (EPC) contract with consortium of NEPC &CECC for the installation of the power plant. [5]
The plant consists of two units, each with a capacity of 660 MW. [6] The cost was estimated initially around US$1.56 billion; [7] the total project cost was US$2.48 billion. [8] The plant has been built on an area of 397 hectare. [9] The first unit became operational on the 15th May 2020 and the second unit on the 8th December 2020. It is the largest electricity generating unit of Bangladesh currently in operation. On 21 March 2022, PM Sheikh Hasina inaugurated the power plant after it was fully completed.
Wind power is a form of renewable energy in Pakistan which makes up more than 6% of the total electricity production in the country. As of 2018, wind power capacity in Pakistan was 1,287 MW. The government is looking to increase the share of renewable energy and plans to add around 3.5 GW of wind energy capacity by 2018.
Shanghai Electric is a Chinese multinational power generation and electrical equipment manufacturing company headquartered in Shanghai. The company traces its roots to 1880.
The utility electricity sector in Bangladesh has one national grid operated by Power Grid Company of Bangladesh with an installed capacity of 25,700 MW as of June 2022. Bangladesh's energy sector is not up to the mark. However, per capita energy consumption in Bangladesh is considered higher than the production. Electricity was introduced to the country on 7 December 1901.
NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking (PSU) under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.
Bangladesh first conceived building a nuclear power plant in 1961. The Bangladesh Atomic Energy Commission was established in 1973. The country currently operates a TRIGA research reactor at the Atomic Energy Research Establishment in Savar.
Orion Group is one of the largest Bangladeshi industrial conglomerates. The industries under this conglomerate include Orion Pharma Ltd, chemicals, pharmaceuticals, infrastructure development, agribusiness, hospitality, textiles, aviation etc. Orion was established by Obaidul Karim, the chairman of the group, and Salman Obaidul Karim, his the managing director. It built the Mayor Hanif flyover in Dhaka. The tallest building in Bangladesh, City Centre Dhaka is built by this group. The company is also the sole franchisee of Krispy Kreme and Fish & Co. restaurants in Bangladesh.
The Rooppur Nuclear Power Plant (Bengali: রূপপুর পারমাণবিক বিদ্যুৎকেন্দ্র) is a 2.4 GWe nuclear power plant project in Bangladesh. The nuclear power plant is being constructed at Rooppur of Ishwardi Upazila on the bank of the river Padma, about 160 km northwest of Dhaka. It will be the country's first nuclear power plant, and the first of the two units is expected to go into operation in 2025.
The Duyên Hải Power Station is a complex of under-construction coal-fired power plants in Vietnam. It is located in Mu U Hamlet, Dan Thanh Commune, Duyên Hải District, Trà Vinh Province. The complex will have a total capacity of 3,689 MW. It includes also a seaport coal terminal, to be built by China Communications Construction Company, with a capacity of 12 million tonnes of coal and oil per year.
The Rampal Power Station is a 1320 megawatt coal-fired power station currently under construction at Rampal Upazila of Bagerhat District in Khulna, Bangladesh. The power plant, being constructed over 1834 acres of land, is situated 14 kilometres north of the world's largest mangrove forest Sundarbans, which is a UNESCO World Heritage Site. It will be the country's largest power plant.
Renewable energy in Bangladesh refers to the use of renewable energy to generate electricity in Bangladesh. The current renewable energy comes from biogas that is originated from biomass, hydro power, solar and wind. According to National database of Renewable Energy total renewable energy capacity installed in Bangladesh 1374.68 MW.
Barapukuria Power Station is located near Durgapur, Dinajpur, Bangladesh. It consists of two 125-megawatt units and one 275-MW unit. This coal-fired power station was commissioned in 2006, and is operated by the Bangladesh Power Development Board (BPDB).
The Nabinagar Thermal Power Station Project (NTPS) of Bhartiya Rail Bijlee Company Limited is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It installs a 4X 250 MW thermal power plant at Nabinagar in Aurangabad district, Bihar, India. Nearly 90 per cent of the electricity generated from the plant is supplied to the railways to meet nationwide requirements and remaining 10 per cent is given to Bihar.
The Engro Thar Coal Power Project (Thar-ll), also known as Engro Powergen Thar, is a coal-fired power plant developed as part of the China–Pakistan Economic Corridor by Sindh Engro Coal Mining Company and China Machinery Engineering Corporation in the Thar Block-II of the Thar Coalfield, Tharparkar District, Sindh, Pakistan 25 kilometers from the town of Islamkot near the village of Singharo-Bitra.
The Port of Payra is a seaport located at Kalapara in Patuakhali, Bangladesh. It was established by an Act of Parliament in 2013. The port was officially inaugurated in 2016. It is located on the Ramnabad Channel near the Bay of Bengal. The port is undergoing several Development and expansion and the project is expected to be completed in 2020.
Bangladesh Diesel Plant Limited is a state owned company in Bangladesh, that is operated by Bangladesh Army. As of 2024, General Waker-uz-Zaman is the chairman of the board of directors and Brig Gen Md Reazur Rahman is the managing director of Bangladesh Diesel Plant Limited.
Cuddalore IL&FS Power Station is a 1,200-megawatt (MW) coal-fired power station in Tamil Nadu, India.
North-West Power Generation Company Limited (NWPGCL) is a state owned power and electric company in Bangladesh and is located in UTC Building, 8 Panthapath, Kawranbazar, Dhaka, Bangladesh. It is an enterprise of the Bangladesh Power Development Board (BPDB).
Ashuganj Power Station is located near to the Titas Gas field and at the bank of river Meghna, Bangladesh. It consists of 1647 megawatt units. An agreement was signed in 1966 with a foreign construction company to establish a Thermal Power Plant in Ashuganj. It is owned and operated by Ashuganj Power Station Company Ltd.
Emba Hunutlu power station is a 1320 MW coal fired power station in Turkey in Adana Province. As of 2022 it is the largest Chinese foreign direct investment in the country. Despite opposition from many environmental organisations the plant was started up in 2022 and burns Russian coal as it is cheaper than other coal. The plant is less than 2 km from another coal-fired power station, İsken Sugözü.