Ravenswood Generating Station

Last updated

Ravenswood Generating Station
Ravenswood Generating Station (41875).jpg
Ravenswood Generating Station in 2017
Ravenswood Generating Station
CountryUnited States
Location Long Island City, Queens, New York City
Coordinates 40°45′35″N73°56′45″W / 40.75972°N 73.94583°W / 40.75972; -73.94583
StatusOperational
Commission date 1963 (1963)
Owner(s)L.S Power
Operator(s)IHI Power Services
Thermal power station
Primary fuel Fuel Oil, Natural Gas
Secondary fuel Fuel Oil, Natural Gas
Turbine technology Steam turbine, Gas turbine
Combined cycle?Yes (Unit 40)
Power generation
Units operational5
Units cancelled2 × 500 MW PWR
Nameplate capacity 2,480 MW
External links
Commons Related media on Commons

Ravenswood Generating Station is a 2,480 megawatt power plant in Long Island City in Queens, New York City. [1] It is owned and operated by LS Power/Helix Energy Solutions Group. [2] The plant is fueled primarily by fuel oil (no. 6) and natural gas which heats the boilers. [1]

Contents

History

Ravenswood was originally built and owned by Consolidated Edison of New York Inc. (Con Edison) in 1963. The first two units constructed in 1963 were Ravenswood 10 and 20, each having a generating capacity of approximately 385 megawatts. Then, in 1965, Ravenswood 30 (commonly called "Big Allis") was commissioned with a generating capacity of nearly 981 megawatts. In the 1970s, multiple combustion turbine units were installed in a simple cycle configuration to meet peak power demands. Two 2030 MWth(500 MWe) nuclear reactors were planned to begin operation on the site in 1970, but they were cancelled due to controversy and safety concerns.

Due to deregulation of the energy markets in New York State, Con Edison was required to sell all of its "in-city" generating stations in New York City including Ravenswood. In 1999, Con Edison transferred ownership of Ravenswood to KeySpan Energy for $597 million. [3] In 2004, KeySpan constructed a new unit, Ravenswood 40, using combined cycle technology with generating capacity of 250 megawatts.

National Grid plc acquired KeySpan in 2007 [4] but due to its involvement in electrical transmission the New York Public Service Commission required National Grid to sell Ravenswood to ensure competition in the market. On August 26, 2008, Ravenswood was sold by National Grid to TransCanada Corporation for $2.9 billion. [5] TransCanada later sold Ravenswood to LS Power/Helix Energy Solutions Group in a package deal also including the Ironwood, Ocean State and Kibby Wind facilities for a total price of US$2.1 Billion. [6] [7] [8] In 2018, Helix Generation LLC filed a lawsuit against TransCanada Facility USA Inc. for allegedly fraudulently misleading Helix prior to the sale. [9]

In 2019, it was announced that a 316 MW battery storage system would be built at the Ravenswood Generating Station. The system would be the largest in New York state and would be built in three phases, the first of which would be complete in 2021. [10]

Description

Ravenswood is located in Long Island City in Queens, New York, across from Roosevelt Island. The site is connected to the New York City electrical system through the 138 kV Vernon substation and the 345 kV Rainey substation. [11] It is capable of producing 2,480 MW of electric power. [1]

UnitApproximate PowerFirst Operated [1] Power Source [2]
10380 MW [11] 1963No.6 Fuel (Primary fuel) / Natural Gas (Secondary Fuel)
20280 MW [11] 1963No.6 Fuel (Primary fuel) / Natural Gas (Secondary Fuel)
30990 MW [11] 1965No.6 Fuel (Primary fuel) / Natural Gas (Secondary Fuel)
40250 MW [12] 2004Natural Gas (Primary Fuel) / No.2 Fuel (Secondary)
Peaking Gas Turbines400 MW [11] VariousNatural Gas

Ravenswood No. 3

Ravenswood No. 3, also known as Unit 30 or Big Allis, is a natural gas facility at Ravenswood Generating Station owned by LS Power and operated by IHI Corporation Energy Services. During 1963, Allis-Chalmers announced that ConEd had ordered the "world's first MILLION-KILOWATT unit...big enough to serve 3,000,000 people." This sheer scale helped the plant become popularly known as "Big Allis", due to Allis-Chalmers' role in construction. During the Northeast blackout of 1965, the bearings of the Allis-Chalmers Turbine were damaged. The lube oil pumps were hooked up to the electrical grid and thus shut down during the blackout, causing bearing damage. [13] [14]

At the time of its installation, it was the world's largest steam energy generating facility. It is located on the Ravenswood site, consisting of Units 1, 2, 3 and 4, as well as several small gas turbines (GTs), and an oil depot. The site overall produces about 2,500 MW, or approximately 20% of New York City's current energy consumption. [15] [16] In 2011, Big Allis burned 97% natural gas, 3% oil (used as backup fuels).

The site also includes a steam generation plant consisting of four Babcock & Wilcox boilers, owned and run by Con Edison. The plant helps in the supply of steam to the Manhattan steam system when needed, via the Ravenswood Tunnel under the East River. [17] [18]

See also

Related Research Articles

<span class="mw-page-title-main">Athens, New York</span> Town in New York, United States

Athens is a town in Greene County, New York, United States. The population was 3,916 at the 2020 census. The town of Athens has a village also called Athens. The town is near the eastern edge of the county.

The New York City blackout of 1977 was an electricity blackout that affected most of New York City on July 13–14, 1977. The only unaffected neighborhoods in the city were in southern Queens, which were part of the Long Island Lighting Company system, as well as the Pratt Institute campus in Brooklyn, and a few other large apartment and commercial complexes that operated their own power generators.

<span class="mw-page-title-main">Kintigh Generating Station</span>

The Kintigh Generating Station, also known as Somerset Operating Co. LLC of the Upstate New York Power Producers was a 675-megawatt coal-fired power plant located in Somerset, New York, United States. The plant was owned by AES Corporation until bankruptcy. Its unit was launched into service in 1984. Coal is provided to the plant via the Somerset Railroad. The waste heat is dumped into Lake Ontario, resulting in a warm-water plume visible on satellite images. The plant's 625-foot smoke stack can be seen across Lake Ontario from the shores of Toronto, Pickering, Oshawa, and Ajax, Ontario. It can also be seen from points along the Niagara Escarpment, including Lockport, NY, approximately 20 miles south. Power from the plant is transferred by dual 345kV power lines on wood pylons, which run south from the plant through rural agricultural land. In Royalton, NY they split at their physical junction with the dual circuit 345-kV Niagara-to-Edic transmission line, owned by the New York Power Authority, one circuit heads west to a substation at Niagara Falls, the other heads east to Station 80 south of Rochester. This bulk electric transmission constraint, created by the Somerset plant tie-in and forcing wheeling through 230kV and 345kV transmission lines to the Homer City Coal Plant east of Pittsburgh, PA, and returning to NY at the Watercurry substation outside Elmira, will be resolved through the Empire State Line proposal approved by NY Independent System Operator (NYISO).

<span class="mw-page-title-main">Consolidated Edison</span> American energy company

Consolidated Edison, Inc., commonly known as Con Edison or ConEd, is one of the largest investor-owned energy companies in the United States, with approximately $12 billion in annual revenues as of 2017, and over $62 billion in assets. The company provides a wide range of energy-related products and services to its customers through its subsidiaries:

<span class="mw-page-title-main">Southern California Edison</span> Electrical utility in Southern California, United States

Southern California Edison (SCE), the largest subsidiary of Edison International, is the primary electric utility company for much of Southern California. It provides 15 million people with electricity across a service territory of approximately 50,000 square miles.

<span class="mw-page-title-main">Indian Point Energy Center</span> Nuclear power plant in Buchanan, New York

Indian Point Energy Center (I.P.E.C.) is a now defunct three-unit nuclear power station located in Buchanan, just south of Peekskill, in Westchester County, New York. It sits on the east bank of the Hudson River, about 36 miles (58 km) north of Midtown Manhattan. The facility permanently ceased power operations on April 30, 2021. Before its closure, the station's two operating reactors generated about 2,000 megawatts (MWe) of electrical power, about 25% of New York City's usage. The station is owned by Holtec International, and consists of three permanently deactivated reactors, Indian Point Units 1, 2, and 3. Units 2 and 3 were Westinghouse pressurized water reactors. Entergy purchased Unit 3 from the New York Power Authority in 2000 and Units 1 and 2 from Consolidated Edison in 2001.

The New York Power Authority (NYPA), is the largest state public power utility in the United States providing some of the lowest-cost electricity in the nation, operating 16 generating facilities and more than 1,400 circuit-miles of transmission lines. Its main administrative offices are in White Plains, New York

<span class="mw-page-title-main">Long Island Power Authority</span> Municipal subdivision of New York, US

Long Island Power Authority is a municipal subdivision of the State of New York that owns the electric transmission and electric distribution system serving all of Long Island and a portion of New York City known as the Rockaways. LIPA was originally created under the Long Island Power Act of 1985 to acquire the Long Island Lighting Company (LILCO)'s electric and natural gas infrastructure after the cancellation of the Shoreham Nuclear Power Plant. LIPA acquired LILCO's transmission system in May 1998, while the remainder of LILCO's natural gas-related infrastructure merged with Brooklyn Union Gas to form KeySpan Energy.

<span class="mw-page-title-main">Constellation Energy</span> Energy company headquartered in Baltimore, Maryland

Constellation Energy Corporation is an American energy company headquartered in Baltimore, Maryland. The company provides electric power, natural gas, and energy management services. It has approximately two million customers across the continental United States.

<span class="mw-page-title-main">NRG Energy</span> Energy company serving customers in the northeast United States and Texas

NRG Energy, Inc. is an American energy company, headquartered in Houston, Texas. It was formerly the wholesale arm of Northern States Power Company (NSP), which became Xcel Energy, but became independent in 2000. NRG Energy is involved in energy generation and retail electricity. Their portfolio includes natural gas generation, coal generation, oil generation, nuclear generation, wind generation, utility-scale generation, and distributed solar generation. NRG serves over 7 million retail customers in 24 US states including Texas, Connecticut, Delaware, Illinois, Maryland, Massachusetts, New Jersey, New York, Pennsylvania, Ohio; the District of Columbia, and eight provinces in Canada.

<span class="mw-page-title-main">Moss Landing Power Plant</span> Natural gas-fired power station in Moss Landing, California

The Moss Landing Power Plant is a natural gas powered electricity generation plant located in Moss Landing, California, United States, at the midpoint of Monterey Bay. Its large stacks are landmarks, visible throughout the Monterey Bay Area. The plant is owned and operated by Houston-based Dynegy and currently has a generation capacity of 1020 MW (net) from its two combined cycle generation units. It was once the largest power plant in the state of California, with a generation capacity of 2560 MW, before its two large supercritical steam units were retired in 2016.

<span class="mw-page-title-main">Black start</span> Restoring of electric power station without external electric power

A black start is the process of restoring an electric power station or a part of an electric grid to operation without relying on the external electric power transmission network to recover from a total or partial shutdown.

<span class="mw-page-title-main">St. Clair Power Plant</span> Power generation facility

The Saint Clair Power Plant was a major coal- and oil-fired power plant owned by DTE Electric, a subsidiary of DTE Energy. It was located in St. Clair County, Michigan, on the west bank of St. Clair River. The plant was across M-29 from the newer Belle River Power Plant in East China, Michigan. The first four units of St. Clair were built in 1953–1954. Since then, three more generating units were added to the plant. The St. Clair Power Plant generated 1982 megawatts in total. It was Detroit Edison's second largest power producer. The power plant has a large impact on the local economy, employing about 300 workers. The plant shut down in May 2022.

There are a number of wind power projects in the state of Maine, totaling more than 900 megawatts (MW) in capacity. In 2020 they were responsible for 24% of in-state electricity production. In 2019, Maine had more wind capacity than the other five New England states combined, at 923 MW.

<span class="mw-page-title-main">NextEra Energy Resources</span> American electricity supplier

NextEra Energy Resources, LLC (NEER) is a wholesale electricity supplier based in Juno Beach, Florida. NEER is a subsidiary of NextEra Energy, a Fortune 200 company. Prior to 2009, NextEra Energy Resources was known as FPL Energy.

<span class="mw-page-title-main">West Springfield Generating Station</span> Power plant in Massachusetts, U.S.

The West Springfield Generating Station, also known by its corporate name EP Energy Massachusetts, LLC, was a fossil-fuel-fired power plant located in West Springfield, Massachusetts. The station was a "peaking" facility, meaning that it primarily operates during peak electrical demand. The facility consisted of two 49-megawatt (MW) combustion turbine generators fueled by natural gas or ultra low-sulphur diesel fuel, one 18 MW jet turbine that was fueled by kerosene, and one 107 MW simple-cycle steam boiler unit burning no. 6 fuel oil, ULSD or natural gas. The station also had a small auxiliary boiler for process and building heat and an emergency back-up generator.

<span class="mw-page-title-main">Bayonne Energy Center</span>

Bayonne Energy Center is a power plant on Constable Hook in Bayonne, New Jersey originally built as a joint venture between Hess Corporation and ArcLight Capital Partners. It is operated by EthosEnergy.

Empire Wind is a proposed utility-scale offshore wind farm on the Outer Continental Shelf Offshore New York. It will be located in Bureau of Ocean Energy Management (BOEM) lease area OCS-A 0512 in the New York Bight about 15 miles (24 km) south of Jones Beach, Long Island.

LS Power is an American independent power company that owns, operates, and develops power generating stations, storage facilities, and transmission lines. Founded in 1990, the company originally focused on developing and selling natural gas power plants, but has since expanded into developing renewable energy plants and transmission lines. The company's approach focuses on competing to win transmission line contracts at a lower price than established utilities and using its large asset portfolio to develop projects with "high barriers to entry." With a combined capacity of 2.3 GW of pumped storage hydropower and lithium-ion battery storage, LS Power has the largest non-utility owned energy storage portfolio in the United States.

References

  1. 1 2 3 4 "Ravenswood Generating Station" (PDF). Archived from the original (PDF) on November 5, 2012. Retrieved September 3, 2011.
  2. 1 2 "NYISO 2018 Gold Book (pdf)". www.nyiso.com. p. 55. Retrieved January 2, 2019.
  3. "Con Edison Completes Sale of Ravenswood Power Plant in Queens" (Press release). Con Edison. June 18, 1999. Archived from the original on November 5, 2006. Retrieved April 21, 2017.
  4. "National Grid to Acquire KeySpan in $7.3 Billion Cash Transaction" (Press release). National Grid. February 27, 2006. Archived from the original on June 20, 2006. Retrieved April 21, 2017.
  5. "National Grid plc Announces Sale of Ravenswood Generating Station for $2.9 Billion". www.businesswire.com. March 31, 2008. Archived from the original on January 3, 2019. Retrieved January 2, 2019.
  6. "TransCanada completes sale of US Northeast power assets to Helix Generation". www.dailyenergyinsider.com. June 9, 2017. Retrieved January 2, 2019.
  7. "LS Power Completes Acquisition of 3,950 MW Power Generation Portfolio in Northeast". www.lspower.com. June 5, 2017. Retrieved January 2, 2019.
  8. "TransCanada Completes Sale of U.S. Northeast Power Assets". www.transcanada.com. June 5, 2017. Archived from the original on January 3, 2019. Retrieved January 2, 2019.
  9. Krebs, Rose (November 30, 2018). "TransCanada Accused Of Misleading Electricity Plant Buyer". www.law360.com. Retrieved January 2, 2019.
  10. "Long Island City will soon be home to New York's biggest battery". Crain's New York Business. October 17, 2019. Retrieved October 18, 2019.
  11. 1 2 3 4 5 "New York Energy Highway RFI Response by TransCanada Corporation" (PDF). May 30, 2012. Archived from the original (PDF) on January 3, 2019.
  12. Ravenswood Unit 40, Long Island City, N.Y.
  13. Lubasch, Arnold H. (August 4, 1970). "Con Ed Is Still Mystified By Big Allis Short‐Circuit". The New York Times. Retrieved November 1, 2018. On Nov. 9, 1965. four months after Big Allis went into operation, a blackout in the North east ruined 14 of the generator's 15 bearings.
  14. Schewe, Phillip F. (February 20, 2007). The Grid: A Journey Through the Heart of Our Electrified World . Joseph Henry Press / National Academies Press. pp.  133. ISBN   9780309133890.
  15. Massey, Daniel (June 23, 2009). "Labor fight could unplug Queens power plant". Crain's New York Business. Archived from the original on June 26, 2009. Retrieved August 14, 2009.
  16. Kihss, Peter (August 1, 1982). "Con Ed Preparing Queens Plant for Coal Use". The New York Times. Retrieved April 6, 2014.
  17. Jacobs, Charles M. (1894). A General Report Upon the Initiation and Construction of the Tunnel Under the East River New York.
  18. "ENB Region 2 Completed Applications 05/16/2001". New York State Department of Environmental Conservation. Archived from the original on July 25, 2008.