Frongoch | |
---|---|
General information | |
Location | Frongoch, west of Bala, Gwynedd Wales |
Coordinates | 52°56′20″N3°38′00″W / 52.9388°N 3.6332°W Coordinates: 52°56′20″N3°38′00″W / 52.9388°N 3.6332°W |
Grid reference | SH 903 392 |
Platforms | 1 [1] [2] |
Other information | |
Status | Disused |
History | |
Original company | Bala and Festiniog Railway |
Pre-grouping | Great Western Railway |
Key dates | |
1 November 1882 | Opened [3] |
4 January 1960 | Closed to passengers [4] |
28 January 1961 | Closed completely |
Bala & Festiniog Railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Frongoch railway station served the village of Frongoch on the Great Western Railway's Bala Ffestiniog Line in Gwynedd, Wales. [5]
The station closed to passengers in January 1960, and to freight a year later, with the last revenue-earning train on 27 January 1961. [6]
In 1882 the Bala and Ffestiniog Railway opened the line from Bala Junction to a temporary terminus at Festiniog, Frongoch was one of the stations opened with the line. At Festiniog passengers had to transfer to narrow gauge trains if they wished to continue northwards. [7] [8] To do this people travelling from Bala to Blaenau or beyond walked the few yards from the standard gauge train to the narrow gauge train much as they do today between the Conwy Valley Line and the Ffestiniog Railway at Blaenau Ffestiniog.
The following year the narrow gauge line was converted to standard gauge, but narrow gauge trains continued to run until 5 September 1883 using a third rail. Standard gauge trains first ran through from Bala to Blaenau Ffestiniog on 10 September 1883. [9] The line was taken over by the Great Western Railway (GWR) in 1910. [10]
The station remained part of the GWR through the Grouping of 1923. It passed to the Western Region of British Railways on nationalisation in 1948 and was closed by the British Transport Commission, primarily because the line was to be flooded by damming between Arenig and Frongoch to create Llyn Celyn.
The single platform carried both a station building and a signalbox. [11] [12] [13] A siding ran off from the Blaenau end of the platform leading to a goods warehouse [14] and cattle pens. [15] The line crossed the Afon Tryweryn by a metal bridge a short distance from the Bala end of the platform. [16]
The station was the archetypal country station, but served three short-lived unusual traffics:
Despite Royal connections the whisky venture is said to have failed in part because it was founded at the height of "chapel building mania" in North Wales. [22]
The September 1959 timetable shows
After the Second World War at the latest most trains were composed of two carriages, with one regular turn comprising just one brake third coach. At least one train along the line regularly ran as a mixed train, [24] [25] with a second between Bala and Arenig. By that time such trains had become rare on Britain's railways. Workmen's trains had been a feature of the line from the outset; they were the Festiniog and Blaenau Railway's biggest source of revenue. [26] Such a service between Trawsfynydd and Blaenau Ffestiniog survived to the line's closure to passengers in 1960. [27] [28] Up to 1930 at the earliest such services used dedicated, lower standard, coaches which used a specific siding at Blaenau where the men boarded from and alighted to the ballast. [29] [30]
The station closed in January 1960 but freight services between Bala and Blaenau continued for a further year, the last train of all passing on 27 January 1961. [31] The track though the station was lifted in the 1960s.
In 1964 the line reopened from Blaenau southwards to a siding near the site of Trawsfynydd Lake Halt where a large ("Goliath") gantry [32] [33] was erected to load and unload traffic for the then new Trawsfynydd nuclear power station. The main goods transported were nuclear fuel rods carried in nuclear flasks. The new facility was sixteen route miles north of Frongoch, so the reopening brought no reprieve.
Rail enthusiasts' special trains traversed the line from time to time, notably the "last train" from Bala to Blaenau Ffestiniog and return on 22 January 1961. [34] [35]
In 2015 the station building and signal box were in use as a private residence.
The station building was converted to a holiday home during the early 1970s when it was rescued from complete dilapidation. [36] Initially the signal box was converted and the local council agreed that 2½ people could sleep in it. The main station had a small extension added to the end to house a bathroom and the goods warehouse was demolished to make way for several homes.
In 2015 the trackbed in both directions from the station was clearly defined both on satellite imagery and on the ground.
Since 2000 there have been at least two attempts to put the mothballed section of the line to use, but none of these came close to Frongoch. As the line of route to the west has been severed by Llyn Celyn the prospects of revival must be very remote.
Preceding station | Disused railways | Following station | ||
---|---|---|---|---|
Tyddyn Bridge Halt Line and station closed | Great Western Railway Bala and Festiniog Railway | Bala Line and station closed |
The Bala and Festiniog Railway was a 4 ft 8+1⁄2 in, standard gauge, railway backed by the Great Western Railway (GWR) in north-west Wales. It connected Bala with Blaenau Ffestiniog.
Bala Junction railway station was on the Ruabon to Barmouth line in southern Gwynedd, Wales. It closed to passengers on Monday 18 January 1965. Bala Junction was unusual in that it was inaccessible by road and merely served as an interchange station; it was located about ¾ mile to the south-east of the town of Bala.
Capel Celyn Halt was a solely passenger railway station which served the rural area of Capel Celyn west of Bala. It was on the Great Western Railway's (GWR's) Bala Ffestiniog Line in Gwynedd, Wales.
Arenig railway station stood beneath Arenig Fawr on the Great Western Railway's Bala Ffestiniog Line in Gwynedd, Wales. It served this thinly populated upland area, but its particular purposes were to serve Arenig Granite quarry which opened in 1908 next to the station and to act as a passing loop on the largely single-track route. The railway was the quarry's main carrier and also its main customer, crushed stone being used for track ballast.
Trawsfynydd Lake Halt was a solely passenger railway station near the northeastern tip of Llyn Trawsfynydd, Gwynedd, Wales. Many Nineteenth and early Twentieth Century institutions in Wales were given anglicised names, this station being one. Over the years, and especially since the Second World War, most have been rendered into Welsh or given both Welsh and English names. Trawsfynydd Lake Halt closed before this happened.
Maentwrog Road railway station was on the Great Western Railway's Bala Ffestiniog Line in Gwynedd, Wales.
Festiniog railway station served the village of Llan Ffestiniog, Gwynedd, Wales. This station was one of many 19th century institutions in Wales to be given an anglicised name. Over the years, and especially since the Second World War, most have been rendered into Welsh or given both Welsh and English names, but Festiniog station closed before this happened. The village of Llan Ffestiniog - known locally simply as "Llan" - lies over 3 km south of the larger and more recent Blaenau Ffestiniog, and over three miles south by rail.
Trawsfynydd railway station served the village of Trawsfynydd, Gwynedd, Wales.
Manod railway station served the village of Manod which then stood on the southern edge of Blaenau Ffestiniog in Gwynedd, Wales. By 2015 urban spread had resulted in Manod being subsumed by its neighbour.
Tan-y-Manod railway station was a railway station approximately 1 mile (1.6 km) south of Blaenau Ffestiniog, in Gwynedd, North Wales.
Bala railway station was on the Great Western Railway's Bala Ffestiniog Line in Wales. It replaced the first Bala station which was further away from the town, on the Ruabon–Barmouth line.
Tyddyn Bridge Halt was a solely passenger railway station which served a rural area west of Frongoch, near Bala. It was on the Great Western Railway's (GWR's) Bala Ffestiniog Line in Gwynedd, Wales.
Bryn-Celynog Halt was an unstaffed solely passenger railway station which served the rural area of Bryn-Celynog, east of Trawsfynydd, Gwynedd, Wales.
Llafar Halt was an unstaffed solely passenger railway station which served the rural area of Glanllafar, east of Trawsfynydd, Gwynedd, Wales.
Teigl Halt was a solely passenger railway station which served the rural area of Cwm Teigl, south of Blaenau Ffestiniog, Wales.
Trawsfynydd Camp railway station, sometimes referred to as Trawsfynydd Military station served the Trawsfynydd Artillery range at Bronaber, south of Trawsfynydd in Gwynedd, Wales. The station never opened for civilian traffic.
Cwm Prysor Halt was a railway station which served the remote rural area of Cwm Prysor, east of Trawsfynydd, Gwynedd, Wales.
Tyddyngwyn railway station was immediately north of the later Manod station in what was then Merionethshire, now Gwynedd, Wales.
Glynllifon Street railway station was a temporary northern terminus station of the Festiniog and Blaenau Railway (F&BR), sited between the street of the same name and Cwmbowydd Road in Blaenau Ffestiniog. It was never named.
On 10 September 1883 the Bala and Festiniog Railway (B&FR) and the Festiniog Railway (FR) opened what would be known as an interchange station in Blaenau Ffestiniog, Merionethshire, Wales. Merionethshire is now part of the county of Gwynedd.