Pesa Bydgostia

Last updated
ED74 [1] [2]
Ed74-005 at Wroclaw.jpg
Stock typeelectric multiple unit
Manufacturer Pesa Bydgoszcz
AssemblyFlag of Poland.svg  Poland
Constructed2007–2008
Capacity310 (194+8 seats)
Specifications
Train length80,330 millimetres (263.55 ft)
Width2,870 millimetres (9.42 ft)
Height4,360 millimetres (14.30 ft)
Platform height 1,000 millimetres (3.3 ft)
Wheel diameter840 millimetres (2.76 ft)
Maximum speed160 kilometres per hour (99 mph)
Weight158.9 tonnes (350,000 lb)
Engine typeTMF59-39-4
Power output3 kV DC
Electric system(s) 2,000 kW
AAR wheel arrangement Bo’2’2’2’Bo’
Braking system(s) Knorr + ED

Pesa Bydgostia (type 16WEk designated as series ED74, with car types 310Bak, 411Bak, 411Bbk, and 310Bbk) [2] is a four-car standard-gauge electric multiple unit of Polish production, manufactured by Pesa Bydgoszcz upon order from Przewozy Regionalne, with a total of 14 units produced. In December 2008, they were transferred to PKP Intercity. The train set is a developmental version of the Pesa Acatus train.

Contents

History

After World War II, electric multiple units were produced exclusively by Pafawag in Wrocław until 1997. [3] Pafawag was the manufacturer of the most popular electric multiple unit series in Poland, the EN57. [4] Following its privatization in the 1990s, Pafawag ceased the production of these rolling stock, with the last unit produced being the ED73 in 1997. [4] For several years, no electric multiple units were produced in Poland.

During this period, Polish State Railways and later local governments primarily purchased diesel railcars and diesel multiple units due to the dominance of fuel-intensive diesel locomotives on non-electrified lines. This allowed Polish manufacturers and operators to gain experience in the production and operation of lightweight rail vehicles. [5] Additionally, the EN57 electric multiple units owned by Polish operators were modernized. [6]

Electric multiple units from new manufacturers began to appear on Polish tracks in 2004. Since then, tenders for the supply of electric multiple units have been won by three manufacturers: Pesa Bydgoszcz (formerly ZNTK Bydgoszcz), Newag (formerly ZNTK Nowy Sącz), and Stadler Rail. [7] Pesa, after undergoing a significant restructuring in 1998, initially focused on producing railbuses from 2001 but began constructing its first electric multiple units in 2004 for the Warsaw Commuter Railway – the 13WE (EN95). Despite plans to purchase 10 units, [8] production ceased after just one unit. In 2005, Pesa developed a project to produce the first electric multiple units adapted for 3,000 V DC voltage in both 3 and 4-car versions. [9] The first prototype was the 4-car Acatus, tested initially as a 4-car unit (ED74-01, type 16WE) and later as a 3-car unit (ED59-01, type 15WE), which significantly reduced the number of tests required for the slightly later ordered 4-car Bydgostia units. [10] [11]

Construction

Layout in 2016 ED74 uklad miejsc 2016-02-26.png
Layout in 2016
First class interior in 2009 ED74 wnetrze 1 klasa.JPG
First class interior in 2009
Coupling Sprzeg ED74-010 i 007.JPG
Coupling

The Bydgostia is a four-car, single-space train designed for inter-regional passenger transport. Each car features two pairs of doors on each side, designed to accommodate platforms ranging from 300 to 1,000 mm in height. For lower platforms, steps extend to facilitate boarding. [1] The first and last bogies are powered 22MNK bogies with a wheelbase of 2,500 mm, while the intermediate Jacobs bogies are non-powered 37ANK bogies, also with an axle base of 2,500 mm. [12] The wheel diameter is 850 mm. [12] Due to the method of connecting the cars, shortening or lengthening the train is not feasible during operation, although up to 3 trains can be coupled for multiple-unit train control. However, due to high power consumption, they are typically operated in pairs. [2]

A mixed seating arrangement is used, with seats arranged in rows and groups. [2] The ED74-01 is equipped with 179 fixed and 8 folding seats in second class and 21 in first class. [2] After its production, a decision was made to implement changes: the interior layout was altered, bicycle racks were removed, and only first-class seats were installed. Consequently, subsequent units have 161 fixed and 8 folding seats in second class and 33 in first class. [2] In 2014, during level P4 maintenance, the seating layout of the first unit was standardized to match the others. [13]

Both end cars contain closed-system toilets, and the D car includes space for passengers with reduced mobility or large luggage. Nearby, there are lifts for disabled passengers. [2] All cars are equipped with air conditioning, displays, a sound system, and surveillance. [12]

The vehicles are equipped with standard train protection systems: vigilance control, automatic train braking, and Radio-Stop  [ pl ]. [2]

Modernizations

During the first annual inspection in 2008, seat arrangements were modified: one row of seats was removed in the middle sections between vestibules, and in the end sections, group seating was replaced with row seating, creating additional seats near the entrance doors. [2] Additionally, two folding seats were added near the WC in the D cars, and first-class seats were recolored for easier distinction from second-class seats. [2]

In 2009, an additional seat for an assistant driver was installed, allowing the trains to exceed speeds of 130 km/h. [2]

In early 2014, the first trains underwent level 4 maintenance, during which they were repainted in PKP Intercity colors. [14]

In June 2019, further modernizations of the ED74 units began at ZNTK Mińsk Mazowiecki, [15] including the removal of half the entrance doors, reduction of window areas, interior reconfiguration, and replacement of inverters and converters. [16]

Operation

PKP Przewozy Regionalne

ED74 in PKP Przewozy Regionalne livery at InnoTrans 2008 ED74 Innotrans.jpg
ED74 in PKP Przewozy Regionalne livery at InnoTrans 2008

On 16 December 2005, a contract was signed with PKP Przewozy Regionalne for the delivery of 11 units to serve the WarsawŁódź route. [2] The purchase was financed by the European Regional Development Fund under the EU Sectoral Operational Program for Transport  [ pl ], along with government budget contributions. [2]

In early June 2007, the first set was completed and sent for trial runs to obtain operational approval. [11] On 23 August 2007, an official presentation of the ED74 took place at Warszawa Centralna railway station, followed by a trip to Łódź. The next day, two coupled ED74 units operated the first scheduled train. On October 31, an amendment to the contract increased the order to 14 units. [17] The initially ordered 11 sets were delivered by the end of 2007, and by summer 2008, an additional 3 sets were delivered. [2]

On October 10, ED74-005 was presented at the Trako Fair  [ pl ] in Oliwa, and from 23 to 26 September 2008, ED74-014 was displayed at InnoTrans in Berlin. [18]

In December 2008, the units were transferred to PKP Intercity to operate Twoje Linie Kolejowe, replacing discontinued express trains previously run by PKP Przewozy Regionalne. [2]

PKP Intercity

ED74 in PKP Intercity colors ED74-008, Warszawa Grochow, 2014-07-31.jpg
ED74 in PKP Intercity colors

Initially, the units served the Warsaw–Łódź route for which they were purchased. On 29 December 2009, a separation occurred between two coupled sets during departure, [19] leading the Office of Rail Transport  [ pl ] to prohibit coupling until the issue was resolved. [19] The incident was deemed isolated, and by January 9, the sets resumed running in pairs [20] but with a driver in both units. [21] In summer 2010, some sets were reassigned to the Łódź–Terespol route. [17] From 13 December 2010, the sets also served routes such as KrakówBiałystok, Białystok–Katowice, Warsaw EastPoznań, Kraków–Warsaw East, and Katowice–Warsaw East. [22] Later, they also operated routes like Kraków–Zakopane, Kraków–Wrocław, Warsaw WestBiała Podlaska, and Warsaw West–Terespol. [23]

In 2011, four sets were leased back, followed by another four in 2012. [24]

By February 2015, only 5 out of 14 units were operational, with the rest awaiting repairs. In September, 7 units were operational, but repair delays persisted due to difficulties in finding suitable roles for the units. [25] By November, 7 units remained in service on routes linking Warsaw with Kraków, Piła, and Terespol, while the other 7 were out of service. [26] In 2016, the prosecutor's office launched an investigation into the failure to perform mandatory maintenance on the trains. [27]

In 2014, different operators sought to acquire the unused ED74 sets from PKP Intercity, but no ownership changes occurred. In April 2016, after purchasing other electric multiple units, PKP Intercity announced plans to sell the ED74 sets due to their unsuitability for long-distance service. [28] It was planned that 7 units would be sold first, followed by another 3 at the end of 2016, and the last 4 in the second quarter of 2017. [29] At that time, 5 units of this series were still in operation, servicing connections from Płaszów to Łódź Kaliska, Terespol, and Białystok. [30] At the end of August, the technical dialogue announced by PKP Intercity saw participation from Koleje Małopolskie, Przewozy Regionalne, and Koleje Śląskie. [31] Koleje Małopolskie expressed interest in purchasing all 14 ED74 units and began negotiations with PKP Intercity, [32] while Przewozy Regionalne submitted an offer to lease all vehicles with an option to purchase them later, and Koleje Śląskie did not submit any offer. [31]

On 17 October 2016, PKP Intercity announced the intention to dispose of 14 ED74 series electric multiple units. [33] At that time, all the vehicles were located in Bieżanów, with half of them operational and the other half awaiting P4 repairs. [34] In the 2016/2017 timetable, the units were assigned to serve only the Wit Stwosz route between Kraków and Terespol. [35]

In early December 2016, the carrier was analyzing the submitted offers and anticipated that the sale of the vehicles would be finalized by mid-2017. [36] Ultimately, at the end of April 2017, PKP Intercity canceled the sale proceedings and decided that the units would be returned to service. [37] In October, the carrier announced that all ED74 units would undergo P5 level repairs along with modernization. Afterward, they would be based in Wrocław and would serve InterCity category trains from Wrocław to Lublin and Kielce, as well as from Kraków to Lublin. [38] Pesa and H. Cegielski expressed interest in carrying out these repairs. [39] In January 2019, bids were opened in the tender for the modernization of the units, with Pesa submitting the only offer. [40] However, the proposed price was higher than the cost of purchasing new units. [41] On 27 June 2019, a contract was signed for the modernization of 14 ED74 series units, which was expected to take up to 48 months. [42] Even before the contract was signed, the transport of the units from Prokocim, where they had been stored, to the facilities in Mińsk Mazowiecki began. [43]

On 10 December 2017, with the introduction of the new timetable, the units were assigned exclusively to serve the Twoje Linie Kolejowe Kinga route between Kraków and Warsaw via Kielce and Radom. [44] In June, the Kinga route was discontinued, and the units were reassigned to the Cyryl route between Kraków and Poznań, where they operated until the end of the 2018 summer season. [45] [46] After the summer, the units again began servicing the reinstated Kinga route. [47] Between July and August 2019, one unit was assigned to the Intercity Galicja route between Przemyśl and Kraków. [48]

The first modernized unit was ready in March 2021, [16] and on 12 December 2021, the first two modernized units completed their first trip on the Wrocław–Przemyśl route. [49] By the end of 2022, 12 modernized units had been delivered. [15] In spring 2023, the modernization of the last two units was completed, with the final unit, ED74-014, leaving the Mińsk Mazowiecki facility on May 31. [50]

Reception

The ED74 units faced much criticism due to the insufficient number of toilets, lack of compartments, and uncomfortable, tightly arranged seats. [2] However, the units were designed for short connections of up to 90 minutes of travel, hence the characteristic seats criticized for their shape. [51] Meanwhile, they were deployed on the Warsaw to Łódź route, where travel time due to renovations lasted about 2 hours until 2015, [52] and later on even longer routes. Additionally, especially in the initial period, there were issues with electronics, heating, and retractable steps. [2]

Awards and recognitions

Related Research Articles

<span class="mw-page-title-main">PKP Intercity</span> Polish transportation subsidiary

PKP Intercity is the subsidiary of the PKP Group responsible for long-distance rail passenger transport. It operates around 350 trains daily, connecting large agglomerations and smaller towns in Poland. It offers its services under TLK, InterCity, Express Intercity and Express Intercity Premium brands. The company also provides most international rail connections to and from the country. In 2023, the company reported an 18.2% of market share in terms of total number of served passengers in the country.

<span class="mw-page-title-main">Pesa Elf</span>

The Elf is an electric multiple unit developed by Polish rolling-stock manufacturer Pesa SA. It is intended for commuter and regional service where platform height is 55 cm (22 in). It is based on earlier EMU designs named ED59 and ED74. A Pesa Elf was exhibited at InnoTrans 2010.

<span class="mw-page-title-main">Newag 220M/221M</span> Train Model

Newag 220M/221M is a series of diesel multiple units, they are two and three-section passenger trains which have been manufactured since 2010. They are designed for suburban and long-distance passenger transit. They are low-floor, open-coach units produced by Newag in Nowy Sącz in Poland. Altogether 9 units have been produced which are operated by Przewozy Regionalne and Silesian Railways.

The Łódź Cross-City Line is an under construction railway line running through the centre of the city of Łódź, Poland, intended to connect three major railway stations of the city: Łódź Kaliska, Łódź Fabryczna, and Łódź Widzew. It consists of two sections: an open-air section between Łódź Widzew and Łódź Niciarniana stations, and a tunnel, currently reaching Łódź Fabryczna station.

<span class="mw-page-title-main">Düwag Wadloper</span> A family of diesel railcars and diesel multiple units

Düwag Wadloper is a family of diesel railcars and diesel multiple units produced by the German Düwag plant in Düsseldorf. Between 1981 and 1983, a total of 50 vehicles of this kind were built specifically for the Dutch Nederlandse Spoorwegen railroad. At the beginning of the 21st century, they were mainly operated by private carriers; in 2006 they began to be phased out, and in 2008 they were sold to other countries. The trains went to carriers from Poland, Argentina and Romania. They were operated by Przewozy Regionalne, Masovian Railways and Koleje Śląskie, and also used by Trenes de Buenos Aires to operate a cross-border service between Argentina and Uruguay. They currently operate services connecting Argentina with Paraguay, and are operated in Poland by SKPL Cargo, as well as on several lines in Romania.

<span class="mw-page-title-main">Pesa Acatus</span> Electric multiple unit produced by Pesa Bydgoszcz in 2006

Pesa Acatus is a standard-gauge electric multiple unit produced in a single copy at the Pesa plant in Bydgoszcz in 2006, specifically for the Marshal's Office of the Łódź Voivodeship. During test runs, it was a four-car unit, and it is nowadays operated in a three-car configuration.

<span class="mw-page-title-main">Pesa Dart</span> Class of Polish electric train

The Dart is a long distance electric multiple unit developed by Polish rolling-stock manufacturer Pesa SA. PKP Intercity operates 20 Dart units, which are designated as PKP Class ED161.

<span class="mw-page-title-main">Pafawag 101N</span> Tram formerly operated by Warsaw Commuter Railway

Pafawag 101N was a two-car, low-floor electric multiple unit (EPU) tram produced by Pafawag in Wrocław from 1968 to 1972. A total of 40 101Ns were built for the Warsaw Commuter Railway.

<span class="mw-page-title-main">Pesa 401M</span> 2009 Polish passenger railroad car

Pesa 401M is a control car used as a trailer for Pesa 214M railbuses of the SA106 series. This wagon was built by Pesa for the Marshal's Office of the Kuyavian–Pomeranian Voivodeship, with a total of 5 units produced.

<span class="mw-page-title-main">Pesa Mazovia</span> Electric multiple unit produced in 2004 by Pesa for the Warsaw Commuter Railway

Pesa Mazovia is a standard-gauge, four-car electric multiple unit produced in 2004 by Pesa from Bydgoszcz in a single unit for the Warsaw Commuter Railway. It is the first vehicle of this kind built by the manufacturer.

<span class="mw-page-title-main">Newag 19WE</span> Electric multiple unit produced by Newag, operated by Szybka Kolej Miejska in Warsaw

Newag 19WE is a standard-gauge, four-car electric multiple unit (EMU) produced between 2008 and 2010 at the Newag plant in Nowy Sącz. A total of 4 units were built, which are operated by Szybka Kolej Miejska in Warsaw.

<span class="mw-page-title-main">Pesa 214M</span> Family of standard-gauge diesel railcars produced by Pesa

The Pesa 214M is a family of standard-gauge diesel railcars produced by Pesa Bydgoszcz between 2001 and 2016, intended for regional transport on non-electrified lines. The family includes: 214M (SA106), 214Ma (SA103), and 214Mb (SA135). A total of 56 units were produced, which are operated by Arriva, Koleje Dolnośląskie, Masovian Railways, and Polregio.

<span class="mw-page-title-main">Pesa Acatus II</span> Electric multiple unit of Polish production, manufactured by Pesa

Pesa Acatus II is a four-car, partially low-floor, standard-gauge electric multiple unit of Polish production, manufactured by Pesa at the turn of 2010 and 2011. Five units were purchased by the local government of the Lesser Poland Voivodeship. Initially, the vehicles were operated by Przewozy Regionalne, and later by Koleje Małopolskie, which have additionally owned the vehicles since 2018.

<span class="mw-page-title-main">Pesa 218M</span> Family of diesel multiple units produced by Pesa

Pesa 218M is a family of two-car standard-gauge diesel multiple units (DMUs) produced by Pesa between 2005 and 2015. Only one single-engine unit of the original 218M model was built, while the remaining dual-engine units were designated as subtypes 218Ma-218Md. A total of 76 units were produced, which are operated by Arriva, Koleje Dolnośląskie, Koleje Wielkopolskie, Polregio, and Szybka Kolej Miejska in Tricity.

<span class="mw-page-title-main">Katowice Załęże railway station</span> Railway station in Katowice, Poland

Katowice Załęże is a railway station in Katowice, located in the Załęże district in southern Poland. The stop, situated on the international E 30 railway line, was built in 1957, with scheduled train services beginning in 1966. Regional trains operated by Koleje Śląskie, traveling towards Częstochowa, Katowice, Lubliniec, and Gliwice, stop at this station.

<span class="mw-page-title-main">Pesa 620M</span> Diesel railcar produced since 2004 by Pesa

Pesa 620M is a broad-gauge diesel railcar produced since 2004 by Pesa for the Lithuanian Railways and Ukrainian Railways, and since 2011, in cooperation with Belkommunmash, also for the Belarusian Railway. A total of 29 units were produced.

<span class="mw-page-title-main">PKP class ED250</span> High-speed electric multiple unit from the Pendolino family

Alstom EMU250 is a seven-car standard gauge high-speed electric multiple unit from the Pendolino family, manufactured by Alstom at the factory in Savigliano, Italy, as the Alstom ETR 610 model, commissioned by PKP Intercity. A total of 20 units were produced, and since 14 December 2014, they have been operating Express InterCity Premium trains on routes connecting Warsaw with Bielsko-Biała, Gdynia, Gliwice, Jelenia Góra, Katowice, Kołobrzeg, Kraków, Rzeszów, and Wrocław.

<span class="mw-page-title-main">PKP class EN97</span> Electric multiple unit produced by Pesa

Pesa 33WE is a standard-gauge, low-platform electric multiple unit produced by Pesa in Bydgoszcz in a quantity of 14 units for the Warsaw Commuter Railway. They replaced the EN94 series trains.

<span class="mw-page-title-main">Newag 222M</span> Diesel multiple unit produced by Newag

Newag 222M is a two-car diesel multiple unit produced by the Newag company from Nowy Sącz. Two units were manufactured for Masovian Railways, and four more for the Subcarpathian Voivodeship.

<span class="mw-page-title-main">Pesa Tramicus</span> Tram produced by Pesa

Pesa Tramicus is a single-space, single-direction low-floor tram produced by Pesa in Bydgoszcz. The tram is available in three versions: a three-car (121N) or five-car configuration, connected by accordion-type pivot joints. Between 2005 and 2008, a total of 33 Tramicus trams were produced, and they were delivered to Warsaw, Łódź, Elbląg, and Bydgoszcz. The experience gained from designing and operating the Tramicus family led to the development of the Swing vehicles.

References

  1. 1 2 "Czteroczłonowy elektryczny zespół trakcyjny ED74" (PDF). pesa.pl (in Polish). Retrieved 2024-07-03.
  2. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Terczyński, Paweł (2011). "Zespoły trakcyjne ED74 "Bydgostia"". Świat Kolei (in Polish). 12. Łódź: Emi-press: 12–15. ISSN   1234-5962.
  3. Rusak, Ryszard (2005). "Od Pafawagu do Bombardiera. 60 lat Państwowej Fabryki Wagonów Pafawag we Wrocławiu". Świat Kolei (in Polish). 10. Łódź: Emi-press. ISSN   1234-5962.
  4. 1 2 Terczyński, Paweł (2005). "Pafawag – kronika produkcji". Świat Kolei (in Polish). 10. Łódź: Emi-press. ISSN   1234-5962.
  5. Terczyński, Paweł (2008). "Wagony i zespoły spalinowe w obsłudze ruchu regionalnego na PKP". Świat Kolei (in Polish). 9. Łódź: Emi-press: 12–21. ISSN   1234-5962.
  6. Waga, Bogdan (2007). "Elektryczne na start". Koleje Małe i Duże (in Polish). 1. Łódź: Emi-press: 18–27. ISSN   1234-5962.
  7. Sobolewski, Piotr (2008). "Nowy Zakład Montażu Taboru Kolejowego firmy STADLER w Siedlcach". Świat Kolei (in Polish). 5. Łódź: Emi-press: 3. ISSN   1234-5962.
  8. Tomaszewski, Tomasz (2004). "EN95 – nowy zespół trakcyjny dla Warszawskich Kolei Dojazdowych". Świat Kolei (in Polish). 9. Łódź: Emi-press: 3. ISSN   1234-5962.
  9. Terczyński, Paweł (2007). Atlas Lokomotyw 2007 (in Polish) (III ed.). Poznań: Poznański Klub Modelarzy Kolejowych. ISBN   978-83-920757-7-6.
  10. Kotlarz, Grzegorz (2006). "Elektryczny zespół trakcyjny ED74-01 na pierwszych testach". Świat Kolei (in Polish). 6 (12–13). Łódź: Emi-press. ISSN   1234-5962.
  11. 1 2 Terczyński, Paweł (2007). "Prototyp ED74 dla PKP Przewozy Regionalne". Świat Kolei (in Polish). Łódź: Emi-press: 3. ISSN   1234-5962.
  12. 1 2 3 Maricnika, Józef (2011). "Współczesne elektryczne zespoły trakcyjne ED74 i FLIRT". Logistyka (in Polish). 6. Poznań: Instytut Logistyki i Magazynowania. Archived from the original on 2013-10-22. Retrieved 2024-07-03.
  13. "Jest przetarg na naprawę P4 pozostałych ED74". rynek-kolejowy.pl (in Polish). 2014-02-14. Archived from the original on 2014-02-25.
  14. "ED74 w końcu w barwach PKP Intercity". rynek-kolejowy.pl (in Polish). 2014-01-13. Archived from the original on 2014-01-17.
  15. 1 2 "PKP Intercity: Kończymy projekt modernizacji Edyt". www.rynek-kolejowy.pl (in Polish). Retrieved 2024-07-03.
  16. 1 2 "Pierwsze ED74 dla PKP Intercity gotowe. Zobacz, jak wyglądają "Edyty" po modernizacji [zdjęcia]". www.rynek-kolejowy.pl (in Polish). 2021-03-02. Retrieved 2024-07-03.
  17. 1 2 "Dokąd pojadą edyty?". kurier-kolejowy.pl (in Polish). 2010-06-09. Archived from the original on 2020-10-23.
  18. "Pesa na InnoTrans 2008". inforail.pl (in Polish). 2008-10-14. Archived from the original on 2023-11-29.
  19. 1 2 Wasiak, Piotr (2010-01-07). "Na stacji została połowa pociągu. Wagony się odczepiły". lodz.gazeta.pl (in Polish). Archived from the original on 2016-02-12.
  20. "ED74 znów w trakcji podwójnej". rynek-kolejowy.pl (in Polish). 2010-01-10. Archived from the original on 2015-10-22.
  21. Waszak, R. (2010). "ED74 tylko pojedynczo". Świat Kolei (in Polish). 2. Łódź: Emi-press: 4. ISSN   1234-5962.
  22. Terczyński, Paweł (2011). "ED74 w Krakowie". Świat Kolei (in Polish). 1. Łódź: Emi-press: 4. ISSN   1234-5962.
  23. "ED74 będzie jeździć z Krakowa do Wrocławia". rynek-kolejowy.pl (in Polish). 2011-06-30. Archived from the original on 2011-07-12.
  24. "Jest chętny na leasing zwrotny "Edyt" PKP Intercity". rynek-kolejowy.pl (in Polish). 2012-10-05. Archived from the original on 2012-10-08.
  25. "Koleje Dolnośląskie zainteresowane ED74". rynek-kolejowy.pl (in Polish). 2015-09-12. Archived from the original on 2015-09-16.
  26. "Dlaczego ED74 nie jeżdżą do Terespola a stoją zabezpieczone?". TransInfo (in Polish). 2016-08-16. Retrieved 2024-07-03.
  27. "Prokuratura zajmuje się sprawą ED74". TransInfo (in Polish). 2016-11-09. Retrieved 2024-07-03.
  28. Szymajda, Michał (2016-04-08). "PKP Intercity potwierdza: Chcemy sprzedać ED74". rynek-kolejowy.pl (in Polish). Archived from the original on 2016-04-09.
  29. "PKP Intercity jednak sprzedadzą ED74, wiemy kiedy". InfoRail (in Polish). 2016-04-24. Archived from the original on 2016-04-25.
  30. Szymajda, Michał (2016-04-26). "Piotr Stomma: PKP Intercity sprzeda wszystkie swoje "Edyty"". rynek-kolejowy.pl (in Polish). Archived from the original on 2016-04-26.
  31. 1 2 Madrjas, Jakub (2016-08-25). "ED74 wrócą do Przewozów Regionalnych? Chętne też KŚ". rynek-kolejowy.pl (in Polish). Archived from the original on 2016-08-25.
  32. Madrjas, Jakub (2016-08-24). "Koleje Małopolskie chcą kupić wszystkie ED74". rynek-kolejowy.pl (in Polish). Archived from the original on 2016-08-24.
  33. "Ogłoszenie o zamiarze zbycia składników majątku trwałego spółki "PKP Intercity" S.A. w postaci 14 elektrycznych zespołów trakcyjnych serii ED74". PKP Intercity (in Polish). 2016-10-17. Archived from the original on 2016-10-17.
  34. "Ogłoszenie o zamiarze zbycia składników majątku trwałego spółki "PKP Intercity" S.A. w postaci 14 sztuk elektrycznych zespołów trakcyjnych serii ED74. Postępowanie nr BFZ1-073-PS-8/2016" (PDF). PKP Intercity (in Polish). 2016-10-17. pp. 10–11. Archived from the original (PDF) on 2016-10-17.
  35. "Tylko Wit Stwosz na ED74, prawdopodobnie do czerwca zakończenie eksploatacji w PKP IC". TransInfo (in Polish). 2016-12-29. Retrieved 2024-07-03.
  36. Madrjas, Jakub (2016-12-08). "ED74 do połowy 2017 roku w IC. Mniej chętnych na zakup". rynek-kolejowy.pl (in Polish). Archived from the original on 2016-12-08.
  37. Madrjas, Jakub (2017-04-26). "PKP Intercity jednak nie sprzeda ED74. Przywróci je do ruchu". rynek-kolejowy.pl (in Polish). Archived from the original on 2017-04-26.
  38. Szymajda, Michał (2017-10-13). "Wszystkie ED74 wrócą na tory. Jest decyzja PKP Intercity". rynek-kolejowy.pl (in Polish). Archived from the original on 2017-10-13. Retrieved 2024-07-03.
  39. "Dwa podmioty chcą modernizować ED74". TransInfo (in Polish). 2018-01-25. Retrieved 2024-07-03.
  40. "Tylko PESA chce zmodernizować ED74". TransInfo (in Polish). 2019-01-21. Retrieved 2024-07-03.
  41. Bryła, Edyta (2019-01-23). "Remont droższy niż nowe pociągi". wyborcza.pl. Retrieved 2024-07-03.
  42. "PKP Intercity podpisało umowę na modernizację ED74". www.rynek-kolejowy.pl (in Polish). Retrieved 2024-07-03.
  43. "Edyty opuszczają Kraków". TransInfo (in Polish). 2019-06-28. Retrieved 2024-07-03.
  44. "Gdzie w nowym rozkładzie jazdy pojadą ED74?". www.rynek-kolejowy.pl (in Polish). 2017-11-27. Retrieved 2024-07-03.
  45. "Nowe zadanie dla ED74". TransInfo (in Polish). 2018-05-28. Retrieved 2024-07-03.
  46. "ED74 obsługuje już tylko TLK Kinga". www.rynek-kolejowy.pl (in Polish). 2018-09-11. Retrieved 2024-07-03.
  47. "Takie mają być "Edyty" po modernizacji. Jest szczegółowa specyfikacja". www.rynek-kolejowy.pl (in Polish). 2018-11-05. Retrieved 2024-07-03.
  48. "ED74 znowu w ruchu. Obsłuży IC Galicja". TransInfo (in Polish). 2019-07-29. Retrieved 2024-07-03.
  49. "ED74 po modernizacji pojechał z pasażerami. Jest bardzo cichy [zdjęcia]". www.rynek-kolejowy.pl (in Polish). Retrieved 2024-07-03.
  50. "14 elektrycznych zespołów trakcyjnych ED74 już w PKP Intercity". kurier-kolejowy.pl. Retrieved 2024-07-03.
  51. "Superpociąg – superawarie i superniewygoda". wiadomosci24.pl (in Polish). 2007-11-15. Retrieved 2024-07-03.
  52. "Remontują linię kolejową. Pociagiem do Łodzi w 70 minut?". TVN Warszawa (in Polish). 2013-10-29. Retrieved 2024-07-03.
  53. Goździewicz, Jacek (2007). "Tabor na Trako 2007". Świat Kolei (in Polish). 11. Łódź: Emi-press: 12–13. ISSN   1234-5962.