Federation Tower

Last updated • 9 min readFrom Wikipedia, The Free Encyclopedia

Federation Tower
Башня Федерация
Federation Tower in July 2016.jpg
Federation Tower
General information
StatusCompleted
Type Residential building; office building
Architectural style Postmodernism
Location12, Krasnopresnenskaya Embankment, Moscow-City, Moscow
CountryRussia
Coordinates 55°44′59.17″N37°32′13.70″E / 55.7497694°N 37.5371389°E / 55.7497694; 37.5371389
Groundbreaking28 November 2003
Construction started2005
Completed7 December 2017
OpenedZapad: 2008
Vostok: 7 December 2017
CostUS$1.2 billion [1]
Owner AEON Corporation (Russian)
Height
Antenna spire450 m (1,480 ft) (dismantled)
Top floor374 m (1,227 ft) (East Tower)
242 m (794 ft) (West Tower)
Technical details
Floor count97 (East Tower)
63 (West Tower)
Floor area439,154 m2 (4,727,010 sq ft)
Lifts/elevators66
Design and construction
Architect(s) Sergei Tchoban, Peter Schweger
DeveloperMirax Group (now Potok Corporation)
Structural engineerThornton Tomasetti
Main contractorRenaissance Construction Company

The Federation Tower (Russian : Башня Федерация, romanized: Bashnya Federatsiya) is a complex of two skyscrapers built on the 13th lot of the Moscow International Business Center in Moscow, Russia. The two skyscrapers are named Tower East or Vostok (Russian: Восток; literally means "East") and Tower West or Zapad (Russian: Запад; literally means "West").

Contents

The supertall skyscraper Tower East (Vostok) is currently the second-tallest skyscraper in Europe and Russia after the Lakhta Center, the tallest building in Moscow, and the 55th-tallest building in the world. Zapad is a shorter skyscraper than Vostok and is the eleventh-tallest building in Russia, and the 22nd-tallest building in Europe. The complex stands on the 13th lot, which has an area of 439,154 square meters.

The project was conceived by German-Russian engineer Sergei Tchoban and German professor and engineer Peter Schweger. The complex was designed by architecture companies nps+partner and Schweger Associated Architects. The complex started construction in 2005, with Zapad completed first in 2008 with a height of 242 meters (794 feet). As a result of the Great Recession, construction of the complex stopped until August 2011, and Vostok was completed on 7 December 2017 with a height of 374 meters (1,227 feet). In late 2014, Vostok surpassed the South Tower of OKO, which it is also part of the MIBC, as the tallest skyscraper of Russia and Europe. A spire was to be also built which would have extended the complex's height to 450 meters (1,480 feet) as well as provided an observation deck but it was never completed and was dismantled afterward.

The complex is owned by the AEON Corporation, a Russian private international investment group. The complex consists of two towers built on one podium. Tower East is a 97-story structure and Tower West is a 63-story structure. The complex is bounded by a rectangle of 3 alleys & a driveway. All three alleyways are named Krasnopresnenskaya Embankment, but the driveway on its east side is named 3rd Main Street. On 30 July 2023, across the alley from the back entrance, on the first floor, an aircraft (a Ukrainian drone) crashed into Rosbank (whose address is 1st Krasnogvardeisky Direction 19) & exploded, causing a small amount of damage to its facade. [2] [3]

Tower East

Planning and early development

The higher tower of the complex located in the eastern part of lot number 13 was formerly known as Tower "A". But in November 2006, to avoid name competition with Naberezhnaya Tower, it was renamed Tower "Vostok (East)". Tower East is designed to have 95 above-ground and 3 underground floors, and 17 high-speed elevators will be installed there (JP. Kocher). According to the company Potok, which is the builder of the tower, it used grade B90 concrete which is twice as strong as regular concrete and will allow the skyscraper to withstand a direct hit of an aircraft. In early December 2009, the Potok Corporation management (ex-Mirax Group) announced that in the case of financial problems it could reduce the number of floors of Tower East from 95 to 64 floors. However, in March 2010, the company's management stated that Tower East would be completed according to the original project design.

The construction of this tower is the second stage of the entire complex construction, and during the construction of the first tower, "Zapad (West)", its design underwent some significant changes and became radically different from the original version. In the first place, the square footage of the floors changed, and visually the tower became thicker at the base to the extent that a part of the floors, starting with the 11th, protrude a little beyond the 13th lot borderline. The tower core was significantly revised, too, and now has a trapezoidal shape rather than hexagonal as in the earlier design. The load-bearing columns became twice as thick; therefore, the amount of concrete required for the construction of the columns increased 4 times, and, consequently, significantly increased the total mass of the building.

Construction

Construction started in 2005. During the construction of the foundation slab on 21–24 February 2007, a new record listed in the Guinness Book of Records was set: 14,000 cubic meters of concrete were placed then. Somewhat unusual in the construction process was that the first base plate was covered with the second base plate, which resulted in the complex losing one underground level and the construction delayed by at least five months. The extravagance of this decision lies in the fact that, judging by the photographs obtained from the site, the builders began active preparations for the construction of the first underground floor, but suddenly stopped working, dismantled the installed cranes, cut the reinforcement bars previously prepared for the columns and began to place reinforcement for the second base plate. That the construction organizers did not clearly comment on the reasons for this decision was also unusual. The tower was climbed solo by the Frenchman Alain Robert in September 2007.

In the process of further construction the pace of the tower erection changed over a fairly wide range: the underground and podium parts of the building were being built at an average rate of about two levels a month; after the podium was completed, the construction of standard floors went at a faster rate of four floors per month, while at the technical 33–34 levels of the building the construction of that floor was significantly suspended and lasted more than five months; one of the cranes was replaced with two more powerful ones, and a strong metal outrigger structure was formed, contributing to the greater rigidity of the building and its resistance to wind loads.

As of mid-May 2008, the tower was built to a height of about 170 meters (560 feet). In November 2008, due to the Great Recession and a lack of funding, construction of the skyscraper was suspended.

The building is actively used as a sightseeing object and a high-rise structure for extreme sports lovers (base jumpers, climbers, etc.), as well as a site for shooting films and videos (TV shows, advertising, and movie production). In 2012, the Moscow 24 TV channel shot a movie about the business complex. Another film dedicated to the skyscraper was made by the Discovery Channel TV channel in 2009.

On 5 July 2011, the construction company Potok announced the tower construction to be resumed. The actual growth of the tower was scheduled to begin in September 2011. As of 30 March 2012, the 67th story of Tower East had been completed; the glazing of the tower was being conducted as well.

On 2 April 2012, firefighters and firefighting helicopters struggled to put out a massive blaze that broke out on the 67th floor of the under-construction Federation Tower East. "The fire was visible from much of the Russian capital's western half. Two firefighting helicopters noisily circled the blaze, dumping huge buckets of water on the flames before the Emergencies Ministry said the fire had been stopped from spreading by about 11:30 p.m. (1930 GMT), some three hours after it broke out." [4] "The area affected by the fire has exceeded 300 square meters (3,200 square feet)", Major-General Sergei Anikeyev, deputy head of the city's emergency department, told the news agency Itar-Tass. "The 14 people who were at the top floors when the fire started have been evacuated. No one was hurt," he told Itar-Tass. [5]

On 18 December 2014, Vostok was topped out when the skyscraper reached its planned height of 374 meters (1,227 feet). The construction teams, including Turner, celebrated the pouring of the last structural concrete cube, 374 meters above the ground. The topping-out generated excitement in the Russian press, as the tower received the title of being the tallest building in Russia and Europe, surpassing OKO's South Tower. [6]

On 20 January 2017, Europe's tallest elevator shaft was constructed in Vostok, with the launch of the tallest elevator in Europe taking place simultaneously with the opening of the southern entrance lobby of the tower. According to Russian Construction, the elevator's cabin moves without switches from the second underground level to the 94th story. Schindler freight-passenger elevator will go up at the height of 355 meters above the ground level. Its total path of motion with the consideration of underground floors will amount to 365 meters. The elevator's carrying capacity is 2 tons. [7] During an interview with the director general of the "Federation Tower" Ltd., Mikhail Smirnov by Iterfax-Realty, construction of the skyscraper would finish by the end of March 2017. Earlier, the Moscow State Construction Supervision Committee reported that the tower would be put in operation by July 2017, Interfax reports. [8]

On 6 October 2017, the Lakhta Center of St. Petersburg surpassed Vostok's height of 1,227 ft (374 m), making it the tallest building in Russia and Europe. [9]

On 7 December 2017, construction of Vostok was completed, making it the tallest completed skyscraper in Russia and Europe currently. [10]

Purpose

Vostok would be used for multiple purposes, high rise development designed to house offices, retail areas, a five star hotel, and luxury apartments upon completion. A number of luxurious offices will occupy the penthouse's area of 12,000 square meters from the 90th to 98th stories. [11] The upper levels of the 95-story tower will include the hotel lobby, restaurants, and a public viewing platform. The lower levels will contain retail shops and restaurants as well as the hotel's ballroom, and conference and events center. [6] The building would also feature the highest digital clock in the world.

Tower West

Planning and early development

The lower tower of the complex is located on the western part of lot 13 in the MIBC. The tower was formerly known as Tower "B" but in order to avoid name competition with Naberezhnaya Tower, it was renamed Tower "Zapad (West)". In November 2006, after the name competition, it was renamed Tower West. Tower West is planned to have 62 stories above ground and four underground floors, with 11 twin and six high-speed elevators.

Construction

The erection of Tower West was the first stage of the entire Federation complex construction, but the height of the tower was increased in comparison with the original models (originally, Tower West was planned to be half the height of Tower East). The cross-section of the tower's core, originally planned to be hexagonal, was modified after construction began and is now trapezoidal. The core was constructed so it rose above the rest of the structure, which was assembled one or two floors behind. The building was completed in early 2008.

Purpose

Tower West would include a hotel spa and swimming pool. The 61st floor of the Tower West accommodates the tallest restaurant in Moscow, 'Sixty', run by Ginza Project.[ citation needed ]

Awards

See also

Related Research Articles

<span class="mw-page-title-main">Central Plaza (Hong Kong)</span> Supertall skyscraper in Wan Chai, Hong Kong

Central Plaza is a 78-storey, 374 m (1,227 ft) skyscraper at 18 Harbour Road, in Wan Chai on Hong Kong Island in Hong Kong. Completed in August 1992, it is the third tallest tower in the city after 2 International Finance Centre in Central and the International Commerce Centre in West Kowloon. It was the tallest building in Asia from 1992 to 1996, until the Shun Hing Square was built in Shenzhen, a neighbouring city. Central Plaza surpassed the Bank of China Tower as the tallest building in Hong Kong until the completion of 2 IFC.

<span class="mw-page-title-main">Skyscraper</span> Tall habitable building

A skyscraper is a tall continuously habitable building having multiple floors. Modern sources define skyscrapers as being at least 100 metres (330 ft) or 150 metres (490 ft) in height, though there is no universally accepted definition, other than being very tall high-rise buildings. Skyscrapers may host offices, hotels, residential spaces, and retail spaces.

<span class="mw-page-title-main">Ostankino Tower</span> Radio and television tower in Moscow

Ostankino Tower is a television and radio tower in Moscow, Russia, owned by the Moscow branch of unitary enterprise Russian TV and Radio Broadcasting Network. Standing 540.1 metres (1,772 ft), it was designed by Nikolai Nikitin. As of 2022, it is the tallest free-standing structure in Europe and 12th tallest in the world. Between 1967 and 1974, it was the tallest in the world. The tower was the first free-standing structure to exceed 500 m (1,600 ft) in height. Ostankino was built to mark the 50th anniversary of the October Revolution. It is named after the surrounding Ostankino district of Moscow.

<span class="mw-page-title-main">Seven Sisters (Moscow)</span> Seven skyscrapers in Moscow, Russia

The Seven Sisters are a group of seven skyscrapers in Moscow designed in the Stalinist style. They were built from 1947 to 1953. At the time of construction, they were the tallest buildings in Europe, and the main building of Moscow State University remained the tallest building in Europe until 1990.

<span class="mw-page-title-main">Moscow International Business Center</span> Commercial district in central Moscow, Russia

The Moscow International Business Center (MIBC), also known as Moscow-City, is an under-construction commercial development in Moscow, the capital of Russia. The project occupies an area of 60 hectares, and is located just east of the Third Ring Road at the western edge of the Presnensky District in the Central Administrative Okrug. Construction of the MIBC takes place on the Presnenskaya Embankment of the Moskva (river), approximately 4 kilometers (2.5 mi) west of Red Square.

<span class="mw-page-title-main">One Rincon Hill</span> Upscale residential complex on the apex of Rincon Hill in San Francisco

One Rincon Hill is an upscale residential complex on the apex of Rincon Hill in San Francisco, California, United States. The complex, designed by Solomon, Cordwell, Buenz and Associates and developed by Urban West Associates, consists of two skyscrapers that share a common townhouse podium. It is part of the San Francisco skyline and is visible from several parts of the Bay Area.

<span class="mw-page-title-main">Mercury City Tower</span> Supertall skyscraper in Moscow, Russia

Mercury City Tower is a supertall skyscraper located on plot 14 in the Moscow International Business Center (MIBC), in Moscow, Russia. Occupying a total area of 173,960 square metres (1,872,500 sq ft), the mixed-use building houses offices, apartments, a fitness center, and retail stores.

<span class="mw-page-title-main">Lakhta Centre</span> Skyscraper in Saint Petersburg, Russia

The Lakhta Centre is an 87-story skyscraper built in the northwestern neighbourhood of Lakhta in Saint Petersburg, Russia. Standing 462 metres (1,516 ft) tall, it is the tallest building in both Russia and Europe, and the sixteenth-tallest building in the world. It is also the second-tallest structure in Russia and Europe, behind the Ostankino Tower in Moscow, in addition to being the second-tallest twisted building and the northernmost skyscraper in the world.

<span class="mw-page-title-main">Imperia Tower</span> Building complex in Moscow, Russia

Imperia Tower, is a complex located on plot 4 of the MIBC in Moscow, Russia. The 287,723 square metres (3,097,020 sq ft) mixed-use complex includes a completed 60-story skyscraper with a height of 239 metres (784 ft) and a 14-story building with a height of 53 metres (174 ft) that is currently under construction. Construction of the skyscraper started from 2001 to 2002, but halted in 2003 until it was resumed in 2006 and was completed in 2011. The 14-story building started construction in 2013 and finished by 2018. The 60-story skyscraper of the complex is the fifteenth-tallest building in Russia, and the 24th-tallest building in Europe.

<span class="mw-page-title-main">Naberezhnaya Tower</span> Office in Moscow, Russia

Naberezhnaya Tower is an office complex composed of two skyscrapers and a high-rise located on plot 10 in the Moscow International Business Center (MIBC) in Moscow, Russia with a total area of 254,000 m2 (2,730,000 sq ft). The buildings are named after the first three letters of the alphabet and from the lowest height to the tallest: the 17-story tall Tower A, the 27-story tall Tower B, and the 59-story tall Tower C. Construction of the complex started in 2003, with Tower A being completed in 2004, Tower B in 2005, and Tower C in 2007.

<span class="mw-page-title-main">Torre Altus</span> Residential condominiums in Mexico

Torre Altus is one of the tallest skyscrapers in Mexico City, Mexico. It is a residential condominium tower located on Paseo de los Laureles y Alcanfores in the Bosques de las Lomas district of the Miguel Hidalgo borough in the city. Bosques de las Lomas is one of the more exclusive residential and commercial districts in Latin America.

<span class="mw-page-title-main">City of Capitals</span> Mixed-use complex in Moscow, Russia

The City of Capitals is a mixed-use complex composed of two skyscrapers and an office building located on plot 9 in the Moscow International Business Center in Moscow, Russia with a total area of 288,680 square metres (3,107,300 sq ft). The two skyscrapers are named after the two historical capitals of Russia: Moscow and Saint Petersburg. Construction of the complex began in 2005, with the office building completed in 2008 and the two skyscrapers completed in 2009.

<span class="mw-page-title-main">House on Mosfilmovskaya</span> Building in Moscow, Russia

The House on Mosfilmovskaya, or Mosfilm Tower, is a Russian skyscraper in the Mosfilmovskaya section of Moscow, Russia. This building, located on Mosfilmovskaya street, is a residential complex consisting of 2 towers: one of 213 meters and the other 131 meters. The building was completed in December 2011.

<span class="mw-page-title-main">OKO</span> Complex of two skyscrapers in Moscow, Russia

OKO is a complex of two skyscrapers located on plot 16 in the Moscow International Business Center (MIBC) in Moscow, Russia. Occupying a total area of about 250,000 square metres (2,700,000 sq ft), the mixed-use complex houses apartments, office space, a 5-star hotel, and other commodities.

The Exchange 106, formerly known as the TRXSignature Tower, is a 445.5-meter-tall supertall skyscraper in Kuala Lumpur, Malaysia. It is the fourth-tallest building in Malaysia and the fifth-tallest building in Southeast Asia. It is also the second largest skyscraper in Malaysia by floor area with 453,885 m2 (4,886,000 sq ft). The tower has a net lettable area of 240,000 square metres. It is also the centerpiece of the new Tun Razak Exchange (TRX) financial district.

<span class="mw-page-title-main">Neva Towers</span> Building in Moscow, Russia

The Neva Towers, formerly the Renaissance Moscow Towers, is a complex of two skyscrapers located on plots 17 and 18 of the Moscow International Business Center (MIBC) in Moscow, Russia. Tower 1, at 302 metres tall with 65 floors, is the ninth-tallest building in Europe. Tower 2, at 345 metres tall with 79 floors, is the tallest residential building in Europe and the sixth-tallest building in Europe. The complex was completed in 2020.

<span class="mw-page-title-main">Dalmatia Tower</span> Mixed-use: office, hotel in Split, Croatia

Dalmatia Tower is a high-rise office building and a hotel in Split, Croatia. It is located on the intersection of the Domovinskog rata Street and the Dubrovačka Street and it is the tallest building in Croatia.

References

  1. "The Federation Tower – Tallest Building in Europe – Every Record". Every-Record.com. 1 February 2016. Archived from the original on 16 September 2017. Retrieved 16 September 2017.
  2. Osborn, Andrew; Harmash, Olena; Jaiswal, Rishabh (30 July 2023). Mallard, William; Feast, Lincoln; Kerry, Frances; Graff, Peter (eds.). Russia says it downs Ukrainian drones, Moscow buildings hit (Television production). Krasnopresnenskaya Embankment: Reuters. Retrieved 30 July 2023. Ah! Mamochka! [Mummy!]
  3. Waterhouse, James; Gregory, James (30 July 2023). "Zelensky after Moscow drone attack: War coming back to Russia". bbc.com. Ivano-Frankivsk. Retrieved 30 July 2023.
  4. "huffingtonpost.com". HuffingtonPost.com. 2 April 2012. Retrieved 16 September 2017.
  5. "msnbc.msn.com". MSN.com. 2 April 2012. Archived from the original on 2 May 2012. Retrieved 16 September 2017.
  6. 1 2 "News | Federation Towers – Vostok Tower Tops Out | Turner Construction Company". www.TurnerConstruction.com. Retrieved 26 May 2017.
  7. "Europe's highest elevator starts operation in Moscow City". Construction.RU – Russia-wide construction online journal (in Russian). Retrieved 26 May 2017.
  8. ""Federation" complex's second tower to be completed by April". Construction.RU - Russia-wide construction online journal (in Russian). Retrieved 26 May 2017.
  9. "Russian skyscraper 'becomes Europe's tallest building'". Euronews . Retrieved 24 August 2020.
  10. "Russia Completes Europe's Tallest Skyscraper – Federation Tower", Russia Insight, 7 December 2017, archived from the original on 21 December 2021, retrieved 28 December 2017
  11. "Penthouse of "Vostok" Tower in Moscow City to host offices". Construction.RU – Russia-wide construction online journal (in Russian). Retrieved 26 May 2017.
Records
Preceded by
OKO
(South Tower)
Europe’s tallest building
2014 – 2017
Succeeded by
Russia’s tallest building
2014 – 2017
Tallest building in Moscow
2014 – present
Succeeded by
Incumbent
Notes and references
1. Records for Tower East of the Federation Tower

|}