{{lang-de|Brennerautobahn}}
Brenner motorway"},"established":{"wt":"1968"},"direction_a":{"wt":"South"},"terminus_a":{"wt":"[[Modena]]"},"junction":{"wt":"[[Image:Autostrada A1 Italia.svg|23px]] [[Autostrada A1 (Italy)|A1]] in [[Modena]]
[[Image:Autostrada A4 Italia.svg|23px]] [[Autostrada A4 (Italy)|A4]] in [[Verona]]"},"direction_b":{"wt":"North"},"terminus_b":{"wt":"[[Brenner Pass]]"},"length_km":{"wt":"315"},"regions":{"wt":"[[Emilia-Romagna]],[[Lombardy]],[[Veneto]],[[Trentino-Alto Adige/Südtirol]]"},"map":{"wt":"Italia - mappa autostrada A22.svg"},"e-road":{"wt":"[[European route E45|E45]]"},"state":{"wt":"Italy"},"maint":{"wt":"[[Autostrada del Brennero (company)|Autostrada del Brennero S.p.A.]]"},"previous_type":{"wt":"A"},"previous_route":{"wt":"21"},"next_type":{"wt":"A"},"next_route":{"wt":"23"},"notes":{"wt":""}},"i":0}}]}" id="mwBw">.mw-parser-output .hlist dl,.mw-parser-output .hlist ol,.mw-parser-output .hlist ul{margin:0;padding:0}.mw-parser-output .hlist dd,.mw-parser-output .hlist dt,.mw-parser-output .hlist li{margin:0;display:inline}.mw-parser-output .hlist.inline,.mw-parser-output .hlist.inline dl,.mw-parser-output .hlist.inline ol,.mw-parser-output .hlist.inline ul,.mw-parser-output .hlist dl dl,.mw-parser-output .hlist dl ol,.mw-parser-output .hlist dl ul,.mw-parser-output .hlist ol dl,.mw-parser-output .hlist ol ol,.mw-parser-output .hlist ol ul,.mw-parser-output .hlist ul dl,.mw-parser-output .hlist ul ol,.mw-parser-output .hlist ul ul{display:inline}.mw-parser-output .hlist .mw-empty-li{display:none}.mw-parser-output .hlist dt::after{content:":"}.mw-parser-output .hlist dd::after,.mw-parser-output .hlist li::after{content:" ·";font-weight:bold}.mw-parser-output .hlist dd:last-child::after,.mw-parser-output .hlist dt:last-child::after,.mw-parser-output .hlist li:last-child::after{content:none}.mw-parser-output .hlist dd dd:first-child::before,.mw-parser-output .hlist dd dt:first-child::before,.mw-parser-output .hlist dd li:first-child::before,.mw-parser-output .hlist dt dd:first-child::before,.mw-parser-output .hlist dt dt:first-child::before,.mw-parser-output .hlist dt li:first-child::before,.mw-parser-output .hlist li dd:first-child::before,.mw-parser-output .hlist li dt:first-child::before,.mw-parser-output .hlist li li:first-child::before{content:" (";font-weight:normal}.mw-parser-output .hlist dd dd:last-child::after,.mw-parser-output .hlist dd dt:last-child::after,.mw-parser-output .hlist dd li:last-child::after,.mw-parser-output .hlist dt dd:last-child::after,.mw-parser-output .hlist dt dt:last-child::after,.mw-parser-output .hlist dt li:last-child::after,.mw-parser-output .hlist li dd:last-child::after,.mw-parser-output .hlist li dt:last-child::after,.mw-parser-output .hlist li li:last-child::after{content:")";font-weight:normal}.mw-parser-output .hlist ol{counter-reset:listitem}.mw-parser-output .hlist ol>li{counter-increment:listitem}.mw-parser-output .hlist ol>li::before{content:" "counter(listitem)"\a0 "}.mw-parser-output .hlist dd ol>li:first-child::before,.mw-parser-output .hlist dt ol>li:first-child::before,.mw-parser-output .hlist li ol>li:first-child::before{content:" ("counter(listitem)"\a0 "}
Autostrada A22 | ||||
---|---|---|---|---|
Italian: Autostrada del Brennero ‹See Tfd› German: Brennerautobahn Brenner motorway | ||||
![]() | ||||
Route information | ||||
Part of E45 | ||||
Maintained by Autostrada del Brennero S.p.A. | ||||
Length | 315 km (196 mi) | |||
Existed | 1968–present | |||
Major junctions | ||||
South end | Modena | |||
![]() ![]() | ||||
North end | Brenner Pass | |||
Location | ||||
Country | Italy | |||
Regions | Emilia-Romagna, Lombardy, Veneto, Trentino-Alto Adige/Südtirol | |||
Highway system | ||||
|
The Autostrada A22 or Autobrennero or Autostrada del Brennero ("Brenner motorway"; ‹See Tfd› German : Brennerautobahn) is one of the most important autostrada (Italian for "motorway") in Italy, as it connects Po Valley, the city of Modena and the Autostrada A1 to Austria through the Brenner Pass, located in the municipality of Brenner. The Autostrada A22 is 315 kilometres (196 mi) long. It is a part of the E45 European route. The operator of the road is Autostrada del Brennero S.p.A.. The Autostrada A22 is located in the regions of Emilia-Romagna, Lombardy, Veneto and Trentino-Alto Adige/Südtirol.
In 1949, during the Geneva Convention on Road Traffic, it was designed a route, identified as E56, leading from Scandinavia to the southernmost point of Italy. The current Autobrennero track was already part of that route plan.
The next step for the fulfillment of the project was the foundation of Autostrada del Brennero S.p.A., on 20 February 1959, that two years later was given the concession for the building and the following management of the highway. Autostrada del Brennero S.p.A. is still the company which curates A22 infrastructure. The motorway track was initially designed by Bruno and Lino Gentilini, assisted by senator Guido de Unterrichter. The first plan was then edited, and it was made up by two carriageways, 7,5 × 2 metres each. The project Verona-Brenner was approved by ANAS on 25 January 1962, while the segment Verona-Modena was approved during the following year. Later on, several plots of land had to be dispossessed, underpasses and flyovers had to be built (for both roads and railroads), 307 kilometers of power lines and 74 km of telephone lines even had to be moved away. It all required about 23 billion lira. [1]
In 1963, the definitive track plan was approved. The first segment open to the public – 50 km between Bolzano and Trento – was inaugurated on 21 December 1968. The first motorway traffic between Italy and Austria occurred on 5 April 1971. [1]
After the opening of other segments, the highway could be considered as definitively completed on 11 April 1974, with the inauguration of the section between Chiusa and Bolzano, resulting in the most complicated one due to the complex infrastructural and engineering work. Overall, at that time 21 entrance-and-exit toll booths and 12 service stations were opened.
At that time the overall cost of A22 amounted to 243,721,821,000 lire, or about 780 million lire per kilometer. Only in 1984, highway A22 managed to have its first net profit. [1]
During the years, the expressway A22 had been subjected to few track modifications; mostly toll booths have been opened or closed. For instance:
Nowadays, the motorway consists of 313,5 km of track, with 23 entrance toll booths, 22 exit toll booths, 6 security centers, 6 service centers, and 22 gas stations.
With a total of 313 km of highway track, A22 originates near Modena, at the interchange on motorway A1, not far from Modena Nord toll booth. After Modena, the motorway traverses the whole Po Valley, overshooting Carpi and Mantua. In Verona A22 crosses highway A4, afterwards it settles in the Adige Valley, in parallel to Lake Garda. It goes past Rovereto, then passing through Trento and Bolzano. From here, it sets inside the Isarco Valley (known in German as 'Eisacktal'), tighter than Po and Adige valleys. Therefore, here A22 twists and turns through the valley, easily overtaking Bressanone and then going over Vipiteno toll booth. Finally, A22 reaches the Brenner Pass in Brennero, where it gets the Austrian border and comes to its end. Here, the passageway Modena-Munich goes on crossing the boundary, following the Austrian A13 Brenner Autobahn. As it clearly appears, A22 is a strongly important highway for connections and transports between Southern and Northern Europe, designed on a track studied and planned to make use of one of the lowest mountain passes in the Alps, the Brenner Pass – one of the busiest borders in Europe – located at only 1375 m above sea level.
Statistical studies calculated that this expressway moves 30,000–40,000 vehicles per day (among them, approximately a third are heavy vehicles), with higher peaks during holiday transfers; sometimes the circulation of traffic comes to a standstill, because of this congestion, causing several serious breakings, queues and small accidents and rear-end collisions, also due to the limitation of the track at just two lanes. To avoid these problems, it is suggested and incentivized the use of intermodal freight transport for the heavy vehicles, taking them onto specific wagons or boxcars, and the conveyance abroad from Verona by railway.
A22 guardrails, whose brown colour is very typical, are made in Corten Steel, an alloy showing elevated corrosion resistance rates and high mechanical strength.
Traffic news in Trentino-Alto Adige are provided by Radio NBC (in Italian) and radio Südtirol 1 (in German), whereas in the remaining section are broadcast by radio Pico.
The highway is 315 km long: the track begins nearby Modena, at the junction with Autostrada A1, and vertically crosses the whole Northern Italy, finally reaching at the Brenner Pass, along the Austrian border. Once over the boundary, the expressway is connected with A13 Austrian motorway (Brennerautobahn A13, Innsbruck-Brenner). A22 highway passes through four Italian regions (Trentino-Alto Adige, Veneto, Lombardia, Emilia-Romagna). The management of the road has been assigned since its construction to specific concessionaires and motorway maintenance companies.
A22 highway, inside the network of European roads, is part for its entire track of the north–south route E45, connecting Karesuando and Gela. The main intersection with the west–east routes is with E70 (in that point represented by Italian motorway A4) in Verona.
Signage is bilingual: both in Italian and in German, due to the fact that in the province of Bolzano German is mostly spoken.
![]() Autostrada del Brennero | |||||
Exit | ↓km↓ | ↑km↑ | Province | European Route | |
---|---|---|---|---|---|
![]() ![]() ![]() ![]() | 0 km (0 mi) | 315 km (196 mi) | MO | ![]() | |
![]() | 3 km (1.9 mi) | 311 km (193 mi) | |||
![]() | 5 km (3.1 mi) | 309 km (192 mi) | |||
![]() | 11 km (6.8 mi) | 303 km (188 mi) | |||
![]() | 28 km (17 mi) | 286 km (178 mi) | RE | ||
![]() ![]() | 37 km (23 mi) | 277 km (172 mi) | MN | ||
![]() | 47 km (29 mi) | 267 km (166 mi) | |||
![]() | 49 km (30 mi) | 265 km (165 mi) | |||
![]() | 57 km (35 mi) | 257 km (160 mi) | |||
![]() | 71 km (44 mi) | 243 km (151 mi) | VR | ||
![]() | 74 km (46 mi) | 240 km (150 mi) | |||
![]() ![]() ![]() ![]() | 86 km (53 mi) | 228 km (142 mi) | |||
![]() ![]() | 88 km (55 mi) | 226 km (140 mi) | |||
![]() | 104 km (65 mi) | 210 km (130 mi) | |||
![]() ![]() | 108 km (67 mi) | 206 km (128 mi) | |||
![]() | 128 km (80 mi) | 186 km (116 mi) | |||
![]() | 135 km (84 mi) | 179 km (111 mi) | TN | ||
![]() ![]() ![]() ![]() | 147 km (91 mi) | 167 km (104 mi) | |||
![]() | 154 km (96 mi) | 160 km (99 mi) | |||
![]() ![]() ![]() | 156 km (97 mi) | 158 km (98 mi) | |||
![]() ![]() ![]() ![]() | 174 km (108 mi) | 140 km (87 mi) | |||
![]() ![]() | 178 km (111 mi) | 136 km (85 mi) | |||
![]() ![]() | 182 km (113 mi) | 132 km (82 mi) | |||
![]() | 185 km (115 mi) | 129 km (80 mi) | |||
![]() ![]() ![]() ![]() ![]() | 193 km (120 mi) | 121 km (75 mi) | |||
![]() ![]() Strada del vino dell'Alto Adige | 212 km (132 mi) | 102 km (63 mi) | BZ | ||
![]() | 218 km (135 mi) | 99 km (62 mi) | |||
![]() ![]() ![]() ![]() ![]() | 229 km (142 mi) | 85 km (53 mi) | |||
![]() | 237 km (147 mi) | 77 km (48 mi) | |||
![]() | — | 69 km (43 mi) | |||
![]() | 250 km (160 mi) | — | |||
![]() ![]() | 261 km (162 mi) | 53 km (33 mi) | |||
![]() ![]() | 266 km (165 mi) | 48 km (30 mi) | |||
![]() | 272 km (169 mi) | 42 km (26 mi) | |||
![]() ![]() ![]() ![]() ![]() ![]() | 276 km (171 mi) | 38 km (24 mi) | |||
![]() | 294 km (183 mi) | 20 km (12 mi) | |||
![]() ![]() ![]() ![]() | 298 km (185 mi) | 16 km (9.9 mi) | |||
![]() | 298 km (185 mi) | 16 km (9.9 mi) | |||
![]() ![]() | 307 km (191 mi) | — | |||
![]() ![]() | — | 6 km (3.7 mi) | |||
![]() ![]() | 309 km (192 mi) | 5 km (3.1 mi) | |||
![]() ![]() | 312 km (194 mi) | 1 km (0.62 mi) | |||
![]() ![]() ![]() | 313 km (194 mi) | 0 km (0 mi) |
In the section between Trento Sud and Rovereto Nord, a pilot project of the so-called "third dynamic lane", which includes the use of the breakdown lane as a normal drive lane when occurring particular situations such as traffic congestions. This is signalled to drivers by determined lightning Variable-message signs along the route as they display green arrows if the breakdown lane is usable as a normal lane, oblique yellow arrows if the third lane is being shut down, and red crosses if the third lane is closed and can be used only in case of emergency. [6] This project includes the use of the dynamic lane technique also in the segment between Bolzano Sud and Verona Nord tollbooths, [7] where it is scheduled to take place the interchange with the third permanent lane (which is going to be built) up to the intersection with motorway A1 in Modena. [8]
By 2016 the work for the realisation of the third motorway lane in the segment between Verona Nord toll booth and the intersection with highway A1 in Modena Nord had begun. In this last section, the interchange will be enlarged enough to satisfy the needs of the constantly rising traffic. Moreover, it will be already prearranged for the future add-on towards Sassuolo (through a beltway). For this extension of the motorway, no land expropriations are planned to be brought. Instead, the already present 11 meters of central reservation between the two carriageways will be used. This intervention also provides for the widening of the hard shoulder of about one meter. Furthermore, it is planned the building of lay-by stopping places every 500 meters. [9] [10]
The project about the elongation of the A22 heading South, from the junction of Campogalliano to Sassuolo, 14 km long and provided with 6 tollbooths, was approved in 2005 by ANAS Governing Body. [11] The beginning of the work, which was subcontracted to the temporary enterprise association Autocs (made up by Autostrada del Brennero spa, Coopsette, Impresa Pizzarotti & C., Cordioli, Edilizia Wipptal, Oberosler, and Consorzio stabile Coseam Italia), is due in May 2018. Works will last four years, for a total amount of 516 million euros.
The executive project provides for the realisation of 25,5 km of road in total, 14 km of which represented by the above-mentioned highway add-on Campogalliano-Sassuolo, 6 km constituting the new Rubiera south bypass (with extra 1,4 km for the joint), and 3,6 km for the joint with Modena ring road. Two viaducts are planned to be built to cross river Secchia (814 m) and to overpass via Emilia and Milano-Bologna railway beam (621 m), and two underground tunnels to shield the natural oasis in Colombarone di Formigine, in addition to 15 underpasses and 12 flyovers for the secondary traffic stream. [12]
Ti.Bre project (Italian acronym for Tyrrhenian-Brenner) includes the lengthening of highway A15 La Spezia-Parma northbound, from Fontevivo (Parma Ovest) to Nogarole Rocca tollbooth on A22, consisting of 85 km in total. [13]
In March 2017, 12 km out of the 85 km planned were under construction, for a total amount of 2.7 billion euros. The link ends in San Quirico di Trecasali (Parma). [14]
In order to solve the traffic problems inside the cities of Trento and Rovereto, it is under consideration of the Autonomous Province of Trento the free use of the highway in the sections between the tollbooths of Trento Nord and Sud, and Rovereto Nord and Sud. In particular, in the city of Rovereto, not being served by its own ring road, often occur long queues and traffic jams, frequently causing delays and accidents. The study provides for the gratuitousness of the segments between the tollbooths just for the citizens who entered and exited at the toll booths at issue. This is preferable due to the elevated construction costs of the potential building of an orbital road around Rovereto, about 200 million euros against about one million euro per year as pledged by the agreement between the Province and A22, and due to the lower environmental and panoramic impact compared to the building of a new ring road. [15] [16]
A22 was due to be the first "hydrogen highway" all over Europe. By 2010, the motorway was planned to be served by a hydrogen supply system, based upon the California Hydrogen Net (CaH2Net), realised due to the will of the governor of the State of California Arnold Schwarzenegger. Hydrogen, not present in nature in its free form, must be produced by petroleum or by alternative sources; in line with the severe environmental safeguard adopted in the area of Bolzano, the propellant was due to be produced by renewable sources.
After prolonged hesitations by both the province and A22, led respectively by Luis Durnwalder and Silvano Grisenti, in 2013 the works for the realisation of the hydrogen production plant got underway, despite the fact that yet in 2012 no decisions were made.
In summer 2014, the plant was finished, supplying a new fuel station nearby Bolzano Sud tollbooth, inaugurated at the end of November. [17]
On 3 May 2011 Trento Sud tollbooth was opened, and it allowed to redirect the traffic circulation on the Trento orbital road whenever the motorway is partially or totally shut down. However, with the opening of Trento Sud tollbooth, the Trento Centro one has been closed outbound. [4] [18]
Italy has a well developed transport infrastructure. The Italian rail network is extensive, especially in the north, and it includes a high-speed rail network that joins the major cities of Italy from Naples through northern cities such as Milan and Turin. The Florence–Rome high-speed railway was the first high-speed line opened in Europe when more than half of it opened in 1977. Italy has 2,507 people and 12.46 km2 per kilometer of rail track, giving Italy the world's 13th largest rail network. The Italian rail network is operated by state-owned Ferrovie dello Stato, while the rail tracks and infrastructure are managed by Rete Ferroviaria Italiana.
The Brenner Pass is a mountain pass over the Alps which forms the border between Italy and Austria. It is one of the principal passes of the Eastern Alpine range and has the lowest altitude among Alpine passes of the area.
Brixen is a town and commune in South Tyrol, northern Italy, located about 40 kilometres (25 mi) north of Bolzano.
Bologna Centrale is the main railway station in Bologna, Italy. The station is situated at the northern edge of the city centre. It is located at the southern end of the Milan-Bologna high-speed line, which opened on 13 December 2008, and the northern end of three lines between Bologna and Florence: the original Bologna-Florence line through Porretta Terme and Pistoia; the Bologna–Florence Direttissima via Prato, which opened on 22 April 1934 and the Bologna-Florence high-speed line, which opened to traffic on 13 December 2009.
The autostrade are roads forming the Italian national system of motorways. The total length of the system is about 7,016 kilometres (4,360 mi), as of 30 July 2022. There are also 13 motorway spur routes, which extend for 355 kilometres (221 mi).
European route E45 connects Norway and Italy, through Finland, Sweden, Denmark, Germany and Austria. With a length of about 5,190 kilometres (3,225 mi), it is the longest north–south European route.
San Michele all'Adige is a comune (municipality) in Trentino in the northern Italian region Trentino-Alto Adige/Südtirol, located about 15 kilometres (9 mi) north of Trento.
The Brenner Autobahn refers to a major European truck route that connects Innsbruck in Austria to Verona in northern Italy.
Innsbruck Hauptbahnhof is the main railway station in Innsbruck, the capital city of the Austrian federal state of Tyrol. Opened in 1853, the station is a major hub for western and central Austria. In 2019, it was the 8th-busiest station in the country, and the 2nd-busiest outside of Vienna after only Linz Hauptbahnhof, with 315 train movements and 38,500 passengers daily.
The Autostrada A15 or Autostrada della Cisa is an autostrada 108.5 kilometres (67.4 mi) long in Italy located in the regions of Emilia-Romagna, Tuscany and Liguria connecting Parma and La Spezia through the valleys of the Taro and Magra rivers. It is a part of the E33 European route.
Verona Porta Nuova is the main railway station of Verona, Italy. It is one of the two stations serving central Verona; the other station, Verona Porta Vescovo, is located at the east of the city.
The Brenner Railway is a major line connecting the Austrian and Italian railways from Innsbruck to Verona, climbing up the Wipptal, passing over the Brenner Pass, descending down the Eisacktal to Bolzano/Bozen, then further down the Adige Valley to Rovereto/Rofreit, and along the section of the Adige Valley, called in Italian the "Vallagarina", to Verona. This railway line is part of the Line 1 of Trans-European Transport Networks (TEN-T). It is considered a "fundamental" line by the state railways Ferrovie dello Stato (FS).
Bolzano/Bozen railway station is the main station of Bolzano, capital of the autonomous province of South Tyrol, in northeastern Italy.
Trento railway station is the main station of Trento, capital of the autonomous province of Trentino, in northeastern Italy.
Rovereto railway station serves the Comune of Rovereto in the autonomous province of Trentino, northeastern Italy.
Brenner railway station is the border station of Italy and Austria. It serves the town and comune of Brenner in the autonomous province of South Tyrol, northeastern Italy.
Tyrol is a historical region in the Alps of Northern Italy and western Austria. The area was historically the core of the County of Tyrol, part of the Holy Roman Empire, Austrian Empire and Austria-Hungary, from its formation in the 12th century until 1919. In 1919, following World War I and the dissolution of Austria-Hungary, it was divided into two modern administrative parts through the Treaty of Saint-Germain-en-Laye:
Autostrada del Brennero S.p.A. is the operator of the Italian A22 motorway.
Mirandola railway station is a railway stop along the Verona-Bologna railway serving the city of Mirandola, in the province of Modena, in Emilia-Romagna, Italy. The station serves also the municipalities of Medolla, Cavezzo, San Possidonio, and Finale Emilia. Located in the village of Cividale, about 3 km from the town centre of Mirandola, th station is connected by a SETA shuttle bus.