2027 in rail transport

Last updated

Years in rail transport
Timeline of railway history

This article lists events related to rail transport that are currently scheduled to occur in 2027. Please be aware that the actual dates on which these events occur may differ substantially from what is shown here.

Contents

Events

March

October

December

Unknown date

before the automatisation in 2035.

Related Research Articles

<span class="mw-page-title-main">Warsaw Metro</span> Rapid transit system in Warsaw

The Warsaw Metro is a rapid transit underground system serving the Polish capital Warsaw. It currently consists of two lines, the north–south M1 line which links central Warsaw with its densely populated northern and southern districts, and the east–west M2 line. Three more lines are planned. The system is operated by Metro Warszawskie, a company owned by the city, and managed by Public Transport Authority in Warsaw. As of 2024, it is the only metro system in Poland.

<span class="mw-page-title-main">Silver Spring station</span> Washington Metro and MARC Train station

Silver Spring station is a train station on the Red Line of the Washington Metro and the Brunswick Line of the MARC Train commuter rail system. The Metro station averaged 4,536 daily riders in 2023, making it the 19th-busiest stop in the network and the busiest in the state of Maryland. Trains travelling south from the station quickly cross the border into Washington, D.C., while northbound trains head underground and make their way further into Montgomery County.

<span class="mw-page-title-main">MRT (Bangkok)</span> Thai rapid transit system serving Bangkok

The Metropolitan Rapid Transit or MRT is a mass rapid transit system serving the Bangkok Metropolitan Region in Thailand. The MRT system comprises two fully operational rapid transit lines and two fully operational monorail line, with another rapid transit line (Orange) under construction. The MRT Blue Line, officially the Chaloem Ratchamongkhon Line, between Hua Lamphong and Bang Sue was the first to open in July 2004 as Bangkok's second metro system. The MRT Blue line is officially known in Thai as rotfaifa mahanakhon (รถไฟฟ้ามหานคร) or "metropolitan electric train", but it is more commonly called rotfai taidin (รถไฟใต้ดิน), literally, "underground train" as it was distinguished from the BTS Skytrain by being completely underground when its first section between Hua Lamphong to Bang Sue opened.

<span class="mw-page-title-main">New Carrollton station</span> Washington Metro station

New Carrollton station is a joint Washington Metro, MARC, and Amtrak station just outside the city limits of New Carrollton, Prince George's County, Maryland located at the eastern end of the Metro's Orange Line. The station will also serve as the eastern terminus of the Purple Line, currently under construction, and is adjacent to the Capital Beltway.

<span class="mw-page-title-main">College Park–University of Maryland station</span> Rail station in College Park, Maryland, US

College Park–University of Maryland station is a Washington Metro and MARC station located in College Park, Maryland, near the University of Maryland, College Park campus. It is served by the Metro Green Line and limited service on the MARC Camden Line. The light rail Purple Line is planned to begin service at the station in 2027.

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">Milwaukee District West Line</span> Commuter rail line in Illinois

The Milwaukee District West Line (MD-W) is a Metra commuter rail line in Chicago, Illinois, and its western suburbs. Metra does not refer to any of its lines by a particular color, but the timetable accents for the Milwaukee District West line are dark "Arrow Yellow," honoring the Milwaukee Road's Arrow passenger train. Trains are dispatched from the Canadian Pacific Kansas City Railway's American headquarters in Minneapolis.

<span class="mw-page-title-main">Tel Aviv Light Rail</span> Mass transit system for Tel Aviv, Israel

The Tel Aviv Light Rail, also known as Dankal is a mass transit system for Gush Dan, the Tel Aviv metropolitan area in central Israel. The system will include different modes of mass transit, including rapid transit (metro), light rail transit (LRT), and bus rapid transit (BRT). Overseen by NTA Metropolitan Mass Transit System Ltd., a government agency, the project will complement the intercity and suburban rail network operated by Israel Railways.

<i>Black Hawk</i> (Amtrak train) Former Amtrak intercity rail service

The Black Hawk was an Amtrak passenger train service that operated from 1974 to 1981 between Chicago, Illinois, and Dubuque, Iowa, via Rockford, Illinois. The original Black Hawk operated over the Illinois Central route, now the Canadian National's Chicago Central/Iowa Zone.

<span class="mw-page-title-main">Purple Line (Maryland)</span> Under construction light rail line in Maryland

The Purple Line is a 16.2-mile (26.1 km) light rail line being built to link several Maryland suburbs of Washington, D.C.: Bethesda, Silver Spring, College Park, and New Carrollton. Currently slated to open in late 2027, the line will also enable riders to move between the Maryland branches of the Red, Green, and Orange lines of the Washington Metro without riding into central Washington, and between all three lines of the MARC commuter rail system. The project is administered by the Maryland Transit Administration (MTA), an agency of the Maryland Department of Transportation (MDOT), and not the Washington Metropolitan Area Transit Authority (WMATA), which operates Metro.

<span class="mw-page-title-main">Loudoun Gateway station</span> Washington Metro station

Loudoun Gateway station is a Washington Metro station in Loudoun County, Virginia, on the Silver Line. It is located at SR 606 and the ramps to SR 267. Originally planned to begin operations in 2016, the station opened on November 15, 2022. Loudoun Gateway averaged just 214 daily riders in 2023, replacing Cheverly as the least busy station in the entire Metro system.

<span class="mw-page-title-main">Ashburn station (Washington Metro)</span> Washington Metro station

Ashburn station is a Washington Metro station in Loudoun County, Virginia, United States, that serves as the western terminus of the Silver Line. Originally planned to begin operation in 2016, the station opened on November 15, 2022.

<span class="mw-page-title-main">LRT Line 2 (Metro Manila)</span> Manila Metro line

The Light Rail Transit Line 2, also known as LRT Line 2, LRT-2, or Megatren, is a rapid transit line in Metro Manila in the Philippines owned and operated by the Light Rail Transit Authority (LRTA). The line generally runs in an east–west direction between Recto in Manila and Antipolo. The line is officially referred to as the Purple Line.

<span class="mw-page-title-main">Purple Line (Bangkok)</span> Rapid transit line in Bangkok, Thailand

The MRT Purple line or MRT Chalong Ratchadham line is Bangkok's fifth rapid transit line, following the Sukhumvit Line, Silom Line, MRT Blue Line, and Airport Rail Link. The line is 23 km (14 mi) long, serving the north-western area of Bangkok running from Tao Poon to Klong Bang Phai in Nonthaburi Province.

<span class="mw-page-title-main">Takoma Langley Crossroads Transit Center</span>

The Takoma Langley Crossroads Transit Center is a bus transit center in Langley Park, Maryland. It is at the intersection of University Boulevard and New Hampshire Avenue, and is the largest bus-only transfer in the Washington, D.C. metropolitan area. It is a future transfer point for the Purple Line.

The Rockford Intercity Passenger Rail is a proposed Metra inter-city rail service between Chicago and Rockford, Illinois. The project is being led by the Illinois Department of Transportation (IDOT) funded with $275 million through the Rebuild Illinois capital plan. The route is expected to begin by late 2027, reinstating rail service to Rockford for the first time in over 40 years after the discontinuation of Amtrak's Black Hawk in 1981.

References

  1. "Patna Metro – Information, Route Map, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 2024-11-19.
  2. Luczak, Marybeth (31 January 2023). "Transit Briefs: Brightline, NYMTA, OCTA, SacRT, SCVTA". Railway Age. Retrieved 2 February 2023.
  3. "Surat Metro phase I to start operations in December 2027 – Check route, distance and stations here". Financialexpress. 2023-07-13. Retrieved 2024-11-19.
  4. "Green Line Stage One". Calgary Engage. Retrieved June 23, 2020.
  5. Pelley, Lauren; Crawley, Mike (April 10, 2019). "Doug Ford commits $11.2B for 4 major GTA transit projects, including new 'Ontario Line'". CBC News . Archived from the original on April 10, 2019. Retrieved April 10, 2019.
  6. "Work Schedule". REM. Retrieved 2024-11-19.
  7. Hindi, Rob (November 9, 2023). "Dilkens believes Amtrak-VIA Rail link is an 'exciting opportunity'". iHeartRadio. Retrieved 10 November 2023.
  8. Zand, Bernhard (2021-09-13). "Egypt Picks Europe Over China: High-Speed Rail To Connect Red Sea and Mediterranean". Der Spiegel. ISSN   2195-1349 . Retrieved 2024-11-18.
  9. "madrid metro lines 6 and 8 automation". Bing. Retrieved 2024-11-18.
  10. "Mayangone residents oppose transit project". Myanmar Times. 14 January 2020. Archived from the original on 14 January 2020. Retrieved 14 January 2020.
  11. "Jurong Region Line to open from 2026 in three phases". The New Paper. Archived from the original on 12 May 2018. Retrieved 12 May 2018.
  12. Emmanuelle Birraux (24 October 2019). "Lausanne:Le premier tronçon du métro m3 mis à l'enquête" (in French). 24 heures. Archived from the original on 25 October 2019. Retrieved 21 November 2019.
  13. Etat de Vaud (June 2019). "Développement des métros automatiques m2-m3". www.vd.ch. Retrieved 2019-10-12.
  14. Jotikasthira, Om (29 July 2018). "Cranking up the train plan". Bangkok Post. Retrieved 29 July 2018.
  15. Theparat, Chatrudee (30 October 2020). "Tangled lines". Bangkok Post. Retrieved 31 October 2020.
  16. Neveau • •, James (2023-07-06). "Metra to restore rail service between Rockford, Chicago for first time in 40 years". NBC Chicago. Retrieved 2024-11-18.
  17. "New York City 2nd Ave Subway Phase 2 Profile" (PDF). FTA. December 27, 2016. Archived from the original (PDF) on January 5, 2017. Retrieved January 4, 2017.
  18. Ruch, John (May 28, 2021). "MARTA aims to link Streetcar and BeltLine by 2027, seeks public input on route". Saporta Report. Retrieved June 15, 2021.
  19. Moore, Janet (January 26, 2022). "Southwest LRT now expected to cost up to $2.75B, open in 2027". Star Tribune. Retrieved January 29, 2022.
  20. Shaver, Katherine (January 19, 2023). "Maryland's Purple Line construction faces another seven-month delay". The Washington Post . Retrieved January 30, 2023.
  21. Strupp, Julie; Barthel, Margaret (24 June 2020). "Purple Line Group Threatens To Quit If There's No Deal With Maryland On Delays, Cost Overruns". WAMU. Retrieved 26 July 2020. The state says the eastern section, from New Carrollton to College Park, is now expected to open in late 2022 and the rest of the line, from College Park to Bethesda, will likely open in June 2023. However, PLTP has said the various delays will set the opening dates back at least another two and a half years.
  22. Shaver, Katherine (18 July 2020). "Purple Line project delays, cost overruns reveal long-brewing problems". Washington Post. Retrieved 26 July 2020.
  23. Shaver, Katherine (24 September 2020). "Purple Line construction workers will be packed up and ready to leave by mid-October, contractor says". The Washington Post. Retrieved 26 September 2020.
  24. Ingalls, William (July 6, 2023). "Metra chosen as passenger rail service provider from Rockford/Belvidere to Chicago". wrex.com. Retrieved 6 July 2023.
  25. "Interborough Express looks to bring trolley cars back to NYC streets with light rail connecting Brooklyn and Queens – CBS New York". www.cbsnews.com. 2023-08-24. Retrieved 2023-09-02.
  26. "Amtrak service connecting Baton Rouge to Nola opens 2027, officials project". www.wafb.com. WAFB. 26 October 2023. Retrieved 3 November 2023.
  27. "FACT SHEET" (PDF). Miami-Dade County. Retrieved 8 November 2023.
  28. "New line Bettembourg – Luxembourg". CFL. Retrieved 2024-02-08.
  29. "Tram network: Chamber of Deputies approves €135 million extensions in Kirchberg and Hollerich". RTL Today. 2024-02-03. Retrieved 2024-02-17.