Arenig railway station

Last updated

Arenig
Arenig station site geograph-3235580-by-Ben-Brooksbank.jpg
Site of the station in 1992
LocationArenig, west of Bala, Gwynedd
Wales
Coordinates 52°56′18″N3°44′27″W / 52.9382°N 3.7408°W / 52.9382; -3.7408 Coordinates: 52°56′18″N3°44′27″W / 52.9382°N 3.7408°W / 52.9382; -3.7408
Grid reference SH 831 392
Platforms2 [1] [2] [3]
Other information
StatusDisused
History
Original company Bala and Festiniog Railway
Pre-grouping Great Western Railway
Key dates
1 November 1882Opened [4]
4 January 1960Closed to passengers [5]
28 January 1961Closed completely [6]

Arenig railway station stood beneath Arenig Fawr on the Great Western Railway's Bala Ffestiniog Line in Gwynedd, Wales. [7] It served this thinly populated upland area, but its particular purposes were to serve Arenig Granite quarry which opened in 1908 next to the station and to act as a passing loop on the largely single-track route. The railway was the quarry's main carrier and also its main customer, crushed stone being used for track ballast. [8] [9]

Contents

The station closed to passengers in January 1960 and freight a year later, with the last revenue earning train on 27 January 1961. [10]

Origins

In 1882 the Bala and Ffestiniog Railway opened the line from Bala Junction to a temporary terminus at Festiniog, Arenig was one of the stations opened with the line. At Festiniog passengers had to transfer to narrow gauge trains if they wished to continue northwards. [11] [12] To do this people travelling from Bala to Blaenau or beyond walked the few yards from the standard gauge train to the narrow gauge train much as they do today between the Conwy Valley Line and the Ffestiniog Railway at Blaenau Ffestiniog.

The following year the narrow gauge line was converted to standard gauge, but narrow gauge trains continued to run until 5 September 1883 using a third rail. Standard gauge trains first ran through from Bala to Blaenau Ffestiniog on 10 September 1883. [13] The line was taken over by the Great Western Railway (GWR) in 1910. [14]

The station remained part of the GWR through the Grouping of 1923, passing to the Western Region of British Railways on nationalisation in 1948. It was closed by the British Transport Commission, primarily because the line was to be flooded by damming east of Arenig. The station was staffed to the end. [15]

Description

There was a station building and signalbox [16] on the Blaenau platform with a waiting shelter on the other. [17] The station was a key watering point before the big slog "over the top" to Trawsfynydd and had a classic GWR water column for this purpose. [18] The site was dominated by the quarry and its plant, which included a large stone crusher next to the station and a bridge bearing a conveyor belt which carried stone over the station to the crusher. [19] [20] [21] [22] The proximity of quarry and railway necessitated clear and precise arrangements for blasting, over which the railwayman in charge at the station had the ultimate veto. [23]

The conveyor belt was installed around 1940 to replace a 2 feet (610 mm) narrow gauge railway which had carried stone from the quarries to the "main line". [24] [25] [26]

Passenger services

The September 1959 timetable shows

After the Second World War at the latest most trains were composed of two carriages, with one regular turn comprising just one brake third coach. At least one train along the line regularly ran as a mixed train, [28] [29] with a second between Bala and Arenig. By that time such trains had become rare on Britain's railways. Workmen's trains had been a feature of the line from the outset; they were the Festiniog and Blaenau Railway's biggest source of revenue. [30] Such a service between Trawsfynydd and Blaenau Ffestiniog survived to the line's closure to passengers in 1960. [31] [32] Up to 1930 at the earliest such services used dedicated, lower standard, coaches which used a specific siding at Blaenau where the men boarded from and alighted to the ballast. [33] [34]

Occasionally "double trains" ran, including at least one mixed double, composed of two locomotives, two coaches and several wagons. [35]

Closure

By the 1950s the line was deemed unremunerative. A survey undertaken in 1956 and 1957 found that the average daily numbers of passengers boarding and alighting were:

Military traffic had ended and, apart from a finite contract to bring cement to Blaenau in connection with the construction of Ffestiniog Power Station [36] freight traffic was not heavy, most arriving and leaving Bala did so from and to the south and that to Blaenau could be handled from the Conwy Valley Line northwards.

In 1957 Parliament authorised Liverpool Corporation to flood a section of the line by damming the Afon Tryweryn. Monies were made available to divert the route round the dam, but it was decided that improving the road from Bala to Llan Ffestiniog would be of greater benefit. [37] Road transport alternatives were established for groups such as schoolchildren and workers. The plans afoot for rail serving Trawsfynydd nuclear power station were to be catered for by building the long-discussed cross-town link between the two Blaenau standard gauge stations. The estimated financial savings to be made were £23,300 by withdrawing the passenger service and £7000 in renewal charges. [38]

The station closed in January 1960 but freight services between Bala and Blaenau continued for a further year, the final train passing on 27 January 1961. [39] The track though the station was lifted in the 1960s.

In 1964 the line reopened from Blaenau southwards to a siding near the site of Trawsfynydd Lake Halt where a large ("Goliath") gantry [40] [41] was erected to load and unload traffic for the then new Trawsfynydd nuclear power station. The main goods transported were nuclear fuel rods carried in nuclear flasks. The new facility was over ten route miles north of Arenig, so the reopening brought no reprieve.

Special trains

Rail enthusiasts' special trains traversed the line from time to time, notably the "last train" from Bala to Blaenau Ffestiniog and return on 22 January 1961. [42] [43] This train took water at Arenig. [44] [45]

The station and art

The mountainous countryside around Arenig was of particular interest to James Dickson Innes who introduced his friend Augustus John to the area. Innes painted several works which have been publicly displayed to some renown, such as "Arenig, North Wales". [46] He and his friend are known to have used the railway as a means of getting to remote spots, as well as to arrive and depart for London and elsewhere. [47]

The station site in the 21st Century

The site was taken over by the adjacent quarry after closure. The platforms and station buildings survived in a derelict state until the early 1980s. Although by 2015 no trace of the platforms and buildings remained, the site could be identified by pillars which were used for supporting the conveyor belt which ran from the quarry over the station to the stone crusher. [48] When the railway closed the quarry lost its key customer and road transport proved costly compared with the erstwhile railborne arrangements. One source writes that the quarry closed in the early 1960s. This in turn led to the village of Arenig losing its main source of employment so it also shrank; [8] another source says it was still being worked by ARC in the 1980s. [49] By 2016 it was definitely disused. [50]

In 2015 the trackbed in both directions from the station was clearly defined both on satellite imagery and on the ground.

The future

Between 2000 and 2011 there were at least two attempts to put the remaining line to use, but none of these aspired to come close to Arenig. As the line of route to the east has been severed by Llyn Celyn the prospects of revival must be very remote.

To considerable local surprise fresh moves to reopen the line from Blaenau as far south as Trawsfynydd began in September 2016, with the formation of The Trawsfynydd & Blaenau Ffestiniog Community Railway Company. On 21 September at least one regional newspaper reported that "Volunteers are set to start work this weekend on clearing vegetation from the trackbed between Blaenau Ffestiniog and Trawsfynydd." The company was quoted as saying "We have been given a licence by Network Rail to clear and survey the line." [51]

Preceding station Disused railways Following station
Cwm Prysor Halt
Line and station closed
  Great Western Railway
Bala and Festiniog Railway
  Capel Celyn Halt
Line and station closed

Related Research Articles

Frongoch railway station Disused railway station in Gwynedd, Wales

Frongoch railway station served the village of Frongoch on the Great Western Railway's Bala Ffestiniog Line in Gwynedd, Wales.

Capel Celyn Halt was a solely passenger railway station which served the rural area of Capel Celyn west of Bala. It was on the Great Western Railway's (GWR's) Bala Ffestiniog Line in Gwynedd, Wales.

Trawsfynydd Lake Halt was a solely passenger railway station near the northeastern tip of Llyn Trawsfynydd, Gwynedd, Wales. Many Nineteenth and early Twentieth Century institutions in Wales were given anglicised names, this station being one. Over the years, and especially since the Second World War, most have been rendered into Welsh or given both Welsh and English names. Trawsfynydd Lake Halt closed before this happened.

Maentwrog Road railway station Disused railway station in Gwynedd, Wales

Maentwrog Road railway station was on the Great Western Railway's Bala Ffestiniog Line in Gwynedd, Wales.

Festiniog railway station served the village of Llan Ffestiniog, Gwynedd, Wales. This station was one of many 19th century institutions in Wales to be given an anglicised name. Over the years, and especially since the Second World War, most have been rendered into Welsh or given both Welsh and English names, but Festiniog station closed before this happened. The village of Llan Ffestiniog - known locally simply as "Llan" - lies over 3 km south of the larger and more recent Blaenau Ffestiniog, and over three miles south by rail.

Trawsfynydd railway station Disused railway station in Gwynedd, Wales

Trawsfynydd railway station served the village of Trawsfynydd, Gwynedd, Wales.

Manod railway station Disused railway station in Gwynedd, Wales

Manod railway station served the village of Manod which then stood on the southern edge of Blaenau Ffestiniog in Gwynedd, Wales. By 2015 urban spread had resulted in Manod being subsumed by its neighbour.

Tan-y-Manod railway station

Tan-y-Manod railway station was a railway station approximately 1 mile (1.6 km) south of Blaenau Ffestiniog, in Gwynedd, North Wales.

Bala (New) railway station Disused railway station in Gwynedd, Wales

Bala railway station was on the Great Western Railway's Bala Ffestiniog Line in Wales. It replaced the first Bala station which was further away from the town, on the Ruabon–Barmouth line.

Tyddyn Bridge Halt was a solely passenger railway station which served a rural area west of Frongoch, near Bala. It was on the Great Western Railway's (GWR's) Bala Ffestiniog Line in Gwynedd, Wales.

Bryn-Celynog Halt was an unstaffed solely passenger railway station which served the rural area of Bryn-Celynog, east of Trawsfynydd, Gwynedd, Wales.

Llafar Halt was an unstaffed solely passenger railway station which served the rural area of Glanllafar, east of Trawsfynydd, Gwynedd, Wales.

Teigl Halt was a solely passenger railway station which served the rural area of Cwm Teigl, south of Blaenau Ffestiniog, Wales.

Trawsfynydd Camp railway station Disused railway station in Gwynedd, Wales

Trawsfynydd Camp railway station, sometimes referred to as Trawsfynydd Military station served the Trawsfynydd Artillery range at Bronaber, south of Trawsfynydd in Gwynedd, Wales. The station never opened for civilian traffic.

Cwm Prysor Halt railway station Disused railway station in Gwynedd, Wales

Cwm Prysor Halt was a railway station which served the remote rural area of Cwm Prysor, east of Trawsfynydd, Gwynedd, Wales.

Tyddyngwyn railway station was immediately north of the later Manod station in what was then Merionethshire, now Gwynedd, Wales.

Glynllifon Street railway station was a temporary northern terminus station of the Festiniog and Blaenau Railway (F&BR), sited between the street of the same name and Cwmbowydd Road in Blaenau Ffestiniog. It was never named.

Blaenau Ffestiniog Central railway station

On 10 September 1883 the Bala and Festiniog Railway (B&FR) and the Festiniog Railway (FR) opened what would be known as an interchange station in Blaenau Ffestiniog, Merionethshire, Wales. Merionethshire is now part of the county of Gwynedd.

Blaenau Ffestiniog passenger stations

North west Wales experienced a slate boom in the first half of the nineteenth century. Three sites stood out as experiencing the most explosive growth: Dinorwic near Llanberis, Penrhyn near Bethesda and Blaenau Ffestiniog.

Diphwys railway station was on the same site as the later Great Western Railway station in the heart of Blaenau Ffestiniog in what was then Merionethshire, now Gwynedd, Wales.

References

  1. Mitchell & Smith 2010, Photo 14.
  2. Southern 1995, pp. 52 & 100.
  3. Photo visible by scrolling well down the text, via Purleston Jones Family History
  4. Quick 2009, pp. 62.
  5. Butt 1995, p. 18.
  6. Shannon & Hillmer 1999, p. 105.
  7. Jowett 2000, Map 45.
  8. 1 2 Southern 1995, p. 49.
  9. Clemens 2003, 9 mins from start.
  10. Southern 1995, p. 64 & 81.
  11. Mitchell & Smith 2010, Map XVI.
  12. Southern 1995, p. 74.
  13. Boyd 1988, p. 47.
  14. Southern 1995, p. 8.
  15. Mitchell & Smith 2010, Photo 20.
  16. Lloyd 1971, p. 203.
  17. Bannister 1987, Chapter Bala Jcn-Blaenau Festiniog.
  18. Turner 2003, p. 18.
  19. Southern 1995, p. 53.
  20. Judge 2001, p. 35.
  21. Southern, Leadbetter & Weatherley 1987, pp. 60–1.
  22. Bannister 1975, p. 82.
  23. Southern 1995, pp. 48–9.
  24. Boyd 1959, p. 540.
  25. Coleford 2010a, p. 510.
  26. Tracks in the quarry, via National Library of Scotland
  27. Mitchell & Smith 2010, Preface.
  28. Christiansen 1976, p. 71.
  29. "Mixed train approaching Blaenau Ffestiniog". RCTS.
  30. Boyd 1988, p. 88.
  31. Southern 1995, pp. 15–17.
  32. 1960 Working timetable, via 2D53
  33. Southern 1995, p. 13.
  34. Blaenau Ffestiniog (GWR) track layout, via Signalling Record Society
  35. Green 1996, p. 37.
  36. Mitchell & Smith 2010, Plate 15.
  37. Morton Lloyd 1961, pp. 270–1.
  38. Coleford 2010b, pp. 577–582.
  39. Southern 1995, p. 64.
  40. Mitchell & Smith 2010, Photo 28.
  41. Southern 1995, p. 71.
  42. Southern 1995, p. 93.
  43. Mitchell & Smith 2010, Photo 16.
  44. Special "Last train" at Arenig, via flickr
  45. "1961 last train at Bala, Arenig and Cwm Prysor Viaduct". NW Rail.
  46. The painting "Arenig, North Wales", via Tate Gallery
  47. "Innes's use of the line, via Keith Bowen, Artist". Archived from the original on 20 December 2016. Retrieved 26 September 2016.
  48. Remains of the quarry, via Geograph
  49. Quarry history visible by scrolling well down the text, via Purleston Jones Family History
  50. Quarrying sites in North Wales, via N Wales Regional Aggregates Working Party
  51. Crump 2016, p. 15.

Sources

Further material