Moolort railway line

Last updated

Moolort
Overview
StatusClosed apart from 1.5 km Castlemaine to Maldon Junction
Connecting linesMildura Line at Maryborough and Bendigo Line at Castlemaine
Stations6
Service
TypeCross Country
History
Opened7 July 1874
Completed7 July 1874
Closed17 December 2004 (Moolort - Maldon Junction)
Technical
Line length54.653 km (33.96 mi)
Number of tracks Single track
Route map

Contents

BSicon CONTg.svg
BSicon BHF.svg
BSicon ABZgl.svg
BSicon CONTfq.svg
BSicon CONTgq.svg
BSicon xABZgr.svg
BSicon exHST.svg
BSicon exHST.svg
BSicon exHST.svg
BSicon exHST.svg
BSicon exHST.svg
BSicon exHST.svg
BSicon CONTgq.svg
BSicon ABZql.svg
BSicon BHFq.svg
BSicon CONTfq.svg

The Moolort Line was a cross-country railway line which connected Maryborough and Castlemaine in Victoria, Australia. The line, now defunct, starts in Castlemaine, passes through Campbells Creek, Yapeen, Guildford, Strangways, Newstead, Moolort, and Carisbrook, before joining the Mildura line at Maryborough.

History

The Castlemaine and Maryborough railway, known as the Moolort line, was started in September 1872, raising local concerns over the effect trains would have on horses. [1]

Its course and construction of its first section from Castlemaine to Newstead was described in the Melbourne Argus;

The line will be constructed upon economic principles. The width of gauge will be 5ft. 3in., so that although the cost of construction will be greatly reduced even in comparison with the North Eastern line, the railway will not be built upon what is known as the narrow gauge or cheap principle. All the bridges and culverts will be of wood instead of iron or stone. The redgum required for the sleepers and piles will be procured from the Murray district, and the posts and rails for fencing from the Bullarook forest near Daylesford. The contract price of the first section is £19,500 [A$2,492,000.00 value in 2021]. The contractor will have to lay, but not supply, the rails and the stations will form a separate contract. The ruling gradient on the first section is 1 in 50, and the heaviest 1 in 43. Active operations will be commenced to-day, and before the expiration of the week it is expected that about 300 men will be employed. The average rate of wages given will be about 6s. 6d. per day for navvies. It is anticipated that unless something unforeseen occurs, the first section will be completed within 13 months. Mr. Gibbons is the engineer employed by Mr. Doran, and Mr. Wilkinson will have charge of the line for the Government, under the direction of Mr. Green, the resident engineer. [2]

Eight hundred schoolchildren were the first to travel from Maryborough to Castlemaine at the line's inauguration on 26 June 1874. Already conveying freight, the line was opened to general passenger traffic on 7 July 1874. [3] There was agitation for a connection from Daylesford via Yandoit but it was refused.

A derailment of an entire passenger train near Carisbrook, during general floods in the district in 1877, was recounted in the Colac Herald in 1896. [4]

Demise

Maryborough, where Moolort line previously connected to the Victorian Broad Gauge Network Moolort Line Disconnected At Maryborough - Nov 2020.jpg
Maryborough, where Moolort line previously connected to the Victorian Broad Gauge Network

The last passenger rail service operated between Castlemaine and Maryborough on 31 July 1977, [5] just over a century after its opeining, and most of the line (between Moolort and Maldon Junction) has been out of use since 2004. The Victorian Goldfields Railway operates on around 1.5 km of the line between Castlemaine and Maldon Junction, then continues on to Maldon using the Shelbourne line. Ballast trains used to run from Moolort to Maryborough, but the railway line is now closed from Maldon Junction (which is in Castlemaine) right through to Maryborough. Some level crossings have been asphalted over, however the rails are in effect still below. As of 2023 the track at Maldon Junction is lifted.

Mooted revival

Line is unservicable at McClure St Level Crossing, Maryborough McClure St Maryborough Level Crossing - Nov 2020.jpg
Line is unservicable at McClure St Level Crossing, Maryborough

One of the policies of the Victorian Coalition government elected in November 2010 was to undertake a study into reintroducing passenger services between Ballarat and Bendigo, which would include running between Maryborough and Castlemaine. A media release in 2011 stated that a review was under way, [6] but nothing further was heard about the plan.

There has been significant discussion on the re-opening of this rail line for passenger services [7]

Rail Trail

Plans to revive the railway line were not realised. Instead a Castlemaine-Maryborough Rail Trail was proposed, [8] with Victorian State funding of $120,000 for planning of the project announced in June 2022, and a commencement date for construction projected for 2024. [9]

Related Research Articles

<span class="mw-page-title-main">Castlemaine railway station</span> Railway station in Victoria, Australia

Castlemaine railway station is located on the Deniliquin line in Victoria, Australia. It serves the town of Castlemaine, and it opened on 21 October 1862.

<span class="mw-page-title-main">Victorian Goldfields Railway</span> Tourist railway in Victoria, Australia

The Victorian Goldfields Railway is a 1,600 mm broad gauge tourist railway in Victoria, Australia. It operates along a formerly disused branch line between the towns of Maldon and Castlemaine.

<span class="mw-page-title-main">Ballarat railway station</span> Railway station in Victoria, Australia

Ballarat railway station is located on the Serviceton line in Victoria, Australia. It serves the city of Ballarat, and opened on 11 April 1862 as Ballarat West. It was renamed Ballarat in 1865.

The Deniliquin railway line is a broad-gauge railway line serving northwestern Victoria, Australia. The line runs from the border settlement of Deniliquin into Bendigo, before turning south-southeast towards Melbourne, terminating in Docklands near the central business district. It is a major trunk line both for passenger and freight trains, with many railway lines branching off from it.

<span class="mw-page-title-main">Maryborough railway station, Victoria</span> Railway station in Victoria, Australia

Maryborough railway station is located on the Mildura line in Victoria, Australia. It serves the town of Maryborough, and it opened on 7 July 1874.

<span class="mw-page-title-main">Creswick railway station</span> Railway station in Victoria, Australia

Creswick railway station is located on the Mildura line in Victoria, Australia. It serves the town of Creswick, and the original station opened on 7 July 1874.

Dunolly is a closed railway station on the Mildura line in the town of Dunolly, Victoria, Australia. The station was one of 35 closed to passenger traffic on 4 October 1981 as part of the New Deal timetable for country passengers. Today it is the junction for the lines towards Inglewood, Kulwin, and Robinvale. It also contains grain silos.

The Mildura railway line is a heavy rail line in northwestern Victoria, Australia. The line runs from Yelta station to Ballarat station via the settlements of Mildura, Ouyen and Maryborough in an approximate south-southeasterly direction. Initial sections of the line opened from Ballarat in 1874 and the line reached Mildura in 1903.

<span class="mw-page-title-main">County of Talbot, Victoria</span> Cadastral in Victoria, Australia

The County of Talbot is one of the 37 counties of Victoria which are part of the cadastral divisions of Australia, used for land titles. It is located to the north of Ballarat, and includes Castlemaine. The county was proclaimed in 1849.

The Geelong–Ballarat railway line is a broad-gauge railway in western Victoria, Australia between the cities of Geelong and Ballarat. Towns on the route include Bannockburn, Lethbridge, Meredith, Elaine and Lal Lal. Major traffic includes general freight from the Mildura line, and grain.

<span class="mw-page-title-main">Victorian Railways Royal Train</span> Trains to transport the Royal Family in Australia

The Victorian Railways' (VR) Royal Trains operated to transport members of the Royal Family on their numerous tours of Australia on the Victorian rail network. The same carriages were also used for a number of vice-regal trains for the Governor-General of Australia and the Governor of Victoria. The last Royal Train ran in 1988.

Moolort station was opened on 7 July 1874. There is no longer a station platform at Moolort. However, there are still sidings provided to grain silos and to ballast piles. On 17 December 2004, the line from Moolort to Maldon Junction was closed, due to the line being reserved for the Victorian Goldfields Railway to operate between Maldon and Castlemaine. Ballast trains operate from Maryborough to Moolort.

<span class="mw-page-title-main">Newstead railway station, Victoria</span> Former railway station in Victoria, Australia

Newstead Station was opened on Tuesday, 7 July 1874. Although no longer in use, Newstead retains a bricks station building, booking office, platform and goods shed. On Friday 17 December 2004, the line from Moolort to Maldon junction was closed, due to the line being reserved for the Victorian Goldfields Railway to operate between Maldon and Castlemaine.

<span class="mw-page-title-main">Goldfields region of Victoria</span>

The Goldfields region of Victoria is a region commonly used but typically defined in both historical geography and tourism geography. The region is also known as the Victorian Golden Triangle.

<span class="mw-page-title-main">Carisbrook, Victoria</span> Town in Victoria, Australia

Carisbrook is a town in Victoria, Australia, located on the Pyrenees Highway, 7 kilometres (4.3 mi) east of the regional and local government centre of Maryborough, in the Shire of Central Goldfields. At the 2016 census, Carisbrook had a population of 1115. Carisbrook is closely linked with Maryborough historically, socially and economically.

The 1927 Victorian state election was held on 9 April 1927.

Strangways is a locality within the local government area of Mount Alexander, in Central Victoria, Australia. It covers an area of 20.105 square kilometres between the townships of Guidford to the east, Newstead to the north-west and Clydesdale to the south.

References

  1. "Strangways". Castlemaine Mail. 15 April 1873. p. 2.
  2. "TURNING THE FIRST SOD OF THE CASTLEMAINE AND DUNOLLY RAILWAY". Argus. 9 September 1872. Retrieved 3 November 2021.
  3. "THE MARYBOROUGH AND DUNOLLY RAILWAY". Age. 4 July 1874. Retrieved 16 February 2023.
  4. "Tales Of The Footplate. Strange incidents of the Victorian Railways, told by a driver. No. 5 "The Carisbrook Crash"". Colac Herald. 25 December 1896. p. 8. Retrieved 16 February 2023.
  5. "Traffic". Newsrail. Australian Railway Historical Society. August 1977. p. 178.
  6. "Rail Revival Study: Geelong – Ballarat – Bendigo investigations underway" . Retrieved 10 May 2012.
  7. "Rail Revival Study: Geelong – Ballarat – Bendigo [Railpage] forums detailed discussions" . Retrieved 9 December 2013.
  8. "Castlemaine to Maryborough Rail Trail – Rail Trails Australia" . Retrieved 16 February 2023.
  9. Dennis, Lisa (17 June 2022). "$120,000 boost for rail trail". Midland Express. Retrieved 16 February 2023.