This article has multiple issues. Please help improve it or discuss these issues on the talk page . (Learn how and when to remove these template messages)
|
Dart | |
---|---|
Manufacturer | Pesa SA |
Family name | Dart |
Constructed | 2014–2016 |
Entered service | 2015 |
Number built | 20 |
Fleet numbers | ED161 |
Operators | PKP Intercity |
Specifications | |
Train length | 150,230 mm (492 ft 11 in) |
Width | 2,880 mm (9 ft 5 in) |
Height | 4,300 mm (14 ft 1 in) |
Platform height | 760 mm (2 ft 6 in) |
Maximum speed |
|
Weight | 395 t |
Traction system | electric |
Traction motors | 6 x 400 kW |
Power output | 2400 kW |
Acceleration | around 0,6 m/s2 |
Electric system(s) | 3 kV DC |
Current collector(s) | pantograph |
Coupling system | Scharfenberg |
Multiple working | yes, up to 2 units |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
The Dart (Manufacturer designation 43WE, stylized as PesaDART.) is a long distance electric multiple unit developed by Polish rolling-stock manufacturer Pesa SA. PKP Intercity operates 20 Dart units, which are designated as PKP Class ED161.
Pesa has been developing electric multiple units since 2004, when the Pesa Mazovia for Warszawska Kolej Dojazdowa was built. In 2006 the Acatus was introduced, which was later developed into a series of 14 Bydgostia units, first ordered by Przewozy Regionalne and now operated by PKP Intercity. In 2010, the first 4-section Elf was introduced, which became the basis of a new family of EMUs. In the later years, the Elf family expanded to include 2-, 3-, 4- and 6-section EMUs for operation on metropolitan and regional services. The manufacturer also planned other variant of the Elf, including an 8-section long distance unit. This version was never developed into a prototype, since Pesa decided to offer PKP Intercity a vehicle from the new Dart family
The development of the Dart was partially funded by the National Centre for Research and Development, which provided Pesa with a 7 million PLN subsidy in April 2014, to create a prototype of the new unit. [1] On May 24, 2014 PKP Intercity signed a contract with Pesa for the delivery and 15-year maintenance of 20 Dart units. [2] The exterior and interior of the trainsets were designed by Bartosz Piotrowski. Jakub Gołębiewski also worked on the interior, while Mariusz Gorczyński designed the driver's cabin. Miłosz Pszczóliński and the Kaniewski Design firm also worked on creating the Dart. [3] The prototype was scheduled to be ready by the end of 2014. That was however affected by a delay [4] and the first Dart was completed in May 2015. [5] The first trainset was tested on a local line near Bydgoszcz, [6] where it reached its top speed of 160 km/h. On May 23, 2015, it was transferred to the Test Track Centre near Żmigród, where the homologation testing began. On May 30, during testing on the Central Rail Line, the train reached 204 km/h. The Dart was officially presented to the public during the Trako 2015 trade fair on September 22. [7] The first Dart was approved for service by the Railway Transport Office on October 30, 2015. [8] PKP Intercity received its first unit on December 2, 2015. [9] The 20th, final unit, was delivered on March 5, 2015. [10] On November 16, 2016, the ED161 was certified to for operation with ETCS level 2.
The body is made out of high-strength steel and compsite materials, it meets the requirements of the EN 15227 norm (Four collision scenarios). The safety equipment consists of a cowcatcher, a safety cage around the driver's cabin, a honeycomb-shaped aluminum block in the front of the trainset and multiple energy absorbers. [11] The ED161 consists of 8 sections, with 90 cm wide doors in the middle of each section of the EMU. [12]
The interior of the Dart is separated into sections: Corridors, first and second class, a bar section and a crew compartment. The floor is flat on the entire length of the train, staying at the width of 1220 mm (Except the regions near the doors, where it descends to 760 mm). The train is disabled-friendly, featuring a lift, designated wheelchair spots and an accessible toilet. [13] [11] [14]
The second class features 292 seats in a 2+2 configuration, while first class features 60 seats in a 2+1 configuration. The restaurant section features single-seat tables and one 4-seat tables. Food delivery from the restaurant section directly to the passenger seats is also available. [15] The crew compartment features a bed and a bathroom with a shower. [12]
The Dart features a bicycle rack with space for six bikes, luggage space, 7 toilets (One for the crew and six available to the passengers, including a wheelchair-accessible one). The train is equipped with air conditioning, electrical sockets under the seats, Wi-Fi, video surveillance and electronic route displays. [12] [16] [17] [18] [19]
The Dart features 9 bogies. The ones at the front are 39MN-type power bogies, while the middle ones are Jacobs bogies. The third bogie is a 40MN-type power bogie. The rest are 40MNT-type trailer bogies. The drivetrain consists of 6 400 kW traction motors, providing 2400 kW of power in total. [19]
The trains built for PKP Intercity are certified for operation at a top speed of 160 km/h, but the manufacturer says that the Dart family can be adapted for speeds of up to 230 km/h. [20] While one of the units for PKP IC did reach 204 km/h during testing, this does not mean it is suitable for operation at speeds above 160 km/h, mostly because of the reduced amount of power bogies and the underpowered power inverters. The vehicles are equipped with ERTMS level 2 and support multiple working of up to two units
PKP Intercity ordered 20 ED161 units together with a 15-year maintenance package. [21] [22] The vehicles were ordered to serve connections from Warsaw to: Wrocław (Via Łódź, some services extended towards Jelenia Góra), Bielsko-Biała (Some services extended towards Wisła and Zakopane possible), Lublin (Some services extended towards Chełm) and Białystok. [23] The first units were scheduled to start operating with the inauguration of the new timetable in December 2015. [24]
In September 2015, the construction of a new maintenance depot for the Darts in Mińsk Mazowiecki was completed. [22]
At the beginning of December 2015, the operator informed that the new fleet of long-distance EMUs will not enter service with the new timetable on December 13, 2015. [25] In mid-December, it was reported that the Darts might start operating until the end of the year. [26]
The Dart entered service on December 29, 2015 on the Warszawa Zachodnia-Lublin service. [27] The next day, the Dart started operating on the route to Białystok. [28] On January 9, 2016, the ED161 started operating the Warszawa Wschodnia-Wisła Głębce and Białystok-Bielsko-Biała. On January 11, the Warszawa Wschodnia-Katowice and Lublin-Katowice services were inaugurated. [29] On January 23, the Dart started operating the Warszawa Wschodnia-Wrocław route. [30] In the first month of service, the new Pesa trains made 247 trips, during which they traveled 69000 km and transported almost 45000 passengers. [31]
EP09 is a Polish electric locomotive used by the Polish railways, Polskie Koleje Państwowe (PKP) and produced by Pafawag of Wrocław between 1986 and 1997.
PKP Intercity is the subsidiary of the PKP Group responsible for long-distance rail passenger transport. It operates around 350 trains daily, connecting large agglomerations and smaller towns in Poland. It offers its services under TLK, InterCity, Express Intercity and Express Intercity Premium brands. The company also provides most international rail connections to and from the country. In 2023, the company reported an 18.2% of market share in terms of total number of served passengers in the country.
High-speed rail service commenced in Poland on 14 December 2014, with the introduction of 20 non-tilting New Pendolino trainsets operating on 4 designated lines radiating out from Warsaw. Polish State Railways started passenger service using Pendolino trains operating at a maximum speed of 200 km/h on 80 km line Olszamowice-Zawiercie. From December 2017 there are two 200 km/h sections, 136 km long in total. All high-speed services operated by PKP in Poland are branded as Express Intercity Premium (EIP).
Pesa SA is a Polish rolling stock manufacturer based in Bydgoszcz. The name 'Pesa' derives from the initials PS which stand for Pojazdy Szynowe, 'railway vehicles' in Polish. Pesa is a successor to the Bydgoszcz repair shops of PKP Polskie Koleje Państwowe, Polish State Railways. From the 1950s until 1998 the repair shops operated under the name ZNTK Bydgoszcz, Zakłady Naprawcze Taboru Kolejowego, 'Repair Shop for Railway Rolling Stock' in Bydgoszcz.
The Elf is an electric multiple unit developed by Polish rolling-stock manufacturer Pesa SA. It is intended for commuter and regional service where platform height is 55 cm (22 in). It is based on earlier EMU designs named ED59 and ED74. A Pesa Elf was exhibited at InnoTrans 2010.
Warszawa Zachodnia station, in English Warsaw West, is a railway and long-distance bus station in Warsaw, Poland on the border of Ochota and Wola districts. The railway station is the westernmost terminus of the Warsaw Cross-City Line. It serves trains from PKP Intercity, Polregio, Koleje Mazowieckie, Szybka Kolej Miejska and Warszawska Kolej Dojazdowa as well as international trains passing through Warsaw. It is one of the busiest railway stations in Poland, with over 800 daily trains.
The Pomeranian Metropolitan Railway is a railway in the Tricity area connecting Gdańsk Lech Wałęsa Airport with Wrzeszcz. The line was officially opened by the Prime minister of Poland Ewa Kopacz on 30 August 2015 and regular train services started on 1 September 2015. The line is owned by the Pomeranian Voivodeship and managed by the Pomorska Kolej Metropolitalna, a company wholly owned by the voivodeship. Services on the line are provided by Szybka Kolej Miejska (SKM) and Polregio.
The Pesa Jazz is a family of low floor, articulated and multiple carriage trams by Pesa SA which have been manufactured since 2013. The trams are currently serving the cities of Gdańsk and Warsaw.
The Łódź Cross-City Line is an under construction railway line running through the centre of the city of Łódź, Poland, intended to connect three major railway stations of the city: Łódź Kaliska, Łódź Fabryczna, and Łódź Widzew. It consists of two sections: an open-air section between Łódź Widzew and Łódź Niciarniana stations, and a tunnel, currently reaching Łódź Fabryczna station.
The Łódź–Bednary railway is a railway line located in Łódź Voivodeship, Poland, connecting the city of Łódź with the village of Bednary, located on Warsaw-Kunowice railway. It is commonly described as Łódź-Łowicz railway, because the passenger traffic on the railway is guided toward the main station in the town of Łowicz. The section from Zgierz to Łódź is a crucial part of a railway ring around the city.
Łódź Retkinia is a commuter railway station in the Polish city of Łódź, in Polesie district, on the outskirts of the Retkinia housing neighbourhood. The station is located on the Łódź-Tuplice railway between Łódź Kaliska and Łódź Lublinek stations.
Pesa Acatus is a standard-gauge electric multiple unit produced in a single copy at the Pesa plant in Bydgoszcz in 2006, specifically for the Marshal's Office of the Łódź Voivodeship. During test runs, it was a four-car unit, and it is nowadays operated in a three-car configuration.
Rybnik Towarowy–Chałupki railway, designated as rail line number 158, is a railway line in the southwestern part of the Silesian Voivodeship. The entire length of the line is electrified, the section from Rybnik Towarowy to Wodzisław Śląski is double-track, while the section from Wodzisław Śląski to Chałupki and the track within the Rybnik Towarowy station area are single-track.
Pafawag 101N was a two-car, low-floor electric multiple unit (EPU) tram produced by Pafawag in Wrocław from 1968 to 1972. A total of 40 101Ns were built for the Warsaw Commuter Railway.
Pesa 401M is a control car used as a trailer for Pesa 214M railbuses of the SA106 series. This wagon was built by Pesa for the Marshal's Office of the Kuyavian–Pomeranian Voivodeship, with a total of 5 units produced.
Newag 19WE is a standard-gauge, four-car electric multiple unit (EMU) produced between 2008 and 2010 at the Newag plant in Nowy Sącz. A total of 4 units were built, which are operated by Szybka Kolej Miejska in Warsaw.
The Pesa 214M is a family of standard-gauge diesel railcars produced by Pesa Bydgoszcz between 2001 and 2016, intended for regional transport on non-electrified lines. The family includes: 214M (SA106), 214Ma (SA103), and 214Mb (SA135). A total of 56 units were produced, which are operated by Arriva, Koleje Dolnośląskie, Masovian Railways, and Polregio.
Pesa Acatus II is a four-car, partially low-floor, standard-gauge electric multiple unit of Polish production, manufactured by Pesa at the turn of 2010 and 2011. Five units were purchased by the local government of the Lesser Poland Voivodeship. Initially, the vehicles were operated by Przewozy Regionalne, and later by Koleje Małopolskie, which have additionally owned the vehicles since 2018.
Pesa 218M is a family of two-car standard-gauge diesel multiple units (DMUs) produced by Pesa between 2005 and 2015. Only one single-engine unit of the original 218M model was built, while the remaining dual-engine units were designated as subtypes 218Ma-218Md. A total of 76 units were produced, which are operated by Arriva, Koleje Dolnośląskie, Koleje Wielkopolskie, Polregio, and Szybka Kolej Miejska in Tricity.
Pesa 611M is a broad-gauge diesel railcar manufactured by Pesa in Bydgoszcz. Two units were produced for Russian Railways and delivered in 2013.