Joint Light Tactical Vehicle

Last updated

Joint Light Tactical Vehicle
JLTV-DEC14-4999.jpg
A production standard JLTV, the Oshkosh L-ATV, in USMC M1280 General Purpose (GP) configuration, fitted with deep fording kit, and tire chains
TypeLight tactical vehicle
Place of origin United States
Production history
Designer Oshkosh Corporation
Designed2005–2015
ManufacturerOshkosh Defense
Unit costUS$344,000 in 2017, Average Procurement Unit Cost (APUC) in FY 2015 $ [1]
Produced2016 (Low Rate Initial Production, LRIP); full rate production approved June 2019. [2]
No. builtover 18,500 [3]
VariantsM1278, M1279, M1280, M1281, plus a companion trailer, JLTV-T
Specifications
Mass11.32 short tons (10.27 t) GVW
Length20 ft 4 in (6.2 m)
Width8 ft 2 in (2.5 m)
Height8 ft 6 in (2.6 m)
Crew1 + 3 in individual seats + optional gunner (I + 1; M1279 Utility)

Armor Classified (A-kit/B-kit configuration)
Main
armament
Various light and medium caliber weapons, plus AGLs or ATGWs as required
Engine Gale Banks Engineering 866T, 6.6-liter diesel (based on GM Duramax architecture) [4]
Transmission Allison 2500SP six-speed automatic
SuspensionOshkosh TAK-4i independent suspension
Operational
range
300 miles
Maximum speed Forward: 70 mph (110 km/h)
Reverse: 8 mph (13 km/h)
Steering
system
Power-assisted, front axle

The Joint Light Tactical Vehicle (JLTV) is a U.S. Army, U.S. Marine Corps and Special Operations Command program to partially replace the Humvee fleet [5] with a family of more survivable vehicles having a greater payload. Early studies for the JLTV program were approved in 2006. The JLTV program incorporates lessons learned from the earlier Future Tactical Truck Systems program and other associated efforts. [6]

Contents

The JLTV program has evolved considerably throughout various development phases and milestones including required numbers and pricing. Variants are capable of performing armament carrier, utility, command and control (shelter), ambulance, reconnaissance and a variety of other tactical and logistic support roles. JLTV follows the U.S. Army's Long Term Armor Strategy with kits for two levels of armor protection. Oshkosh's L-ATV was selected as the winner of the JLTV program in August 2015 and awarded an initial production contract for up to 16,901 JLTVs. The U.S. Army approved the JLTV for full-rate production in June 2019.

Development

The High Mobility Multipurpose Wheeled Vehicle (HMMWV), which first entered service in 1985, was developed during the Cold War when improvised explosive devices (IEDs) and asymmetric warfare were not a major factor for military planners. The HMMWVs demonstrated vulnerability to IEDs, and the difficulties and costs experienced in satisfactorily up-armoring HMMWVs led to the development of a family of more survivable vehicles with greater payload and mobility. JLTV was originally reported as a one-for-one HMMWV replacement; however, U.S. Department of Defense (DoD) officials now emphasize that JLTVs are not intended to replace all HMMWVs. [7]

The JLTV publicly emerged in 2006. Early government documents note: "In response to an operational need and an aging fleet of light tactical wheeled vehicles, the joint services have developed a requirement for a new tactical wheeled vehicle platform that will provide increased force protection, survivability, and improved capacity over the current [Up-armored Humvee] while balancing mobility and transportability requirements with total ownership costs." The joint service nature of the effort was assured through Congressional language in the Fiscal Year 2006 (FY06) Authorization Act, which mandated that any future tactical wheeled vehicle program would be a joint program. [6]

The Joint Chief of Staff's Joint Requirements Oversight Council approved the JLTV program in November 2006; this began a 13-month Concept Refinement phase which is a pre-systems acquisition process designed to further develop the initial concepts resident in the Initial Capabilities Document. The Concept Refinement phase also includes an Analysis of Alternatives. At the conclusion of the Concept Refinement phase in December 2007, the Joint Program Office JLTV project manager intended to transition the program directly into the engineering, manufacturing, and development phase. [6]

As the milestone approached, it became clear that the Under Secretary of Defense for Acquisition and Sustainment John Young would not support the JLTV program entering into the acquisition process at that time. He denied the request and instructed the Army and the Marine Corps to develop a more vigorous Technology Development (TD) phase. [6]

The DoD released a request for proposal (RFP) for the TD phase of the JLTV program on 5 February 2008. Industry proposals were due 7 April. TD phase contract award was postponed in July 2008. [6] The following companies and partnerships responded to the TD phase RFP:

A BAE Systems Valanx JLTV in 2012. BAE's Valanx did not progress to the EMD phase. BAE JLTV.jpg
A BAE Systems Valanx JLTV in 2012. BAE's Valanx did not progress to the EMD phase.
A General Tactical Vehicles JLTV during field trials in 2010. This design did not progress to the EMD phase. GTV JLTV.jpg
A General Tactical Vehicles JLTV during field trials in 2010. This design did not progress to the EMD phase.
Lockheed Martin JLTV variants in 2012. Lockheed Martin's vehicle progressed to the EMD phase and was selected to progress to the prototype stage. Lockheed JLTV.jpg
Lockheed Martin JLTV variants in 2012. Lockheed Martin's vehicle progressed to the EMD phase and was selected to progress to the prototype stage.
A AM General BRV-O JLTV on static display. The BRV-O progressed to the EMD phase and was selected to progress to the prototype stage. AM General BRV-O.jpg
A AM General BRV-O JLTV on static display. The BRV-O progressed to the EMD phase and was selected to progress to the prototype stage.

In October 2008, the Pentagon narrowed the field of vendors to Lockheed Martin, General Tactical Vehicles and BAE Systems/Navistar. Each team was awarded contracts worth between $35.9 million and $45 million to begin the next phase of the program, which at the time was stated to be worth $20 billion or more. [17] The Northrop Grumman/Oshkosh group contested the awards, but their protest was denied by the Government Accountability Office. [18]

In June 2010, it was confirmed that all three contractors had delivered seven JLTV platforms for TD phase evaluation. The U.S. Army appeared to have reduced its support for the program at this time, omitting JLTV numbers from its tactical vehicle strategy published in June 2010. [19] [20] However, the U.S. Army clarified that JLTVs are slated to both replace and complement the Humvee. [20] [21]

JLTV's TD phase was completed in May 2011. In February 2011, the JLTV Program Office announced the award of the follow-on Engineering and Manufacturing Development phase contract would be delayed until January or February 2012 because the Army changed requirements for the JLTV, requiring it to have the same level of under-body protection as the Oshkosh M-ATV. [6] Updated specifications for the program included reducing the payload options to the Combat Tactical Vehicle (CTV) configuration, which would be a 4-seat vehicle with a 3,500 pound payload, and the Combat Support Vehicle (CSV), which would be a 2-seat vehicle with a 5,100-pound payload.

Engineering and Manufacturing Development phase

The draft RFP for the Engineering and Manufacturing Development (EMD) phase was released in October 2011. It called for an average unit manufacturing cost between $230,000 and $270,000 across the JLTV family of vehicles. The cost target for the B-kit armor package remains at US$65,000. The EMD phase requirements created some trade space for industry by easing weight and mobility constraints. At this time JLTV was in danger of severe budget cuts and possible cancellation in the wake of spiraling costs, delays, and defense-wide budgetary cutbacks. It was also competing against the HMMWV Modernized Expanded Capacity Vehicle (MECV) program, the draft RFP for which was released in August 2011.

In January 2012 the request for proposals for JLTV's EMD phase was released. Budget priorities for FY13 released on the same day included the termination of the HMMWV MECV program in order to focus vehicle modernization resources on the JLTV. [6] Not all of the TD phase contract award teams remained in place for the EMD phase. By late March 2012, at least six teams had submitted responses to the EMD phase RFP, [22] and following EMD phase contract awards in August 2012, in September Hardwire LLC disclosed itself as a previously unknown seventh bidder. The bidders were:

On 23 August 2012, the Army and Marine Corps selected the Lockheed Martin JLTV, the Oshkosh L-ATV, and the AM General BRV-O as the winners of the EMD phase of the competition. The three companies were awarded a contract to build 22 prototype vehicles in 27 months to be judged by the services. [23] Losing bidder Navistar filed a protest with the Government Accountability Office over the evaluation criteria later that month; [24] the company withdrew the protest in September 2012. [25]

On 27 August 2013, the Army and Marine Corps announced that full-scale testing of JLTV prototypes would begin the following week. Each company delivered 22 vehicles and six trailers to Aberdeen Proving Ground, Maryland, and Yuma Proving Ground, Arizona. Previous testing had already put the vehicles through more than 400 ballistic and blast tests on armor testing samples, underbody blast testing, and more than 1,000 miles in shakedown testing. Soldiers from the Army Test and Evaluation Command and personnel from the Defense Department's Office of Test and Evaluation put the vehicles through realistic and rigorous field testing during 14 months of government performance testing. Testing was to be completed by FY 2015, with a production contract to be awarded to a single vendor for nearly 55,000 vehicles. [26] In September 2013, full-pace, full-scope JLTV testing began at Aberdeen Proving Ground, Yuma Proving Ground, and Redstone Arsenal, Alabama. [27]

On 1 October 2013, the Defense Department Inspector General launched a year-long audit of the JLTV program. It was one of about a dozen acquisition programs outlined in the FY 2014 "audit plan". The audit was to determine whether Army and Marine Corps officials were overseeing and managing the program effectively before low-rate production began. A June 2013 report by the Congressional Research Service estimates the program cost at $23 billion, or $400,000 per vehicle; military leaders contend the unit cost at $250,000. [28]

The Army planned to issue a RFP to companies interested in bidding for production contracts in mid-November 2014 and to pick a winner possibly by July 2015. [29] Discrepancies in unit cost have been attributed to different methods for analyzing cost. The Inspector General report concludes program officials "appropriately assessed the affordability" of the effort, and that average unit production cost remains stable at $250,000. [30] All three vehicles completed limited user testing and production readiness reviews by mid-November 2014. [31]

The Army released the final JLTV RFP for low rate initial production (LRIP) and full rate production (FRP) in December 2014, clearing the way for AM General, Lockheed Martin, and Oshkosh Defense to submit their vehicle proposals. The Army gave competitors until 10 February 2015, to refine and submit their bids. The Army, on behalf of itself and the Marines, stated plans to select a winner and issue a single contract award in the late summer of 2015. [32]

The winning contractor would build approximately 17,000 JLTVs for the Army and Marine Corps during three years of LRIP, followed by five years of FRP. The first Army unit would be equipped with JLTVs in FY2018, and the Army's complete acquisition of 49,099 JLTVs would be completed in 2040, with 2,200 JLTVs delivered each year between 2020 and 2036. The Marine Corps would begin acquiring their 5,500 JLTVs at the beginning of production and would be completed by FY 2022. [32]

FY 2015 budget requests included 176 JLTV for the Army and 7 JLTV for the Marine Corps in various configurations. The total procurement cost of the JLTV program was quoted as US$30.04 billion and US$0.98 billion in research and development funds, giving a total estimated program cost of US$31.03 billion (figures are aggregated annual funds spent over the life of the program with no price/inflation adjustment).

Contract award

Oshkosh was selected for production in August 2015. [33] The award included a base contract and eight option years covering two years of LRIP (revised from three) and five years of FRP. The initial contract award was valued at US$114 million, with LRIP slated to begin in the first quarter of FY 2016, and with Oshkosh commencing delivery of vehicles approximately 10 months after contract award. The JLTV contract award had a value of up to US$6.749 billion and called for a maximum of 16,901 JLTVs and includes a sustainment element. JLTV manufacturing is performed in Oshkosh, Wisconsin. Around contract award, Oshkosh CEO Charles Szews said the production contract award would involve more than 300 suppliers in 31 states across the country. [1]

On 8 September 2015, it was reported that Lockheed Martin would protest the award; on the same day it was also disclosed that AM General had decided not to file a protest. Any work that would be performed under the contract stopped during the review period. [34] In December 2015 the Government Accountability Office (GAO) dismissed Lockheed Martin's protest because the company in December 2015 decided to file a "Notice of Post-Award Bid Protest" with the U.S. Court of Federal Claims; according to a source with knowledge of the procedures, it is uncommon for a company to file with the court close to a GAO protest decision. [35] [36]

Immediately after the GAO dismissed the protest, the Army instructed Oshkosh to resume work on the JLTV order. [37] Lockheed Martin filed a preliminary injunction in December, stating that new Army-supplied information related to the contract emerged toward the end of the GAO's protest process that was not considered before their ruling and no deadline extension was granted. [38] The U.S. Court of Federal Claims denied Lockheed Martin's request to stop work while the lawsuit was pending, allowing Oshkosh to continue work during the process. [39] The company withdrew its protest in the Court of Federal Claims in February 2016. [40]

Around the time Lockheed Martin withdrew its protest some potentially crucial data from JLTV testing was revealed. The 472–page annual report from the Pentagon's independent Director of Operational Test and Evaluation revealed that in testing Oshkosh's JLTV prototype lasted nearly six times longer between significant breakdowns than the next closest, Lockheed Martin's prototype. The Oshkosh vehicle achieved 7,051 mean miles between operational mission failure (MMBOMF); Lockheed Martin's vehicle achieved 1,271 MMBOMF. AM General's vehicle achieved just 526 MMBOMF. The target for JLTV is 2400 MMBOMF, the current up-armored HMMWV achieving 2,968 MMBOMF. [41] [42]

Information on protection levels was also released. In testing, both Oshkosh and Lockheed prototypes met all threshold force protection requirements and some objective-level requirements. This level of protection is better than that of up-armored HMMWVs, and similar to MRAP (Mine Resistant Ambush Protected) All-Terrain Vehicles without the underbody improvement kit across all spectrum of tested threats. AM General's prototype would need a significant redesign to meet threshold protection requirements. [43]

The Pentagon FY2017 requested budget included US$587.5 million to procure 1,828 JLTVs for the Army and US$113.2 million to procure 192 for the Marines. About US$34.7 million was requested for research and development between the Army and Marines' JLTV programs. [44] Procurement objectives at this time remained 49,099 JLTV for the Army and 5,500 for the Marines. [45]

The final request for proposal (RFP) for a competitive rebuy for the JLTV was issued in February 2022. [1] In February 2023, AM General won a competition to manufacture the JLTV. [46]

Production and deliveries

The first delivery order for JLTV was announced in March 2016 with the U.S. Army ordering 657 JLTVs, along with kits and support. The $243 million order included vehicles for the Army and Marines. According to Oshkosh, "The vehicles, trailers, and installed kits for this order will be delivered by first quarter FY2018." [47] [48] As part of the original JLTV base award in August 2015, an initial 201 JLTVs for the test and evaluation phase were ordered. The 657-vehicle order is an exercised option from the program's eight option years. [49] Initial USMC operating capability was stated to be delayed by about one year to the first quarter of FY2020, with procurement by the Marines complete by FY2022. [50]

In March 2016, the Pentagon announced that the total program costs had dropped 19.32%, from $30.574 billion to $24.668 billion "due primarily to revised estimates for unit costs of vehicles and kits based on realized savings", which accounted for a $3.7 billion decrease. A stretched out procurement "due to budget adjustments and revised assumptions regarding the maximum buy profile year" decreased costs by $1.28 billion, and several other changes – such as for cost estimation methodologies and indices – accounted for another $921 million decrease. [51] The total cost estimates include "research and development, procurement, military construction, and acquisition-related operations and maintenance" associated with a program, the Pentagon said. These reflect actual costs so far and anticipated costs in the future, with all estimates in fully inflated then-year dollars. [51] Scott Davis, program executive officer for Combat Support & Combat Service Support, stated that overall the JLTV program expects to cut about five years off of the total program and save about US$5.9 billion, as Oshkosh's final competitive bid was low enough so the Army decided to 'buy to budget' and get more platforms each year, which shrunk the total length of the contract and increased cost avoidances accrued each year. [52]

The U.S. Army disclosed that the JLTV was to be used as the platform for the upcoming Light Reconnaissance Vehicle (LRV) program rather than procuring a new system. The LRV is to be an off-road platform for carrying a suite of intelligence, surveillance, and reconnaissance sensors; it is to be light enough to be carried by a CH-47 Chinook helicopter. The JLTV was described as an "interim LRV solution". [53] It was also reported that the JLTV - Reconnaissance Vehicle (JLTV-RV) was to be incorporated into the JLTV technical data package and would be a kit option on future contracts. [54] By Q4 2020 the LRV requirement had evolved to such an extent that it excluded the JLTV, requiring a six-person crew. [1]

The Army received its first seven JLTVs for test at the end of September 2016. According to the Army, its first unit to receive JLTVs was to be an Infantry Brigade Combat Team in the 10th Mountain Division at Fort Drum, New York. The bulk of their 500 HMMWVs were to be replaced by early 2019. According to the Marine Corps, an infantry battalion within II MEF at Camp Lejeune, North Carolina, were to receive 69 JLTVs to replace the same number of Humvees in July 2019. The Marine Corps revealed they wished to adjust their acquisition objective for JLTV by 65% to up to 9,091 vehicles. At this time overall JLTV requirements remained at 5,500 for the USMC and 49,099 for the army. [55]

In January 2017, the U.S. Air Force announced it was considering acquiring JLTVs for its security forces that protect missile launch facilities. [56] The vehicles are used by security forces, explosive ordnance disposal teams, para-rescue and personnel recovery units, tactical air control party teams, and special tactics forces. At this time, released documents revealed no further planned JLTV procurement for the period FY 2019–22, but the service was known to want to replace its entire fleet of 3,270 HMMWVs with JLTVs. [57] In its 2018 budget the Pentagon requested $1.143 billion for the program. The DoD requested 2,110 JLTVs for the Army, 140 for the Air Force, and 527 for the Marines. [58]

At AUSA 2016, Oshkosh displayed a JLTV General Purpose variant equipped with an EOS R-400S-MK2 remote weapon system integrated with Orbital ATK's M230 LF 30 mm lightweight automatic chain gun. [59] At AUSA 2017 JLTVs were displayed in three new configurations. Oshkosh displayed a general purpose variant fitted with a Boeing compact laser weapon system, a Kongsberg Protector LW 30 remote weapon system with a M230LF cannon, and a communications suite that includes a Thales VRC-111 and Thales VRC-121 VIPER. The company also displayed a utility variant equipped with the Boeing Maneuver short range air defense launcher including a M3P .50 cal machine gun, M299 launcher with four Longbow Hellfire missiles, sensor suite, and a communications suite including a Thales VRC-111. Rafael displayed a general purpose vehicle fitted with the company's Samson dual stabilized remote weapon system with M230 LF, and the Trophy Light active protection system. [60]

Following an announcement in December 2018 that a total of 500 JLTVs would be delivered by the end of March 2019, JLTV deliveries to the Army commenced the week of 7 January 2019. The first unit to receive JLTVs was the 1st Armored Brigade Combat Team, 3rd Infantry Division at Fort Stewart. To coincide with the first fielding Oshkosh confirmed that over 3,000 JLTVs had been delivered to the Army and Marine Corps. [61] In January 2019, the Army Reserve announced it was set to acquire 60 JLTVs for training in preparation for fielding to the entire force. No date for actual fielding was given. [62] In June 2019, Dr. Bruce Jette, Assistant Secretary of the Army for Acquisition, Logistics and Technology, approved the JLTV program's transition into full-rate production (FRP). [63]

In July 2019 an initial Sources Sought notice was issued for the A2 JLTV recompete program. Four draft requests for proposals (RFPs) followed, these in April 2020, December 2020, April 2021, and October 2021. [1]

The Marine Corps declared initial operational capability for the JLTV in August 2019, ahead of the scheduled June 2020 date. [64] The Marines had previously announced in January 2019 that its first JLTV had fielded that day at the School of Infantry West at Camp Pendleton, California, with around 1,000 further JLTVs scheduled to be fielded during FY2020. [65]

For FY2020 (1 October 2019 - 30 September 2020) the Pentagon's JLTV funding request totaled US$1.641 billion to procure 2,530 vehicles for the Army, 1,398 for the Marine Corps (with 3,986 more between FY2021 and FY2024), 140 for the Air Force, and 22 for the Navy. Other FY2020 budget activities included $4.8 million for engineering and manufacturing development. In March 2019, it was reported that Army's FY2020 budget request included proposed cuts to pay for modernization priorities, with one of those proposed cuts being the JLTV. It was reported that over the coming five years the service would spend US$800 million less on the JLTV program than initially expected; this potentially resulting in the purchase of 1,900 fewer vehicles. As of May 2019, the service had not changed its approved acquisition objective of 49,099 JLTVs. [62]

In July 2020, Oshkosh stated that over 7,500 JLTVs had been delivered to the U.S. Army, U.S. Marine Corps, U.S. Air Force, and U.S. Navy since the production contract was awarded in 2015. [66] This order brought the total of JLTVs ordered for US forces to date to 15,052.

In September 2020 a justification and approval (J&A) for up to an additional 6,262 JLTVs sole source from Oshkosh was granted, the original notice published in June 2020. This award will enable continued JLTV production, industry arguing successfully that it required up to 33 months with the JLTV TDP package to be able to respond to the A2 JLTV RfP. The up to 6,262 JLTVs approved will technically be delivered under a separate second JLTV contract, but the original contract costings and timelines and remain. Final orders must be placed in November 2023, with deliveries permitted until late 2025, but expected to conclude mid-2025. Permissible total orders under the original JLTV award were 16,901 JLTVs. [1]

When the U.S. Army unveiled its fiscal year 2021 (FY 2021) budget request in February 2020, supporting budget documents detailed plans for the "competitive follow on contract [JLTV] award" in FY 2022. It was disclosed that the service wants to reduce its JLTV buy by US$201.6 million over the coming years, but retaining a 40,099 procurement objective. Two years of JLTV production cuts, in FY 2020 and FY 2021, will now extend the full operational capability timeline out by three years until FY 2042. In June 2020, Oshkosh announced the company had been awarded a $61.8M contract modification to increase available trailer options under the current JLTV Family of Vehicles contract from 32 to 3,541. The JLTV-T (JLTV - Trailer) was designed as an integral part of the JLTV Family of Vehicles. [67]

In February 2021 Oshkosh announced the company had produced its 10,000th JLTV, and had received orders for 18,126 JLTVs in contracts totaling more than USD6 billion. The first National Guard fielding of JLTV was the 19th SF in 3QFY21.

In January 2022 a presolicitation notice was issued for the Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV) Follow-On, the A2 contract. The anticipated solicitation release date was 4 February 2022 with an anticipated proposal due date of 12 April 2022. The actual release date was 09 Feb. The planned period of performance for this contract is from September 2022 through September 2032. The awarded contract will be a single award, five-year requirements type contract, with five one-year options on a Cost-Plus Fixed-Fee and Firm-Fixed Price basis. The projected contract value is $7.3 billion with original contract award pricing retained (plus inflation), and the award is expected to call for a maximum of 15,425 A2 JLTV and 6,000 JLTV Trailers, with deliveries to commence 18 months after the contract award. In addition to Oshkosh, respondents to the RfP are expected to include AM General, GM Defense, and Navistar. [1]

As of April 2022, 15 JLTV delivery orders had been placed, the most recent of these in November 2021 and valued at $591 million. The order includes 1,669 vehicles and 868 trailers, the vehicle total including 125 JLTVs for Brazil, Lithuania, Montenegro, and Slovenia. Deliveries are expected to be completed by September 2023. This latest order brings the total number of JLTVs ordered to date to 19,727.

In summary, known JLTV delivery orders for U.S. armed forces to date have been:

All orders include unspecified quantities of training, support, kits and/or trailers.

Other operators

Outside of the United States, a number of other countries have shown an interest in or have ordered the JLTV. These include Belgium, Brazil, Lithuania, North Macedonia, Montenegro, Romania and Slovenia. All have ordered via FMS with the exception of Belgium which is a direct sale. Portugal and the United Kingdom have expressed an interest in acquiring the JLTV. Australia joined the TD phase of JLTV but ultimately opted to procure the locally produced Thales Hawkei. India expressed interest in joining the JLTV program, but did not join. [2]

Technical description

Given the competitive nature of the JLTV competition and recompete, only limited technical detail has been released by either the U.S. Army or Oshkosh. Only basic outline dimensions and limited operating weight and automotive data is available. [62] The JLTV is based around Oshkosh's TAK-4i (i=intelligent) independent suspension system. Around 26,000 military vehicles are fitted with an earlier version of the system, [68] including the Oshkosh Medium Tactical Vehicle Replacement (MTVR), Oshkosh Logistic Vehicle System Replacement (LVSR), and (Oshkosh MRAP All-Terrain Vehicle (M-ATV); the TAK-4 system has been retro-fitted to the Force Protection Inc Cougar and BAE Systems RG-33 MRAPs. [69]

The majority of systems supplied to date have been coil-sprung. The TAK-4i version fitted to the JLTV remains undisclosed, but is not coil-sprung and is of the variable adjustable ride-height type with up to 20 inches (51 cm) of wheel travel, 25% more than the current standard. [70] [71] The JLTVs suspension aided egress system capability levels side to side and front to rear on slopes or grades when selected by the operator. The front and rear suspension height can also be independently controlled for ship and transportability. The suspension system has ride height control at all four wheels. [62]

Motive power is provided by a digitally-controlled Gale Banks Engineering 866T V-8 diesel, this based on the architecture of the General Motors Duramax LML. [4] Power output is 340 hp. Production of the Duramax LML engine concluded in 2017, the unit replaced by the Duramax L5P. JLTV A1 models that were introduced in 2017 are powered by a derivation of this engine. The A2 JLTV will be powered by the next generation of the Duramax engine, production of the current Duramax MY2020 L5P scheduled to conclude Q3FY22. An Allison 2500SP six-speed fully automatic transmission is fitted to all JLTVs [62]

The JLTV has been designed to comply with the U.S. Army's Long Term Armor Strategy (LTAS). The LTAS system follows an A-kit/B-kit principle, with vehicles designed "fitted for, but not with" protection. Protection kits can be installed and uninstalled from vehicles in the field using basic tools. The A-kit is fitted on the production line and is a combination of a limited amount of armoring, in difficult-to-access areas of the vehicle, together with a significant amount of armor installation attachments and required support structures. The bulk of the armor, the B-kit, is installed in the field on an as-required basis. [6]

Two soldiers can install B-kit armor in five hours. An 800-pound RPG protection kit can be installed in two hours at field-level maintenance and completed by the crew within 30 minutes. [72] The JLTV offers protection levels greater than those of up-armored HMMWVs and comparable to those of original MRAP class designs, but in an overall vehicle package that is considerably smaller and lighter than vehicles procured under the U.S. Marines MRAP procurement. [73]

The benefits of the A-kit/B-kit principle are that armor is only fitted when required, reducing vehicle wear and tear and, by default, whole lifecycle costs. Improvements and/or upgrades to armor are also far easier to integrate into an appliqué solution. No quantity for JLTV armoring kits has yet been disclosed, but it is anticipated that the estimated $65,000 kits will be procured on a one-kit to three-vehicle basis. [6] The overall protection will include a spall liner to minimize perforation effects within a vehicle when the vehicle takes hostile fire. [74] [75]

The JLTV has an automatic fire-extinguishing system to protect the crew cabin. [72] Fuel tanks are mounted externally and shielded by the JLTV structure. Each crew seat has a combined seat and blast restraint device. Ingress time for a crew of four in combat equipment is 30 seconds or less. Egress with B-kit doors is within 10 seconds. [72] The only weight-related data officially released includes a gross vehicle weight of 10,266 lb. Payload for the two-door variant is quoted as 2,318 kg, payload for the four-door variant is quoted as 1,590 kg. The USMC required a vehicle that can be transported by their current and planned systems. In April 2009, Marine Corps Commandant James Conway warned that the Marine Corps "will not buy a vehicle that's 20,000 lb." [76]

Requirements called for the cabin heater to raise the crew compartment temperature from −40 °F (−40 °C) to 65 °F (18 °C) in one hour. The air-conditioner should drop the temperature from 120 °F (49 °C) to 90 °F (32 °C) within forty minutes. [72] The JLTV was to be equipped with a diagnostic monitoring system that will electronically alert the operator of equipment failures so that they can be fixed. The electronic monitoring will observe the fuel, air intake, engine, cooling, transmission, energy storage, power generation and vehicle speed as well as other systems. [74]

Mobility

The Pentagon required at least 600 mean miles before an essential function failure. [72] The vehicle was to be capable of traveling for 3 miles (5 km) cross-country having endured three 0.3-inch (7.6 mm) perforations of half-full main fuel tanks. [62] [74] The JLTV must operate in altitudes from minus 500 feet to 12,000 feet and maintain full mission capability in temperatures from −40 to 125 °F (−40 to 52 °C), according to established requirements. When temperatures drop well below zero, the JLTV must start within one minute with no external aids, kits or prior warming of the batteries. The vehicle must be capable of traveling paved 350 miles (560 km) at 35 miles per hour (56 km/h) or 300 miles (480 km) in operational terrain on a single tank of JP-8 fuel. Acceleration from 0 to 30 miles per hour (0 to 48 km/h) in 9.7 seconds on dry, level, hard terrain was required as a threshold requirement (objective being 7 seconds), as was the ability to ford 60 inches (150 cm) of saltwater without a fording kit, in forward and reverse, while maintaining contact with the ground. [72] [62]

Other tactically driven mobility requirements include a threshold 27-foot turning radius and the ability to climb 24-inch vertical obstacles in forward and reverse. The JLTV must be able to drive off an 18-inch vertical step at 15 mph and sustain no mechanical damage. It will be capable of traversing a 20-degree V-ditch that is 25 feet wide at an approach angle of 45-degree. It can 'jump' a 6-inch parallel curb at 15 mph and traverse a 20-foot flight of stairs at 5 mph. It must climb a 60 percent dry, hard-surfaced gradient and traverse a 40 percent sideslope with no degradation in driver control. [72] [62]

The JLTV is transportable by sea, rail, and air. The JLTV is transportable on all classes of ocean-going transport ships with minimal disassembly. It was required to be rail-transportable on U.S. and NATO country railways. Air transportability will be by fixed-wing aircraft as large or larger than the Lockheed C-130 Hercules and sling-loadable with rotary-wing aircraft such as the CH-47/MH-47 Chinook and Sikorsky CH-53 Sea Stallion. The proposed ambulance variant was to be air-droppable by Lockheed C-5 Galaxy and Boeing C-17 Globemaster III fixed-wing aircraft. [77] The JLTV can be prepared in 30 minutes for transport by aircraft, Maritime Prepositioning Force ships or rail. This is aided by an adjustable-height suspension. [72] [62]

Versions

Early JLTV configurations JLTV Config1.jpg
Early JLTV configurations

The JLTV family and its nomenclature evolved throughout the development process and to date the U.S. Army has allocated M designations to four individual JLTV configurations. [78] In JLTV's Initial Capability Document, there were four payload options. This later reduced to three, Payload Categories A, B, and C. By the time Capability Development Document version 3.3 was published at the conclusion of JLTV's Technology Development (TD) phase, payload options had been reduced to two and payload verbiage had been dropped, replaced by reference to variants. From that point on, two stated variants were required, the Combat Tactical Vehicle (CTV) and Combat Support Vehicle (CSV). [79]

JLTV variants including companion trailer as of October 2017 JLTV 2.jpg
JLTV variants including companion trailer as of October 2017

The CTV configuration replaced the previous Category A and Category B configurations and was a 4-seat vehicle with a 3,500-pound payload. The CSV replaced the previous Category C configuration and was a 2-seat vehicle with a 5,100-pound payload. The JLTV family now consists of three base vehicle platforms, Utility (JLTV-UTL), Close Combat Weapons Carrier (JLTV-CCWC) and General Purpose (JLTV-GP). The Utility base vehicle platform has two doors. The General Purpose and Close Combat Weapons Carrier base vehicle platforms have four doors. Standard U.S. military M-designators are applied base vehicle platforms when outfitted to a specific Mission Package Configuration. These currently are:

There is a companion trailer (JLTV-T), which is towable by all JLTV variants. [78]

L-ATV specific versions

Oshkosh showcased for the first time the L-ATV Ambulance at the Association of the United States Army (AUSA) Global Force Symposium in Huntsville, Alabama, in March 2019. The L-ATV Ambulance is based on the utility configuration base platform and the rear can hold 4 litters or up to 8 seated patients or a combination of the two. At present the L-ATV Ambulance is not a JLTV variant, but according to the company the design will be marketed to the U.S. Army and Marines. [80]

Hybrid electric JLTV

In January 2022 Oshkosh unveiled a hybrid-electric Joint Light Tactical Vehicle (eJLTV) technology demonstrator that uses a ‘commercially available' lithium-ion battery. It takes the diesel engine of the JLTV about 30 minutes to charge the lithium-ion battery, and then the eJLTV can operate off of battery power for approximately the same amount of time. It can export up to 115 kW of power. The hybrid electric configuration adds more than 453 kg to the vehicle's curb weight.

JLTV-T (T - Trailer)

From June 2019 a dedicated trailer (JLTV-T) is being procured for the JLTV, as in-service trailers were unable to safely match the performance and mobility of the JLTV. A dedicated companion trailer for the JLTV (the JLTV – Trailer (JLTV-T)) formed part of the requirement from its early stages, and the production contract awarded to Oshkosh included the option for trailer production. The decision was taken to leverage the investment made in the HMMWV’s Light Tactical Trailer (LTT) and not to resource procurement of the JLTV-T.

As a result of this, initial quantities were limited to test examples only. Operational testing demonstrated that the LTT was not compatible with a JLTV operating at mission profile speeds, so the JLTV was limited to the safe towing speed of the LTT to limit equipment damage. In June 2020 Oshkosh announced that the company had been awarded a contract modification to increase available trailer options from 32 to 3,541. As part of a November 2020 JLTV award 1,001 trailers were ordered. First fielding of the JLTV-Trailer is scheduled for March 2022, and until then the JLTV is used with the LTT, but at a reduced mission profile.

The JLTV-T is based on a bolted channel section chassis and features independent trailing arm and air suspension. Wheels and tires are shared with the JLTV. The cargo deck features removable sidewalls and tailgate, an onboard stowage box included for these when the trailer is used as a flatbed. ISO locks are provided on the loadbed for any required shelter of similar interface.

Operators

Current operators

Oshkosh Falcon of the Belgian Army Oshkosh Falcon, BAS 24, Brussels (P1170434-RR).jpg
Oshkosh Falcon of the Belgian Army
Flag of Belgium (civil).svg  Belgium (322)
The Belgian Army ordered 322 JLTV to replace the Iveco LMV fleet in September 2020 for €135 million. The JLTV was ordered in two variants, 302 "VCL" (Command and Liaison Vehicle) and 20 "Médicale" (medical / ambulance), 135 CLV are to be equipped with a light weapon stations deFNder® from FN Herstal. [81]
The first delivery to the Belgian Army occurred in January 2024. [82] [83]
Flag of Brazil.svg  Brazil (12)
The Brazilian Marine Corps signed a contract for a batch of 12 JLTV in October 2020, to be delivered between 2022 and 2026. [84] [85]
The Brazilian JLTV are equipped with an Objective Gunner Protection Kit and have an Explosively Formed Penetrator (EFP) kit armour suite and a B-kit add-on armour system. [86]
Rumours surfaced in September 2021 regarding a potential purchase of 32 additional JLTV to equip 1st, 2nd, and 3rd Marine Infantry Battalions and 12 for the Special Operations Battalion, but no additional order has yet taken place. [86] The first delivery of 4 JLTV took place in March 2023. [87] [88]
Flag of Lithuania.svg  Lithuania (500)
The Lithuanian Army signed a contract for a batch of 200 JLTV in November 2019. [89] An additional contract for 300 JLTV was signed in October 2022 for a total of 500 vehicles ordered. [90] The delivery of the first contract was split in 4 batches of 50 vehicles. The first delivery took place in August 2021, [91] the second in December 2022, [92] the third in May 2023, [93] and the fourth in December 2023. [94] The delivery of the second contracts is planned for 2024. [95] The variant selected by Lithuania is the M1278A1 with the main equipment being the M153 CROWS v2 remote weapon station. This weapon station is equipped with the M2 QCB50 machine gun and a M230 TacFLIR multisensor systems. [96]
Flag of Montenegro.svg  Montenegro (67)
The Armed Forces of Montenegro ordered 67 JLTV in October 2019 for USD $36.17 million. This order was completed by an order in December 2019 to Elbit for the OCRWS (Overhead Remote Control Weapon Station) weapon station at a cost of USD $35 million. [97]
The variants selected by Montenegro are 55 "M1280 General Purpose" to be fitted with the Elbit weapon station equipped with a 3-barrel GAU-19 machine gun (calibre 12.7×99mm NATO). For the other variants, Montenegro mentions having received 10 "M1278 Heavy Guns Carrier" as of 2024. In 2024, the army announced its interest to equip four of the M1278 variant with a SAMSON 30 (Katlanit) turret. Also, in May 2023, Montenegro signed a contract with Israel for €20 million regarding the supply of Elbit 120 mm Spear Mk2 low recoil mortar systems to be installed on the JLTV (quantity unknown). Those systems are designed to be installed on the M1279 Utility variant, and therefore, with 55 in the M1280 variant and 10 in the M1278 variant, only 2 are possible with the unique order. [98]
Flag of North Macedonia.svg  North Macedonia (~97) [99]
The Army of the Republic of North Macedonia signed a contract in 2020 for 33 JLTV to be delivered in 2022 and 2023. [100] The country has plans for 99 JLTV and options to buy a total of up to 152 JLTV by 2024. [101] [100]
In July 2022, the first 6 JLTV were delivered to the Army, and the rest was delivered by year end of 2022. [102]
Flag of Romania.svg  Romania (129)
The Romanian government made a Foreign Military Sales request for 34 M1278 Heavy Guns Carrier for the Romanian Special Operations Forces. This request valued at USD $43.73 million was approved by the US Congress and in July 2021, it was announced that a contract was made to supply Romania and other nations with the JLTV. [103] A complementary request was made for 95 additional M1278 HGC valued at USD $104 million for the Romanian Army and was approved by the US Congress in March 2023. [104]
Romania received the first 33 JLTVs in November 2023. [105]
Flag of Slovenia.svg  Slovenia (129)
Slovenia Ministry of Defense signed a Letter of Offer and Acceptance (LOA) with the U.S. Government in October 2018 for the purchase of 38 JLTV in the M1278 Heavy Guns Carrier variant. [106] The order to Oshkosh by the US government was announced in February 2020. [107] The delivery of this batch took place at the port of Luka Koper in May 2021. [108] At that time, the minister of defence announced an interest for 99 additional JLTV. Regarding the equipment, all are to be equipped with the Kongsberg M153 CROWS remote weapon station. These are fitted with a M2 machine gun and capable to shoot the Spike LR and Spike LR2 which are in service in the Slovenian Army. [109]
In September 2021, Slovenia Ministry of Defense signed a Letter of Offer and Acceptance (LOA) with the U.S. Government for the purchase of 37 JLTV for an estimated cost was €33 million. [110] The delivery of this batch of 37 JLTV took place in December 2023. [111]
In December 2022, another order for 47 vehicles obtained via Direct Commercial Sale was placed in the same variant, with a delivery planned for 2024. [112] The US will also donate 7 JLTVs as a compensation for the Ukrainian support. [113]
As of January 2024, 75 JLTV were delivered, and 54 additional are to be delivered. The plan is to reach a total fleet of 161 JLTV. [114]
Flag of the United States.svg  United States of America (around 19,150 delivered, around 64,000 planned)
U.S. Army, U.S. Marine Corps and U.S. Air Force – Original contract award in August 2015. Overall requirements have fluctuated, but as of January 2022 were stated by Micheal Sprang, JLTV Project Director to be: Army - 49,099 (this figure has remained relatively constant); Marine Corps - 12,500 (approx.); Air Force - 2,000 (dependent on funding); Navy (approx. 400). The initial JLTV contract award had a potential value of US$6.749 billion and called for a maximum of 16,901 JLTVs. The second sole source to Oshkosh contract allows for 6,262 JLTVs to be ordered by November 2023. The JLTV re-compete award will allow for 15,586 JLTV when awarded. Current U.S. Army and Marines orders are for around 19,150 JLTVs. [115] [116] [1]

Future operators

Flag of Israel.svg  Israel (≥ 99)
In December 2023, Oshkosh announced that the Israel Defense Forces ordered 75 JLTV through the Foreign Military Sale (FMS) mechanism, and dozens additional were purchased via Direct Commercial Sale (DCS). [117]
Flag of Mongolia.svg  Mongolia (unknown quantity)
In November 2023, it is mentioned in official documents that JLTV were ordered by the United States for Foreign Military Sales to the Mongolian Army. No mention of the volume, neither the price of the order is made in the document. [118]
Flag of Slovakia.svg  Slovakia (160)
The Slovak Defence Ministry announced its interest for the acquisition of 180 JLTV in the M1278A1 Heavy Gun Carrier variant in March 2023, using a grant of €200 million from the United States. In May 2023, the US State Department approved the sale of up to 192 vehicles for USD $250 million. [119]
In July 2023, The Slovak Defence Ministry accepted the offer for 160 JLTV for USD $190 million through the FMF grant (Foreign Military Financing). Some of the JLTV are to be equipped with the Kongsberg M153 CROWS remote station, and some with a manned weapon station. The deliveries are due to take place in 2025. [120]

Potential operators

Flag of Greece.svg  Greece (unknown)
The Hellenic Army mentioned the potential purchase of JLTV to be equipped with various equipments as an option:
  • In June 2022, the Hellenic Army General Staff met with representatives from Elbit Systems after showing interest in the acquisition of SPEAR 120mm mortar systems mounted on the JLTV. [121] [122]
  • In April 2023, the Hellenic Army ordered Spike missiles for €370 million. As part of the variants ordered, Greece mentions the Spike NLOS. In its terrestrial use, it would be installed on the Plasan SandCat or the JLTV. [123]
Flag of Poland.svg  Poland (26)
In December 2022 U.S. Congress approved the sale of 26 M1279A1 JLTVs to Poland as part of a package of military sales to Poland. [124] In January 2023, the order of the 116 M1A1 was confirmed, with this confirmation, 12 M88A2, 8 M1110, 6 M577 and 26 M1152A1 workshop Humvee was confirmed with their logistic package, but no mention of the JLTV. [125]
Flag of Portugal.svg  Portugal (230 planned)
Portuguese Army – In April 2020, Portugal announced that it would be seeking to procure the JLTV through the US Foreign Military Sales program. The intention was expressed to Janes by Lieutenant Colonel Ricardo Manuel dos Santos Camilo, head of the capabilities branch of the army general staff's force planning division. In 2019, EUR79 million (US$86 million) was allocated to the revised Portuguese Military Programming Law for the acquisition of JLTVs by 2030 for further army modernisation. The total procurement was under review and it was stated that it could change. If purchased, the JLTV would replace the Land Rover Defender series and the Toyota Land Cruiser HZJ73LV vehicles used by the Portuguese Army. [126] [127] In 2023, it was reported that 230 JLTVs are to be procured. [128]
Flag of the United Kingdom.svg  United Kingdom (up to 2,747)
British Army – In June 2016 it was reported that to meet Package 1 of the Multi Role Vehicle-Protected (MRV-P) requirement, the UK Ministry of Defence (MoD) was in talks with the Pentagon on acquiring the JLTV via the Foreign Military Sales (FMS) route. “We can confirm that we are talking to the US DOD regarding Package 1 [of MRV-P], to inform our understanding of an FMS option for the Joint Light Tactical Vehicle,” said an MoD spokesman. [129] It was stated in January 2017 by Maj. Gen. Robert Talbot Rice, the director of land equipment at the Defence Equipment and Support arm of the Ministry of Defence (MoD), that: "We are working through the Foreign Military Sales process. A letter of request has been sent to our American colleagues, and we expect a response in the next few months." Talbot Rice told an audience of industry executives and military personnel at the International Armoured Vehicles conference in London on 24 January that the Army had opted for the single-source purchase due to its ability to meet UK requirements and its value for money. [130] In July 2017, the DSCA notified the US Congress of a possible sale of 2,747 JLTV vehicles and accessories to the UK. [131] [57] Jane's Defence Weekly reported in September 2019 that approval for the JLTV to enter the demonstration phase was received in April 2019 and that once the demonstration phase was complete in 2021, a new business case would be submitted to the MoD for approval to enter full rate production. The requirement at that time stood at 821 vehicles for the Army and Marines. [132] In June 2022, it was announced that the Package 1 Multi Role Vehicle-Protected (MRV-P) requirement purchase would not move forward; cancellation of the MRV-P Package 1 is not a direct cancellation of the JLTV acquisition, and actually a result of the British Army reviewing its protected mobility needs after the 2021 Integrated Review and associated Command Paper. Delaying any JLTV purchase will also allow the UK to await the outcome of the US Army JLTV recompete process. [133]

Related Research Articles

<span class="mw-page-title-main">Humvee</span> Family of light military vehicles

The High Mobility Multipurpose Wheeled Vehicle is a family of light, four-wheel drive, military trucks and utility vehicles produced by AM General. It has largely supplanted the roles previously performed by the original jeep, and others such as the Vietnam War-era M151 Jeep, the M561 "Gama Goat", their M718A1 and M792 ambulance versions, the Commercial Utility Cargo Vehicle, and other light trucks. Primarily used by the United States military, it is also used by numerous other countries and organizations and even in civilian adaptations. The Humvee saw widespread use in the Gulf War of 1991, where it navigated the desert terrain; this usage helped to inspire civilian Hummer versions. The vehicle's original unarmored design was later seen to be inadequate, and was found to be particularly vulnerable to improvised explosive devices in the Iraq War. The U.S. hastily up-armored select models and replaced front-line units with the MRAP. The U.S. military sought to replace the vehicle in front-line service under the Joint Light Tactical Vehicle (JLTV) program. In 2015 the Oshkosh L-ATV was selected for production.

<span class="mw-page-title-main">Heavy Expanded Mobility Tactical Truck</span> US Army heavy tactical truck, in service since 1982

The Heavy Expanded Mobility Tactical Truck (HEMTT) is an eight-wheel drive, diesel-powered, 10-short-ton (9,100 kg) tactical truck. The M977 HEMTT first entered service in 1982 with the United States Army as a replacement for the M520 Goer, and since that date has remained in production for the U.S. Army and other nations. By Q2 2021, around 35,800 HEMTTs in various configurations had been produced by Oshkosh Defense through new-build contracts and around 14,000 of these had been re-manufactured. Current variants have the A4 suffix.

<span class="mw-page-title-main">Oshkosh Corporation</span> American industrial company

Oshkosh Corporation, formerly Oshkosh Truck, is an American industrial company that designs and builds specialty trucks, military vehicles, truck bodies, airport fire apparatus, and access equipment. The corporation also owns Pierce Manufacturing, a fire apparatus manufacturer in Appleton, Wisconsin, and JLG Industries, a manufacturer of lift equipment, including aerial lifts, boom lifts, scissor lifts, telehandlers and low-level access lifts.

<span class="mw-page-title-main">Medium Tactical Vehicle Replacement</span> Family of 6x6 tactical trucks with 7-ton payload (U.S. tons)

The Medium Tactical Vehicle Replacement (MTVR) is a series of vehicles used by the U.S. Marines. The first MTVRs were delivered in late 1999. The MTVR is the equivalent of the U.S. Army's Family of Medium Tactical Vehicles (FMTV); the Marines do not use the FMTV and the Army does not use the MTVR.

<span class="mw-page-title-main">Family of Medium Tactical Vehicles</span> Series of US military trucks since 1996

The Family of Medium Tactical Vehicles (FMTV) is a series of military vehicles that are based on a common chassis and vary by payload and mission requirements. The FMTV is derived from the Austrian Steyr 12M18 truck, but substantially modified to meet United States Army requirements, these including a minimum 50 percent U.S. content.

<span class="mw-page-title-main">Palletized Load System</span> 10×10 heavy tactical truck

The Palletized Load System (PLS) is a truck-based logistics system that entered service in the United States Army in 1993. It performs long and short distance freight transport, unit resupply, and other missions in the tactical environment to support modernized and highly mobile combat units. It provides rapid movement of combat configured loads of ammunition and all classes of supply, shelters and intermodal containers. It is similar to systems such as the British Demountable Rack Offload and Pickup System (DROPS).

<span class="mw-page-title-main">MRAP</span> Armoured vehicle designed to survive IED explosion

Mine-Resistant Ambush Protected is a term for United States military light tactical vehicles produced as part of the MRAP program that are designed specifically to withstand improvised explosive device (IED) attacks and ambushes. The United States Department of Defense MRAP program began in 2007 as a response to the increased threat of IEDs during the Iraq War. From 2007 until 2012, the MRAP program deployed more than 12,000 vehicles in the Iraq War and War in Afghanistan.

Plasan is an Israeli-based company that now specializes in survivability solutions for all domains, the design, development and manufacture of protected vehicles, and most recently maneuvering robotics.

The Humvee replacement process was an effort by the U.S. military to replace the current AM General Humvee multi-purpose motor vehicle. The Humvee had evolved several times since its introduction in 1984, and is now used in tactical roles for which it was not originally intended. The U.S. military pursued several initiatives to replace it, both in the short and long term. The short-term replacement efforts utilize commercial off-the-shelf (COTS) vehicles, while the long-term efforts focused on building requirements for the Humvee replacement and technology research and evaluation in the form of various prototype vehicles.

<span class="mw-page-title-main">M1120 HEMTT Load Handling System</span> 10-ton, 8×8 heavy tactical truck

The M1120 HEMTT LHS is a M977 Heavy Expanded Mobility Tactical Truck with a load handling system in place of a flat bed/cargo body. The HEMTT is an eight-wheel drive, diesel-powered, tactical truck used by the US military and others. The HEMTT is manufactured by Oshkosh Defense and entered Army service in 1982, with the M1120 variant first produced in 1999.

<span class="mw-page-title-main">Oshkosh M-ATV</span> Mine-resistant ambush protected vehicle (MRAP), light utility vehicle

The Oshkosh M-ATV is a mine-resistant ambush protected (MRAP) vehicle developed by the Oshkosh Corporation for the MRAP All Terrain Vehicle (M-ATV) program. Intended to replace M1114 HMMWVs (Humvee), it is designed to provide the same levels of protection as the larger and heavier previous MRAPs, but with improved mobility.

<span class="mw-page-title-main">Future Tactical Truck System</span> Utility vehicle

The Future Tactical Truck System (FTTS) was a United States Armed Forces program for which the Operational Requirements Document was drawn up during 2003. FTTS was a proposed two vehicle modular family that was to replace the AM General High Mobility Multipurpose Wheeled Vehicle, Family of Medium Tactical Vehicles (FMTV), Oshkosh M977 Heavy Expanded Mobility Tactical Truck (HEMTT), Palletized Load System (PLS), and all remaining M35, M809 and M939 series of 2.5 and 5 ton trucks. The FTTS-UV was to replace the HMMWV, while the FTTS-MSV was to replace all other types.

<span class="mw-page-title-main">Marine Personnel Carrier</span> Wheeled armored personnel carrier

The Marine Personnel Carrier (MPC) is a wheeled armored personnel carrier under development for acquisition by the United States Marine Corps. The program was canceled in 2013 but resurrected in 2014 as part of phase one of the Amphibious Combat Vehicle.

<span class="mw-page-title-main">Lockheed Martin JLTV</span> Light tactical vehicle

The Lockheed Martin JLTV is a prototype armor-capable vehicle that was one of six original competitors for a Joint Light Tactical Vehicle that will replace the Humvee. The JLTV goal was to provide a family of vehicles able to perform multiple missions protected, sustained and networked mobility for personnel and payload over a full range of operations. Lockheed's JLTV design lost out to the Oshkosh L-ATV in August 2015.

<span class="mw-page-title-main">Hawkei</span> Multirole armoured car

The Hawkei is an Australian light four-wheel-drive protected mobility vehicle. Originally designed in 2010 to meet an Australian Defence Force (ADF) requirement for a light armoured patrol vehicle to replace some of its Land Rover Perentie variants. The Hawkei is a highly mobile, highly protected, 7-tonne vehicle, with inbuilt systems to allow it to be used as a fighting platform. It has been developed with Vehicle Electronic Architecture to be mission system ready.

<span class="mw-page-title-main">AM General BRV-O</span> Light tactical vehicle

The AM General BRV-O competed in an original field of six vehicle designs as part of the JLTV Joint Light Tactical Vehicle program that will replace the Humvee. AM General designed the BRV-O JLTV to provide better protection, performance, payload, transportability, reliability and affordability than the current Humvee.

<span class="mw-page-title-main">Oshkosh L-ATV</span> Military light utility/combat multi-role vehicle

The Oshkosh L-ATV is a light utility/combat multi-role vehicle that won the US military's Army-led Joint Light Tactical Vehicle (JLTV) program. In the very early stages of the program it was suggested that JLTV would replace the AM General High Mobility Multi-purpose Wheeled Vehicle (HMMWV) on a one-for-one basis. It is now suggested that the JLTV will partly replace the HMMWV, not replace it on a like-for-like basis.

<span class="mw-page-title-main">Logistic Vehicle System Replacement</span> 10x10 tactical trucks with up to 16.5 / 22.5 ton off-road / on-road payload (MKR18 cargo)

The Logistic Vehicle System Replacement (LVSR) is a family of heavy-duty military logistics vehicles of the United States Marine Corps (USMC) based on a common 5-axle ten-wheel drive (10x10) chassis. The vehicles vary in individual configuration by mission requirements, with three variants in service: a cargo, a wrecker and a tractor truck. The LVSR was designed and is manufactured by Oshkosh Defense.

<span class="mw-page-title-main">Oshkosh TAK-4 Independent Suspension System</span> Weapon

TAK-4 independent suspension system is a family of independent suspension systems designed and manufactured by Oshkosh Corporation for use on military, severe-duty and emergency vehicles. The system was developed from the mid-1990s.

References

  1. 1 2 3 4 5 6 7 8 "Joint Light Tactical Vehicle (JLTV))". Janes. Retrieved 29 March 2022.
  2. 1 2 "JLTV, JAA Yearbook entry (January 2021 update)". Jane's. Retrieved 8 January 2021.
  3. "Oshkosh secures $543m order to deliver JLTV, JLTV-T for US forces". 19 December 2022.
  4. 1 2 ""Humvee" Replacement Powered by Banks-Built Duramax Diesel". trucktrend.com. August 2015. Retrieved 11 July 2017.
  5. "Joint Light Tactical Vehicle (JLTV) Programme". Army Technology.
  6. 1 2 3 4 5 6 7 8 9 10 "Executive Overview: Logistics Support and Unmanned". IHS Jane's Shaun C Connors & Christopher F Foss. 5 May 2015. Retrieved 19 May 2015.
  7. Andrew Feickert. "Joint Light Tactical Vehicle (JLTV): Background and Issues for Congress" (PDF). Congressional Research Service. Retrieved 19 March 2015.
  8. "Defense Markets Summary October 2007". Defense-Update.com. Archived from the original on 26 October 2007. Retrieved 1 November 2007.
  9. A Little LUV for the Future Military Jeep Archived 15 October 2007 at the Wayback Machine . Defense Tech
  10. AM General and General Dynamics Announce Joint Venture Company. globalsecurity.org
  11. Melissa Davis. "Weak MRAP Order Wrecks Force Protection". TheStreet. Archived from the original on 4 February 2013.
  12. DRS Technologies, Force Protection team to compete for JLTV programme
  13. "SEC Info – Force Protection Inc - '10-K' for 12/31/07".
  14. Lockheed Martin And Armor Holdings Announce Teaming Agreement For Joint Light Tactical Vehicles. globalsecurity.org
  15. Wired.com
  16. Blackwater, Raytheon Pitch JLTV Candidate [ dead link ] . Defense News
  17. "MSN.com – Hotmail, Outlook, Skype, Bing, Latest News, Photos & Videos". Archived from the original on 8 March 2007. Retrieved 29 October 2008.
  18. Kris Osborne (17 February 2009). "GAO denies protest of Army JLTV award". Army Times. Army Times Publishing Co.
  19. "JLTV Sinking, EFV Wobbly". Archived from the original on 23 September 2015. Retrieved 7 October 2010.
  20. 1 2 http://images.dodbuzz.com/wp-content/uploads/2010/08/Army-Truck-Program-Report.pdf Archived 29 May 2014 at the Wayback Machine ARMY TRUCK PROGRAM (TACTICAL WHEELED VEHICLE ACQUISITION STRATEGY)
  21. . U.S. Army
  22. "Race to build JLTV grows to 6". Archived from the original on 23 May 2013. Retrieved 29 March 2012.
  23. EMD contract Archived 27 February 2014 at the Wayback Machine – DodBuzz.com, 23 August 2012
  24. McLeary, Paul. "Navistar Files Protest, JLTV Program Comes To Halt". Defense News, 31 August 2012.
  25. McLeary, Paul. "Navistar Withdraws JLTV Protest". Defense News, 4 September 2012.
  26. Army, Marine Corps take delivery of JLTVs for user testing – Army.mil, 27 August 2013
  27. JLTV testing begins, program on schedule, budget – Army.mil, 5 September 2013
  28. Pentagon Inspector General to Audit JLTV – DoDBuzz.com, 28 October 2013
  29. Army to Start Next JLTV Competition This Fall – DoDBuzz.com, 25 September 2014
  30. Army: JLTV on Track Despite Budget Uncertainty – DoDBuzz.com, 15 October 2014
  31. "All JLTV Rivals Finish Limited User Testing; Next Stop, RFP". Breakingdefense.com, 19 November 2014.
  32. 1 2 "Joint Light Tactical Vehicle (JLTV))". IHS Jane's. Retrieved 30 March 2016.
  33. "Oshkosh Wins JLTV Award". Defense News. 25 August 2015.
  34. "Lockheed Martin Protests JLTV contract award to Oshkosh". 8 September 2015. Retrieved 9 September 2015.
  35. Jen Judson (15 December 2015). "GAO Dismisses Lockheed JLTV Protest, Cites Pending Litigation". DefenseNews. Retrieved 16 December 2015.
  36. "GAO Decision B-412056,B-412056.2,B-412056.3: Dec 15, 2015". U.S. Government Accountability Office. US Government Accountability Office. Retrieved 13 March 2017.
  37. US Army Orders Oshkosh to Resumes JLTV Work – Defense-Update.com, 16 December 2015
  38. Lockheed Files Injunction To Stop Work On JLTV – Defensenews.com, 18 December 2015
  39. Oshkosh To Continue JLTV Production During Lawsuit – Defensenews.com, 12 February 2016
  40. Lockheed Withdraws Protest of Army's JLTV Award Archived 19 February 2016 at the Wayback Machine – DoDBuzz.com, 17 February 2016
  41. "Lockheed Drops JLTV Suit; DOT&E Knocks Reliability". breakingdefense.com (Sydney J Freedberg Jr.). 18 February 2016. Retrieved 8 March 2016.
  42. "DOT&E FY2015 Annual Report". DOT&E. Archived from the original on 8 March 2016. Retrieved 8 March 2016.
  43. "DoD Weapons Tester Report Sheds Light on JLTV Competition". Defense News (Jen Judson). 2 February 2016. Retrieved 8 March 2016.
  44. Geoff Fein (18 February 2016). "Lockheed Martin drops JLTV contract award challenge". IHS Jane's. Retrieved 1 March 2016.
  45. "USMC Commandant Neller: Marines Made Cuts In FY2017 JLTV Buy To Save ACV, G/ATOR". USNI News (Megan Eckstein). 11 February 2016. Retrieved 8 March 2016.
  46. "AM General unseats Oshkosh to build Joint Light Tactical Vehicle". Défense News, 9 February 2023.
  47. Daniel Wasserbly. "JLTV orders begin after protest dropped". IHS Jane's. Retrieved 30 March 2016.
  48. Cox, Matthew (26 September 2016). "Army Places Order for More JLTVs". DoDBuzz.com. Military.com. Archived from the original on 5 March 2017. Retrieved 5 March 2017.
  49. News Desk (24 March 2016). "JLTV". defense-update.com. Retrieved 7 April 2017.
  50. Jen Hudson (14 April 2016). "Humvee Replacement Delayed for Army and Marine Corps". DefenseNews. Retrieved 12 May 2016.
  51. 1 2 Daniel Wasserbly. "Pentagon: JLTV programme costs decrease". IHS Jane's. Retrieved 30 March 2016.
  52. Daniel Wasserbly. "AUSA 2016: First JLTVs accepted, new testing round to begin". IHS Jane's. Retrieved 7 October 2016.
  53. Stew Magnuson. "Army selects JLTV Truck for Light Recon Vehicle Program". National Defense Magazine. Archived from the original on 22 May 2016. Retrieved 12 May 2016.
  54. Daniel Wasserbly. "Pentagon budget 2018". Jane's Defence Weekly. Retrieved 20 June 2017.[ permanent dead link ]
  55. Connors, Shaun C; Foss, Christopher F; Wasserbly, Daniel. "Joint Light Tactical Vehicle (JLTV)". IHS Jane's. Retrieved 7 August 2017.
  56. "Joint Light Tactical Vehicle (JLTV): Background and Issues for Congress" (PDF). Congressional Research Service. Retrieved 7 April 2017.
  57. 1 2 Connors, Shaun C; Foss, Christopher F; Wasserbly, Daniel. "Joint Light Tactical Vehicle (JLTV)". IHS Jane's. Retrieved 9 September 2017.
  58. Wasserbly, Daniel. "Pentagon budget 2018: JLTV procurement ramps up with USD1 billion request". Jane's Defence Weekly. Retrieved 25 May 2017.
  59. Oshkosh Corporation (6 October 2016). "Oshkosh Exhibiting JLTV and M-ATV Vehicles at AUSA 2016". OEMoffhighway.com. Retrieved 8 October 2016.
  60. "Oshkosh makes Joint Light Tactical Vehicle more lethal". Defense News. 9 October 2017. Retrieved 18 October 2017.
  61. Connors, Shaun (19 March 2017). "Joint Light Tactical Vehicle (JLTV)". IHS Jane's Joint Light Tactical Vehicle (JLTV) March 2017. Retrieved 19 March 2017.
  62. 1 2 3 4 5 6 7 8 9 "Joint Light Tactical Vehicle (JLTV)". IHS Jane's Shaun C Connors. May 2019. Retrieved 16 May 2019.[ permanent dead link ]
  63. Connors, Shaun C; Foss, Christopher F. "Joint Light Tactical Vehicle (JLTV)". IHS Jane's. Retrieved 25 June 2019.
  64. "USMC declares IOC for JLTV fleet". Shephardmedia.
  65. Todd South (28 February 2019). "Joint Light Tactical Vehicle (JLTV)". These Marine units are the first to field the newest ground combat vehicle, the JLTV. Retrieved 6 March 2019.
  66. "Oshkosh Defense Receives Order for 248 Joint Light Tactical Vehicles". Oshkosh Defense. July 2020. Retrieved 23 September 2020.
  67. "Oshkosh Defense Awarded $61.8M to Produce Trailers for the Joint Light Tactical Vehicle (JLTV)". Oshkosh Defense. 17 June 2020. Retrieved 23 September 2020.
  68. "Smooth ride: tracing the path to improved mobility"  Jane's International Defense Review (IDR), 18 August 2014
  69. "Oshkosh receives contract for MRAP suspension units" Jane's Defence Industry, 29 September 2009
  70. "Light Combat Tactical All-Terrain Vehicle (L-ATV)"  – Army-Technology.com
  71. L-ATV Light Combat Tactical All-Terrain Vehicle Archived 15 March 2013 at the Wayback Machine  – Armyrecognition.com
  72. 1 2 3 4 5 6 7 8 "Safety, cost cuts help JLTV overtake Humvee". Army Times. 16 February 2012. Accessed 20 May 2015
  73. Andrew Feickert. "JLTV Background & Issues For Congress". Congressional Research Service. Retrieved 9 February 2015.
  74. 1 2 3 Osborn, Kris (9 July 2007). "Beefing up the Humvee's replacement". Army Times. Vol. 67, no. 51. Army Times Publishing Co. p. 18.
  75. John Pike. "Joint Light Tactical Vehicle (JLTV)".
  76. Pentagon Seeks More Power From Vehicles aviationweek.com [ permanent dead link ]
  77. "DRAFT PURCHASE DESCRIPTION (PD) FOR JOINT LIGHT TACTICAL VEHICLE (JLTV) FAMILY OF VEHICLES" (PDF). Archived from the original (PDF) on 10 August 2011. Retrieved 22 May 2010.
  78. 1 2 Shaun Connors. "Joint Light Tactical Vehicle (JLTV) 19/03/2017". IHS Jane's Joint Light Tactical Vehicle (JLTV) March 2017. Retrieved 19 March 2017.
  79. "Joint Light Tactical Vehicle: A Case Study" (PDF). 20 August 2012. Archived from the original on 21 May 2015. Retrieved 19 May 2015.
  80. "OSHKOSH DEFENSE TO PREMIER L-ATV AMBULANCE AT AUSA GLOBAL FORCE SYMPOSIUM 2019". Oshkosh. 26 March 2019. Retrieved 8 May 2019.
  81. "JLTV, JAA Yearbook entry (January 2021 update)". Janes. Retrieved 8 January 2021.
  82. ES&T Redaktion (29 January 2024). "Erste gepanzerte Verbindungs- und Führungsfahrzeuge JLTV in Belgien eingetroffen". esut.de (in German). Retrieved 30 January 2024.
  83. Brassart, Pierre (18 January 2024). "Les premiers véhicules de commandement et de liaison FALCON livrés au bataillon ISTAR". À l'Avant-Garde (in French). Retrieved 30 January 2024.
  84. "JLTV, JAA Yearbook entry (January 2021 update)". Janes. Retrieved 8 January 2021.
  85. "La Défense achète 322 véhicules blindés à roues à la société américaine Oshkosh". 20 October 2023.
  86. 1 2 admin (21 November 2023). "Brazilian Marine Corps Receive Four New Joint Light Tactical Vehicles - MilitaryLeak.COM". militaryleak.com. Retrieved 30 January 2024.
  87. "Fuzileiros Navais apresentam o JLTV". Defesa Aérea & Naval (in Brazilian Portuguese). 6 March 2023. Retrieved 7 March 2023.
  88. Jr, Paulo Roberto Bastos. "Fuzileiros Navais recebem seus blindados JLTV". Tecnodefesa (in Brazilian Portuguese). Retrieved 7 March 2023.
  89. "Lithuania signs agreement to purchase 200 JLTVs from US". ArmyTechnology. 25 November 2019. Retrieved 23 September 2020.
  90. "Lithuania buying 300 additional JLTVs from US". LRT. 18 October 2022. Retrieved 18 October 2022.
  91. "Lithuanian military receives new JLTVs from the US". LRT. 16 August 2021. Retrieved 18 August 2021.
  92. "Second shipment of JLTVs arrives in Lithuania". kam.lt. 1 December 2022. Archived from the original on 1 February 2023. Retrieved 2 January 2024.
  93. "Third shipment of Joint Light Tactical Vehicles JLTV arrived in Lithuania". kam.lt. 22 May 2023. Archived from the original on 23 May 2023. Retrieved 2 January 2024.
  94. "First stage of JLTV acquisition completed: all armored vehicles delivered to Lithuania". lrt.lt. 2 January 2024. Archived from the original on 2 January 2024. Retrieved 2 January 2024.
  95. Valpolini, Paolo (19 October 2022). "Lithuania: contract signed on acquisition of additional 300 Joint Light Tactical Vehicles". EDR Magazine. Retrieved 30 January 2024.
  96. "Lithuania completes first phase of JLTV procurement". Janes.com. Retrieved 30 January 2024.
  97. "You are being redirected..." elbitsystems.com. Retrieved 30 January 2024.
  98. https://en.vijesti.me/news/society/689853/wars-also-affect-the-pace-of-equipping-the-Montenegrin-army%2C-the-Americans-are-late-but-not-the-Israelis [ bare URL ]
  99. Thomas (11 March 2024). "North Macedonia orders additional JLTVs armored vehicles from United States | Defense News March 2024 Global Security army industry | Defense Security global news industry army year 2024 | Archive News year". Army Recognition. Retrieved 11 March 2024.
  100. 1 2 Editorial, Defense Brief (17 March 2021). "US clears sale of Stryker fighting vehicles to North Macedonia". Defense Brief. Retrieved 30 January 2024.
  101. Editorial, Defense Brief (1 August 2022). "North Macedonia welcomes first JLTVs from the US". Defense Brief. Retrieved 30 January 2024.
  102. "Тактичките перформанси на новите оклопни возила JLTV Oshkosh презентирани пред претседателот на Собранието Џафери и членовите на Комисијата за одбрана". mod.gov.mk. 23 September 2022.
  103. "Romania quadruples request for JLTV Heavy Gun Carriers". shephardmedia.com. 17 March 2023.
  104. "Romania – M1278A1 Heavy Gun Carriers Joint Light Tactical Vehicles (JLTVs) | Defense Security Cooperation Agency". www.dsca.mil. Retrieved 30 January 2024.
  105. "Romania receives first 33 JLTV armored vehicles intended for Special Forces". armyrecognition.com. 10 November 2023.
  106. Bozinovski, Igor; Fiorenza, Nicholas (24 November 2018). "Slovenia announces 4×4 JLTV procurement as it awaits Boxer offer". IHS Jane's 360. Skopje, London. Archived from the original on 23 November 2018. Retrieved 26 November 2018.
  107. "JLTV, JAA Yearbook entry (January 2021 update)". Janes. Retrieved 8 January 2021.
  108. @MO_RS (12 May 2021). "Včeraj so v pristanišče Koper prispela nova lahka oklepna kolesna vozila JLTV 4x4 proizvajalca Oshkosh, ki jih je…" (Tweet). Retrieved 6 June 2021 via Twitter.
  109. RAFAEL (25 January 2021). "The SPIKE LR missiles firing was performed by the Slovenia Armed Forces". www.rafael.co.il. Retrieved 30 January 2024.
  110. "JLTV, JAA Yearbook entry (January 2021 update)". Janes. Retrieved 8 January 2021.
  111. Editorial, Defense Brief (8 January 2024). "Slovenia receives 37 new Oshkosh JLTVs". Defense Brief. Retrieved 30 January 2024.
  112. Editorial, Defense Brief (8 January 2024). "Slovenia receives 37 new Oshkosh JLTVs". Defense Brief. Retrieved 30 January 2024.
  113. "Predstavitev tovornih vozil 8x8 in lahkih kolesnih oklepnih vozil LKOV 4x4 za Slovensko vojsko | GOV.SI". Portal GOV.SI (in Slovenian). Retrieved 16 December 2022.
  114. Editorial, Defense Brief (8 January 2024). "Slovenia receives 37 new Oshkosh JLTVs". Defense Brief. Retrieved 30 January 2024.
  115. Sgt. 1st Class Emily Anderson (May 15, 2019) JLTV training officially kicks off at Fort McCoy
  116. "IAV 2020: JLTV interview with Michael Sprang, Project Director". Jane's. Archived from the original on 14 December 2021. Retrieved 23 September 2020.
  117. "Oshkosh to Build JLTVs for Israeli Defense Forces". 1 December 2023.
  118. Wiesner, Melonie (16 November 2023). "JLTV INTEREST CONTINUES FOR OSHKOSH DEFENSE". Oshkosh Defense. Retrieved 30 January 2024.
  119. ESD (15 May 2023). "US State Department Approves JLTV Sale to Slovakia". euro-sd.com. Retrieved 30 January 2024.
  120. https://www.mosr.sk/53099-en/rezort-obrany-potvrdil-akviziciu-vozidiel-jltv-4x4-oshkosh-os-sr-tak-po-desiatich-rokoch-ziskaju-pozadovanu-techniku/ [ bare URL ]
  121. "Συνάντηση με Εκπροσώπους Εταιρειών ELBIT SYSTEMS και OSHKOSH DEFENCE στο ΓΕΣ". www.mod.mil.gr (in Greek). HELLENIC REPUBLIC MINISTRY OF NATIONAL DEFENCE. Retrieved 27 June 2022.
  122. "Ελληνικό Ενδιαφέρον για SPEAR 120 χλστ. επί οχημάτων OSHKOSH JLTV" (in Greek). NEMESIS HD. Retrieved 27 June 2022.
  123. admin (11 April 2023). "Greece Acquires RAFAEL's SPIKE Anti-tank Guided Missiles In 370 Million Euro Deal - MilitaryLeak.COM". militaryleak.com. Retrieved 30 January 2024.
  124. "Poland – M1A1 Abrams Main Battle Tanks | Defense Security Cooperation Agency". www.dsca.mil. Retrieved 30 January 2024.
  125. "116 Abrams M1A1 tanks will go to the equipment of the Polish Armed Forces - Ministry of National Defence - Gov.pl website". Ministry of National Defence. Retrieved 30 January 2024.
  126. "Portugal seeks JLTVs | Jane's 360". janes.com. Retrieved 12 April 2020.
  127. "JLTV, JAA Yearbook entry (January 2021 update)". Janes. Retrieved 8 January 2021.
  128. "JLTV to Portuguese Army".
  129. "UK interested in the JLTV even though they have the excellent FoxHound?". SNAFU. Retrieved 30 June 2016.
  130. "British Army Works to Secure Oshkosh JLTV". DefenseNews. 24 January 2017. Retrieved 26 January 2017.
  131. "United Kingdom – Joint Light Tactical Vehicles (JLTV) and Accessories". DSCA. Retrieved 11 July 2017.
  132. "British Army working on JLTV prototype". Jane's. Retrieved 23 September 2020.
  133. "JLTV June 2022". Janes. 6 June 2022. Retrieved 6 June 2022.