Mildura railway line

Last updated

Mildura
Overview
Other name(s)Yelta
StatusOperational
Owner VicTrack
Locale Victoria, Australia
Termini
Service
Type Heavy rail
ServicesMaryborough
Operator(s)Passenger: V/Line
Freight: Pacific National
History
Commenced1874 (1874)
Completed1903 (1903)
Closed for gauge conversionAugust 2017 (Yelta-Maryborough)
ReopenedFebruary 2018 (Yelta-Maryborough)
Technical
Line length474.4 km (294.8 mi)
Number of tracks1
Track gauge
  • 1,435 mm (4 ft 8+12 in) standard gauge between Yelta and Maryborough
  • 1,600 mm (5 ft 3 in) between Maryborough and Ballarat
Old gauge1,600mm (5 ft 3 in) broad gauge (Maryborough-Yelta)

The Mildura railway line is a heavy rail line in northwestern Victoria, Australia. The line runs from Yelta station to Ballarat station via the settlements of Mildura, Ouyen and Maryborough in an approximate south-southeasterly direction. Initial sections of the line opened from Ballarat in 1874 and the line reached Mildura in 1903.

Contents

The line is primarily utilised by freight services. V/Line passenger services also operate on the line between Maryborough and Ballarat.

History

Maryborough station MaryboroughTrainStation.JPG
Maryborough station

The Mildura line was opened from Ballarat to Creswick, Clunes, Maryborough and Dunolly in 1874 and 1875, and extended to St Arnaud in 1878, Donald in 1882, Birchip in 1893, Woomelang in 1899, Ouyen, Red Cliffs and Mildura in 1903, Merbein in 1910 and Yelta in 1925.

A line was opened from Ballarat to Waubra in the 1880s. It closed in the 1960s.

A branch line was built from North Creswick to Daylesford in 1887, connecting with the line from Carlsruhe. It had stations at Broomfield, Allendale, Newlyn, Rocklyn, Wombat, Leonard, Sailor's Falls and Woodburn. This line closed in 1953.

A line was opened from Maryborough to connect with the Melbourne–Bendigo line at Castlemaine in 1874. This line has been partly dismantled, with only the section from Castlemaine to Maldon Junction still in use, as part of the Castlemaine to Maldon Victorian Goldfields Railway.

Another branch line was opened from Maryborough to Avoca in 1876 and Ben Nevis and Ararat in 1890. This line was closed in 1959, reopened in 1966, standardised in 1996 and closed again in 2005. It was then reopened to regular traffic in 2019 as part of the Murray Basin Rail Project. The Navarre line opened from Ben Nevis to Navarre in 1914 and it was closed in 1954.

A line was opened from Dunolly to Inglewood in 1888, connecting with the BendigoBoort line, completed in 1883.

Mildura station Mildura Train Station, Victoria.jpg
Mildura station

The Pinnaroo line (Victoria) opened from Ouyen to Murrayville in 1912 and the South Australian border in 1915, connecting with the Pinnaroo line (South Australia) to Pinnaroo and Tailem Bend. The Genesee & Wyoming Australia line west of Pinnaroo was standardised in 1998 creating a break-of-gauge. Nevertheless, it is proposed to standardise the line from Geelong to Mildura and the line between Ouyen and Pinnaroo. In 2006, state and federal money was announced to upgrade the line to Mildura with gauge convertible sleepers. However, this upgrade will still leave the passenger service in limbo.

The Morkalla line was completed from Red Cliffs to Meringur in the 1920s and extended to Morkalla in the 1930s. This line closed in the 1980s. A 2 km section of the line near Red Cliffs has been converted to a 610 mm-gauge steam railway, operated occasionally by the Red Cliffs Historical Steam Railway (see Victorian Tourism).

In 1923, a series of sidings were placed between the Mildura station and the wharves on the Murray River. These included a zig-zag section to enable trains to travel between the different elevations. These sidings were removed in 1973. [1]

A passenger service was provided by V/Line with three weekly overnight services from Melbourne (known as The Vinelander ), including sleeping cars, until 1993 when it was discontinued by the Kennett Government. [2] The former Bracks/Brumby Governments promised to re-open this line to passenger traffic as part of their pledges for the 1999, 2002 and 2006 elections. They also pledged the reopening of Clunes station in the 2010 election.

In December 2007 work began on upgrading the line between Gheringhap (on the Geelong–Ballarat line) and Mildura, at a cost of $73 million and involving one in every two sleepers being replaced, and lifting maximum train speeds to 80 km/h. [3] Current speeds are restricted to 50 km/h on one-third of the track and are as low as 30 km/h in some sections. [4] In April 2008 it was announced that the Mildura–Yelta section of the line would also be upgraded, as part of the Victorian core grain network in a $23.7 million package with 6 other lines. [5]

As part of upgrades for the return of Maryborough passenger services, the crossing loops at Sulky, Tourello and Talbot stations have been removed, resulting in only one train at a time being able to use the 60 kilometres of line between Ballarat and Maryborough. [6] The loop at Sulky was removed on 12 February, the loop at Talbot on 24 February. [7]

In October 2010, the Victorian government released a report into public transport improvement options for the north-west of Victoria, outlining nine proposals for public transport projects. Options discussed include the return of passenger trains on the existing line, or via an extension of the Yungera line to connect to the Mildura line at Ouyen. [8] [9]

Passenger services were reintroduced from Ballarat to Maryborough in July 2010, after a 17-year absence. [10] [11]

The line closed in August 2017 north of Dunolly for conversion to standard gauge as part of the Murray Basin Rail Project. [12] It reopened gradually from February 2018 with maximum axle load lifted to 21 tonnes and line speed increased to 80 km/h. [13]

Despite reopening to passenger traffic in 2010, the line has continued to have very low patronage figures across all the stations on the Maryborough Line. Creswick and Talbot Railway Stations served less than 400 passengers a year in the 2020–2021 patronage figures, down from only 1000 prior to the Covid-19 Pandemic. Clunes Station also records less than 1000 annual passenger movements. The terminus of the current passenger services, Maryborough, serves approximately 3,600 passenger per year. [14] In 2018–19 however, Maryborough had patronage figures of around 9,350 per annum or 25 passengers per day. There has been on-going discussions about the viability of the railway service to Maryborough with such low patronage on all stations along the branch line. [ citation needed ][ by whom? ]

Services

The main freight traffic on the line is export grain and containerised wine, grapes, citrus, dried fruit and juice, totalling around 1.5 million tonnes per year. Containers are dispatched to Melbourne from a terminal at Merbein (a short distance north of Mildura) operated by Seaway Intermodal, [15] [16] which handles approximately 13,000 export containers a year, as well as 500 import containers. [17] Cement was also despatched to Mildura from Waurn Ponds until 2015, oil and less than container load (LCL) freight were carried until 2007. [18] A freight terminal also exists at Donald, and grain services run as required.

Maryborough services

Maryborough
Victoria train logo.svg
Overview
Service type Regional rail
StatusOperational
Locale Victoria, Australia
First service25 July 2010;13 years ago (2010-07-25)
Current operator(s) V/Line
Route
Termini Maryborough
Ballarat
Stops5
Distance travelled68.7 km (42.7 mi)
Average journey time52 minutes
Service frequency2 services on weekdays, 1 service on weekends each direction
Line(s) usedMildura
On-board services
Class(es) Economy
Disabled accessYes
Catering facilitiesNo
Technical
Track gauge 1,600 mm (5 ft 3 in)
Electrification None
Track owner(s) VicTrack

In December 2008 as part of the Victorian Transport Plan the state government announced that V/Line rail passenger services would be extended from Ballarat to Maryborough station at a cost of $50 million, [19] commencing 25 July 2010. [20] Initially Creswick was to be the only intermediate station, [21] [22] until June 2010 when the government announced $7 million in funding to also reopen Clunes. [23] Talbot also reopened in December 2013. [24]

Two services on weekdays and one service on weekends in each direction operate as a shuttle between Maryborough and Ballarat, stopping at all operating stations. At Ballarat, all terminating services connect to an Ararat or Ballarat service towards Melbourne, and all originating services bound for Maryborough connects to a service from Melbourne.

Line guide

Maryborough V/Line Service
h:mm
0:00
BSicon KINTa.svg
0.0 km
Southern Cross
Zone 1
0:07
BSicon INT.svg
5.6 km
Footscray
Zone 1
0:12
BSicon INT.svg
12.3 km
Sunshine
Zone 1/2
0:16
BSicon HST.svg
15.1 km
Ardeer
Zone 2
0:18
BSicon HST.svg
17.9 km
Deer Park
Zone 2
0:23
BSicon BHF.svg
21.2 km
Caroline Springs
Zone 2
0:28
BSicon HST.svg
30.2 km
Rockbank
Zone 2
BSicon HST.svg
34.3 km
Cobblebank
Zone 2
0:33
BSicon INT.svg
41.3 km
Melton
Zone 2
0:45
BSicon INT.svg
52.9 km
Bacchus Marsh
Zone 2
1:02
BSicon BHF.svg
79.5 km
Ballan
Zone 4
1:24
BSicon INT.svg
113.8 km
Ballarat
Zone 8
BSicon ABZgl.svg
BSicon CONTfq.svg
1:44
BSicon HST.svg
132.9 km
Creswick
Zone 9
1:56
BSicon HST.svg
151.1 km
Clunes
Zone 11
2:08
BSicon HST.svg
168.3 km
Talbot
Zone 13
2:22
BSicon KINTe.svg
182.5 km
Maryborough
Zone 14
Some timetabled journey to Southern Cross.
Most services run between Ballarat and Maryborough only.
Mildura railway line
BSicon CONTgq.svg
BSicon ABZq+r.svg
BSicon CONTfq.svg
Serviceton line to Melbourne
BSicon STR.svg
at North Ballarat Junction
BSicon eHST.svg
123.6 km
Waubra Junction
BSicon ABZgl.svg
BSicon CONTfq.svg
Waubra line
BSicon eHST.svg
125.3 km
Sulky
BSicon eHST.svg
128.4 km
Bald Hills
BSicon HST.svg
133.0 km
Creswick
BSicon eBHF.svg
134.9 km
North Creswick
BSicon exCONTgq.svg
BSicon eABZgr.svg
Daylesford line
BSicon eHST.svg
146.3 km
Tourello
BSicon HST.svg
151.0 km
Clunes
BSicon HST.svg
168.4 km
Talbot
BSicon eHST.svg
174.8 km
Daisy Hill
BSicon SHI1r.svg
BSicon uexSHI1l.svg
Dual Gauge track between Maryborough
and Gheringhap under construction
BSicon uexv-STR.svg
BSicon uv-STR+l.svg
BSicon vSTR-.svg
BSicon uCONTfq.svg
Avoca line towards Ararat
BSicon uv-STR.svg
BSicon lvINT-.svg
BSicon vSTR-.svg
182.5 km
Maryborough
BSicon CONTgq.svg
BSicon vSTRr-.svg
BSicon uv-STR.svg
BSicon exvSTR-.svg
Moolort line
BSicon uSHI1+l.svg
BSicon eSPLe.svg
Maryborough - Dunolly converted to dual (standard and broad) gauge in 1996
Dunolly - Yelta converted to standard gauge in 2018
BSicon ueHST.svg
189.4 km
Simson
BSicon ueHST.svg
194.6 km
Havelock
BSicon ueHST.svg
197.3 km
Bet Bet
BSicon ueBHF.svg
204.6 km
Dunolly
BSicon uCONTgq.svg
BSicon uABZgr.svg
Robinvale line
BSicon ueHST.svg
211.1 km
Goldsborough
BSicon ueHST.svg
224.1 km
Bealiba
BSicon ueHST.svg
236.2 km
Emu
BSicon ueHST.svg
245.8 km
Caraporee
BSicon ueBHF.svg
257.7 km
St Arnaud
BSicon ueHST.svg
268.9 km
Sutherland
BSicon ueHST.svg
276.4 km
Swanwater
BSicon ueHST.svg
284.0 km
Cope Cope
BSicon ueBHF.svg
296.1 km
Donald
BSicon ueHST.svg
302.8 km
Buloke
BSicon ueHST.svg
311.2 km
Litchfield
BSicon ueHST.svg
319.8 km
Massey
BSicon ueHST.svg
328.3 km
Watchem
BSicon ueHST.svg
336.1 km
Morton Plains
BSicon ueBHF.svg
348.0 km
Birchip
BSicon ueHST.svg
363.5 km
Kinnabulla
BSicon ueHST.svg
368.9 km
Curyo
BSicon ueHST.svg
380.3 km
Watchpuga
BSicon ueHST.svg
390.6 km
Woomelang
BSicon ueHST.svg
402.2 km
Lascelles
BSicon ueHST.svg
410.9 km
Gama
BSicon ueHST.svg
421.6 km
Turiff
BSicon ueHST.svg
428.4 km
Speed
BSicon ueHST.svg
434.9 km
Tempy
BSicon ueHST.svg
443.4 km
Gypsum
BSicon ueHST.svg
453.0 km
Bronzewing
BSicon ueHST.svg
459.0 km
Nunga
BSicon uABZgl.svg
BSicon uCONTfq.svg
BSicon ueBHF.svg
467.3 km
Ouyen
BSicon ueHST.svg
475.9 km
Kiamal
BSicon ueHST.svg
489.0 km
Trinita
BSicon ueHST.svg
501.5 km
Hattah
BSicon ueHST.svg
528.3 km
Nowingi
BSicon ueABZgl.svg
BSicon uexCONTfq.svg
BSicon ueHST.svg
528.3 km
Boonoonar
BSicon ueHST.svg
536.6 km
Carwarp
BSicon ueHST.svg
551.2 km
Yatpool
BSicon ueABZg+l.svg
BSicon uexCONTfq.svg
BSicon ueBHF.svg
553.5 km
Red Cliffs
BSicon ueHST.svg
561.1 km
Irymple
BSicon ueBHF.svg
567.8 km
Mildura
BSicon ueHST.svg
579.0 km
Merbein
BSicon ueHST.svg
583.7 km
Merbein West
BSicon ueKBHFe.svg
588.2 km
Yelta

See also

Related Research Articles

<span class="mw-page-title-main">V/Line</span> Railway company in Victoria, Australia

V/Line is a statutory authority that operates regional passenger train and coach services in Victoria, Australia. It provides passenger train services on five commuter lines and eight long-distance routes from its major hub at Southern Cross railway station in Melbourne. It also provides bus services across Victoria and into New South Wales, the Australian Capital Territory and South Australia. In addition, V/Line is responsible for the maintenance of much of the Victorian freight and passenger rail network outside of the areas managed by Metro Trains Melbourne and the Australian Rail Track Corporation.

<span class="mw-page-title-main">Ballarat railway station</span> Railway station in Victoria, Australia

Ballarat railway station is located on the Serviceton line in Victoria, Australia. It serves the city of Ballarat, and opened on 11 April 1862 as Ballarat West. It was renamed Ballarat in 1865.

The Serviceton railway line is part of the Melbourne–Adelaide rail corridor. It serves the west of Victoria, linking the state capital of Melbourne to the cities of Ballarat and Ararat. It once extended to the disputed South Australian border as part of the Melbourne–Adelaide railway. The former broad-gauge track was replaced in 1995 by the 1435 mm Western standard gauge line.

<span class="mw-page-title-main">Ararat railway station</span> Railway station in Victoria, Australia

Ararat railway station is located on the Serviceton and Western standard gauge lines in Victoria, Australia. It serves the town of Ararat, and opened on 7 April 1875.

<span class="mw-page-title-main">Maryborough railway station, Victoria</span> Railway station in Victoria, Australia

Maryborough railway station is located on the Mildura line in Victoria, Australia. It serves the town of Maryborough, and it opened on 7 July 1874.

<span class="mw-page-title-main">Creswick railway station</span> Railway station in Victoria, Australia

Creswick railway station is located on the Mildura line in Victoria, Australia. It serves the town of Creswick, and the original station opened on 7 July 1874.

<span class="mw-page-title-main">Dunolly railway station</span> Former railway station in Victoria, Australia

Dunolly is a closed railway station on the Mildura line in the town of Dunolly, Victoria, Australia. The station was one of 35 closed to passenger traffic on 4 October 1981 as part of the New Deal timetable for country passengers. Today it is the junction for the lines towards Inglewood, Kulwin, and Robinvale. It also contains grain silos.

<span class="mw-page-title-main">Ouyen railway station</span> Former railway station in Victoria, Australia

Ouyen is a closed railway station in Ouyen, on the Mildura railway line, in Victoria, Australia. The station is the junction for the Pinnaroo line westward to Panitya and Pinnaroo.

<span class="mw-page-title-main">Mildura railway station</span> Railway line in Victoria, Australia

Mildura was the passenger terminus for the Mildura railway line in Victoria, Australia. Located in the city of Mildura it is located on the eastern side of the town centre, alongside the Murray River. Although there has not been a passenger rail service since 1993, the Victorian Labor Government promised to return the service in 1999, though it has yet to return as of 2023.

<span class="mw-page-title-main">Robinvale railway line</span>

The Robinvale railway line is a freight only country railway line in north-western Victoria, Australia. The line branches from the Mildura line at Dunolly, and at Inglewood the Eaglehawk – Inglewood line connects with the Piangil line outside Bendigo. The parallel Kulwin line junctions from the Robinvale line at Korong Vale then continues northward.

The Geelong–Ballarat railway line is a broad-gauge railway in western Victoria, Australia between the cities of Geelong and Ballarat. Towns on the route include Bannockburn, Lethbridge, Meredith, Elaine and Lal Lal. Major traffic includes general freight from the Mildura line, and grain.

<span class="mw-page-title-main">Ballarat V/Line rail service</span> Passenger rail service in Victoria, Australia

The Ballarat V/Line rail service is a regional passenger rail service operated by V/Line in Victoria, Australia. It serves passengers between state capital Melbourne and the regional city of Ballarat. Beyond Ballarat, it changes name to the Ararat railway line and the Maryborough railway line.

<span class="mw-page-title-main">Avoca railway line</span>

The Maryborough–Avoca–Ararat railway is a railway line in western Victoria, Australia. It is one of the few railway lines in the state to have been closed and then reopened. Today it is a standard gauge branch line connecting the Western SG with Bung Bong (ballast) and Dunolly (grain), running through Maryborough station.

<span class="mw-page-title-main">Clunes railway station, Victoria</span> Railway station in Victoria, Australia

Clunes railway station is located on the Mildura line in Victoria, Australia. It serves the town of Clunes, and opened on 16 November 1874.

<span class="mw-page-title-main">Talbot railway station</span> Railway station in Victoria, Australia

Talbot railway station is located on the Mildura line in Victoria, Australia. It serves the town of Talbot, and opened on 2 February 1875.

The Moolort Line was a cross-country railway line which connected Maryborough and Castlemaine in Victoria, Australia. The line, now defunct, starts in Castlemaine, passes through Campbells Creek, Yapeen, Guildford, Strangways, Newstead, Moolort, and Carisbrook, before joining the Mildura line at Maryborough.

<span class="mw-page-title-main">Pinnaroo railway line, South Australia</span>

The Pinnaroo railway line ran east from the Adelaide to Melbourne line at Tailem Bend to Pinnaroo near the South Australia / Victoria state border. The route continues into Victoria via the Victorian Railways line to Ouyen where it joined the Mildura line.

The Murray Basin Rail Project is a major railway project in the north-west of Victoria, Australia. The project includes the conversion of a substantial portion of the Victorian freight rail network from the historical broad gauge to the standard gauge used in other parts of Australia, and the upgrading of track to enable higher axle loads for more efficient intrastate freight transfer.

References

  1. "Mildura's Riverfront Railways" Australian Railway Historical Society Bulletin February 1978 pages 33–38
  2. "The Mildura Story The Battle of the Routes" (PDF). Royal Historical Society of Victoria. Archived from the original (PDF) on 19 July 2008. Retrieved 30 August 2008.
  3. "WORKS BEGIN ON MILDURA RAIL FREIGHT UPGRADE". minister.infrastructure.gov.au. Archived from the original on 24 July 2008. Retrieved 27 April 2008.
  4. "Roads, ports and freight – Mildura Rail Freight Upgrade – Frequently asked questions". doi.vic.gov.au. Archived from the original on 26 July 2008. Retrieved 27 April 2008.
  5. "$43m to upgrade rail freight lines". business.theage.com.au. Archived from the original on 6 December 2012. Retrieved 27 April 2008.
  6. V/Line Weekly Notice: "NORTH BALLARAT – MARYBOROUGH. TOURELLO LOOP ABOLISHED LEVEL CROSSING UPGRADES"
  7. "Signalling and Infrastructure" Railway Digest May 2010 page 56
  8. "Victorian Government press release—"NORTH WEST PUBLIC TRANSPORT REVIEW REPORT RELEASED", 13 October 2010". Archived from the original on 21 October 2010. Retrieved 1 November 2010.
  9. "North West Public Transport Review". Archived from the original on 21 October 2010. Retrieved 1 November 2010.
  10. "V/Line Annual Report 2009-2010" (PDF). V/Line Pty Ltd. September 2010. p. 7. Archived (PDF) from the original on 27 February 2011. Retrieved 2 July 2011.
  11. "Transport Projects – Maryborough Rail Services". Department of Transport website. Department of Transport. Archived from the original on 7 January 2010. Retrieved 2 July 2011.
  12. Probert, Oliver (1 August 2017). "Murray Basin upgrades begin". Rail Express. Archived from the original on 21 January 2021. Retrieved 18 February 2018.
  13. DiFabrizio, Michael (14 February 2018). "Birchip stretch in train". Sunraysia Daily. Archived from the original on 13 February 2018. Retrieved 18 February 2018.
  14. "VLine Station Patronage 2013-2021.xlsx". Google Docs. Archived from the original on 10 March 2022. Retrieved 10 March 2022.
  15. "Roads, ports and freight – Intermodal terminals". doi.vic.gov.au. Archived from the original on 4 June 2009. Retrieved 1 August 2008.
  16. "Rail and Road – Seaway". www.seaway.com.au. Archived from the original on 11 February 2022. Retrieved 22 February 2022.
  17. "Melbourne–Mildura Corridor Strategy" (PDF). Building our National Transport Future. Department of Transport and Regional Services. June 2007. Archived from the original (PDF) on 27 October 2009. Retrieved 3 November 2009.
  18. "Wongm's Rail Gallery – Mildura freight". wongm.railgeelong.com. Archived from the original on 27 October 2009. Retrieved 3 November 2009.
  19. "Maryborough Rail Extension Projects". Victorian Transport Plan. www4.transport.vic.gov.au. Archived from the original on 26 December 2008. Retrieved 8 December 2008.
  20. "Maryborough Rail Services". Victorian Transport Plan. transport.vic.gov.au. Archived from the original on 7 January 2010. Retrieved 5 July 2010.
  21. KIM STEPHENS (7 October 2009). "Call to explain Clunes' omission from rail plan". The Courier. thecourier.com.au. Archived from the original on 4 October 2011. Retrieved 15 June 2010.
  22. EMMA BROWN (11 October 2009). "No plans for Clunes train". The Courier. thecourier.com.au. Archived from the original on 13 October 2009. Retrieved 15 June 2010.
  23. "READY FOR TOMORROW: $19 MILLION TO RETURN PASSENGER RAIL TO CLUNES AND IMPROVE NORTH-WEST FREIGHT RAIL LINKS". Media Release: Premier of Victoria. premier.vic.gov.au. June 2010. Archived from the original on 18 June 2010. Retrieved 15 June 2010.
  24. "Tiny Talbot back on track: train service to resume 20 years after stopping". Australian Broadcasting Corporation. Archived from the original on 24 May 2022. Retrieved 24 May 2022.