Tyddyn Bridge Halt railway station

Last updated

Tyddyn Bridge Halt
General information
LocationWest of Frongoch, Bala, Gwynedd
Wales
Coordinates 52°56′46″N3°40′09″W / 52.9461°N 3.6693°W / 52.9461; -3.6693
Grid reference SH 878 401
Platforms1 [1] [2]
Other information
StatusDisused
History
Original company Great Western Railway
Key dates
1 November 1882Line opened [3]
1 December 1930Halt opened for passengers only [4]
4 January 1960Halt closed [5]
28 January 1961Line closed [6]

Tyddyn Bridge Halt was a railway station which served the village of Frongoch, Gwynedd, Wales. It was on the Great Western Railway's (GWR's) Bala Ffestiniog Line in Gwynedd, Wales. [7]

Contents

Origins

In 1882 the Bala and Ffestiniog Railway opened the line from Bala Junction to a temporary terminus at Festiniog, Trawsfynydd was one of the stations opened with the line; the future Tyddyn Bridge Halt would be on this line. At Festiniog passengers had to transfer to narrow gauge trains if they wished to continue northwards. [8] [9] To do this people travelling from Bala to Blaenau or beyond walked the few yards from the standard gauge train to the narrow gauge train much as they do today between the Conwy Valley Line and the Ffestiniog Railway at Blaenau Ffestiniog.

The following year the narrow gauge line was converted to standard gauge, but narrow gauge trains continued to run until 5 September 1883 using a third rail. Standard gauge trains first ran through from Bala to Blaenau Ffestiniog on 10 September 1883. [3] The line was taken over by the Great Western Railway in 1910. [10]

Tyddyn Bridge Halt was one of the 198 opened by the Great Western Railway (GWR) between 1927 and 1939, [11] spurred by rising competition with buses and, to a lesser degree, cars. [12] The prime reason in this case was to serve walkers. [13] [2] The halt stood in a very thinly populated rural area with no obvious source of traffic; conversely, the people who did live, work and increasingly take leisure activities in the area had no other obvious means of transport.

Description

The unstaffed halt's single platform was made of wood. [14] [15] It was a mere 70 feet (21 m) long, [16] so drivers had instructions to stop ensuring the guard's compartment was alongside. The amenities provided were a platform shelter and two oil lamps. [2] The station nameboard was double faced and could therefore be read by people on the platform and trains and from the rear as a station sign by people on surrounding land. The halt stood immediately off the eastern end of the bridge of the same name, which crossed the Afon Tryweryn. [17] The halt was only accessible by path from the Bala to Capel Celyn road.

Services

The September 1959 timetable shows

In 1935 the Ministry of Transport stated that the halt was used by 50 passengers per week. [19]

After the Second World War at the latest most trains were composed of two carriages, with one regular turn comprising just one brake third coach. At least one train along the line regularly ran as a mixed train, [20] [21] with a second between Bala and Arenig. By that time such trains had become rare on Britain's railways. Workmen's trains had been a feature of the line from the outset; they were the Festiniog and Blaenau Railway's biggest source of revenue. [22] Such a service between Trawsfynydd and Blaenau Ffestiniog survived to the line's closure to passengers in 1960. [23] [24] Up to 1930 at the earliest such services used dedicated, lower standard, coaches which used a specific siding at Blaenau where the men boarded from and alighted to the ballast. [25] [26]

Closure

The halt closed in January 1960 but freight trains between Bala and Blaenau continued to pass the site for a further year, the last train of all passing on 27 January 1961. [27] The track though the halt was lifted in the 1960s.

In 1964 the line reopened from Blaenau southwards to a siding near the site of Trawsfynydd Lake Halt where a large ("Goliath") gantry [28] [29] was erected to load and unload traffic for the then new Trawsfynydd nuclear power station. The main goods transported were nuclear fuel rods carried in nuclear flasks. The new facility was over fourteen route miles north of Tyddyn Bridge Halt, so the reopening brought no reprieve.

Controversy

Building the reservoir was very controversial at the time and remains as a symbol in some minds to this day. [30] [31] [32] [33] [34]

Special trains

Rail enthusiasts' special trains traversed the line from time to time, notably the "last train" from Bala to Blaenau Ffestiniog and return on 22 January 1961. [35]

The station site in the 21st century

The site of the halt was subsequently buried under the Llyn Celyn dam wall, [36] the construction of which led to the closure of the line in 1961. By 2014 much of the trackbed was detectable both on satellite imagery and on the ground. It also appears when the waters of Llyn Celyn fall in prolonged dry weather.

Preceding station Disused railways Following station
Capel Celyn Halt
Line and station closed
  Great Western Railway
Bala and Festiniog Railway
  Frongoch
Line and station closed

Related Research Articles

The Bala and Festiniog Railway was a 4 ft 8+12 in, standard gauge, railway backed by the Great Western Railway (GWR) in north-west Wales. It connected Bala with Blaenau Ffestiniog.

<span class="mw-page-title-main">Frongoch railway station</span> Disused railway station in Gwynedd, Wales

Frongoch railway station served the village of Frongoch on the Great Western Railway's Bala Ffestiniog Line in Gwynedd, Wales.

Capel Celyn Halt was a solely passenger railway station which served the rural area of Capel Celyn west of Bala. It was on the Great Western Railway's (GWR's) Bala Ffestiniog Line in Gwynedd, Wales.

<span class="mw-page-title-main">Arenig railway station</span> Disused railway station in Gwynedd, Wales

Arenig railway station stood beneath Arenig Fawr on the Great Western Railway's Bala Ffestiniog Line in Gwynedd, Wales. It served this thinly populated upland area, but its particular purposes were to serve Arenig Granite quarry which opened in 1908 next to the station and to act as a passing loop on the largely single-track route. The railway was the quarry's main carrier and also its main customer, crushed stone being used for track ballast.

Trawsfynydd Lake Halt was a solely passenger railway station near the northeastern tip of Llyn Trawsfynydd, Gwynedd, Wales. Many Nineteenth and early Twentieth Century institutions in Wales were given anglicised names, this station being one. Over the years, and especially since the Second World War, most have been rendered into Welsh or given both Welsh and English names. Trawsfynydd Lake Halt closed before this happened.

<span class="mw-page-title-main">Maentwrog Road railway station</span> Disused railway station in Gwynedd, Wales

Maentwrog Road railway station was on the Great Western Railway's Bala Ffestiniog Line in Gwynedd, Wales.

<span class="mw-page-title-main">Festiniog railway station</span> Disused railway station in Gwynedd, Wales

Festiniog railway station served the village of Llan Ffestiniog, Gwynedd, Wales. This station was one of many 19th century institutions in Wales to be given an anglicised name. Over the years, and especially since the Second World War, most have been rendered into Welsh or given both Welsh and English names, but Festiniog station closed before this happened. The village of Llan Ffestiniog – known locally simply as "Llan" – lies over 3 km south of the larger and more recent Blaenau Ffestiniog, and over three miles south by rail.

<span class="mw-page-title-main">Trawsfynydd railway station</span> Disused railway station in Gwynedd, Wales

Trawsfynydd railway station served the village of Trawsfynydd, Gwynedd, Wales.

<span class="mw-page-title-main">Manod railway station</span> Disused railway station in Gwynedd, Wales

Manod railway station served the village of Manod which then stood on the southern edge of Blaenau Ffestiniog in Gwynedd, Wales.

<span class="mw-page-title-main">Tan-y-Manod railway station</span> Former railway station in Wales

Tan-y-Manod railway station was a railway station approximately 1 mile (1.6 km) south of Blaenau Ffestiniog, in Gwynedd, North Wales.

Bryn-Celynog Halt was an unstaffed solely passenger railway station which served the rural area of Bryn-Celynog, east of Trawsfynydd, Gwynedd, Wales.

Llafar Halt was an unstaffed solely passenger railway station which served the rural area of Glanllafar, east of Trawsfynydd, Gwynedd, Wales.

<span class="mw-page-title-main">Teigl Halt railway station</span> Disused railway station in Gwynedd, Wales

Teigl Halt was a solely passenger railway station which served the rural area of Cwm Teigl, south of Blaenau Ffestiniog, Wales.

<span class="mw-page-title-main">Trawsfynydd Camp railway station</span> Disused railway station in Gwynedd, Wales

Trawsfynydd Camp railway station, sometimes referred to as Trawsfynydd Military station served the Trawsfynydd Artillery range at Bronaber, south of Trawsfynydd in Gwynedd, Wales. The station never opened for civilian traffic.

<span class="mw-page-title-main">Cwm Prysor Halt railway station</span> Disused railway station in Gwynedd, Wales

Cwm Prysor Halt was a railway station which served the remote rural area of Cwm Prysor, east of Trawsfynydd, Gwynedd, Wales.

Tyddyngwyn railway station was immediately north of the later Manod station in what was then Merionethshire, now Gwynedd, Wales.

Glynllifon Street railway station was a temporary northern terminus station of the Festiniog and Blaenau Railway (F&BR), sited between the street of the same name and Cwmbowydd Road in Blaenau Ffestiniog. It was never named.

<span class="mw-page-title-main">Blaenau Ffestiniog Central railway station</span>

On 10 September 1883, the Bala and Festiniog Railway (B&FR) and the Festiniog Railway (FR) opened what would be known as an interchange station in Blaenau Ffestiniog, Merionethshire, Wales. Merionethshire is now part of the county of Gwynedd.

<span class="mw-page-title-main">Blaenau Ffestiniog passenger stations</span>

North west Wales experienced a slate boom in the first half of the nineteenth century. Three sites stood out as experiencing the most explosive growth: Dinorwic near Llanberis, Penrhyn near Bethesda and Blaenau Ffestiniog.

Diphwys railway station was on the same site as the later Great Western Railway station in the heart of Blaenau Ffestiniog in what was then Merionethshire, now Gwynedd, Wales.

References

  1. Southern 1995, Preface & p.42.
  2. 1 2 3 Mitchell & Smith 2010, Photo 12.
  3. 1 2 Boyd 1988, p. 47.
  4. Quick 2009, pp. 389.
  5. Butt 1995, p. 236.
  6. Southern 1995, pp. 64 & 81.
  7. Jowett 2000, Map 45.
  8. Mitchell & Smith 2010, Map XVI.
  9. Southern 1995, p. 74.
  10. Southern 1995, p. 8.
  11. Coleford 2010a, p. 509.
  12. Wells 2016, pp. 374–9.
  13. Southern 1995, p. 43.
  14. Southern 1995, Preface.
  15. Clemens 2003, 10 mins from start.
  16. Southern 1995, p. 41.
  17. Southern 1995, p. 42.
  18. Mitchell & Smith 2010, Preface.
  19. Coleford 2010a, p. 511.
  20. Christiansen 1976, p. 71.
  21. "Mixed train approaching Blaenau Ffestiniog". RCTS.
  22. Boyd 1988, p. 88.
  23. Southern 1995, pp. 15–17.
  24. 1960 Working timetable, via 2D53
  25. Southern 1995, p. 13.
  26. Blaenau Ffestiniog (GWR) track layout, via Signalling Record Society
  27. Southern 1995, p. 64.
  28. Mitchell & Smith 2010, Photo 28.
  29. Southern 1995, p. 71.
  30. Tryweryn inundation history, via National Library of Wales Archived 17 July 2016 at the Wayback Machine
  31. "BBC - iWonder - Tryweryn: The drowning of a village". 22 October 2015. Archived from the original on 22 October 2015. Retrieved 7 October 2020.
  32. "The village drowned to give another nation water". The Independent. 17 October 2010. Retrieved 7 October 2020.
  33. Lloyd, Delyth (21 October 2015). "Tryweryn: 50 years after 'drowning'". BBC News. Retrieved 7 October 2020.
  34. Tryweryn inundation and Canoeing, via Canoe Wales
  35. Southern 1995, p. 93.
  36. Southern 1995, p. 95.

Sources

Further material