Orange station (Metro-North)

Last updated

Orange
General information
LocationMarsh Hill Road
Orange, Connecticut
Coordinates 41°14′50″N72°59′51″W / 41.247139°N 72.997632°W / 41.247139; -72.997632
Owned by Metropolitan Transportation Authority
Line(s)
Platforms2 side platforms
Tracks4
History
OpenedTBD
Electrified12,500V (AC) overhead catenary
Services
Preceding station MTA NYC logo.svg Metro-North Railroad Following station
Milford New Haven Line
proposed
West Haven
Location
Orange station (Metro-North)

Orange station is a planned commuter rail stop that would serve the Metro-North Railroad's New Haven Line in Orange, Connecticut. The station will be located at Marsh Hill Road and a new access road. In early 2017, the station was planned to open in fall 2021, but budget difficulties at the end of the year canceled the plan for the time being.

Contents

Description

The station is planned to be built on a 50-acre parcel in Orange through a public-private partnership. A private transit-oriented development project, which would include residential units, retail, and a parking garage, will be constructed in conjunction with the station. The station will have two canopied side platforms that will be located within the existing right-of-way. The station will be ADA-compliant and will have elevators.

The station, according to the Final Environment Impact Station from June 2007, which was considering both the station and a station at West Haven, would have 1080-foot-long platforms, a 470-space parking structure north of the southbound platform and a 3000-square-foot waiting room. This plan had a pedestrian tunnel connecting the two platforms, while existing plans have them connected by an overpass. The existing station location is primarily undeveloped. [1]

History

In the late 1990s, Metro-North began considering adding a station in either Orange or neighboring West Haven, Connecticut, to fill the ten-mile gap between the Milford and New Haven stations—the longest such gap on the New Haven mainline. Both town governments were supportive of a station, which was then to cost $25–30 million. Support in West Haven was largely rallied by the West Haven Train Station Committee Inc., which circulated a petition eventually signed by 7600 residents. Support in Orange was both local by the Orange Railroad Committee and also aided by several employers, including Bayer Pharmaceuticals, whose employees were likely to use the station. [2] In fall 2001, a site study and a regional transportation committee recommended the Orange site (at Marsh Hill Road) based on cost, time considerations, and highway access. However, in December 2001, the South Central Council of Governments voted instead to support the West Haven site, citing the economic needs of West Haven versus comparatively wealthy Orange. [2]

Orange's first selectman originally planned to appeal the decision, and controversy continued. [2] The sustained bitter animosity between the two towns was cited in a study of bargaining between municipalities. [3] The Final Environmental Impact Statement, issued in June 2007, considered both station sites, noting that "The recommendation of the West Haven site does not preclude the construction of a commuter railroad station at the Orange site in the future, as the demand for additional parking and service warrants, and as additional funding becomes available." [1] In 2011–even after ground was broken at West Haven–state lawmakers considered a funding deal to build an Orange station. [4] In July 2011, Governor Malloy signed a bill that sought a funding source, but that committed no funds to the project. [5] The West Haven station opened on August 18, 2013. [6] On February 1, 2017, the Connecticut State Bond Commission authorized $21 million for design work for the station, in addition to funding for the upgrade of a station on the Danbury Branch. [7]

In November 2017, the Connecticut DOT announced that it would halt funding for the construction of Orange station and the accompanying transit-oriented development as the state was running out of funds for transportation projects. [8]

Related Research Articles

<span class="mw-page-title-main">Shore Line East</span> Commuter rail service in southern Connecticut, US

Shore Line East (SLE) is a commuter rail service which operates along the Northeast Corridor through southern Connecticut, United States. The rail service is a fully owned subsidiary of the Connecticut Department of Transportation (CTDOT) and is operated under the CT Rail brand. SLE provides service seven days a week along the Northeast Corridor between New London and New Haven; limited through service west of New Haven to Bridgeport and Stamford has been suspended since 2020. Cross-platform transfers to Metro-North Railroad New Haven Line trains are available at New Haven for service to southwestern Connecticut and New York City. Pre-COVID, around 2,200 riders used the service on weekdays.

<span class="mw-page-title-main">Route 128 station</span> Rail station in Westwood, MA

Route 128 station is a passenger rail station located at the crossing of the Northeast Corridor and Interstate 95/US Route 1/Route 128 at the eastern tip of Dedham and Westwood, Massachusetts, United States. The station is shared by Amtrak and the Massachusetts Bay Transportation Authority (MBTA). It is served by most MBTA Commuter Rail Providence/Stoughton Line trains, as well as by all Amtrak Northeast Regional and Acela intercity trains. The station building, platforms, and parking garage are all fully accessible. It is the 23rd busiest Amtrak station in the country and the fifth busiest in New England.

<span class="mw-page-title-main">New Haven State Street station</span> Railroad station in Connecticut

New Haven State Street station is a commuter rail station located on State Street in downtown New Haven, Connecticut. The secondary railroad station in the city, it is located 0.8 miles (1.3 km) northeast of the much larger New Haven Union Station and is intended to offer easier access to New Haven's downtown business district. It is served by Shore Line East and Hartford Line commuter trains, Amtrak Hartford Line trains, Springfield-terminating Northeast Regional trains, and Valley Flyer trains, and a limited number of Metro-North Railroad New Haven Line trains. Originally proposed in 1996, State Street opened on June 7, 2002. A second platform opened on June 8, 2018, in time for the beginning of Hartford Line service.

<span class="mw-page-title-main">Old Saybrook station</span> Regional rail station in Connecticut, US

Old Saybrook station is a regional rail station in Old Saybrook, Connecticut. It is served by both Amtrak Northeast Regional intercity trains and CT Rail Shore Line East commuter service.

<span class="mw-page-title-main">Hartford Line</span> CTrail commuter rail service in the US

The Hartford Line is a commuter rail service between New Haven, Connecticut, and Springfield, Massachusetts, using the Amtrak-owned New Haven–Springfield Line. The project is a joint venture between the states of Connecticut and Massachusetts, with support from the federal government as well. CT Rail-branded trains provide service along the corridor, and riders can use Hartford Line tickets to travel on board most Amtrak trains along the corridor at the same prices. The service launched on June 16, 2018.

<span class="mw-page-title-main">West Haven station</span> Railroad station in Connecticut

West Haven station is a commuter rail station on the Metro-North Railroad's New Haven Line, located in West Haven, Connecticut. The station was built on Sawmill Road between Hood Terrace and Railroad Avenue, in the Elm Street-Wagner Place neighborhood. West Haven has 660 parking spaces in on-site lots as well as bicycle facilities. The station is accessible. West Haven has full service on the New Haven Line.

<span class="mw-page-title-main">Noroton Heights station</span> Metro-North Railroad station in Connecticut

Noroton Heights station is a commuter rail station on the Metro-North Railroad New Haven Line located in the Noroton Heights neighborhood of Darien, Connecticut.

<span class="mw-page-title-main">Windsor station (Connecticut)</span> Rail station in Windsor, Connecticut, US

Windsor station is a historic railroad station on Amtrak's New Haven–Springfield Line, located in downtown Windsor, Connecticut. It is served by Amtrak Northeast Regional and Valley Flyer intercity service and CT Rail's Hartford Line commuter rail service. The nearby Hartford & New Haven Railroad-Freight Depot serves as the home of the Windsor Arts Center.

<span class="mw-page-title-main">Windsor Locks station</span> Train station in Windsor Locks, Connecticut, US

Windsor Locks station is an Amtrak and CT Rail train station in Windsor Locks, Connecticut, on the New Haven–Springfield Line. It is served by four Amtrak services - the Hartford Line shuttles, Northeast Regional, Valley Flyer, and Vermonter - as well as CT Rail Hartford Line commuter rail trains.

<span class="mw-page-title-main">New Canaan station</span> Metro-North Railroad station in Connecticut

New Canaan station is a commuter rail station on the New Canaan Branch of the Metro-North Railroad's New Haven Line in New Canaan, Connecticut.

<span class="mw-page-title-main">Stoughton station</span> Rail station in Stoughton, Massachusetts, US

Stoughton station is an MBTA Commuter Rail station in downtown Stoughton, Massachusetts. It is the current terminus of the Stoughton Branch of the Providence/Stoughton Line. The station has a parking lot to serve local riders and those driving from further south, as Stoughton is close to the Massachusetts Route 24 expressway. Stoughton currently has one platform serving one track; the platform has a mini-high section for accessibility.

<span class="mw-page-title-main">Enfield station (Connecticut)</span>

Enfield station is a planned CTrail Hartford Line station in Enfield, Connecticut. As of September 2023, construction is expected to begin in 2025. A previous station at the site was open from 1844 to 1986.

<span class="mw-page-title-main">North Haven station</span>

North Haven is a planned regional rail station on the New Haven–Springfield Line near Route 40 and Route 5 in North Haven, Connecticut, to be served by the Hartford Line service. The project has been funded for design, with construction expected to cost $52 million.

<span class="mw-page-title-main">Middleborough/Lakeville station</span> Commuter rail station in Lakeville, Massachusetts, US

Middleborough/Lakeville station is an MBTA Commuter Rail station in Lakeville, Massachusetts, just south of the Middleborough border. It is the southern terminus of the Middleborough/Lakeville Line; it is also an intermediate stop for seasonal CapeFlyer service to Cape Cod. Middleborough/Lakeville has a single full-length high-level side platform serving the line's single track.

<span class="mw-page-title-main">Flatbush Avenue station (Connecticut)</span> Bus rapid transit station in West Hartford, Connecticut

Flatbush Avenue is a bus rapid transit station on the CTfastrak line, located near the intersection of Flatbush Avenue and New Park Avenue in West Hartford, Connecticut. It opened with the line on March 28, 2015. The station consists of one island platform to the side of the busway, with passing lanes to allow express buses to pass buses stopped at the station. A CTrail Hartford Line commuter rail platform was planned to open in 2022 under the name West Hartford.

<span class="mw-page-title-main">Newington Junction station</span>

Newington Junction is a bus rapid transit station on the CTfastrak line opened in 2015 located off Willard Avenue (CT-173) in the Newington Junction neighborhood of Newington, Connecticut.

<span class="mw-page-title-main">East Taunton station</span> Future railway station in Taunton, Massachusetts, US

East Taunton station is an under-construction MBTA Commuter Rail station in East Taunton, Massachusetts adjacent to the interchange between the Route 24 expressway and County Street. It is planned to open in 2025 as part of the first phase of the South Coast Rail project.

<span class="mw-page-title-main">Church Street station (MBTA)</span> Under-construction railway station in New Bedford, Massachusetts, US

Church Street station is an under-construction MBTA Commuter Rail station located in northern New Bedford, Massachusetts, United States. It is planned to open in May 2025 as part of the first phase of the South Coast Rail project. The station will have a single side platform on the east side of the New Bedford Subdivision, along with a park and ride lot.

<span class="mw-page-title-main">Barnum station</span> Proposed Metro-North Railroad station in Connecticut

Barnum station is a planned regional rail station to be located on the Metro-North Railroad's New Haven Line in East Bridgeport, Connecticut. The station will be named after the circus showman and former Bridgeport mayor P. T. Barnum, and will be located on the south side of Barnum Avenue between Seaview Avenue and Pembroke Street. A feasibility study was released in July 2013, followed by preliminary planning funding in July 2014 and an application for planning funding in June 2015. By January 2017, the station was planned to open in 2021. However, the project was indefinitely postponed in January 2019.

<span class="mw-page-title-main">Middleborough station</span> Rail station in Middleborough, Massachusetts, US

Middleborough station is an under-construction MBTA Commuter Rail station in Middleborough, Massachusetts. It is expected to open in May 2025 as part of the South Coast Rail project, replacing Middleborough/Lakeville station for regular service. The station will have a single side platform located inside the wye between the Middleborough Main Line and the Middleboro Secondary.

References

  1. 1 2 "Final State Environmental Impact Evaluation for the New Railroad Station at City of West Haven or Town of Orange" (PDF). Connecticut Department of Transportation. June 2007. Retrieved May 21, 2013.
  2. 1 2 3 Weizel, Richard (January 6, 2002). "And the Winner Is: West Haven, for Now". New York Times. Retrieved May 21, 2013.
  3. Myers, Minor III (Fall 2005). "Obstacles to Bargaining Between Local Governments: The Case of West Haven and Orange, Connecticut". The Urban Lawyer. 37 (4): 853–892. JSTOR   27895593.
  4. Hladky, Gregory B. (August 9, 2011). "Do We Really Need That Orange Train Station?". CT.com. Retrieved May 21, 2013.
  5. McCready, Brian (July 19, 2011). "Way cleared to fund a train station in Orange". New Haven Register. Archived from the original on September 7, 2012. Retrieved May 21, 2013.
  6. McNamara, Neal (August 19, 2013). "Officials cut ribbon at new West Haven train station". New Haven Register. Retrieved August 21, 2013.
  7. Soule, Alexander (February 1, 2017). "Connecticut OKs funds for Norwalk, Orange stations". The Hour. Retrieved February 2, 2017.
  8. Bisceglia, Brandon (December 21, 2017). "Orange Train Station Plans Derailed". The Orange Times. Retrieved January 16, 2018.

Final Connecticut Department of Transportation Environmental Impact Evaluation - May 2017