Port Chalmers Branch | |
---|---|
Overview | |
Other name(s) | Dunedin and Port Chalmers Railway |
Status | Open |
Owner | New Zealand Railways Corporation (land) |
Termini | |
Service | |
Type | Urban rail |
Operator(s) | KiwiRail |
History | |
Opened | 1 January 1873 [1] |
Closed | 10 December 1979 (for passenger trains) [2] |
Technical | |
Line length | 2.09 km (1.30 mi) (Sawyer's Bay-Port Chalmers) [2] |
Number of tracks | Single |
Character | Urban |
Track gauge | 1,067 mm (3 ft 6 in) |
The Port Chalmers Branch was the first railway line built in Otago, New Zealand, and linked the region's major city of Dunedin with the port in Port Chalmers. [1] The line is still operational today.
Built by the Dunedin and Port Chalmers Railway Company Limited during 1872, [3] the line was approved by and constructed under the auspices of the Otago Provincial Council, not the central government. It was built to the recently adopted national track gauge of 1,067 mm (3 ft 6 in), and it was the first line in the country with that gauge to open, on 1 January 1873. [1] The line was formally opened by Sir George Bowen, former Governor of New Zealand, on a farewell trip prior to his transfer to Victoria. [4] Not long after opening, the central Government purchased the Dunedin and Port Chalmers Railway Company for £150,000, with the transaction completed in May 1873. [5] Otago Provincial Council was abolished along with the other provincial councils of New Zealand in 1876.
The first locomotive to run on the line – and the first 1,067 mm gauge locomotive to operate in New Zealand – was the E class Josephine, a double Fairlie steam locomotive. [6] Local popularity ensured the locomotive was retained beyond its retirement from service on in 1917 and is preserved today in the Otago Settlers Museum in Dunedin. [7]
Much of the Port Chalmers line is now part of the Main South Line from Christchurch to Dunedin. When the first section of the mainline, from Dunedin to Waitati, opened in December 1877 a junction was established at Sawyers Bay. [8] The section from Dunedin to Sawyers Bay became part of the Main South Line, while the remaining two kilometres to Port Chalmers became the Port Chalmers Branch. In 1880 the line was vested in the newly established New Zealand Railways Department, and the private company dissolved.
Suburban passenger services were run from Dunedin on the line for over 100 years, but ceased at the end of 1979. [1] These were usually locomotive-hauled carriage trains, but infrequently, RM class Vulcan railcars were used too. Occasional passenger services were operated by Dunedin Railways to meet cruise ships and carry tourists through the scenic Taieri Gorge on the preserved portion of the Otago Central Railway, but these services have been mothballed since mid-2020.
The main reason for the lines existence is freight to and from the port, and as the shipping industry has changed, so has the traffic on the line. It has evolved from nineteenth century imports of supplies and exports of produce from rural Otago's farms and businesses into today's long-distance containerised freight. The line remains an important link in New Zealand's transport infrastructure and trains are operated by KiwiRail. The Taieri Gorge Railway recently sought a contract to haul logs from a location in the Taieri Gorge to Port Chalmers, but insufficient subsidies meant the venture would not have been cost efficient. [9] In 2012 KiwiRail once again sought subsidies from the Otago Regional Council to move logs through the port, noting that there were annually 450,000 tonnes of logs in the area south of Dunedin available for processing. The volume of logs equated to 15,000 truck movements inwards. For up to $1.5 million, connecting the site to the Main South Line would reduce truck movements by 7,500 each year, KiwiRail submitted. [10]
It estimated 400,000 tonnes of logs (about 13,000 log truck movements) were sent to Port Otago each year and better opportunities to transfer logs to and from rail could reduce truck traffic on State Highway 88 by up to 6500 movements annually. KiwiRail also noted it had increased its Otago operations, carrying 320,000 tonnes, up from 150,000 tonnes in 2010. This was mainly due to increases in freight dispatched by Fonterra from its Edendale and Mosgiel operations. [10]
Motive power has often been provided by shunting locomotives rather than larger mainline engines. At the start of the twentieth century, small tank locomotives such as members of the FA class were used. [11] However, in the 1960s, as diesel locomotives replaced steam locomotives on the main lines, large engines such as members of the AB class operated the suburban trains to Port Chalmers. [12]
Railway preservation in New Zealand is the preservation of historically significant facets of New Zealand's rail transport history. The earliest recorded preservation attempt took place in 1925, although the movement itself did not start properly until 1960. New Zealand appears to have a higher proportion of organized railway enthusiasts per 1,000 of population than any other part of the world.
Rail transport in New Zealand is an integral part of New Zealand's transport network, with a nationwide network of 4,375.5 km (2,718.8 mi) of track linking most major cities in the North and South Islands, connected by inter-island rail and road ferries. Rail transport in New Zealand has a particular focus on bulk freight exports and imports, with 19 million net tonnes moved by rail annually, with 99.5% of New Zealand's exports and imports being transported through the country's seaports.
Dunedin Railways is the trading name of Dunedin Railways Limited, an operator of a railway line and tourist trains based at Dunedin Railway Station in the South Island of New Zealand. The company is a council-controlled trading organisation wholly owned by Dunedin City Council through its holding company Dunedin City Holdings Limited.
The Otago Central Rail Trail is a 150-kilometre walking, cycling and horse riding track in the South Island of New Zealand. A pioneering project for New Zealand, the successful rail trail joined the New Zealand Cycle Trail umbrella organisation in 2012, having been one of the inspirations for it.
The Main North Line between Picton and Christchurch and the Main South Line between Lyttelton and Invercargill, running down the east coast of the South Island of New Zealand, are sometimes together referred to collectively as the South Island Main Trunk Railway (SIMT). Construction of a line running the length of the east coast began in the 1860s and was completed all the way from Picton to Invercargill in 1945; the last sections being on the Main North Line south of Picton. The designation "South Island Main Trunk" originally referred to only that line between Christchurch and Invercargill.
The Main South Line, sometimes referred to as part of the South Island Main Trunk Railway, is a railway line that runs north and south from Lyttelton in New Zealand through Christchurch and along the east coast of the South Island to Invercargill via Dunedin. It is one of the most important railway lines in New Zealand and was one of the first to be built, with construction commencing in the 1860s. At Christchurch, it connects with the Main North Line to Picton, the other part of the South Island Main Trunk.
The Outram Branch was a branch line railway near Dunedin, Otago, that operated from 1877 to 1953 and formed part of New Zealand's national rail network.
The Bluff Branch, officially the Bluff Line since 2011, is a railway line in Southland, New Zealand that links Invercargill with the port of Bluff. One of the first railways in New Zealand, it opened in 1867 and is still operating. Presently, it essentially functions as an elongated industrial siding.
The New Zealand DJ class locomotive is a type of diesel-electric locomotive in service on the New Zealand rail network. The class were built by Mitsubishi Heavy Industries and introduced from 1968 to 1969 for the New Zealand Railways Department (NZR) with a modernisation loan from the World Bank to replace steam locomotives in the South Island, where all of the class members worked most of their lives. Nine of the locomotives remain in use, mainly with Dunedin Railways.
The NZR E class of Double Fairlie steam locomotives were two different types of Fairlie steam locomotives, used on New Zealand's railway network.
The Southerner was a passenger express train in New Zealand's South Island between Christchurch and Invercargill along the South Island Main Trunk, that ran from 1970 to 2002. It was one of the premier passenger trains in New Zealand and its existence made Invercargill the southernmost passenger station in the world.
The Otago Province was a province of New Zealand until the abolition of provincial government in 1876. The capital of the province was Dunedin. Southland Province split from Otago in 1861, but became part of the province again in 1870.
The Otago Central Railway (OCR) or in later years Otago Central Branch Railway, now often referred to as the Taieri Gorge Railway, was a secondary railway line in Central Otago, in the South Island of New Zealand.
The Roxburgh Branch was a branch line railway built in the Otago region of New Zealand's South Island that formed part of the country's national rail network. Originally known as the Lawrence Branch, it was one of the longest construction projects in New Zealand railway history, beginning in the 1870s and not finished until 1928. The full line was closed in 1968.
Project Steam is a railway preservation society based in Dunedin, New Zealand. It is dedicated to the restoration of steam locomotives formerly operated by the New Zealand Railways Department, with its goal to restore at least one locomotive to main line operating conditions in order to operate excursions from Dunedin Railway Station. The society is currently the only one of its kind in Dunedin; the Ocean Beach Railway operates small tank locomotives but on private trackage, and the popular Taieri Gorge Limited is run solely by diesel locomotives.
The Palmerston North–Gisborne Line (PNGL) is a secondary main line railway in the North Island of New Zealand. It branches from the North Island Main Trunk at Palmerston North and runs east through the Manawatū Gorge to Woodville, where it meets the Wairarapa Line, and then proceeds to Hastings and Napier in Hawke's Bay before following the coast north to Gisborne. Construction began in 1872, but the entire line was not completed until 1942. The line crosses the runway of Gisborne Airport, one of the world's only railways to do so since Pakistan's Khyber Pass Railway closed.
The Castlecliff Branch is a branch line railway 5.88 km long in the Manawatu-Whanganui region of New Zealand's North Island. It is an extension of the Wanganui Branch from Taupo Quay in central Whanganui and follows the Whanganui River to Castlecliff on the South Taranaki Bight of the Tasman Sea. From its opening on 31 October 1885 until 1 February 1956 when the NZR took over, it was owned by the Wanganui Heads Railway Company, later renamed the Castlecliff Railway Company. From 5 September 2006 services on the branch were suspended but the infrastructure remained in place. In 2011 KiwiRail resumed services on part of the line.
Lyttelton Line is a name sometimes used to refer to the section of the Main South Line in New Zealand's South Island between Lyttelton and Christchurch, and can also be used to refer to the operations on this section. As it has always been part of the Main South Line, this name has never been officially used to refer to the track itself.
KiwiRail Holdings Limited is a New Zealand state-owned enterprise responsible for rail operations in New Zealand, and operates inter-island ferries. Trading as KiwiRail and headquartered in Wellington, New Zealand, KiwiRail is the largest rail transport operator in New Zealand. KiwiRail has business units of KiwiRail Freight, Great Journeys New Zealand and Interislander. KiwiRail released a 10-Year Turn-around Plan in 2010 and has received significant government investment in support of this in an effort to make KiwiRail a viable long-term transport operator.