North Triangle Common Station

Last updated

North Triangle Common Station
North EDSA Manila Line 7 logo.png
North Avenue Common Station Area A 2023-10-29.jpg
The construction progress of Area A in October 2023
General information
Other namesNorth Avenue Common Station
Unified Grand Central Common Station
North EDSA
Location
Quezon City, Metro Manila
Philippines
Owned by
Operated by
Line(s)
Platforms Side and island platforms
Tracks7
ConnectionsFuture:  MMS   North Avenue
Construction
Structure typeElevated
ParkingYes (TriNoma, SM North EDSA)
Other information
StatusUnder construction
History
Opening2024 (partial) [1]
2025 (full) [1]
Previous namesMetro Manila Integrated Rail Terminal
Passengers
478,000 (projected) [2]
Services
Preceding station Lrtalogo.svg
Manila LRT
Following station
Terminus LRT Line 1 Fernando Poe Jr.
towards Baclaran
Preceding station Manila MRT Following station
Terminus MRT Line 3 Quezon Avenue
towards Taft Avenue
MRT Line 7 Quezon Memorial Circle

The North Triangle Common Station [3] [4] (official temporary designation: Unified Grand Central Station, [5] also called Grand Central Station), popularly known as the Common Station, is an under-construction [6] rapid transit terminal and transport hub that will connect LRT Line 1, MRT Line 3, and MRT Line 7, [7] and the nearby Metro Manila Subway. [8] [9] It is located in Bagong Pag-asa, Quezon City, Philippines, and is named after its location, which is at the corner of EDSA and North Avenue. [10]

Contents

The common alignment had been in limbo for years since the Department of Transportation and Communications (DOTC), now Department of Transportation (DOTr), reviewed the project's technical and financial components. [11] It was in January 2017 that an agreement was reached to build the station. The groundbreaking of the station was held at the North Triangle Transport Terminal in September 2017. The station was expected to fully open in January 2021 but that date has now been pushed back to 2025, with partial operations for MRT-3 and LRT-1 slated for the end of 2023. [12]

History

Negotiations

On June 2, 2011, the Department of Transportation and Communications (DOTC) called for bidders for the contract to build the station, which was estimated to cost 1.5 billion. [7] But on July 13 of that year, then-Secretary of Transportation and Communications Mar Roxas announced a review of the project and considering adding store space for lease. The government, by that time, had allotted ₱2 billion for its construction. [10]

On July 22, 2012, the government shelved the project indefinitely due to the Philippine financial crisis in favor of demolition of the tracks and pillars. [13] Secretary Roxas said that the station was being studied by engineers because the MRT-3's original plans did not include the station, and that problems with the line's timing system may arise. He included that in the event that the station does not go through, the ₱200 million paid by SM Prime Holdings, Inc., the operator of SM City North EDSA and other SM Malls, to the Light Rail Transit Authority for naming rights may have to be returned.

However, at the start of 2013, Roxas' successor, Joseph Emilio Abaya announced that the government has cancelled and abandoned the project indefinitely because the construction of the common station was supposed to be completed back in May 2010 during the presidency of Gloria Macapagal Arroyo but disputes over cost, engineering issues and naming rights caused due to the halting of the project by Arroyo's successor President Benigno Aquino III on January 2, 2013.

On January 9, 2013, Abaya announced that the government has filed for the candidacies for three sites of the common station linking three rapid transit systems for Metro Manila, DOTC is not keen on build the common station in front of the Annex Building of the SM North EDSA shopping mall, adding that other potential locations are the TriNoma mall and the Malvar LRT station in Caloocan. Abaya said the agency is awaiting the results of a study that would determine the final location of the common station. He had said the original design near SM City North EDSA Annex was "ineffective and costly" because the rails of Line 3 would have to be extended and trains would have to be added. [14]

On November 21, 2013, the NEDA board, chaired by President Benigno Aquino III, approved the construction of a common station within North Avenue between SM North EDSA and TriNoma, estimated to cost ₱1.4 billion. The station was set to feature head-to-head platforms for LRT 1 and MRT 3 trains with a 147.4 m (483 ft 7 in) elevated walkalator to MRT 7, [15] inconsistent with the original plan of having seamless connectivity to Monumento and is also an unusual arrangement of having two train stations beside each other. [16] Secretary Abaya said that SM would be able to keep the naming rights for the station, even if it is transferred near rival Ayala's TriNoma mall. [17] This led to the change of the station's location, which was initially set to be near SM City North EDSA, earning the ire of the group of the country's largest mall operator SM Prime Holdings Inc., which paid an initial ₱200 million for the naming rights of the station.

Transportation officials have repeatedly said building the station near TriNoma is both economically and environmentally viable, as this would result in a lower cost and less urban blight.

SM Prime then brought its battle to the Supreme Court, which issued a stay order against the DOTC and the Light Rail Transit Authority (LRTA) in June 2014, enjoining them to stop the transfer of the common alignment's location. [11] [18] [19]

Agreement

At a business forum held on August 12, 2016, Department of Transportation (now abbreviated as DOTr) Secretary Arthur Tugade said that all stakeholders namely Metro Pacific Investments, SMC-Mass Rail Transit 7 Inc. of San Miguel Corporation, SM Prime Holdings, and Ayala Corporation had agreed in principle that the common station will be built in North Avenue between the Southeast end of SM North EDSA and North side of the TriNoma Mall. [20] Negotiations took about 8 years for the station to be built near SM North EDSA and TriNoma. [21]

A memorandum of agreement was signed by the station's stakeholders on January 18, 2017. [5]

Construction

North Avenue Area B Common Station with MRT7 construction 2020-01-24.jpg
Area B construction progress in January 2020
Manila MRT Line 7 construction at North Avenue 38.jpg
Area C construction progress in August 2022

The groundbreaking ceremony of the station was held on September 29, 2017, marking the start of construction. [19] It is planned to be completed in 2023. Three areas were designated for the project with each area with its own developers. Area A which will host a platform and concourse for Lines 1 and 3 will be developed by the Department of Transportation. Area B, which covers two concourses that will connect Areas A and C will be developed by North Triangle Depot Commercial Corporation, an affiliate of Ayala Land. San Miguel Corporation will develop and finance Area C which will host the Line 7 platform. By January 2017, the projected cost for the station is ₱2.8 billion. [21] [22]

The construction of Area A is carried out by BF Corporation and Foresight Development and Surveying Company. The contract for the construction of Area A was signed on February 13, 2019. [23] The Area A involves a spur line branching from Line 1's portion, reusing the previously dug foundations originally intended for the station in front of SM North EDSA for its pier beams. All-steel girders will be used.

As of January 31,2023, the station is 79.72% complete. [24] The station was originally supposed to open in January 2021, [1] but mainly due to the COVID-19 pandemic, which affected manpower as well as construction logistics delays, the station opening was postponed to June 2023, [1] with full operations expected to begin by 2025. [1] Issues such as utilities relocation, the aforementioned pandemic-related issues, and systems upgrades (such as signalling & automated fare collection) [1] contributed to repeated completion delays. In April, additional delays have pushed back the opening of the common station to the end of 2023. [12]

Naming

In 2009, SM Prime Holdings which owns SM North EDSA secured naming rights for the station by paying ₱200 million while Ayala which owns TriNoma contributed ₱150 million which also made it eligible for naming rights. [5] In January 2017, it was agreed that naming rights of both SM Prime Holdings and Ayala will be honored and until the two companies agreed upon a name, the station shall be temporarily called as the Unified Grand Central Station. [5]

Station layout

The station is divided into three primary areas: A, B, and C. Area A hosts a platform and concourse for Lines 1 and 3. Area B will connect Areas A and C. Area C hosts a platform and concourse for Line 7. [21]

See also

Related Research Articles

<span class="mw-page-title-main">EDSA</span> Limited-access circumferential highway around Metro Manila

Epifanio de los Santos Avenue, commonly referred to by its acronym EDSA, is a limited-access circumferential highway around Manila, the capital city of the Philippines. It passes through 6 of Metro Manila's 17 local government units or cities, namely, from north to south, Caloocan, Quezon City, San Juan, Mandaluyong, Makati, and Pasay.

<span class="mw-page-title-main">MRT Line 3 (Metro Manila)</span> Rail line in Metro Manila, Philippines

The Metro Rail Transit Line 3, also known as the MRT Line 3, MRT-3, or Metrostar Express, is a rapid transit line in Metro Manila in the Philippines. The line runs in an orbital north to south route following the alignment of Epifanio de los Santos Avenue (EDSA). Despite its name, the line is more akin to a light rapid transit system owing to its tram-like rolling stock while having total grade separation and high passenger throughput. The line is officially known as the Yellow Line.

<span class="mw-page-title-main">Rail transportation in the Philippines</span>

Rail transportation in the Philippines is currently used mostly to transport passengers within Metro Manila and provinces of Laguna and Quezon, as well as a commuter service in the Bicol Region. Freight transport services once operated in the country, but these services were halted. However, there are plans to restore old freight services and build new lines. From a peak of 1,100 kilometers (680 mi), the country currently has a railway footprint of 533.14 kilometers (331.28 mi), of which only 129.85 kilometers (80.69 mi) are operational as of 2024, including all the urban rail lines. World War II, natural calamities, underspending, and neglect have all contributed to the decline of the Philippine railway network. In the 2019 Global Competitiveness Report, the Philippines has the lowest efficiency score among other Asian countries in terms of efficiency of train services, receiving a score of 2.4, and ranking 86th out of 101 countries globally. The government is currently expanding the railway network up to 1,900 kilometers (1,200 mi) by 2022 through numerous projects.

<span class="mw-page-title-main">Monumento station</span> Train station in Caloocan, Philippines

Monumento station is an elevated Light Rail Transit (LRT) station located on the LRT Line 1 (LRT-1) system in the southern portion of Caloocan. It is named after the most famous landmark of Caloocan, the Monumento Circle, which houses the Bonifacio Monument, a famous monument to Filipino revolutionary Andrés Bonifacio. The name Monumento itself is derived from the Spanish word for monument. Being a former northern terminus of LRT-1, it is called Monumento Terminal.

<span class="mw-page-title-main">LRT Line 1 (Metro Manila)</span> Light rail line in Manila

The Light Rail Transit Line 1, commonly referred to as LRT Line 1 or LRT-1, is a light rapid transit system line in Metro Manila, Philippines, operated by Light Rail Manila Corporation (LRMC) and owned by the Light Rail Transit Authority (LRTA) as part of the Manila Light Rail Transit System. Originally referred to as Metrorail and the Yellow Line, LRT Line 1 was reclassified to be the Green Line in 2012. It travels in a general north–south direction from Baclaran to Monumento, and then east–west from Monumento to Fernando Poe Jr. Currently, the line consists of 20 stations and runs on 19.7 kilometers of fully elevated route. Although it has the characteristics of light rail, such as with the type of rolling stock used, it is more akin to a rapid transit system owing to its total grade separation and high passenger throughput.

<span class="mw-page-title-main">North Avenue station (MRT)</span> Elevated passenger train station in Quezon City, Philippines

North Avenue station is an elevated Metro Rail Transit (MRT) station located on the MRT Line 3 (MRT-3) system in Diliman, Quezon City. It is named after its location, which is at the corner of Epifanio de los Santos Avenue (EDSA) and North Avenue, it is the current northern terminus of the line.

<span class="mw-page-title-main">Shaw Boulevard station</span> Train station in Mandaluyong, Philippines

Shaw Boulevard station is an elevated Metro Rail Transit (MRT) station located on the MRT Line 3 (MRT-3) system in the Mandaluyong portion of Ortigas Center. The station is named after Shaw Boulevard, since the station lies directly above the boulevard. Being at the center of the whole line, many commuters regard Shaw Boulevard station as the "central terminal" of the line.

<span class="mw-page-title-main">Taft Avenue station</span> Train station in Pasay, Philippines

Taft Avenue station is the southern terminus of the Metro Rail Transit Line 3 (MRT-3) system located in Pasay. It is situated at the intersection of Epifanio de los Santos Avenue (EDSA), one of Metro Manila's major thoroughfares, and Taft Avenue usually referred to as Pasay Rotonda or EDSA-Taft. The station is named after Taft Avenue.

<span class="mw-page-title-main">Metro Rail Transit Corporation</span> Philippine financial consortium

The Metro Rail Transit Corporation (MRTC), is a private consortium organized in June 1995. The consortium is composed of seven (7) Filipino-owned companies: Fil-Estate Management Inc, Ayala Land Inc, Ramcar Inc, Greenfield Development Corporation of Unilab, Anglo-Philippine Holdings Corporation, National Book Store Group, Allante Realty and Development Inc, and DBH Inc. The Metro Rail Transit Corporation owns the Manila Metro Rail Transit System Line 3 running along the EDSA corridor. MRTC was the original contractor for the EDSA MRT-3 Project. It runs the MRT-3 in coordination with the Department of Transportation under a 25-year Build-Lease-Transfer contract or BLT Agreement, which will end in 2025.

<span class="mw-page-title-main">Trinoma</span> Shopping mall in Quezon City, Philippines

Ayala Malls Trinoma is a large shopping mall in Quezon City, Philippines, owned by property development firm Ayala Land. Opened on May 16, 2007, the mall is located on the east side of Epifanio de los Santos Avenue in Quezon City, giving significant market competition to the nearby SM North EDSA as one of the largest malls in Metro Manila. It is also one of two malls that will be serving Ayala Land's Vertis North township, which is located beside the mall, along with a new lifestyle block mall Ayala Malls Vertis North, similar to Greenbelt in Makati, which was also developed by Ayala Malls.

<span class="mw-page-title-main">Fernando Poe Jr. station</span> Train station in Quezon City, Philippines

Fernando Poe Jr. station is the current northern terminus of the Light Rail Transit Line 1 (LRT-1) system. It opened on October 22, 2010, as part of the LRT-1 North Extension Project, as Roosevelt and got its current name on August 20, 2023, almost two years after the namesake avenue was officially renamed after the Filipino actor.

<span class="mw-page-title-main">Balintawak station</span> Train station in Quezon City, Philippines

Balintawak station is an elevated Light Rail Transit (LRT) station located on the LRT Line 1 (LRT-1) system at the boundary of barangays Balingasa, Unang Sigaw, and Apolonio Samson in Quezon City, Philippines. It opened on March 22, 2010 as part of the LRT-1 North Extension Project. The station serves passengers going to and from the northern parts of Luzon using the North Luzon Expressway.

<span class="mw-page-title-main">Transportation in Metro Manila</span> Overview of Metro Manilas transportation system

The transportation system in Metro Manila covers the road network, rail network, ferries, ports and airports located within the metropolitan Manila area. Road transportation in Metro Manila is diverse, composed of many types of private and public transport vehicles. These include taxis, buses, jeepneys, tricycles and pedicabs. In some areas, especially in Divisoria and large public markets, two-stroke motors are fitted in the pedicabs and are used for goods transport. Regardless of modernity, horse-drawn kalesas are still used in the streets of Binondo and Intramuros. Ridesharing services such as Grab also operate within in Metro Manila.

<span class="mw-page-title-main">Manila Metro Rail Transit System</span> Transit system in Manila

The Manila Metro Rail Transit System (MRTS), commonly known as the MRT, is a rapid transit system that primarily serves Metro Manila, Philippines. Along with the Manila Light Rail Transit System and the Metro Commuter Line of the Philippine National Railways, the system makes up Metro Manila's rail infrastructure.

<span class="mw-page-title-main">Beep (smart card)</span> Philippines contactless payment card

Beep is a reloadable contactless smart card created in 2015 to be a replacement for the magnetic card-based system in paying rail-based rapid transit transportation fares in and around Metro Manila. Beep is also used in lieu of cash in some convenience stores and other businesses. The Beep system is implemented and operated by AF Payments Incorporated, which is primarily owned by Ayala Corporation and Metro Pacific Investments Corporation.

The Metro Rail Transit Line 4 (MRT-4) is a proposed rapid transit line that would serve the Greater Manila Area of the Philippines. The 12.7 km (7.9 mi), 10-station elevated railway would connect Ortigas Center in Metro Manila and the suburban municipality of Taytay, Rizal. It would traverse along Ortigas Avenue and Manila East Road, starting at the former's junction with EDSA in Quezon City to the west until it terminates near the New Taytay Public Market to the east.

<span class="mw-page-title-main">MRT Line 7 (Metro Manila)</span> Manila Metro line

The Metro Rail Transit Line 7, also known as MRT Line 7 or MRT-7, is a rapid transit line under construction in the Philippines. When completed, the line will be 22.8 kilometers (14.2 mi) long, with 14 stations, and the first line to have a third rail electrification. The line runs in a northeast–southwest direction, beginning at San Jose del Monte, Bulacan up to the North Triangle Common Station in North Avenue, Quezon City.

<span class="mw-page-title-main">EDSA Carousel</span> Bus rapid transit system in Metro Manila

The EDSA Carousel, also known as Route 1 and formerly and still referred to as Route E, is a bus rapid transit (BRT) system, part of several bus routes in Metro Manila. It is situated along EDSA and other roads, running on a dedicated right-of-way called the EDSA Busway, separated from normal road traffic in most of its stretch by concrete barriers and steel bollards on the innermost lane.

<span class="mw-page-title-main">Rail transportation in the Greater Manila Area</span>

Rail transportation in the Greater Manila Area is a major part of the transportation system in Metro Manila and its surrounding areas. It consists of the Manila Light Rail Transit System, Manila Metro Rail Transit System, and the PNR Metro Commuter Line. The network makes up the majority of active railways in the country and bear the brunt of providing the metropolis with rail as a faster alternative mode of transport other than buses and jeepneys. However, these systems are currently insufficient for the rapidly expanding metropolis; to address this, new lines and line extensions are under construction, which will extend the system far out into neighboring regions.

<span class="mw-page-title-main">MRTC 3100 class</span> An MRTC Rolling Stock operating at Manila Line 3

The MRTC 3100 class or CRRC Dalian 8MLB LRV is the class of second-generation uni-directional light rail vehicles built in China by CNR Dalian, now CRRC Dalian. Since its delivery, most of the trains are still being tested and undergoing final assessments, before being used on regular services on Line 3 of the Manila Metro Rail Transit System.

References

  1. 1 2 3 4 5 6 Chavez, Cesar (February 20, 2023). "Common Station na magdurugtong sa MRT-3 at LRT-1, planong buksan sa Hunyo – DOTr" [Common Station that will connect MRT Line 3 and LRT Line 1, planned to open in June – DOTr]. Ito Ang Balita (Interview) (in Filipino). Interviewed by JP Nuñez. Philippines: UNTV News and Rescue . Retrieved February 21, 2023.[ unreliable source? ]
  2. Rosales, Clara (June 9, 2022). "LOOK: The Common Station Connecting Metro Trains is Almost Complete". reportr.world. Retrieved June 9, 2022.
  3. "Take a look at the North Avenue Common Station project". philkotse.com. Retrieved April 26, 2021.
  4. "North Triangle Common Station". Visionarch. Retrieved April 26, 2021.
  5. 1 2 3 4 Gonzales, Yuji Vincent (January 19, 2017). "What will the MRT-LRT common station be called?". Inquirer.net. Retrieved January 19, 2017.
  6. Jiao, Claire (September 29, 2017). "LRT-MRT common station breaks ground". CNN Philippines. Archived from the original on April 11, 2018. Retrieved April 10, 2018.
  7. 1 2 Montecillo, Paolo G. (June 5, 2011). "Bidders for LRT-MRT central station sought". Inquirer.net. Retrieved October 23, 2012.
  8. Pateña, Aerol John (February 13, 2019). "DOTr inks deal on common station construction". Philippine News Agency. Retrieved February 22, 2022.
  9. Department of Transportation (March 7, 2022). "DOTr - CONSTRUCTION OF COMMON STATION STRUCTURE TO BE COMPLETED BY END OF MARCH 2022 – TUGADE". dotr.gov.ph. Archived from the original on March 8, 2022. Retrieved March 31, 2022.
  10. 1 2 Montecillo, Paolo G. (July 13, 2011). "DOTC reviews MRT-LRT central station project". Inquirer.net. Retrieved October 24, 2012.
  11. 1 2 Marasigan, Lorenz S. (February 25, 2015). "SM ready to end feud with Ayala". BusinessMirror.
  12. 1 2 Manabat, Jacque (April 12, 2023). "Opening of common station for train lines postponed anew". ABS-CBN News.
  13. Venzon, Cliff Harvey (July 23, 2012). "Central station near SM North shelved". BusinessWorld. Archived from the original on April 26, 2021. Retrieved April 26, 2021.
  14. Amojelar, Darwin G. (January 9, 2013). "DOTC to choose among 3 possible sites for common train station". Archived from the original on February 2, 2017.
  15. Tan, Kimberly Jane (November 21, 2013). "NEDA approves MRT 7, LRT-1 extension projects". GMA News and Public Affairs . Retrieved January 1, 2014.
  16. Marasigan, Gelo; Remitio, Rex (September 28, 2016). "Finally: A common station for LRT, MRT lines". CNN Philippines. Archived from the original on April 10, 2018. Retrieved April 10, 2018.
  17. "MRT-LRT common station to be located at Trinoma". ABS-CBN News. April 22, 2014.
  18. Flores, Mikhail Franz; dela Paz, Chrisee Jalyssa (August 2, 2014). "High court stops transfer of common train station site". BW. Archived from the original on June 16, 2018. Retrieved August 2, 2014.
  19. 1 2 Fe, Kaye (September 29, 2017). "Construction of P2.8-B Grand Unified Central Station to begin after almost a decade of delay". Eagle News. Eagle Broadcasting Corporation. Retrieved September 29, 2017.
  20. Camus, Miguel R. (August 13, 2016). "Common railway station row resolved". Inquirer.net.
  21. 1 2 3 Ong, Jennifer (January 19, 2017). "MRT, LRT Common Station Construction To Start In 2017". International Business Times. IBT Media Inc. Archived from the original on January 31, 2017. Retrieved January 19, 2017.
  22. GMA News (January 18, 2017). Common station na magkokonekta sa LRT1, MRT3 at MRT7, sisimulan sa Disyembre. YouTube. Archived from the original on December 15, 2021. Retrieved May 19, 2021.
  23. Valdez, Denise A. (February 13, 2019). "Contracting arrangements finalized for common station". BusinessWorld. Retrieved August 15, 2021.
  24. "HOUSE TACKLES DOTR'S RAILWAY PROJECTS STATUS, URGES AGENCY TO FIX PROJECT DELAYS". House of Representatives of the Philippines . Press and Public Affairs Bureau. February 16, 2023. Retrieved February 21, 2023.

14°39′21″N121°1′41″E / 14.65583°N 121.02806°E / 14.65583; 121.02806