King's Highway 413, known as the GTA West Corridor or GTA West until 2021, is a planned 400-series highway and bus transitway in the western Greater Toronto Area of the Canadian province of Ontario. The approximately 52-kilometre (32 mi) route is currently undergoing planning and analysis under an environmental impact assessment (EA) by the Ministry of Transportation of Ontario (MTO) and the Government of Ontario. If approved, a new four-to-six lane controlled-access highway would be built between the existing interchange of Highway 401 and the 407 ETR at the Halton–Peel boundary, and Highway 400 north of Vaughan. In addition, two new extensions would be built to connect Highway 410 and Highway 427 with Highway 413.
The proposed highway would serve as an outer ring road around the built-up areas of Brampton and Vaughan that would permit traffic travelling between Southwestern Ontario and Ontario's cottage country or Northern Ontario to bypass much of the Greater Toronto Area. However, the highway has attracted criticism for its environmental impacts, including concerns about its footprint on designated farmland in the Greenbelt, and its implications to encourage urban sprawl and induced demand.
Planning for the corridor began in the mid 2000s. However the EA was suspended in 2015, and the project shelved in February 2018 by the Liberal government of Kathleen Wynne. Following the 2018 Ontario general election in June of that year, the new Progressive Conservative government of Doug Ford announced the resumption of the suspended EA in November. Since then, several of the municipalities along the route have voiced their opposition to its construction. In April 2024, a previously announced federal EA was dropped by the Canadian government, with the federal and provincial governments to work together to minimize environmental impacts along the corridor instead. Construction is set to begin in 2025.
The proposed route of Highway 413 was confirmed in the Technically Preferred Route report, which was published by Aecon and released on August 7, 2020. [5] The approximately 52 km (32 mi) route would consist of a four-to-six lane freeway as well as a transitway situated within a 170-metre (560 ft)-wide right-of-way. [1] [6] Fifteen interchanges were proposed. Four of the interchanges, including both termini, would be freeway-to-freeway. The corridor would arch around the west and north sides of the rural–urban fringe of Brampton, skirting the boundary between the regions of Halton and Peel before proceeding northwest into York Region. [5] [7]
The southwestern end would be at a freeway-to-freeway connection at the existing interchange between Highway 401 and Highway 407ETR at the tripoint of Halton Hills, Milton and Mississauga. [8] It would meander northward, entering Brampton at an interchange with Winston Churchill Boulevard. Crossing the Credit River immediately east of Georgetown, it would gradually curve northwest to parallel Old School Road east of Heritage Road. It would interchange with Bovaird Drive (Regional Road 107), which becomes Highway 7 to the west beyond the Brampton–Halton Hills boundary. Midway between Bovaird Drive and the next interchange at Mayfield Road (Peel Regional Road 14), the freeway would cross the CN Halton Subdivision, which carries the Kitchener line of GO Transit. [5] [7]
Beyond Mayfield Road, Highway 413 would make a broad curve to the northeast into Caledon, passing Mississauga Road (Peel Regional Road 1). Travelling roughly parallel to and midway between Mayfield Road and King Street (Peel Regional Road 9), it would interchange with Chinguacousy Road and pass north of Snelgrove and Mayfield West near an interchange with Highway 10. [5] [7] Just east of Mayfield West, a new extension of Highway 410, bypassing 4 km (2.5 mi) of the extension north of Mayfield Road that opened in 2009, and would meet Highway 413 at a freeway-to-freeway interchange. [9] [10] To the east would be an partial interchange with Bramalea Road. After interchanging with Airport Road (Peel Regional Road 7), the route would curve southeast, with an interchange at The Gore Road (Peel Regional Road 8), before re-entering Brampton to pass between the large unincorporated community of Bolton in Caledon and the Brampton neighbourhood of Castlemore. An interchange at Humber Station Road would provide an eastern access to Mayfield Road, which Highway 413 would cross. [5] [7]
Highway 413 would cross the Peel–York regional boundary at Regional Road 50 (former Highway 50) immediately north of Nashville Road (York Regional Road 49), where it would encounter a freeway-to-freeway interchange with an extension of Highway 427 northward from Major Mackenzie Drive (York Regional Road 25). [5] Curving northeast, the proposed route would encounter the CP MacTier Subdivision before crossing over the Humber River at the location of the Humber Valley Heritage Trail. [11] Between the main branch and east branch of the Humber River would be an interchange with York Regional Road 27 (former Highway 27) north of Kleinburg. The final several kilometres would travel east, midway between Kirby Road and King Vaughan Road. After a partial interchange with Weston Road (York Regional Road 56) it would end at a freeway-to-freeway interchange with Highway 400. [5] [7]
The GTA West Corridor was first conceived as the GTA East–West Economic Corridor by the Ministry of Transportation of Ontario (MTO) in its Central Ontario Strategic Transportation Directions study in January 2002. [2] The North–South Corridor Feasibility Study, prepared for the MTO and City of Brampton in September 2003, was first to recommend acquiring land for a future "higher order transportation facility" around Brampton. [12] The report identified the need for a controlled-access highway as part of the city's ultimate transportation plan to serve western Brampton. Land was subsequently set aside for the next several years while the MTO analysed the need for both corridors. [13]
In 2005, the Government of Ontario passed the Places to Grow Act, which set forth consistent urban planning principles across the province for the following 25 years. The Growth Plan for the Greater Golden Horseshoe was released in June of the following year as a framework for implementing the act, [14] with a future transportation corridor identified north of Highway 401 between Guelph and Vaughan. [15] Following the submission of a Terms of Reference on June 15, 2007, an EA began [note 1] on March 4, 2008, to establish conceptual routes for additional transportation infrastructure to interconnect the GTA West economic centres (Milton, Brampton and Vaughan) with Guelph and Waterloo Region. [17] [18] The early concepts for the GTA West Corridor considered five different options, including two extending as far west as Guelph without intersecting Highway 401 or Highway 407. [19] When combined with the planned Highway 7N west of Guelph, they would have resulted in a parallel freeway to the north of Highway 401 between Kitchener/Waterloo and Vaughan. [note 2]
Simultaneously, the City of Brampton appealed an amendment of the Halton Region Official Plan to the Ontario Municipal Board. As a result, the North–South Corridor Feasibility Study evolved into the Halton–Peel Boundary Area Transportation Study (HPBATS), which commenced on April 11, 2007. [22] [23] HPBATS recommended a north–south route, known as the Halton–Peel Freeway, east of Georgetown and west of Brampton as a complementary project that would connect in the north with the potential GTA West Corridor. The completed study and its recommendations were submitted to the MTO in late April 2010. [24] In 2012 the provincial EA recommended that the GTA West should follow a broadly similar corridor to the Halton–Peel Freeway. [25]
Stage 1 of the EA concluded with the release of the GTA West Transportation Development Strategy Report in November 2012. The report indicated limited demand for and the considerable environmental consequences of a new crossing of the Niagara Escarpment. It recommended not proceeding further with a new route over the escarpment, instead favouring a connection to Highway 401 west of Mississauga, including the route of the proposed Halton–Peel Freeway. An alternative route, connecting with Highway 401 west of Milton and travelling between 5 Side Road and 10 Side Road through Halton Hills, was also not carried forward, with the MTO instead electing to widen Highway 401 to 12 lanes between Milton and Mississauga. [26] [27]
Stage 2 of the GTA West EA began in February 2014, intended to further refine the study corridor to a preliminary design. [28] However, by this point public opposition to the corridor began to appear, with the group Environmental Defence starting a campaign against the proposed highway by 2015. [29] On December 16, 2015, Minister of Transportation Steven Del Duca announced the suspension of the EA process. [30] A three-member advisory panel [note 3] was formed in October 2016 to assess alternative approaches to meet projected traffic levels. [32] The suspension was opposed by the municipalities of Vaughan, King, York Region, Caledon and Peel Region, [33] as well as Brampton. [34] The advisory panel report was released on May 29, 2017, [35] recommending that the EA be stopped, and the "development of a single transportation plan for the Greater Golden Horseshoe" proceed in its place. [36] The panel also recommended that the provincial government negotiate with the private operators of the 407 ETR to encourage the routing of more truck traffic onto that route, alleviating congestion on the 401, and negating the need for the GTA West. [37] Consequently the Ontario government cancelled the GTA West Study on February 9, 2018. [38] [39] [40] In the run up to the 2018 provincial election, the Progressive Conservatives stated that they would complete the EA of the project if elected. [41]
The 2018 Ontario general election, held on June 7, 2018, ended the 15-year tenure of the Ontario Liberal Party and saw Premier Kathleen Wynne defeated by the Progressive Conservatives (PCs) under Doug Ford. [42] As part of the PCs Fall Economic Statement, released in November 2018, the government committed to the campaign pledge of resuming the suspended EA for the GTA West Corridor, "in order to speed up travel and alleviate traffic congestion". [4] The EA was subsequently resumed on June 5, 2019. [43] [44] In September and October of that year, a series of Public Information Centres were held in which the preferred route and interchange locations were announced. [45] This route, with modifications, [note 4] was confirmed publicly by the provincial government on August 7, 2020. [47] The EA for the corridor was expected to be complete by the end of 2022. [48]
On February 3, 2021, Jonathan Wilkinson, the federal Minister of Environment and Climate Change announced that he had received a request for the project to undergo an EA at the federal level, [49] following a formal request from Environmental Defence. [50] [51] [52] On May 3, 2021, Wilkinson announced that a federal EA would take place. [53] [54] [55] In response, provincial Minister of Transportation Caroline Mulroney stated that she would work with the federal government to address “newly found concerns" on potential adverse effects on species at risk. [55]
Funding was committed to the project as part of the fall economic statement on November 1, 2021. [56] That month, the GTA West began to be referred to by the Government of Ontario as Highway 413 for the first time. [57] The highway was a contentious issue during the 2022 Ontario general election, with the Liberal, NDP and Green Party pledging to cancel the project if elected. [58] The three NDP MPPs in Brampton were defeated by their PC counterparts in the election. [59]
In early 2023, 467 landowners along the planned route received letters requesting permission to enter their property for "intrusive and non-intrusive fieldwork" to assess the suitability of their property for the project. [60] The inspections will be conducted between March 2023 and the end of 2024. [60]
In October 2023, the Supreme Court of Canada ruled that the Impact Assessment Act was largely unconstitutional. [61] Following this, Attorney General of Ontario Doug Downey announced that the province would seek legal action to prevent the federal government intervening in Highway 413. [62] In March 2024, the Canadian government moved to drop the federal EA, with Downey stating "we have come to an agreement". [63] In April 2024, the provincial and federal governments announced that the EA had been dropped, and that they would work together to "minimize environmental impacts in areas of federal environmental jurisdiction" and ensure that impacts to species at risk are considered. [64] [65] Following the announcement, provincial Minister of Transportation Prabmeet Sarkaria stated "we finally have certainty to move forward with the ... project". [64] The announcement was criticised by other political parties and environmental groups. [64] Later that month, Premier Ford announced that construction will begin in 2025. [66]
The highway has attracted criticism from municipalities, politicians, campaign groups and the public regarding its potential impacts. [67] [68] [69]
Environmental groups have criticised the significant impact that the highway would have on the environment. In addition to increasing air pollution and greenhouse gas emissions, opponents claim the highway would disrupt woodlands, waterways, wetlands, wildlife habitats and species at risk. [70] [71] [72] The highway will travel through both the Greenbelt, the Whitebelt (an area of land left unprotected from development when the Greenbelt was established in 2005) and the Humber and Credit watersheds. [73] According to the Toronto and Region Conservation Authority, the highway would specifically impact 85 waterways, 220 wetlands, 10 different species at risk and hundreds of acres of vulnerable wildlife habitat. [70] According to a study commissioned by Environmental Defence, 29 species at risk were found along the proposed highway. [72]
Urban planning critics claim the highway will encourage urban sprawl through induced demand, [74] [75] as research shows that building new highways tends to attract more drivers and fails to improve congestion levels on other roads. [76] Consequently, they claim it would increase car dependency in surrounding areas and ultimately only save commuters around 30 to 60 seconds of travel time. [38] Other groups, such as the National Farmers Union have concerns about the impacts of the highway on agricultural land, as the highway would be built on around 2,000 acres of Class 1 and 2 farmland – the most productive designation. [77] A planning land use expert noted that "agricultural land is valued as low as C$18,000 an acre, but residential land is easily worth C$1 million an acre" and that billions of dollars could be made if farmland adjacent to the highway was rezoned as land for development. [73] Avison Young, a real estate services firm, estimated around 62,000 acres (250 km2) of developable land is available located within 2 kilometres (1.2 mi) of the 16 proposed interchanges. [78] In 2021, a Toronto Star investigation noted that 3,300 acres (13 km2) of land along the route was owned by 8 major property developers, several of which had donated to Doug Ford's Progressive Conservative government. [79]
Other critics have noted the high cost of building the highway – the cost of construction in 2012 was estimated at C$4.7 billion, with recent estimates around C$6 billion. [67] It is unclear whether the highway would be tolled, similar to Highway 407. [80] As an alternative to a new freeway, stakeholders have suggested investing in local transportation improvements. Some proposed suggestions include improvements to local roads, truck priority lanes on Highway 407, public transit investments including GO Transit Regional Express Rail and widening of existing highways. [68] [81] Others have suggested working with the owners of Highway 407 to increase capacity on that highway, [37] or subsidize truck drivers to use Highway 407. [82] A study commissioned by the previous provincial government stated that the highway would save all drivers in Greater Golden Horseshoe approximately 30 seconds of travel time, regardless of whether their trip used the highway or not. The Ministry of Transportation contends that the Highway 413 will save drivers up to 30 minutes if their trip uses the full length of the highway. [83]
The majority of local municipalities have opposed the project, including Mississauga, [1] Vaughan, [84] Halton Hills, [69] Halton Region, [69] Peel Region, [85] King Township [86] and Orangeville. [87] Brampton and Caledon withdrew their support of the fast-tracked environmental assessment. [69] [88] The NDP opposition in the Legislative Assembly of Ontario, the Green Party of Ontario [89] and Ontario Liberal Party have stated that they would scrap the highway following the 2022 provincial election. [90] [91] Despite the corridor not directly impacting the City of Toronto itself, Toronto City Council passed a resolution in March 2021 condemning the proposed highway. [92] In August 2023, over 50,000 people signed a petition requesting that the federal government block the highway. [93]
Supporters of the freeway include Regional Municipality of York [94] as well as the Progressive Conservative government. [41] Several non-governmental organizations such as the Ontario Trucking Association, [95] the Building Industry and Land Development Association (BILD), [96] and the Association of Municipalities of Ontario also continue to support the project. [97] The Toronto Metropolitan University Centre for Urban Research and Land Development (CUR) also specifically supported the streamlining of the EA process, noting that “It is simply taking too long to bring critical infrastructure improvements such as roads, transit, sewers and water to completion". [98]
The following table lists the proposed exits along Highway 413, as shown in the Preferred Route. [45] [47]
Division | Location | km | mi | Destinations | Notes | |
---|---|---|---|---|---|---|
Halton | Milton – Halton Hills – Mississauga boundary | 0 | 0.0 | Highway 401 / 407 ETR | ||
Halton – Peel boundary | Halton Hills – Brampton boundary | 4 | 2.5 | Regional Road 19 (Winston Churchill Boulevard) | ||
Peel | Brampton | 7 | 4.3 | Bridge over the Credit River | ||
9 | 5.6 | Highway 7 west / Regional Road 107 east (Bovaird Drive) | Highway 7 formerly continued east of interchange [note 5] | |||
Brampton – Caledon boundary | 13 | 8.1 | Regional Road 14 (Mayfield Road) | |||
Caledon | 19 | 12 | Chinguacousy Road | |||
22 | 14 | Highway 10 (Hurontario Street) – Orangeville | ||||
26 | 16 | Highway 410 south | Diversion of Highway 410 on east side of Snelgrove | |||
27 | 17 | Bramalea Road | Partial-access interchange with westbound exit and eastbound entrance | |||
30 | 19 | Regional Road 7 (Airport Road) – Caledon East | ||||
35 | 22 | Regional Road 8 (The Gore Road) | ||||
37 | 23 | Humber Station Road – Bolton | ||||
York | Vaughan | 40 | 25 | Highway 427 south | ||
44 | 27 | Regional Road 27 (Highway 27) – Kleinburg, Nobleton | Formerly Highway 27 [note 6] | |||
51 | 32 | Regional Road 56 (Weston Road) | Eastbound exit and westbound entrance | |||
52 | 32 | Highway 400 | ||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
Brampton is a city in the Canadian province of Ontario. It is part of the Greater Toronto Area (GTA) and is a lower-tier municipality within the Peel Region. The city has a population of 656,480 as of the 2021 Census, making it the ninth most populous municipality in Canada and the third most populous city in the Greater Golden Horseshoe urban area, behind Toronto and Mississauga. The City of Brampton is bordered by Vaughan to the east, Halton Hills to the west, Caledon to the north, Mississauga to the south, and Etobicoke (Toronto) to the southeast.
Caledon is a town in the Regional Municipality of Peel in the Greater Toronto Area of Ontario, Canada. The name comes from a shortened form of Caledonia, the Roman name for what is now Scotland. Caledon is primarily rural with a number of hamlets and small villages, but also contains the larger community of Bolton in its southeastern quadrant, adjacent to York Region. Some spillover urbanization also occurs in the south bordering the City of Brampton.
The Greater Toronto Area, commonly referred to as the GTA, includes the City of Toronto and the regional municipalities of Durham, Halton, Peel, and York. In total, the region contains 25 urban, suburban, and rural municipalities. The Greater Toronto Area begins in Burlington in Halton Region to the west, and extends along Lake Ontario past downtown Toronto eastward to Clarington in Durham Region.
King's Highway 407, commonly referred to as Highway 407 and colloquially as the "four-oh-seven", is a tolled 400-series highway in the Canadian province of Ontario. Comprising a privately leased segment and a publicly owned segment, the route spans the entire Greater Toronto Area (GTA) around the city of Toronto, travelling through the suburbs of Burlington, Oakville, Mississauga, Brampton, Vaughan, Markham, Pickering, Whitby, and Oshawa before ending in Clarington, north of Orono. At 151.4 km long, it is the fourth-longest expressway in Ontario's 400-series network, after Highways 417, 400, and 401. The segment between Burlington and Brougham in Pickering is leased to and operated by the 407 ETR Concession Company Limited and is officially known as the 407 Express Toll Route (407 ETR). It begins at the junction of the Queen Elizabeth Way (QEW) and Highway 403 in Burlington and travels 108.0 km (67.1 mi) across the GTA to Brock Road in Pickering. East of Brock Road, the tollway continues east as Highway 407, a toll route operated by the provincial government, for 43.4 km (27.0 mi), to Highway 35/115 in Clarington. The route interchanges with nine freeways: the QEW, Highway 403, Highway 401, Highway 410, Highway 427, Highway 400, Highway 404, Highway 412, and Highway 418. Highway 407 is an electronically operated toll highway; there are no toll booths along the route. Distances are calculated automatically using transponders or automatic number-plate recognition, which are scanned at entrance and exit portals.
The 400-series highways are a network of controlled-access highways in the Canadian province of Ontario, forming a special subset of the provincial highway system. They are analogous to the Interstate Highway System in the United States or the Autoroute system of neighbouring Quebec, and are regulated by the Ministry of Transportation of Ontario (MTO). The 400-series designations were introduced in 1952, although Ontario had been constructing divided highways for two decades prior. Initially, only Highways 400, 401 and 402 were numbered; other designations followed in the subsequent decades. To this day, not all controlled-access highways in Ontario are a part of the 400-series highway network. The network is situated almost entirely in Southern Ontario, although Highway 400 extends into the more remote northern portion of the province.
King's Highway 427, also known as Highway 427 and colloquially as the 427, is a 400-series highway in the Canadian province of Ontario that runs from the Queen Elizabeth Way (QEW) and Gardiner Expressway in Toronto to Major Mackenzie Drive in Vaughan. It is Ontario's second busiest freeway by volume and the third busiest in North America, behind Highway 401 and Interstate 405 in California. Like Highway 401, a portion of the route is divided into a collector-express system with twelve to fourteen continuous lanes. Notable about Highway 427 are its several multi-level interchanges; the junctions with the QEW/Gardiner Expressway and Highway 401 are two of the largest interchanges in Ontario and were constructed between 1967 and 1971, while the interchanges with Highway 409 and Highway 407 were completed in 1992 and 1995, respectively.
King's Highway 409, commonly referred to as Highway 409 and historically as the Belfield Expressway, is a 400-series highway in the Canadian province of Ontario that extends from Highway 401 in Toronto to Pearson International Airport, west of Highway 427, in Mississauga. It is a short freeway used mainly as a spur route for traffic travelling to the airport or Highway 427 northbound from Highway 401 westbound, as these route movements are not accommodated at the complex interchange between Highways 401 and 427.
King's Highway 7, commonly referred to as Highway 7 and historically as the Northern Highway, is a provincially maintained highway in the Canadian province of Ontario. At its peak, Highway 7 measured 716 km (445 mi) in length, stretching from Highway 40 east of Sarnia in Southwestern Ontario to Highway 17 west of Ottawa in Eastern Ontario. However, due in part to the construction of Highways 402 and 407, the province transferred the sections of Highway 7 west of London and through the Greater Toronto Area to county and regional jurisdiction. The highway is now 535.7 km (332.9 mi) long; the western segment begins at Highway 4 north of London and extends 154.1 km (95.8 mi) to Georgetown, while the eastern segment begins at Donald Cousens Parkway in Markham and extends 381.6 km (237.1 mi) to Highway 417 in Ottawa.
King's Highway 400, commonly referred to as Highway 400, historically as the Toronto–Barrie Highway, and colloquially as the 400, is a 400-series highway in the Canadian province of Ontario linking the city of Toronto in the urban and agricultural south of the province with the scenic and sparsely populated central and northern regions. The portion of the highway between Toronto and Lake Simcoe roughly traces the route of the Toronto Carrying-Place Trail, a historic trail between the Lower and Upper Great Lakes. North of Highway 12, in combination with Highway 69, it forms a branch of the Trans-Canada Highway (TCH), the Georgian Bay Route, and is part of the highest-capacity route from southern Ontario to the Canadian West, via a connection with the mainline of the TCH in Sudbury. The highway also serves as the primary route from Toronto to southern Georgian Bay and Muskoka, areas collectively known as cottage country. The highway is patrolled by the Ontario Provincial Police and has a speed limit of 100 km/h (62 mph), except for the section south of Highway 401, where the speed limit is 80 km/h (50 mph) and the 60 km (37 mi) stretch between MacTier and Nobel, where the speed limit was raised to 110 km/h (68 mph) on April 22, 2022.
King's Highway 403, or simply Highway 403, is a 400-series highway in the Canadian province of Ontario that travels between Woodstock and Mississauga, branching off from and reuniting with Highway 401 at both ends and travelling south of it through Hamilton and Mississauga. It is concurrent with the Queen Elizabeth Way (QEW) for 22 km (14 mi) from Burlington to Oakville. The Highway 403 designation was first applied in 1963 to a short stub of freeway branching off the QEW at Burlington, and the entire route was completed on August 15, 1997, when the section from Brantford to the then-still independent Town of Ancaster was opened to traffic. The section of Highway 403 between Woodstock and Burlington was formally dedicated as the Alexander Graham Bell Parkway on April 27, 2016, in honour of Alexander Graham Bell.
King's Highway 410, also known as Highway 410 and colloquially as the four-ten, is a 400-series highway in the Canadian province of Ontario that connects Highways 401 and 403 to Brampton. North of Brampton, the commuter freeway ends and the route becomes Highway 10, which continues north through Caledon as a four-lane undivided highway. The route is patrolled by the Ontario Provincial Police and has a speed limit of 100 km/h (62 mph).
Bolton is an unincorporated town that is the most populous community in the town of Caledon, Ontario, Canada, in the Regional Municipality of Peel. It is located beside the Humber River, approximately 50 kilometres northwest of Toronto. In regional documents, it is referred to as a 'Rural Service Centre'. It has 26,795 residents in 9,158 total dwellings. The downtown area that historically defined the village is in a valley, through which flows the Humber River. The village extends on either side of the valley to the north and south.
Steeles Avenue is an east–west street that forms the northern city limit of Toronto and the southern limit of York Region in Ontario, Canada. It stretches 77.3 km (48.0 mi) across the western and central Greater Toronto Area from Appleby Line in Milton in the west to the Toronto-Pickering city limits in the east, where it continues east into Durham Region as Taunton Road, which itself extends 58 km (36 mi) across the length of Durham Region to its boundary with Northumberland County.
King's Highway 50, commonly referred to as Highway 50, was a provincially maintained highway in the Canadian province of Ontario. The highway, which was decommissioned in 1998, is still referred to as Highway 50, though it is now made up of several county and regional roads: Peel Regional Road 50, York Regional Road 24 and Simcoe County Road 50. The route began in the north end corner of the former Etobicoke at Highway 27 as Albion Road, and travelled northwest to Highway 89 west of the town of Alliston. En route, it passed through the villages of Bolton, Palgrave and Loretto. The road south of Bolton has become more suburban as development has encroached from the east and west; but despite this increased urbanization, the removal of highway status, and the fact that it runs through the former Albion Township, the Albion Road name has not been extended to follow it outside Toronto.
The Mid-Peninsula Highway is a proposed freeway across the Niagara Peninsula in the Canadian province of Ontario. Although plans for a highway connecting Hamilton to Fort Erie south of the Niagara Escarpment have surfaced for decades, it was not until The Niagara Frontier International Gateway Study was published by the Ministry of Transportation of Ontario (MTO) in 1998 that serious examination and planning began. The study called for an alternative route to the QEW, which runs through tender fruitlands and is not capable of expansion beyond its current configuration. The land on which studies are being performed for this future freeway is referred to as the Mid-Peninsula Corridor or the Niagara–GTA Corridor.
Hurontario Street is a roadway running in Ontario, Canada between Lake Ontario at Mississauga and Lake Huron's Georgian Bay at Collingwood. Within Peel Region, it is a major urban thoroughfare within the cities of Mississauga and Brampton, which serves as the divide from which cross-streets are split into East and West, except at its foot in the historic Mississauga neighbourhood of Port Credit. Farther north, with the exception of the section through Simcoe County, where it forms the 8th Concession, it is the meridian for the rural municipalities it passes through. In Dufferin County, for instance, parallel roads are labelled as EHS or WHS for East of Hurontario Street.
The Bradford Bypass, also known as the Highway 400–404 Link is a proposed east–west 400-series highway in the northern Greater Toronto Area of the Canadian province of Ontario. The approximately 16.2-kilometre (10.1 mi) route is currently undergoing planning and analysis under an environmental impact assessment (EA) by the Ministry of Transportation of Ontario (MTO) and the Government of Ontario. If approved, a new four-lane controlled-access highway would be built between Highway 400 near Bradford in Simcoe County, and Highway 404 near Queensville in York Region. It would serve as a bypass to the north side of Bradford.
Dixie Road is a major north–south thoroughfare in the Regional Municipality of Peel in Ontario, Canada, passing through the lower-tier cities of Mississauga and Brampton, and the rural town of Caledon. It is roughly 38 km long and is the third concession road east of Hurontario Street, and before being named was concession-numbered as 3rd Line East. It is designated and signposted as Peel Regional Road 4 in Peel's regional road system. Despite already being named, it has also been designated as Veterans Memorial Roadway since 2016.
Queen Street is a major thoroughfare running in the City of Brampton in Peel Region, Ontario that utilizes the two (separate) aforementioned roadways. Queen Street continues east into the City of Vaughan as York Regional Road 7.
"We see this as a lose-lose proposal," said Susan Lloyd Swail, the Greenbelt Program Manager with Environmental Defence. "There will be a loss to the Greenbelt, a loss of farmland, waterways and forests," said Swail.
Construction for Ontario's Highway 413 will start next year, Premier Doug Ford says.
"Agricultural land is valued as low as $18,000 an acre, but residential land is easily worth $1 million an acre," says Susan Lloyd Swail, a King City-based land-use planning expert who opposes the highway. "There are hundreds of millions of dollars to be made right now simply by rezoning farmlands around the new freeway into development lands. And there are billions more to be made in the future from developing those lands into ever more residential and industrial sprawl.
The group of developers own 39 properties covering 3,300 acres that are conservatively valued at nearly half a billion dollars, according to land registry documents. Most of the developers in the group are also prolific PC donors, contributing at least $813,000 to support the party since 2014.
The 30-second figure is from a study done in 2017 that looked at the average time savings across the entire Greater Golden Horseshoe (GGH). It includes every trip on every road in every region – including places that are nowhere near the proposed Highway 413...People who travel the full length of the highway – from Vaughan to Milton – would save up to 30 minutes each way.
The leaders of the NDP, the Green Party and the Liberal Party have also said that they would not proceed with the project if elected.
Without the proposed streamlining of the process it would be the year 2023 or beyond before the preliminary design study for the corridor is completed, it is simply taking too long to bring critical infrastructure improvements such as roads, transit, sewers and water to completion, or to ensure serviced sites in built-up urban and greenfield areas are available to meet the demands of new residents and businesses.