Overview
StatusClosed
Owner Railways Department
Locale Southland, New Zealand
Termini
  • McNab
  • Waikaka
Stations6
Service
Type Heavy Rail
System New Zealand Government Railways (NZGR)
Operator(s) Railways Department
History
Opened1908
Closed1962
Technical
Line length20.82 km (12.94 mi)
Number of tracksSingle
CharacterRural
Track gauge 3 ft 6 in (1,067 mm)
Route map

Contents

km
BSicon CONTg@Gq.svg
BSicon hKRZWaeq.svg
BSicon eABZq+l.svg
BSicon eBHFq.svg
BSicon dCONTfq.svg
0.00
McNab
BSicon dWASSER.svg
BSicon exHST.svg
2.54
Howe
BSicon dWASSER.svg
BSicon exHST.svg
BSicon WindPump.svg
7.16
Willowbank
BSicon dWASSER.svg
BSicon exHST.svg
11.79
Maitland
BSicon dWASSER.svg
BSicon exHST.svg
14.83
Fleming
BSicon dWASSER.svg
BSicon exHST.svg
16.60
Pullar
BSicon dWASSERl.svg
BSicon exhKRZWae.svg
BSicon WASSERq.svg
Waikaka Stream
BSicon exKHSTe.svg
20.82
Waikaka
Waikaka Branch
Map

The Waikaka Branch was a branch line railway of the Main South Line that ran through agricultural and gold-mining country in Southland, New Zealand. It was constructed in 1907 and 1908, and was operated by the New Zealand Railways Department until its closure in 1962.

Construction

The Waikaka Branch was the last of the minor branches of northern Southland to be authorised, [1] though proposals had existed for decades beforehand. Poor transportation access was causing farm values to depreciate while wagoning costs were prohibitive, and settlers petitioned the government for a railway line to improve their economic prospects. The town of Kelso had already been linked to the Dunedin-Invercargill portion of the Main South Line at Waipahi by the Tapanui Branch, but a prominent proposal supported another link, this time from Kelso via the Waikaka Valley to Gore on the Main South Line.

In 1878, this line was approved by the government and an official survey of the route was anticipated in early 1880, [2] but governmental inaction meant that the proposal lapsed and by 1886, residents of the Waikaka Valley had lost hope that a railway would be built. [3] The prospect of a railway was not seriously revived until 1897 when a community financing initiative in the North Island was approved to construct a line from Paeroa to Waihi (later part of the East Coast Main Trunk Railway). [4] Pressure paid off in 1904 when a branch line to the village of Waikaka was included in the government's Railways Authorisation Act, but official procrastination meant construction did not commence.

The through line from Gore to Kelso still had support; in February 1905, Southland business interests urged the government to begin construction of the Gore-Kelso line and to link the Tapanui Branch with the Roxburgh Branch, as trade that they felt should rightfully benefit Southland was instead benefitting Otago due to superior railway access to Dunedin. [5] No significant action was taken to achieve this proposal, but later in 1905, a company was established by local residents to advance half the construction costs of the approved branch to the government, and this led to the passage of the Waikaka Branch Railway Act. [4]

When the promised money eventuated, construction of the line commenced on 18 April 1907, with the first sod turned by the Acting Prime Minister, Joseph Ward. [6] The branch left the Main South Line just east of Gore at a locality called McNab. Locals under supervision rather than contractors or engineers built the line twenty-one kilometres up the valley to Waikaka, and it was completed in late 1908. On 26 November 1908, the line was handed over to the Railways Department and the official opening was held the following day. [4]

Stations

The following stations were on the Waikaka Branch (in brackets is the distance from the junction in McNab): [7]

Operation

The branch was a typical New Zealand rural branch servicing farms. No towns or major industries existed at any point along the line. Branches such as this were useful to open up internal New Zealand to commercial farming, and the Waikaka Branch provided local farmers with invaluable access to markets before the development of modern road transportation. A daily service carrying both passengers and freight, known as a mixed train, operated from the terminus to Gore and return. [4] The valley of the branch directly paralleled the Pomahaka Valley that was followed by the Tapanui Branch, and they were sufficiently close that locomotive crews on one branch claimed that they could see the smoke from the steam locomotive of a train in the other valley. [1]

On 9 February 1931, regular passenger services were cancelled due to poor patronage and the locomotive depot in Waikaka was closed in an attempt to improve the branch's finances as it had been losing money for a few years. These measures temporarily improved its prospects and trains operated from Gore to Waikaka and return, but by 1950, although revenue had doubled, so had expenses. Improvements in quality and access to road transportation meant that the use of the railway by farmers decreased - by 1950, the train ran only thrice weekly, and not much later, this level of service was further reduced to twice weekly. [4] These services were augmented by highly infrequent excursions, the most notable of which was chartered by the Waikaka Valley Presbyterian Church on 26 March 1962 to convey almost 800 passengers in 12 carriages and 2 vans to Racecourse station on the Wyndham Branch for a picnic near Wyndham. The motive power used on the service was typical of the latter decades of the branch: an A class locomotive on the service out of Waikaka, and an AB class locomotive on the return working. [8]

The line would have been a candidate for closure sometime in the early 1950s like other similar branches in New Zealand, but due to the lack of bridges or tunnels, it was ideal for carrying large, heavy items for the construction of the Roxburgh Dam. This freight sustained the line into the 1960s, but upon completion of the dam, there was not sufficient traffic to justify the branch's continued existence and it was closed on 9 September 1962. [1]

Today

Traces of the branch line's existence remain evident today. In Willowbank, a preserved windmill, wooden water tank, and a Historic Places plaque can be found at the site of the former yard. Stockyards and loading chutes can be found preserved in Fleming. The former railbed is well defined through the countryside for some of its length, and structures of obvious railway origin can be found in Waikaka, such as former Railways Department housing provided for staff based in Waikaka when its locomotive depot was operational. [9]

See also

Related Research Articles

The Tapanui Branch was a railway line located near the border of the regions of Southland and Otago, New Zealand. Although the name suggests that it terminated in Tapanui, its furthest terminus was actually in Edievale. Construction of the line began in 1878 with the first section opened in 1880, and it operated until 1978, when it was destroyed by flooding from the Pomahaka River.

<span class="mw-page-title-main">Main South Line</span> Railway line in New Zealand

The Main South Line, sometimes referred to as part of the South Island Main Trunk Railway, is a railway line that runs north and south from Lyttelton in New Zealand through Christchurch and along the east coast of the South Island to Invercargill via Dunedin. It is one of the most important railway lines in New Zealand and was one of the first to be built, with construction commencing in the 1860s. At Christchurch, it connects with the Main North Line to Picton, the other part of the South Island Main Trunk.

The Shag Point Branch was a short branch off the Main South Line on the east coast of the South Island of New Zealand. It left the main line about nine kilometres north of Palmerston at the small settlement of Shag Point to provide railway access to a nearby supply of coal. It was built in 1879 and ran until 1934.

The Tokanui Branch, also known as the Seaward Bush Branch, was a branch line railway located in Southland, New Zealand. It diverged from the Bluff Branch south of the main railway station in Invercargill and ran for 54 kilometres in a southeasterly direction. Construction began in 1883 and it operated until 1966.

The Wyndham Branch, also known as the Glenham Branch, was a branch line railway in Southland, New Zealand. The first section was opened in 1882 and it operated until 1962. Although its name would imply that it terminated in Wyndham, an extension to a terminus in Glenham operated for forty years. It was operated by the New Zealand Railways Department.

The Waimate Branch was a branch line railway built in southern Canterbury, New Zealand to link the Main South Line with the town of Waimate, the centre of the surrounding rural area. It opened in 1877 and operated until 1966; for some of this time, it included an extension to Waihao Downs that was known as the Waimate Gorge Branch or Waihao Downs Branch. When the line closed, Waimate received the dubious distinction of being New Zealand's first major town to lose its railway line.

The Ngapara and Tokarahi Branches were two connected railway branch lines in northern Otago, New Zealand, part of the national rail network. The Ngapara Branch opened in 1877 and almost all of it closed in 1959; the remaining few kilometres, called the Waiareka Industrial Line, were removed in 1997. The Tokarahi Branch branched off the Ngapara Branch. It operated from 1887 until 1930 and was originally known as the Livingstone Branch, though it never progressed beyond Tokarahi to Livingstone. In early 2008 there is a proposal to reinstate the first 4.5 km of the Ngapara Branch.

<span class="mw-page-title-main">Kingston Branch</span> Railway line in Southland, New Zealand.

The Kingston Branch was a major railway line in Southland, New Zealand. It formed part of New Zealand's national rail network for over a century: construction began in 1864, Kingston was reached in 1878, and it closed in 1979. For much of its life, it was considered a secondary main line rather than a branch line, and in its earlier years, it was sometimes known as the "Great Northern Railway". Today, the southern portion now forms a part of the Wairio Branch and the northernmost 14 kilometres was used by the Kingston Flyer.

The Waimea Plains Railway was a secondary railway line that linked the towns of Lumsden and Gore in northern Southland, New Zealand. It skirted the Hokonui Hills, and operated as a through route between 31 July 1880 and 1 April 1971, with the short section from Lumsden to Balfour continuing as the Balfour Branch until 15 January 1978.

<span class="mw-page-title-main">Waikaia Branch</span> Closed South Island railway branch line

The Waikaia Branch, also known as the Switzers Branch, was a branch line railway in Southland, New Zealand. Proposed as early as the 1870s, it was not opened until 1909 and was operated by the New Zealand Railways Department for half a century until its closure in 1959.

The Mossburn Branch was a branch line railway in New Zealand from Lumsden on the Kingston Branch to the town of Mossburn in northern Southland. Construction began in 1879, Mossburn was reached in 1887, and the line closed in 1982. It was operated by the New Zealand Railways Department.

The Hedgehope Branch, also known as the Browns Branch, was a branch line railway in Southland, New Zealand that started life in the 1880s as a privately owned bush tramway. It opened as a railway in 1899 and operated until 1968, though the section beyond Browns closed in 1953. It connected with the national rail network in Winton on the Kingston Branch.

The Tuatapere Branch, including the Orawia Branch, was a branch line railway in Southland, New Zealand. Although the Tuatapere and Orawia Branches look like a single line, operationally they were considered separate lines. The first section opened to Riverton in 1879 and reached Tuatapere three decades later. The extension from Tuatapere to Orawia operated from 1925 until 1970. In 1976 the Tuatapere Branch was truncated to Riverton, and was known as the Riverton Branch until 1978, when it closed beyond Thornbury. The remaining portion of the line is now part of the Wairio Branch.

<span class="mw-page-title-main">NZR RM class (Clayton)</span>

The NZR RM class Clayton steam rail motor was a unique railcar that was operated by New Zealand Railways (NZR) for New Zealand's national rail network and one of only two steam railcars to operate in New Zealand - the other being 1925's RM class Sentinel-Cammell.

<span class="mw-page-title-main">Otago Central Railway</span> Branch railway line in Otago, New Zealand

The Otago Central Railway (OCR) or in later years Otago Central Branch Railway, now often referred to as the Taieri Gorge Railway, was a secondary railway line in Central Otago, in the South Island of New Zealand.

The Kurow Branch was part of New Zealand's national rail network. In the North Otago region of the South Island, it was built in the 1870s to open up the land behind Oamaru for development, and closed in 1983.

The Roxburgh Branch was a branch line railway built in the Otago region of New Zealand's South Island that formed part of the country's national rail network. Originally known as the Lawrence Branch, it was one of the longest construction projects in New Zealand railway history, beginning in the 1870s and not finished until 1928. The full line was closed in 1968.

The Dunback and Makareao Branches were two connected branch line railways, part of New Zealand's national rail network. Located in the Otago region of the South Island, both lines were 15 kilometres (9.3 mi) in length and shared the first 11 kilometres (6.8 mi). The Dunback Branch, also known as the Waihemo Branch, opened in 1885 and closed in 1968; the Makareao Branch, also known as the Inch Valley Railway or the Inch Valley Branch, opened in 1900 and operated for 89 years to 1989.

<span class="mw-page-title-main">Raetihi Branch</span> Branch line railway

The Raetihi Branch was a branch line railway in the central North Island of New Zealand. It formed part of New Zealand's national rail network and operated from 1917 until 1968.

The Waiau Branch was a branch line railway in the northern Canterbury region of New Zealand's South Island. Known as the Great Northern Railway for its first few decades of life, the Waiau Branch was seen as part of a main line north but was ultimately superseded by a coastal route. Opened in stages from 1882 to 1919, the line closed in 1978 but a portion has been retained as the Weka Pass Railway.

References

Citations

  1. 1 2 3 Geoffrey B. Churchman and Tony Hurst, The Railways of New Zealand: A Journey Through History (Auckland: HarperCollins, 1991), 213.
  2. "Mataura", Otago Witness 1474 (14 February 1880): 10.
  3. "Kelso", Otago Witness 1816 (10 September 1886): 16.
  4. 1 2 3 4 5 David Leitch and Brian Scott, Exploring New Zealand's Ghost Railways, revised edition (Wellington: Grantham House, 1998 [1995]), 109.
  5. "Southland Railways", Otago Witness 2658 (22 February 1905): 15.
  6. "Gore - Waikaka Railway", Hawera and Normanby Star 53(9318) [19 April 1907]: 7.
  7. New Zealand Railway and Tramway Atlas, fourth edition, edited by John Yonge (Essex: Quail Map Company, 1993), 29.
  8. "The Waikaka Excursion", Yarn 99 (May 1962).
  9. Leitch and Scott, Exploring New Zealand's Ghost Railways, 110.

Bibliography

  • Churchman, Geoffrey B; Hurst, Tony (2001) [1990, 1991]. The Railways of New Zealand: A Journey through History (Second ed.). Transpress New Zealand. ISBN   0-908876-20-3.
  • Leitch, David; Scott, Brian (1995). Exploring New Zealand's Ghost Railways (1998 ed.). Wellington: Grantham House. ISBN   1-86934-048-5.
  • Hermann, Bruce J; South Island Branch Lines pp 35,38 (1997, New Zealand Railway & Locomotive Society, Wellington) ISBN   0-908573-70-7
  • Mulligan, Barbara (2000). New Zealand Rail Trails: A Guide to 42 Ghost Lines. Wellington: Grantham House Publishing. pp. 225–227. ISBN   978-1-86934-126-8.