Southbridge Branch, New Zealand

Last updated

Southbridge Branch
Overview
StatusClosed (Excluding Hornby to north of Springs road
Owner Railways Department
Locale Canterbury, New Zealand
Termini
  • Hornby
  • Southbridge
Stations13
Service
Type Heavy Rail
System New Zealand Government Railways (NZGR)
Operator(s) Railways Department
History
Opened28 July 1884 (1884-07-28)
Closed30 June 1962 (1962-06-30) (Southbridge – Lincoln)
1 December 1967 (1967-12-01) (Lincoln – Prebbleton)
1986 (1986) (Prebbleton – north of Springs Road)
Technical
Line length41 km
Number of tracksSingle
CharacterRural
Track gauge 3 ft 6 in (1,067 mm)
Route map

Contents

km
BSicon CONTgq.svg
BSicon eABZq+l.svg
BSicon exlBHF.svg
BSicon CONTf@Fq.svg
0
Hornby
BSicon exHST.svg
5
Prebbleton
BSicon exHST.svg
9
Ladbrooks
BSicon exABZgl.svg
BSicon exCONTfq.svg
BSicon exHST.svg
13
Lincoln
BSicon exHST.svg
18
Springston
BSicon exHST.svg
20
Goulds Road
BSicon exHST.svg
24
Ellesmere
BSicon exHST.svg
26
Lake Road
BSicon exHST.svg
29
Irwell
BSicon exHST.svg
32
Doyleston
BSicon exHST.svg
34
Leeston
BSicon exHST.svg
36
Hills Road
BSicon exKHSTe.svg
41
Southbridge
Southbridge Branch, New Zealand
Map

The Southbridge Branch was a branch line railway that formed part of New Zealand's national rail network. It was located in the Canterbury region of the South Island and operated from 1875 until 1967. Five kilometres of the line remains open as the Hornby Branch, formerly the Hornby Industrial Line. [1]

Construction

On 2 November 1870, the Canterbury provincial government resolved to build a line from Rolleston to Southbridge, as the district around Lake Ellesmere / Te Waihora had become an economically significant grain-growing region that produced almost a quarter of all wheat in New Zealand in the late 1860s. However, by April 1872, the decision had been taken to establish the junction with the Main South Line in Hornby and work began on the line's formation.

Financial difficulties and delays in acquiring materials slowed construction initially, but on 26 April 1875, the line was opened to Springston. This gave the line a length of 17.74 kilometres (11.02 mi). On 13 July 1875, the rest of the line to Southbridge was opened, giving the branch a total length of 41.02 kilometres (25.49 mi) In 1880, construction of a sub-branch line off the Southbridge Branch to Little River from Lincoln began; this became the Little River Branch.

Stations

The following stations were located on the Southbridge Branch (in brackets is the distance from the junction at Hornby):

Operation

In the very early years of the line, a passenger train ran once each way daily between Christchurch and Lincoln, but this service ceased before 1880 and the line settled down to a pattern of "mixed" trains that carried both goods and passengers. These trains ran twice daily in 1914, along with a daily goods-only service, and a locomotive depot operated in Southbridge. Passenger numbers peaked in 1924, with approximately 34,000 carried, and picnic trains to Lake Ellesmere / Te Waihora were popular, but competition from road transport began to markedly increase, and the line was losing money in the late 1920s. In 1930, the decision was taken to close the Southbridge locomotive depot and operate all trains directly out of Christchurch, and this had a notable short-term impact, as the line made a profit in 1938.

However, in 1939, the Southbridge Branch again lost money and never returned to profitably. Post-World War II shortages and other economic factors led to the cancellation of passenger provisions on the line from 12 April 1951. After this stage, freight trains were only required to operate three or four times a week, and as traffic declined further, the decision was taken to abbreviate the line. On 30 June 1962, the 28 km section of line between Lincoln and Southbridge closed to all traffic. The Hornby-Lincoln section was then redesignated as the Hornby Industrial Line, which was cut back to Prebbleton station on 1 December 1967, and to the north side of the Springs Road crossing in 1986.

The line still exists as far as Springs Road at Prebbleton, the overbridge having been demolished in the late 1990s. The couple of kilometres still in use serves a number of industries and is shunted when required. Part of the formation near Prebbleton has been incorporated into the Little River Rail Trail, and a motorway being built just north of Prebbleton will see the line truncated just past the Watties siding, with incorporation of the disused track between the motorway and Marshs Road into the rail trail being proposed. Most of the land around the old Prebbleton yard has been developed for housing in the last five years, although some is in reserves and a pedestrian path runs along part of the formation south of Tosswill Road.

Today

Remnants of closed railways often diminish and disappear with the passage of time, but some relics of the Southbridge Branch remain. Its formation can be traced for much of the line's length, though it does vanish at some points, at least in part because the flat terrain did not require substantial earthworks in the first place. There are also some bridge and culvert remains to be found along the line's former route, such as a footbridge near Lincoln utilising ex-railway abutments. Doyleston contains some of the most significant remnants, with the station site still in possession of its goods shed, loading bank, and passenger platform. Goods sheds can also be found in Leeston (demolished October 2020) and Springston, with the latter utilised as an engineer's workshop. Ellesmere retains concrete foundation remains, and in Irwell, rails can be found scattered at the station site and embedded in a road near an old factory. Some remnants of the line can be seen today in Southbridge, such as the rail and loading dock inside present-day Hamilton Seeds.

The Christchurch Little River Rail Trail Trust is developing a trail from Christchurch to Little River and opened the section from Prebbleton to Lincoln in November 2006, which runs alongside the rail corridor on Springs Road. [2] In September 2009 the Trust opened the section from Hornby to Prebbleton, which utilises the abandoned formation between Marshs Road and Springs Road. [3] As at November 2009 a housing development on the old railway yard at Prebbleton is well underway with railway-themed street names. [4]

Related Research Articles

<span class="mw-page-title-main">Ferrymead Railway</span> Heritage railway in New Zealand

The Ferrymead Railway is a New Zealand heritage railway built upon the track formation of New Zealand's first public railway, from Ferrymead to Christchurch, which opened on 1 December 1863. On the opening of the line to Lyttelton on 9 December 1867, the Ferrymead Railway became the Ferrymead Branch and was closed shortly thereafter. In 1964, rail enthusiasts began relaying track on the historic formation and the new 3 ft 6 in narrow gauge. Ferrymead Railway officially reopened in 1977. It now operates steam, diesel and electric trains regularly and is recognised as one of the most significant rail preservation sites in New Zealand.

<span class="mw-page-title-main">Lincoln, New Zealand</span> Town in Canterbury, New Zealand

Lincoln is a town in the Selwyn District, in the Canterbury Region of New Zealand's South Island. The town is located on the Canterbury Plains to the west of Banks Peninsula, 22 kilometres southwest of Christchurch. The town has a population of 10,250, making it the second largest town in the Selwyn District behind nearby Rolleston.

<span class="mw-page-title-main">Leeston</span> Town in South Island, New Zealand

Leeston is a town on the Canterbury Plains in the South Island of New Zealand. It is located 30 kilometres southwest of Christchurch, between the shore of Lake Ellesmere / Te Waihora and the mouth of the Rakaia River. The town is home to a growing number of services which have increased and diversified along with the population. Leeston has a supermarket, schools, churches, hospital, gym, cafes, restaurants, medical centre, pharmacy and post office. The Selwyn District Council currently has a service office in Leeston, after the headquarters was shifted to Rolleston.

<span class="mw-page-title-main">Main South Line</span> Railway line in New Zealand

The Main South Line, sometimes referred to as part of the South Island Main Trunk Railway, is a railway line that runs north and south from Lyttelton in New Zealand through Christchurch and along the east coast of the South Island to Invercargill via Dunedin. It is one of the most important railway lines in New Zealand and was one of the first to be built, with construction commencing in the 1860s. At Christchurch, it connects with the Main North Line to Picton, the other part of the South Island Main Trunk.

The Wyndham Branch, also known as the Glenham Branch, was a branch line railway in Southland, New Zealand. The first section was opened in 1882 and it operated until 1962. Although its name would imply that it terminated in Wyndham, an extension to a terminus in Glenham operated for forty years. It was operated by the New Zealand Railways Department.

The Waimate Branch was a branch line railway built in southern Canterbury, New Zealand to link the Main South Line with the town of Waimate, the centre of the surrounding rural area. It opened in 1877 and operated until 1966; for some of this time, it included an extension to Waihao Downs that was known as the Waimate Gorge Branch or Waihao Downs Branch. When the line closed, Waimate received the dubious distinction of being New Zealand's first major town to lose its railway line.

<span class="mw-page-title-main">Foxton Branch</span> Railway line in New Zealand

The Foxton Branch was a railway line in New Zealand. It began life as a tramway, reopened as a railway on 27 April 1876, and operated until 18 July 1959. At Himatangi there was a junction with the Sanson Tramway, a line operated by the Manawatu County Council that was never upgraded to the status of a railway.

The Methven Branch was a branch line railway that was part of New Zealand's national rail network in Canterbury. It opened in 1880 and operated until 1976.

The Mount Somers Branch, sometimes known as the Springburn Branch, was a branch line railway in the region of Canterbury, New Zealand. The line was built in stages from 1878, reaching Mount Somers in 1885. A further section to Springburn was added in 1889; this closed in 1957, followed by the rest of the line in 1968. A portion has been preserved as the Plains Vintage Railway.

The Hedgehope Branch, also known as the Browns Branch, was a branch line railway in Southland, New Zealand that started life in the 1880s as a privately owned bush tramway. It opened as a railway in 1899 and operated until 1968, though the section beyond Browns closed in 1953. It connected with the national rail network in Winton on the Kingston Branch.

<span class="mw-page-title-main">Okaihau Branch</span> Railway branch line in New Zealand

The Okaihau Branch, sometimes known as the Kaikohe Branch and rarely the Rangiahua Branch, was a branch line railway that joined the North Auckland Line of the national rail network of New Zealand at Otiria. It was the most northerly line in New Zealand and was intended to run all the way to Kaitaia. It opened to Ōkaihau in 1923 and closed in 1987.

<span class="mw-page-title-main">NZR RM class (Edison battery-electric)</span>

The NZR RM class Edison battery-electric railcar was a railcar that ran in Canterbury, New Zealand for eight years. It was built for New Zealand Railways (NZR) as a prototype for battery-electric railcars. While the railcar, classified "RM 6", was considered the first successful railcar in New Zealand, it was later destroyed in a fire, and battery-electric traction for railcars was not developed further in New Zealand. Two other classes of battery-electric locomotives were introduced about the same time as RM 6, the E class of 1922 and the EB class of 1925.

<span class="mw-page-title-main">Oxford Branch (New Zealand)</span>

The Oxford Branch was a branch line railway that formed part of New Zealand's national rail network. It was located in the Canterbury region of the South Island, and ran roughly parallel with the Eyreton Branch that was located some ten kilometres south. It opened to Oxford in 1875 and survived until 1959.

<span class="mw-page-title-main">Little River Branch</span>

The Little River Branch was a branch line railway that formed part of New Zealand's national rail network. It diverged from the Southbridge Branch in Lincoln and ran down Banks Peninsula in the Canterbury region of the South Island. It was opened to Little River in 1886 and operated until 1962.

<span class="mw-page-title-main">Little River Rail Trail</span>

The Little River Rail Trail is a cycling and walking track on Banks Peninsula in the Canterbury region of New Zealand's South Island.

The Waiau Branch was a branch line railway in the northern Canterbury region of New Zealand's South Island. Known as the Great Northern Railway for its first few decades of life, the Waiau Branch was seen as part of a main line north but was ultimately superseded by a coastal route. Opened in stages from 1882 to 1919, the line closed in 1978 but a portion has been retained as the Weka Pass Railway.

<span class="mw-page-title-main">Ross Branch (railway line)</span>

The Ross Branch, officially known as the Hokitika Line since 2011, and previously as the Hokitika Industrial Line, is a branch line railway that forms part of New Zealand's national rail network. It is located in the Westland District of the South Island's West Coast region and opened to Hokitika in 1893. A further extension to Ross operated from 1909 until 1980.

Rail transport in Christchurch, the largest city on New Zealand's South Island, consists of two main trunk railway lines intersecting in the suburb of Addington, carrying mainly long-haul freight traffic but also two long distance tourist-oriented passenger trains. The two lines are the Main North Line and Main South Line, collectively but unofficially known as the South Island Main Trunk Railway. There is a heritage line at the Ferrymead Historic Park that is operated with steam, electric, and diesel motive power hauling tourist-oriented services.

References

Citations

  1. "Hornby Branch". Land Information New Zealand . Retrieved 10 March 2019.
  2. Section 2 – Prebbleton-Lincoln. Christchurch Little River Railtrail Trust. Accessed on 22 November 2009
  3. Railtrail Opening Event. Christchurch Little River Railtrail Trust. Accessed on 22 November 2009
  4. Prebbleton Central Subdivision. Accessed on 22 November 2009

Bibliography

  • Churchman, Geoffrey B; Hurst, Tony (2001) [1990, 1991]. The Railways of New Zealand: A Journey through History (Second ed.). Transpress New Zealand. ISBN   0-908876-20-3.
  • Leitch, David; Scott, Brian (1995). Exploring New Zealand's Ghost Railways (1998 ed.). Wellington: Grantham House. ISBN   1-86934-048-5.
  • Hermann, Bruce J; South Island Branch Lines pp 9,10 (1997, New Zealand Railway and Locomotive Society, Wellington) ISBN   0-908573-70-7
  • Mulligan, Barbara (2000). New Zealand Rail Trails: A Guide to 42 Ghost Lines. Wellington: Grantham House Publishing. pp. 115–119. ISBN   978-1-86934-126-8.