Rail electrification in Queensland

Last updated

In the late 1970s and 1980s, a significant rail electrification program was completed in the Australian state of Queensland. The electrified Queensland network is the largest in Australia with over 2,000 kilometres electrified, the next biggest is New South Wales with 640 kilometres, that is served mainly as passenger operations.

Contents

Today all suburban passenger services in South East Queensland are operated by Queensland Rail electric multiple units, as well as electric tilt train services as far as Rockhampton. An extensive network of freight lines are operated to service the Central Queensland coal networks is operated by Aurizon. The two networks are joined by the electrified North Coast line from Brisbane to Rockhampton, and the entire system is energised at 25 kV AC.

History

EMU at Ferny Grove station for the opening of the Ferny Grove to Darra rail electrification on 17 November 1979 EMU at the opening of Queensland rail electrification.jpg
EMU at Ferny Grove station for the opening of the Ferny Grove to Darra rail electrification on 17 November 1979

In the 1980s, three significant programs were completed:

Since then there have been a number of new lines opened that have been electrified. As at 2014, 2,033 km of the 7,739 km Queensland network was electrified. [1]

Brisbane Suburban Electification

Earlier proposals

The first electrification proposal was in 1897 [2] when the chief engineer of the Queensland Railways was sent to study electrified railways in Europe and America. At the time the technology was in its infancy, and the costs outweighed the benefits, with Brisbane having a population of just 120,000. Further studies were carried out in 1915, and three decades later more investigations were carried out.[ citation needed ]

After World War II the Brisbane suburban network had become run down, and coal shortages were affecting the ability to run regular services. A committee was appointed to investigate, delivering their report in November 1947. It recommended the electrification of the suburban network by 1959 with the 1.5 kV DC system. 290 km (180 mi) of single track including sidings would be involved, covering the lines to Shorncliffe, Yeerongpilly via Sherwood, Ferny Grove, Petrie, Pinkenba and Kingston. The report was adopted in February 1950 and preliminary works started.[ citation needed ]

However, the General Manager of QR's South Eastern Division decided track amplification was more important, with quadruplication of the line from Corinda to Zillmere given priority. A cutback in loan funds in 1952-53 slowed the works further, and a change of state government in 1957 saw the scheme abandoned in 1959. The main legacies of the project were the quadruplication of the Roma Street to Corinda section and the 112 stainless steel locomotive-hauled SX carriages, that were intended to be converted to electric multiple units at a later date. Built by Commonwealth Engineering between 1961 and 1963, they replaced older wooden stock and were the first stainless steel carriages in suburban traffic, [3] and improved passenger comfort.[ citation needed ]

In 1965, a transport study recommended the closure of the entire suburban railway network except for an electrified corridor between Darra and Zillmere. In 1970, another study recommended the electrification of the entire network with the 1.5 kV DC system, and the construction of a link between South Brisbane and Roma Street (later realised as the Merivale Bridge).[ citation needed ]

Construction approved

In 1973, the Federal Government under Gough Whitlam offered the states a two-thirds subsidy on approved public passenger transport projects. The Queensland Government announced that it intended to electrify and modernize the Brisbane suburban network, but the Federal funding did not materialise and the state ended up funding the project itself. In 1974, Elrail Consultants and Transmark were engaged to advise of the design of the system, which was changed from 1.5 kV DC to the more efficient 25 kV AC system enabling the number of substations to be significantly reduced. Tenders were called in 1975 for the electrification of 150 route kilometres (250 track kilometres) of lines. [4]

Work to improve overhead clearances for the catenary, and track amplification was also carried out. A new four-track capable tunnel was built between Brunswick Street (now Fortitude Valley) and Bowen Hills stations, and the tunnel floors were lowered between Central and Fortitude Valley, and Central and Roma Street . A new operations centre was opened at Mayne and the city sections of the network were resignalled. A flyover was built at Mayne for the Ferny Grove line to eliminate junction conflicts, and to serve the new electric car sidings. Work was also started on the Merivale Bridge to link the two halves of the network, separated by the Brisbane River. The Petrie to Caboolture section was rebuilt with five deviations to permit 100 km/h running speeds over the entire line, with similar deviation works carried out on the Beenleigh line.[ citation needed ]

Construction begins

EMU01 at Ferny Grove station for the opening of the Ferny Grove to Darra rail electrification on 17 November 1979 EMU01 at the opening of Queensland rail electrification.jpg
EMU01 at Ferny Grove station for the opening of the Ferny Grove to Darra rail electrification on 17 November 1979

Work began on erecting catenary on 16 May 1977, with a ceremony for the digging of the first post hole held at Ferny Grove station. The Ferny Grove to Darra section of line was chosen to be first due to the steep gradients and frequent stops. The contract for the trains themselves was awarded in 1977 to a consortium of Walkers Limited of Maryborough and ASEA of Sweden. The EMUs featured acceleration of 0.75  m/s2 (2.46 ft/s2) and braking of 1.0 m/s2 (3.28 ft/s2) enabling an all-stops train to operate a Ferny Grove service in 25 minutes, an eight-minute saving over diesel-hauled services.

On 8 May 1979, the first section of the new system was energized, from Roma Street to Corinda to permit testing and driver training. On 17 November the same year, the Darra to Ferny Grove and Mayne Depot sections were officially opened. [5] Although only four three-car sets were available for traffic at the time, services commenced between Darra to Ferny Grove on 19 November 1979. All off-peak services were able to be provided by the four units, but most peak hour services remained diesel hauled, with additional EMU units introduced as they were delivered.

Further commissioning dates were:

The Roma Street to Mayne connection via Normanby enabled the operation of electric trains to the 1982 Brisbane Exhibition. The line to Yeerongpilly enabled the operation of trains between Sunnybank and Ipswich for the 1982 Commonwealth Games.

Whilst the Pinkenba line was the final to be electrified under this program, completing the electrification of the Brisbane suburban network as it was at the time, the Thorneside to Cleveland sections were electrified from opening. The original 'rural' branch line to Cleveland (opened 1889) was closed beyond Lota in 1960, but the local government retained the corridor, which allowed the line to be rebuilt to contemporary standards as a suburban line and serve the expanding Greater Brisbane area only a generation later. The new terminal station was the former Raby Bay station, one station before the original Cleveland station, purportedly to facilitate extension of the line to Redland Bay in the future.

Despite the introduction of electric trains some diesel hauled services continued, such as to Pinkenba, which continued beyond the end of the wires on the Doomben line until September 1993.

The benefits of electrification were soon realised, with patronage increasing 60–65% on most lines in the first full year of operation.

Subsequent expansion

Interurban multiple unit on the Gold Coast line in June 2012 IMU 181 heads for Gold Coast Jun,2012.JPG
Interurban multiple unit on the Gold Coast line in June 2012

Electrification of the Main Line west of Ipswich 18 km to Rosewood opened in 1993.

In 1983, the State Government announced an investigation into the reconstruction of the Gold Coast railway as far as Robina after the lacking interest of rail transport forced the closure of the South Coast line. Construction was approved in 1991, the railway being electrified when opened from Beenleigh to Helensvale in 1996, and was extended to Robina in 1997, and to Varsity Lakes in 2009. This was another situation of a contemporary replacement for a former line (the South Coast line), though in this case there was a new alignment adopted allowing 160 km maximum speed, though units currently operate at 140 km/h. There are plans to extend the line to Gold Coast Airport, though not until 2025 at the earliest.

The growth in patronage as a result of electrification resulted in the quadruplication of the Roma Street to Northgate section in 1996, including two pairs of single track tunnels and the realisation of the use of the Bowen Hills tunnel widened 20 years earlier. Some of the roadbed and bridge abutments had been built in the 1950s before the original scheme was abandoned. A third line has been added to Petrie as part of the construction of the Redcliffe Peninsula line which opened in October 2016.

A third line has also been added from South Brisbane to Kuraby, including the dual gauging of the standard gauge line to Acacia Ridge, with proposals to extend it to Kingston.

The Airport line opened from Eagle Junction to the Brisbane Airport in 2001. The Springfield line opened from Darra to Richlands in 2011, being extended to Springfield Central in December 2013. In October 2016, the Redcliffe Peninsula line opened from Petrie to Kippa-Ring

With the introduction of the Translink integrated electronic ticketing system, electric services on the North Coast line to Nambour and Gympie, and on the Main Line west of Ipswich to Rosewood are considered part of the Brisbane suburban network. [6]

Coal System scheme

3100 class on the Goonyella line in 1991 QR electric locos 3102 & 3255 on the Goonyella line ~1991.jpg
3100 class on the Goonyella line in 1991
3500 class on the Blackwater line in 1993 QR electric loco 3508 and another haul an eastbound coal train on the Blackwater line ~1993.jpg
3500 class on the Blackwater line in 1993

The efficiencies shown by the suburban electrification, and the fact the diesel locomotive fleet was due for renewal, led to an investigation of the potential benefits in electrifying the Central Queensland coal networks in 1979. A four-stage scheme was approved in 1983, the stages being:

The Blackwater system was given priority because it would achieve greater fuel savings, as its coal trains were interrupted by general traffic, and the first section was commissioned in September 1986.

The first section of the Goonyella system, from Hay Point to Peak Downs Mine, was commissioned on 29 May 1987, and extended to Saraji coal mine on 4 June 1987 and the balance to Gregory Junction in September that year.

The Emerald extension was to enable goods traffic from further west to be electrically hauled, and in anticipation of coal mines developing in the area. It involved relaying the entire section with 50 kg/m rail, some curve easing and replacing all timber bridges with concrete structures.

Stage 4 was subsequently amended to be the Caboolture to Gladstone project covered below, and Newlands line coal trains remain diesel hauled.

Implementation

The Gladstone to Rockhampton section opened on 6 September 1986, and was extended to Curragh coal mine on 29 May 1987, with the remaining coal lines being commissioned over the remainder of 1987. Some upgrading of the lines was undertaken as part of the scheme, such as realigning any curves sharper than 600m radius so a constant 60 km/h speed for loaded trains could be achieved. Empty trains travel at 80 km/h.

The Hay Point to Coppabella coal mine section opened in May 1987, and the entire system was in operation by the end of that year. This stage included electrifying the connection to the Blackwater system, providing an alternative route in situations of line disruption, but the two systems otherwise operate independently.

The Emerald section was opened on 30 October 1987 after the line was extensively upgraded, including being relaid with 50 kg/m rail, the first use of rail of this weight in Queensland. To date no electric coal trains use this section, and the Minerva mine on the Springsure branch is served by diesel locomotives.

Included in the scheme was the order of 146 3000 kW tri-bo 3100/3200 and 3500/3600 class locomotives, later increased to 166 to include the North Coast line requirements. Additional 3800 class locomotives have since been added to the fleet with a power output of 4000 kW.

The advances in diesel locomotive development in the 1990s changed the cost-benefit aspects of electrification, and the 107 km Bauhinia line from Kinrola to Rolleston was not electrified when opened in 2006. Due to increased tonnage being hauled, it was electrified in December 2014. [7]

North Coast line scheme

3900 class on the North Coast line in 1989 QR electric loco 3917 and another haul a northbound goods train on the NCL with Mt Tibrogargan in the background.jpg
3900 class on the North Coast line in 1989
Tilt Train in January 2006 QR TiltTrain.JPG
Tilt Train in January 2006

In 1986, the Queensland government announced it had deferred the electrification of the Abbot Point to Newlands line and would instead electrify the Caboolture to Gladstone section (469 km) of the North Coast line connecting the Brisbane and Central Queensland electrified systems.

In addition, four major deviations were undertaken to improve the rail alignment, at Eumundi, a bypass of Gympie, at Maryborough West and at Benaraby. The Eumundi Range deviation eased the grade from 1 in 48 (~2.1%) to 1 in 90 (1.1%) and reduced the minimum curve to 550m radius. The Gympie bypass removed the steepest grade on the entire North Coast line, reducing the grade from 1 in 45 (~2.2%) to 1 in 100 (1%). The Maryborough West project eliminated the need for passenger trains to back into or out of Baddow station. The realigned Benaraby bank crossed the original sharply curved alignment eight times.

Electrification works commenced from Caboolture, and opened to Nambour on 28 April 1988 in time for World Expo 88. The electrification was opened to the new Gympie North station on 4 February 1989, and to Gladstone on 3 July 1989.

A 120 km/h Intercity Express service was introduced from Brisbane to Rockhampton, reducing the journey by three hours, and all express freight trains were electrically hauled. An interesting outcome of this was the decision by QR to purchase larger diesel locomotives for use north of Rockhampton, in order to avoid the need to divide the freight trains there, as there was an imbalance between the maximum load the existing diesels could haul.

A further improvement to the Brisbane to Rockhampton passenger service occurred with the introduction of the Tilt Train in 1998, reducing the journey time by another two hours.

As coal export volumes grew significantly in the early 2000s, the 3900 class locomotives utilised on the North Coast linewere transferred to the Blackwater system, though as they had been geared for 100 km/h operation compared to the 80 km/h gearing for the coal locos, they were only considered to be a stop-gap measure. However, although new locomotives have since been put into service on the electrified coal systems, the locomotives have not returned to the line and are in storage. All freight trains to Brisbane are currently diesel hauled, with the Tilt Train being the only electrically powered service between Gympie North and Gladstone.

See also

Related Research Articles

<span class="mw-page-title-main">Exhibition railway line</span> Special-purpose railway line in Brisbane

The Exhibition railway line is a special-purpose railway line in Brisbane, the state capital of Queensland, Australia. It conveys Queensland Rail City network passengers during the Royal Queensland Show in August and rare other special events held in the showgrounds. It is informally known as the Ekka Loop.

<span class="mw-page-title-main">Queensland Rail</span> Railway operator in Queensland, Australia

Queensland Rail (QR) is a railway operator in Queensland, Australia. Queensland Rail is owned by the Queensland Government, and operates both suburban and interurban rail services in South East Queensland, as well as long-distance passenger train services connecting Brisbane to regional Queensland. QR also owns and maintains rolling stock, in addition to approximately 6,600 kilometres (4,101 mi) of track and related infrastructure.

<span class="mw-page-title-main">Ferny Grove railway line</span> Australian railway line

The Ferny Grove railway line is a 13-kilometre (8 mi) suburban railway line in Brisbane, the state capital of Queensland, Australia. It is part of the Queensland Rail Citytrain network.

<span class="mw-page-title-main">Doomben railway line</span> Railway line in Brisbane, Australia

The Pinkenba railway line is a railway line in the City of Brisbane, Queensland, Australia. It is the part of the Doomben railway line that still operates a regular passenger service. Doomben, or dumben, is the Indigenous Yuggera name for a tree fern which was prolific in the area. The railway line branches from the North Coast line at Eagle Junction, extending 8 kilometres (5.0 mi) to the industrial suburb of Pinkenba, situated on the northern bank at the mouth of the Brisbane River. It is part of the Queensland Rail Citytrain network.

<span class="mw-page-title-main">Caboolture railway line</span> Suburban railway service in Brisbane, Australia

The Caboolture railway line refers to the section of Queensland's North Coast Line that has a regular suburban railway service, extending north of Brisbane, the state capital of Queensland, Australia. The line commences at Roma Street railway station, travelling through the city and extends through Brisbane's northern suburbs to Caboolture, which the line continues north to Sunshine Coast and connects with the Ipswich line south-west of Brisbane. The line distance from Brisbane Central railway station is 49.6 km (30.8 mi).

<span class="mw-page-title-main">Ipswich and Rosewood railway line</span> Railway line in Australia

The Ipswich and Rosewood line refers to the section of the Main Line to Toowoomba that has a regular suburban rail service, extending southwest from the Brisbane central business district. It is part of the Queensland Rail City network.

<span class="mw-page-title-main">Beenleigh railway line</span> Suburban railway line in Brisbane, Australia

The Beenleigh railway line is a suburban railway line extending 40.1 km from Boggo Road / Park Road to Beenleigh. It is part of the Queensland Rail Citytrain network.

<span class="mw-page-title-main">Corinda railway station</span> Railway station in Brisbane, Queensland, Australia

Corinda railway station is located on the Main line in Queensland, Australia. It serves the Brisbane suburb of Corinda.

<span class="mw-page-title-main">North Coast railway line, Queensland</span> Railway line in Queensland, Australia

The North Coast railway line (NCL) is a 1,681-kilometre (1,045 mi) 1067 mm gauge railway line in Queensland, Australia. It commences at Roma Street station, Brisbane, and largely parallels the Queensland coast to Cairns in Far North Queensland. The line is electrified between Brisbane and Rockhampton. Along the way, the 1680 km railway passes through the numerous towns and cities of eastern Queensland including Nambour, Bundaberg, Gladstone, Rockhampton, Mackay and Townsville. The line though the centre of Rockhampton runs down the middle of Denison Street.

<span class="mw-page-title-main">Corinda–Yeerongpilly railway line</span> Railway line in Brisbane, Australia

The Corinda–Yeerongpilly line is a railway line in Brisbane, the state capital of Queensland, Australia. It connects the Beenleigh and Ipswich lines for freight trains, but is no longer used for revenue passenger services in normal operation.

<span class="mw-page-title-main">Sunshine Coast railway line</span> Section of Queenslands North Coast line

The Sunshine Coast railway line refers to the section of Queensland's North Coast line that has regular interurban passenger services, which connect Brisbane with the Sunshine Coast and as far north as Gympie. It is the longest line on the Queensland Rail Citytrain network.

<span class="mw-page-title-main">Rail transport in Queensland</span>

The rail network in Queensland, Australia, was the first in the world to adopt 1,067 mm narrow gauge for a main line, and, in 2013, was claimed to the second largest narrow gauge network in the world, consists of:

<span class="mw-page-title-main">Electric multiple unit (Queensland Rail)</span>

The Electric multiple unit (EMU) is a class of electric multiple units manufactured by Walkers at Maryborough for Queensland Rail between 1979 and 1986. They were the first EMUs in Queensland and are progressively being retired from the Queensland Rail Citytrain network.

<span class="mw-page-title-main">Railways in South East Queensland</span>

Railways in South East Queensland consist of a large passenger and freight rail network centred on Brisbane, the capital city of the Australian state of Queensland. Suburban and interurban passenger rail services are operated by Queensland Rail, which also operates long-distance services connecting Brisbane to the rest of the state. Aurizon and Pacific National are private companies which operate freight services. The passenger rail network in South East Queensland is known as the Citytrain network.

<span class="mw-page-title-main">Construction of Queensland railways</span>

Queensland's railway construction commenced in 1864, with the turning of the first sod of the Main Line by Lady Diamantina Bowen, the wife of Queensland's first governor Sir George Bowen at Ipswich, Queensland, Australia. A narrow gauge of 3 ft 6 in was selected due to cost savings in providing a rail link to Toowoomba. Despite being built with bridges wide enough for standard gauge, and the fact that most other lines did not require heavy earthworks, the gauge remained the Queensland system norm.

<span class="mw-page-title-main">Main Line railway, Queensland</span> Railway line in Queensland, Australia

The Main Line is a railway line in South East Queensland, Australia. It was opened in a series of sections between 1865 and 1867. It commences at Roma St Station in Brisbane and extends west 161 km to Toowoomba. It is the first narrow gauge main line constructed in the world. The section of the line from the end of Murphys Creek railway station to the Ruthven Street overbridge, Harlaxton is listed on the Queensland Heritage Register. The Murphys Creek Railway Complex, the Lockyer Creek Railway Bridge (Lockyer), the Lockyer Creek Railway Bridge and Swansons Rail Bridge are also heritage listed.

<span class="mw-page-title-main">Moura railway line</span> Railway line in Queensland, Australia

The Moura railway line is a railway in central Queensland, connecting several coal mines to the port of Gladstone. It connects the remnants of several lines that previously connected to Rockhampton, originally by a rack railway.

North Coast Line (NCL) opening dates chronologically

<span class="mw-page-title-main">Queensland Railways 2100 class</span> Class of Australian Co′Co′ diesel-electric locomotives

The 2100 class is a class of diesel locomotives built by Clyde Engineering, Eagle Farm for Queensland Railways between 1970 and 1973.

<span class="mw-page-title-main">Spirit of Capricorn</span> Australian train service

The Spirit of Capricorn was a long distance passenger rail service in Queensland, Australia, Operated by Queensland Rail Traveltrain between 1988 and 24 May 2003. It operated between Rockhampton, Queensland and the Capital of the state, Brisbane at its station Roma Street.

References

  1. Trainline 2 Statistical Report Bureau of Infrastructure Transport & Regional Economics 2014 page 53
  2. Churchman 1995, p. 131.
  3. "Rebuilding of the railway network". History. Queensland Rail. Archived from the original on 16 November 2007. Retrieved 16 August 2008.
  4. Kerr, J. 'Triumph of Narrow Gauge' Boolarong Publications 1990
  5. "Modern competitive railway". History. Queensland Rail. Archived from the original on 22 July 2008. Retrieved 16 August 2008.
  6. "QR History". QR Limited. Archived from the original on 15 January 2010. Retrieved 27 April 2006.
  7. Electrification of Bauhinia rail line complete Central Queensland News 17 December 2014