British Rail Class D3/12

Last updated

Southern Railway diesels 1–3
British Rail Class D3/12 [1]
Hither Green Locomotive Depot geograph-2396523-by-Ben-Brooksbank.jpg
Ex-SR 0-6-0 Diesel-electric shunter 15202 at Hither Green Locomotive Depot, looking north-east in the Locomotive Yard. 12 March 1960
Type and origin
Power typeDiesel-electric
Builder Southern Railway, Ashford Works
English Electric Co. Ltd, Preston Works
Order numberSR A936/37
Build date1937
Total produced3
Specifications
Configuration:
   Whyte 0-6-0 DE
   UIC C
Gauge 4 ft 8+12 in (1,435 mm) standard gauge
Wheel diameter4 ft 6 in (1.372 m)
Minimum curve 3 chains (198.00 ft; 60.35 m)
Wheelbase 11 ft 6 in (3.505 m)
Length30 ft 3.25 in (9.227 m)
Width8 ft 5.5 in (2.578 m)
Height12 ft 9 in (3.886 m)
Loco weight55 long tons 5 cwt (123,800 lb or 56.1 t)
56.1  t; 61.9 short tons
Fuel capacity600 imp gal (2,700 l; 720 US gal)
Prime mover English Electric 6K
Traction motors English Electric, 2 off
MU working Not fitted
Train heatingNone
Performance figures
Maximum speed30 mph (48 km/h)
Power outputEngine: 350 bhp (260 kW)
Tractive effort 30,000 lbf (133.4 kN)
Career
Operators
Class BR: D3/12; later 3/9A
Numbers
  • SR: 1–3
  • BR: 15201–15203
Withdrawn1964
DispositionAll scrapped

British Rail class D3/12 was a class of three experimental diesel-electric shunting locomotives designed by Richard Maunsell of the Southern Railway in 1937. They quickly proved their effectiveness, and although they were not immediately replicated due to the advent of the Second World War, the class were the basis for a larger class of similar locomotives introduced by Oliver Bulleid in 1949.

Contents

Background and Construction

Once the UK economy began to improve in the mid 1930s, the Southern Railway had further need for heavy shunting locomotives in its marshalling yards around London. The Z class steam locomotives had proved successful for this task but Maunsell wanted to compare their performance with diesel-electric alternatives. He therefore sought authorisation for the construction of three experimental locomotives for use in the busy Norwood marshalling yard where there was a continuous need for such locomotives. No private manufacturer was in a position to build the new locomotives and so they were jointly constructed by the Southern Railway's Ashford works, who constructed the framing, cabs and bodywork, and English Electric Ltd of Preston, who fitted the traction motors. The three locomotives were also provided with duplicate controls to enable them to be driven by one man from either side of the cab. They were delivered during September and October 1937. [2]

Operation

After a few teething problems, the class quickly proved the advantages of diesel electric shunters in terms of effectiveness, cost-saving, and driver comfort. Although at £7,275 they cost £1,100 more to build than a Z class steam locomotive, each one saved about £1,700 per year in operating costs. They could be used continually day and night for six days each week at Norwood without any service requirement beyond refuelling. [3] They were however found to be too slow for their secondary task of freight transfers around the congested passenger lines in the London area, although perfectly well suited to this traffic on rural lines.

As a result of these experiments Maunsell's successor, Oliver Bulleid, received authorisation to build a further eight members of the class in July 1939 but this order was quickly cancelled as a result of the outbreak of the Second World War. [4]

Between 1941 and 1945 the locomotives were commandeered by the War Department for use on the Martin Mill military railway to haul cross-channel gun installations and ammunition. (Diesel locomotives were required for this task as they would not give away their position to enemy gunners.) They were returned to the Southern Railway in 1945. [4]

Following the formation of British Railways in 1948, twenty-six similar, but lighter locomotives were constructed to Bulleid's design. These later became British Rail Class 12. The three original locomotives continued their traditional work around London. Two of the locomotives were however loaned to the Western Region between 1951 and 1953 for use at the Acton marshalling yard. After replacement at Norwood by more modern locomotives they worked as shunters at Hither Green marshalling yard, at Eastleigh and Ashford works. One was also tried out at Lancing Carriage Works in 1961 as a replacement for the aged "Stroudley Terrier" but was found to be too slow.

Although they were still in good operating condition, the locomotives were withdrawn in November and December 1964, as by then the Southern Region had many modern replacements. None have been preserved.

Numbering

The original intention was to number the locomotives 958 to 960, following on from the steam locomotives of the Z class, but as delivered they were numbered 1 to 3 in a separate list from the SR's steam locomotives. [3] They were later renumbered by British Railways 15201–15203. [5]

See also

Footnotes

  1. Details from Marsden 1981, pp. SR: 1–3
  2. Bradley 1975, pp. 51–53.
  3. 1 2 Bradley 1975, p. 51.
  4. 1 2 Bradley 1975, p. 52.
  5. Bradley 1975, p. 53.

Related Research Articles

Switcher Small railroad locomotive intended for assembling trains

A switcher, shunter, yard pilot, switch engine, yard goat, or shifter is a small railroad locomotive used for manoeuvring railroad cars inside a rail yard in a process known as switching (US) or shunting (UK). Switchers are not intended for moving trains over long distances but rather for assembling trains in order for another locomotive to take over. They do this in classification yards. Switchers may also make short transfer runs and even be the only motive power on branch lines and switching and terminal railroads. The term can also be used to describe the workers operating these engines or engaged in directing shunting operations. Switching locomotives may be purpose-built engines, but may also be downgraded main-line engines, or simply main-line engines assigned to switching. Switchers can also be used on short excursion train rides.

Oliver Bulleid British railway engineer (1882-1970)

Oliver Vaughan Snell Bulleid CBE was a British railway and mechanical engineer best known as the Chief Mechanical Engineer (CME) of the Southern Railway between 1937 and the 1948 nationalisation, developing many well-known locomotives.

Southern Railway (UK) British "Big 4" railway company, active 1923–1947

The Southern Railway (SR), sometimes shortened to 'Southern', was a British railway company established in the 1923 Grouping. It linked London with the Channel ports, South West England, South coast resorts and Kent. The railway was formed by the amalgamation of several smaller railway companies, the largest of which were the London & South Western Railway (LSWR), the London, Brighton and South Coast Railway (LB&SCR) and the South Eastern and Chatham Railway (SE&CR). The construction of what was to become the Southern Railway began in 1838 with the opening of the London and Southampton Railway, which was renamed the London & South Western Railway.

British Rail Class 05 Class of 69 204hp diesel-mechanical shunting locomotives

The British Rail Class 05 is a class of 0-6-0 diesel-mechanical shunters built by Hunslet Engine Company from 1955 to 1961. They were used on the Eastern and Scottish Regions of British Railways. The first two batches were delivered as 11136-11143 and 11161-11176. Subsequent locomotives were delivered, new, as D2574-D2618.

British Rail Class 08 Diesel-electric shunting locomotives

The British Rail Class 08 is a class of diesel-electric shunting locomotive built by British Railways (BR). As the standard BR general-purpose diesel shunter, the class became a familiar sight at major stations and freight yards. Since their introduction in 1952 however, the nature of rail traffic in Britain has changed considerably. Freight trains are now mostly fixed rakes of wagons, and passenger trains are mostly multiple units or have Driving Van Trailers, neither requiring the attention of a shunting locomotive. Consequently, a large proportion of the class has been withdrawn from mainline use and stored, scrapped, exported or sold to industrial or heritage railways.

British Rail Class 12

The British Rail Class 12 is a diesel locomotive built primarily for shunting duties around London.

British Rail Class 13

The British Rail Class 13 was a type of diesel-electric shunting locomotive. The type was designed in 1965 because of the need to provide more powerful shunters for the Tinsley Marshalling Yard. Because of Tinsley's status as a hump yard, it was not possible to use a single locomotive owing to the risk of grounding. So, to achieve the required power, a pair of Class 08 shunters were permanently coupled in 'master and slave' formation, with the slave unit having had its cab removed. Both units were then ballasted to improve traction. Initially coupled cab-to-cab, it was found more practical to couple master nose to slave cab.

The Southern Railway took a key role in expanding the 660 V DC third rail electrified network begun by the London & South Western Railway. As a result of this, and its smaller operating area, its steam locomotive stock was the smallest of the 'Big Four' companies.

SR Z class

The SR Z class was an 0-8-0T 3-cylinder tank engine designed by Richard Maunsell and intended for heavy shunting on the Southern Railway, the first eight entering into service in 1929. It was a successful design and would have been built in greater numbers, but an order for a further ten was cancelled in 1930 due to the reduction in freight traffic as a result of the Great Depression.

SR W class

The SR Class W were 3-cylinder 2-6-4T tank engines designed in 1929 by Richard Maunsell for use on the Southern Railway. They were introduced in 1932 and constructed at Eastleigh and Ashford. The class was intended for short distance, inter-company/regional freight traffic transfer in London, and were standardised with parts from the N, N1, U and U1 classes.

LSWR N15 class Class of 74 two-cylinder 4-6-0 locomotives

The LSWR N15 class was a British 2–cylinder 4-6-0 express passenger steam locomotive designed by Robert W. Urie. The class has a complex build history spanning three sub-classes and eight years of construction from 1918 to 1927. The first batch of the class was constructed for the London and South Western Railway (LSWR), where they hauled heavy express trains to the south coast ports and further west to Exeter. After the Lord Nelsons, they were the second biggest 4-6-0 passenger locomotives on the Southern Railway. They could reach speeds of up to 90 mph (145 km/h).

SR Q1 class Class of 0-6-0 freight engines designed by Oliver Bulleid

The SR Q1 class is a type of austerity steam locomotive constructed during the Second World War. The class was designed by Oliver Bulleid for use on the intensive freight turns experienced during wartime on the Southern Railway network. A total of 40 locomotives were built. Bulleid incorporated many innovations and weight-saving concepts to produce a highly functional design. The class lasted in service until July 1966, and the first member of the class, number C1, has been preserved by the National Railway Museum.

Ashford railway works

Ashford railway works was in the town of Ashford in the county of Kent in England.

SR Q class Class of 20 two-cylinder 0-6-0 steam locomotives

The Q Class is a type of 0-6-0 steam locomotive designed by Richard Maunsell of the Southern Railway and constructed immediately prior to the Second World War for use on medium-distance freight trains throughout the network. Twenty locomotives were built by Maunsell's successor, Oliver Bulleid, in 1938. The design was relatively old-fashioned and the class was soon afterwards eclipsed by Bulleid's own more powerful Q1 class. Nevertheless the locomotives performed adequately and reliably on the tasks for which they had been designed, until their withdrawal in 1965. Only one has survived, and is preserved on the Bluebell Railway.

LB&SCR E2 class Class of 0-6-0T steam locomotives

The London, Brighton and South Coast Railway (LB&SCR) E2 Class was a class of 0-6-0T steam locomotives designed by Lawson Billinton, intended for shunting and short-distance freight trains. Ten examples were built between 1913 and 1916, and all were withdrawn from service and scrapped between 1961 and 1963.

British Rail 11001 Diesel-mechanical railway locomotive used in Great Britain

11001 was one of the first British Railways diesel locomotives, built in 1949 at British Railways' Ashford Works. It was designed by O. V. S. Bulleid when he was Chief Mechanical Engineer of the Southern Railway. It was powered by a Paxman RPH Series 1 engine, capable of delivering 500 brake horsepower (370 kW) at 1,250 rpm. It was driven via a Vulcan-Sinclair fluid coupling to an SSS (synchro-self-shifting) Powerflow gearbox. The gearbox provided three forward and reverse gears in either high or low range, with top speed ranging from 5 mph (8 km/h) in 1st gear, low range up to 36 mph (58 km/h). It had a 0-6-0 wheel formation, driven by rods from a rear jackshaft on the final drive, and with Bulleid's favoured BFB wheels.

SR USA class

The SR USA class are some ex-United States Army Transportation Corps S100 Class steam locomotives purchased and adapted by the Southern Railway (SR) after the end of the Second World War to replace the LSWR B4 class then working in Southampton Docks. SR staff nicknamed them "Yank Tanks".

New Zealand DH class locomotive

The New Zealand DH class locomotive is a type of diesel-electric heavy transfer and shunting locomotive in New Zealand's national railway network. The class consists of six heavy shunt U10B type locomotives built by General Electric United States at their Erie, Pennsylvania plant in 1978. Five of the class are used in the Auckland area for heavy shunting duties, including services around Auckland and the Port of Auckland, while one is based at the Port of Tauranga in Mount Maunganui.

LSWR G16 class

The LSWR G16 class is a steam tank locomotive class of 4-8-0T wheel arrangement. It was designed by Robert Urie and introduced in 1921 specifically for heavy shunting over humps at Feltham marshalling yard, on the London and South Western Railway (LSWR). They were based upon Urie's previous S15 class freight design, and apart from several periods of operating elsewhere on the LSWR and Southern railway network, they remained at Feltham for most of their operational careers.

0-6-0+0-6-0 Locomotive wheel arrangement

Under the Whyte notation for the classification of steam locomotives, 0-6-0+0-6-0 represents the wheel arrangement of an articulated locomotive with two separate swivelling engine units, each unit with no leading wheels, six powered and coupled driving wheels on three axles and no trailing wheels. The arrangement is effectively two 0-6-0 locomotives operating back-to-back and was used on Garratt, Double Fairlie, Meyer and Kitson-Meyer articulated locomotives. A similar arrangement exists for Mallet steam locomotives on which only the front engine unit swivels, but these are referred to as 0-6-6-0.

References