Kamalapur Railway Station, officially Dhaka Railway Station, is the central railway station in Kamalapur, Dhaka, capital of Bangladesh. It is the largest station and the busiest infrastructure for transportation in the country that acts as a gateway of the country's capital. It was opened on 1 May 1968. [1] [4] [5] [6]
It was built during the Pakistan period but its railway line was built during the British period. After the creation of Pakistan, another railway station was constructed at Kamalapur as the old railway station in Dhaka was inadequate and a part of the existing railway line was moved from the previous position. Built in 1968, this railway station was witness to the massacre that took place during the liberation war in 1971.
After the liberation, the country's first inland container depot was established here. After that several proposals and decisions were made to relocate and demolish the station building but due to objections from the authorities and dignitaries it was not done. A multimodal transport hub around the station is currently under construction which is expected to be completed by 2030.
This station is plagued with various issues. Among them are homeless people, height of platforms, insecurity, criminal activities, reluctance of passengers to use foot overbridges, problem of railway porters and unavailability of information. This central railway station of the country has 8 platforms. Apart from this, there are various facilities including hospital, mosque and police station.
In 1885, when Bangladesh was under the British Raj, Dacca State railway built Narayanganj–Bahadurabad Ghat line and opened its part for train service from the old city of Dacca (now Dhaka) to Narayanganj. In 1895, [7] Dacca railway station (also known as Fulbaria railway station) was built with other facilities. [8] It was established on the south side of the then main city of Dhaka. In the same year, railway connections from Dhaka to Narayanganj and Dhaka to Mymensingh were established. After the partition of India and the creation of Pakistan in 1947, Dhaka became the main city and capital of East Bengal (later East Pakistan). In that time, the railway line used to go straight from Tejgaon railway station to Fulbaria. [9]
Dhaka's urban status grew in the early 20th century, and so did its economy, especially after 1947. The existing railway lines extended northwards bisecting Dhaka into old and new cities, and these railway lines intersected with roads at various points, blocking the flow of north–south road traffic. Also the old Dacca railway station on the northern side of the city was incomplete, consisting of a platform, a small yard and a locomotive shed. Relocating the station to a less congested area is expected to facilitate unhindered north–south vehicular flow, and also bring old and new Dhaka cities together. In 1948, experts suggested shifting the station to Kamalapur. [6] In 1952, a plan of shifting the railway station outside of the city area was made. It was also planned to build a new railway line from Tejgaon to Gandaria. However, due to the fund shortage the plan wasn’t executed that time. [10] After 10 years of the suggestion on 20 December 1958, the provincial government finalized to construct the new railway station in Kamalapur with the deadline of 1964. The initial budget for its construction was Rs. 45.6 million (equivalent to Rs. 230 millionorUS$800,000 in 2021) of which the provincial government was supposed to provide about 60%. [11] Before the construction of the station, there was a paddy field at the construction site. [5] The government started the construction in 1960. [10] From Tejgaon the railway line was diverted to Khilgaon, and then to Kamalapur. [6] The operational elements and logistics of old Dacca railway station was transferred to the new railway station in 1965. [10] The station was inaugurated by East Pakistani governor Abdul Monem Khan on 27 April 1968. [12] Pakistani president Ayub Khan was at the inauguration ceremony. [6] Its construction cost was Rs. 135 million (equivalent to Rs. 690 millionorUS$2.4 million in 2021). [12] A year after that, the headquarters of the railway mail service of the province was moved here. [13]
On 11 April 1987, after sixteen years of the independence of Bangladesh, the first inland container depot in Bangladesh was opened in the railway station. [4] In 2005, American consultancy firm Louis Berger Group prepared a strategic transport plan (STP) for Dhaka. [14] The STP suggested the relocation of the central railway station to Tongi, but the steering committee, formed by Dhaka Transport Coordination Board, rejected the suggestion. [15] In the 2010s, the government proposed to shift the railway station to Gazipur District. But the ministry of Railways opposed the proposal considering the inconvenience of the city dwellers. [16] The station building underwent renovation four times between 2013 and 2023. [17]
Under the construction project of Dhaka–Jessore line which started in 2016, it was decided to renovate six railway stations which included Kamalapur railway station. [18] In 2020, a government meeting held at the Railway Bhaban in Dhaka informed that as part of the renovation work, three new dual gauge railway line and a new platform for the station's broad gauge railway line will be constructed at the station. [19]
The Dhaka–Narayanganj section of the existing Narayanganj–Bahadurabad Ghat line has been declared closed from 4 December 2022 for upgradation from meter gauge to dual gauge [20] and the Padma Bridge Rail Link project. The announcement led to the suspension of train services from Kamalapur to Narayanganj railway station, causing suffering to commuters plying the route who used to travel by train to save money. [21] Md. Nurul Islam Sujon, railway minister of the country, had announced on 14 January 2023 that the section would be opened for train traffic by March. But it could not be done as two projects were not completed. [22] On 25 July 2023, the Railway Minister announced that the Dhaka–Narayanganj section would be reopen on the first day of August. [23] On the final promised day, train services resumed from Kamalapur to Narayanganj. [24]
During the COVID-19 pandemic in 2020, train services at Kamalapur railway station were suspended and access to the station was closed. [25] Although the Kamalapur railway station was opened in June, the authority did not arrange additional trains for passengers on the occasion of Eid al-Adha. [26] After the end of the lockdown in 2021, the government mandated online-only ticket sales, leaving the lower classes deprived of using the station. On the other hand, they could not travel sitting on the roof of the train as they were not allowed to enter the station without a ticket. [27] After the second phase of lockdown, Kamalapur railway station was opened and rail communication resumed. [28] In early 2022, new restrictions were imposed on the railway station as a result of the SARS-CoV-2 Omicron variant, and ticket sales were halved. [29] It faced disaster due to the overcrowding of passengers due to the ban on the use of motorcycles in the highways and outside of district by the government around Eid-ul-Azha of the same year. [30] As a result, its trains schedule was disrupted. [31]
In 2018, a public-private joint investment (PPP) project with Kajima was approved to create a multimodal hub around Dhaka Airport and Tejgaon railway station along with Kamalapur Railway Station. Under this infrastructure will be built around Kamalapur Railway Station; There will be multi-storied residential buildings, hotels, shopping malls, subways and runways. [32] In 2019, the Bangladesh Railway authority objected to the construction of a multimodal hub in front of the station building. [33] In 2020, Bangladesh Railway and Dhaka Mass Transit Company Limited have decided to connect Kamalapur railway station with MRT Line 6 of Dhaka Metro Rail. But as the current station could not match the proposed route of MRT Line 6, it was decided to demolish the Kamalapur station and construct a new one 130 meters north. [34] Various architects and individuals of the country opposed this decision. [35] On 30 January 2021, the Prime Minister's Office gave permission to demolish the railway station, but in February, the Railway Ministry withdrew its decision to demolish Kamalapur. However, related authority said that the railway station may be shifted in the near future if required. [36] [37] Instead of demolishing the station, the government plans to construct a station complex for metrorail, subway, elevated express and bus rapid transit under the railway station area as part of the multimodal hub that is scheduled to be completed by 2030. [1]
The architects of Kamalapur railway station were two Americans: Daniel Dunham and Bob Buie. Both came to East Pakistan as architects with Louis Berger Group. [34] The design process started under the direction of Dunham, followed by Robert Boughey. [38]
Dunham & Buie's design included the creation of a wide-span structure that would be suitable for the climate of the region, a challenge to them. For that they designed a concrete structure of the station building roof that was unusual, the structure had a parasol roof. The roof shelters a row of downward-facing interconnected structures. The terminal's profile – a rhythmic arrangement of gently tapered and arched shells evokes the typical image of a tropical climate, with an umbrella providing protection from monsoon rains. The design of the station includes various functional spaces including the station's ticket booth, administrative offices, passenger rest areas and waiting areas under an integrated canopy roof. [6]
The entire structure consists of 36 squares. It has a total of 49 columns. Above it stands a roof with 36 slender concrete domes. Each column, 59 feet high, extends four branches upward and supports the roof. The station is spread over an area of 156 acres. It has 11 ticket counters and several passenger rest areas. [34]
A monument called "Suryaketan" was constructed at the entrance of the railway station in 1999 in memory of all the railway officers and employees who were martyred in the 1971 liberation war. [39]
In 1971, Pakistan Army attacked the Kamalapur railway station soon after Operation Searchlight began. They killed the people in the trains reaching the station and burnt the trains. Also everyone in the station building was killed by Pakistani army. About 30 employees working at the railway station died in this massacre. [39]
22 June 2009, Incorrect signal caused head on collision between Mahanagar Probhati and Isa khan express. It caused 1 fatality and 40 others to be injured. [40]
On 29 December 2014, Kamalapur railway station was involved in an accident when a train collided with a lorry, resulting in the death of 6 people. [41] On 12 August 2017, around Eid-ul-Azha, 18 persons accused of various crimes were arrested from the railway station during the operation of the railway police station. [42] In January 2019, a fire broke out in the station's control room, disrupting train schedules. In May 23 of the same year, a fire broke out in the station master's room, but it was extinguished with the use of fire extinguishers. [43] On 19 August 2019, a girl was raped and killed in an abandoned compartment of the station. [44] On 23 December 2021, a person was crushed under a train and died due to an accident on the second platform of the terminal. [45]
On 9 January 2022, a points man of the railway station was cut and killed by an approaching train while connecting train carriages. [46] On 23 April of the same year, During a press conference organized by Kamalapur railway station, the belongings of the station master were stolen. Later during the investigation on 18 May, the detective police recovered the stolen items along with the thieves. [47] On 7 May, a cargo container caught fire at the station, which was brought under control by three units of the fire service. [48]
On 7 October, a girl, who was seventeen, was raped in a train on the first platform of the station. The incident involved 6 people who worked as cleaners at the railway terminal. [49] On 20 October 2022, Rapid Action Battalion arrested a gang of ticket black marketers of Kamalapur railway station, who since 2015 used to buy station tickets from others and sell them at high prices, creating a shortage of tickets. [50] On 29 December 2022, during the anti-government protest in the country, a railway security guard was killed by the explosion of a crude bomb on its platform. [51]
On Eid-ul-Fitr 2023, it was prohibited to enter the station and travel on the roof of the train without purchasing an advance ticket online. [52] As a result of this decision, tickets are sold out quickly, so some people come to the station plaza to buy tickets before Eid and suffered. [53] So The station counters were not crowded with people waiting for tickets. [54]
On 24 October 2024. Two carriages of Narayanganj commuter derailed near the southern end of the station at Gopibag at 7:30am . [55]
On 25 October 2024. Five carriages of Panchagarh Express derailed soon after it set off from Kamalapur at around midnight. No one was injured however the recovery took 7 hours and morning trains were delayed by 2 hours. [56]
There are eight 918.4 meter [57] long platforms at this station, numbered 1-8 from the North West to the South East (left to right when viewed from the passenger entrance):
Kamalapur railway station has a yard of Dhaka Inland Container Depot owned by the authority of the Port of Chittagong. Saif Power Tech Limited was appointed as its operator in 2015. [59] It was built on 32 acres of land near the terminal. [60] It can hold 10 percent of Chittagong Port's 70 percent containers, i.e. 90,000 TEUS. [61]
The Railway General Hospital, Kamalapur was constructed in 1986 on 4.3 acres. The hospital was started to provide medical services to the officers and employees of the Bangladesh Railway. In 2013, the hospital was planned to be taken up in public private partnership [62] and two years later, its services were opened to all and expanded to 100 beds. [63] Its current number of beds is 40. [64]
There is a mosque for passengers use in the station known as the "Dhaka Railway Station Central Jame Mosque". Free food is distributed during iftar every year in the month of Ramadan to those who come to pray at the mosque. [65]
The Railway Police maintains a police station at Kamalapur, with a custody suite. At the station, various accused are arrested in this railway station. The police station was modernized and renovated in 2021. After the renovation, a library and drinking water facilities have been kept here for the prisoners and the police. [66]
As of 2022, at least 115,000 passengers travel by train using Kamalapur railway station daily. [1] The railway station is usually crowded with people returning home by train on the occasion of the festivals of Eid al-Fitr and Eid al-Adha every year. However, there was an exception during the year of the COVID-19 pandemic. [67]
According to the statistics of 2014, the number of homeless people in Dhaka is at least 7 thousand. Many of them live in Kamalapur railway station because of lack of means. Today it is one of the refuges of the destitute population in the city. [68] This unguarded railway station building is the target of criminal activities of vagrants. According to the information of the detective branch, various criminals are waiting to commit misdeeds at this railway terminal and hence the station is dangerous for passengers. According to Railway Police data, 86 criminals were arrested from the terminal in 2021. [69] This is also a safe place for drug dealers. [70] In 2022, Newsbangla24.com reported that there is a lack of security at the terminal and a lack of police personnel can be seen after the evening. The reporter saw some people taking drugs in public and interviewed a porter who was there revealed that the policemen are removed after 12:00 am. On the other hand, the railway police authority blamed the lack of manpower for this insecurity in the station. [71]
The height of the platforms at Kamalapur railway station is disproportionate to the height of the trains. [72] As all trains in East Pakistan were meter gauge when the railway station was built, the platforms were designed keeping meter gauge trains in mind. As a result, passengers face problems in boarding broad gauge and demo trains from the platforms. [73] In 2021, the station was renovated to raise some of the platforms to address the issue. But after renovate it at a cost of ৳2.7 crore, questions arose about the substandard construction work on those platforms. [58] Although foot overbridges are provided at each platform for movement between the platforms of the station, many passengers walk over the tracks without using them to save time and the station authority does not take any measures to prevent and discourage them. [74]
Most of the displays and schedule boards at the station are non-functional and passengers do not get accurate train information from the police information center at the station. [75] Passengers face the problem of missing station master to get various train related information at the station. [76] The microphone to announce the train schedule at the terminal cannot be heard clearly, leading to confusion. [77] As of 2021, the number of railway porters work in this railway station is 210. To work as a railway porter, permission is required from the railway station authority. A reporter from Jago News 24 reported that bribes are being paid to work as porters here. Besides, it is said that the authority does not take any measures or help to solve the problems of the porters. [78] It is also alleged by passengers that porters charge more than the government fixed rates for carrying goods. [79]
Kamalapur railway station is often featured in films and other pop culture in the country. The station has been used in numerous Bangladeshi film and television productions over the years. Many films and television programs have been filmed at the station, including: Swatta , [80] Fereshte, [81] and Istition. [82]
The original design of Bangabandhu Hi-Tech City railway station, situated in Bangabandhu Hi-Tech City near Dhaka is designed like this station. [83] Sylhet railway station, another railway station in the north-eastern region of the country, has the structure like the central station. [84]
Bangladesh Railway is the state-owned rail transport agency of Bangladesh. It operates and maintains all railways in the country, and is overseen by the Directorate General of Bangladesh Railway. The Bangladesh Railway is governed by the Ministry of Railways and the Bangladesh Railway Authority with a reporting mark known as "BR".
On the night of 23 June 2019, at around 11 PM, an Upaban Express train from Sylhet was on its way to Dhaka. Whilst passing through a culvert, a calamity took place leading to 5 deaths and hundreds of injuries. 1 km of rail line was damaged.
Cox's Bazar Railway Station is a railway station in Bangladesh, situated near the bus terminal of the city of Cox's Bazar. The railway station was officially inaugurated on 11 November 2023 and is considered the first iconic railway station in the country.
Chittagong–Cox's Bazar line is a railway line under Bangladesh Railway. It is operated by East Zone of Bangladesh.
Feni Junction Railway Station is a railway station located in Feni Sadar Upazila, Feni District, Chittagong Division, Bangladesh.
Jagati railway station is a railway station in Kushtia, Bangladesh. It was one of the first railway station in present-day Bangladesh.
Bangabandhu Hi-Tech City Railway Station is a B class railway station in Bangladesh located on the western side of Bangabandhu Hi-Tech City in Kaliakair Upazila of Gazipur District. The station was inaugurated on 1 November 2018. It is regarded as a ghost station now.
Bhanga Junction Railway Station is a junction station of Bangladesh. It is a junction which is being built in Bhanga. It will connect Dhaka with Jessore, Rajbari and Port of Payra through Padma Bridge. Its construction is likely to be end in June 2023.
Fulbaria Railway Station is a defunct railway station in Bangladesh which was located in Dhaka. It was the central railway station of Bangladesh before Kamalapur railway station came into operation. The station was closed when trains started running at the new station from 1 May 1968.
Tejgaon Railway Station is a railway station in Bangladesh located in Tejgaon Thana, Dhaka District.
Gandaria Railway Station is a railway station located in Gendaria Thana, Dhaka District, Bangladesh. The Dhaka–Jessore line starts from this station.
Tongi Junction Railway Station is a railway station in Bangladesh located in Tongi, Gazipur District. It is a station between Dhirashram and Dhaka Airport railway station. It is about 5 km north of the airport station and about 12 km south of Joydebpur. The station is served by two dual gauge lines and two platforms. Tongi–Bhairab–Akhaura line starts from this station. During the Bishwa Ijtema, it become a hub of communication and additional trains plied the station.
Dhaka–Jessore line is a 172 km long under construction broad gauge railway. It is being constructed under the Ministry of Railways, Government of Bangladesh. The line will connect the capital of Bangladesh to Jessore via Dhaka District, Narayanganj District, Munshiganj District, Shariatpur District, Madaripur District, Faridpur District, Gopalganj District, Bangladesh, and Narail District. It is a project related to Padma Bridge.
Bhairab Bazar Junction railway station is a railway junction located in Bhairab, Kishoreganj District, Bangladesh. At least 3000 passengers use this railway junction regularly.
The MRT Line 6 is a rapid transit line of the Dhaka Metro Rail. It is Bangladesh's first rapid transit line and has been in service since 2022. The line is entirely elevated and currently has 16 stations operational in service between Uttara North and Motijheel.
Kamalapur is an elevated metro station of the Dhaka Metro's MRT Line 6, currently under construction. This station is located in Kamalapur, adjacent to Kamalapur railway station. It is scheduled to be opened in 2026 and is integrated as MRT Line 6's third phase.
The Narayanganj Commuter is a commuter train service operated by Bangladesh Railway. The service operates trains every day between the cities of Dhaka and Narayanganj in Dhaka Division, Bangladesh.
The MRT Line 4 of Dhaka Metro Rail is a proposed mass rapid transit line, stretching from the city's main railway station to the Bandar Upazila. This line is scheduled to be completed by 2030 and will be operated by the Dhaka Mass Transit Company Limited (DMTCL). South Korea has expressed interest to invest in this project.
Kamalapur Multimodal Transport Hub is a proposed transport hub in Dhaka, capital of Bangladesh. It will be a large structure with three levels around to the station plaza of Dhaka railway station which is the central railway station of the country.
Turag Commuter, formerly Turag Express, is a local train in Bangladesh operated by Bangladesh Railway. It runs from Kamalapur in Dhaka to Joydebpur in Gazipur. Earlier this train used to run from Joydebpur station to Narayanganj in Narayanganj. The specialty of this train is that it has a reserved coach for women.
{{cite web}}
: CS1 maint: numeric names: authors list (link){{cite web}}
: CS1 maint: numeric names: authors list (link){{cite web}}