Tsing Yi North Coastal Road

Last updated

HK-Street-name-plate-left.svg
Tsing Yi North Coastal Road
青衣北岸公路
HK-Street-name-plate-right.svg
Tsing Yi North Coastal Road
Tsing Yi North Coastal Road
Road highlighted in blue
Route information
Length2.2 km [1]  (1.4 mi)
Existed2 February 2002–present
HistoryConstruction began in February 1999
Major junctions
East endTsing Tsuen Road in Tsing Yi
West endHK Route3.svgHK Route8.svg Route 3  / Route 8 near Shek Wan
Location
Country China
Special administrative region Hong Kong
Districts Kwai Tsing
Highway system
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
Tsing Yi North Coastal Road
Traditional Chinese 青衣北岸公路
Transcriptions
Yue: Cantonese
Yale Romanization Chīng yī bāk ngohn gūng louh
Jyutping Cing1 ji1 bak1 ngon6 gung1 lou6

See also

References

  1. 1 2 3 4 5 Public Works Subcommittee (22 July 1998). ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE (Report). The Legislative Council Commission. Archived from the original on 15 April 2016. Retrieved 2 April 2016.
  2. 1 2 3 萬里地圖製作中心 (2015). "青衣" (Map). 2015香港大地圖:新界及離島篇 (in Chinese and English). 萬里機構出版有限公司. p. 43. ISBN   9789622774438 . Retrieved 8 May 2016.
  3. 1 2 3 "Tsing Yi North Coastal Road" (Map). Google Maps . Retrieved 30 March 2016.
  4. The Annual Traffic Census 2018 (PDF) (Report). Transport Department. August 2019. p. C-52. Archived (PDF) from the original on 15 March 2020. Retrieved 28 December 2019.
  5. Progress Report (Report). Transport Bureau. 8 October 1997. Archived from the original on 14 June 2018. Retrieved 2 April 2016. To cater for increased traffic generated by the opening of the new airport by constructing the Tsing Yi North Coastal Road, a 2.1 kilometre dual two-lane carriageway linking the Tsing Tsuen Bridge and the Lantau Fixed Crossing.
  6. 1 2 "Tenders for construction of Tsing Yi North Coastal Road". Daily Information Bulletin (Press release). Hong Kong. 9 October 1998. Archived from the original on 25 September 2004. Retrieved 3 April 2016.
  7. 1 2 "Tsing Yi North Coastal Road - another key access to airport". Daily Information Bulletin (Press release). Hong Kong. 8 February 1999. Archived from the original on 9 April 2016. Retrieved 3 April 2016.
  8. "Achievements in environmental pollution control on construction activities". epd.gov.hk. Environmental Protection Department. Archived from the original on 9 August 2014. Retrieved 8 May 2016.
  9. Ho, K.K.S.; Li, K.S. (10–14 December 2001). Geotechnical Engineering: Meeting Society's Needs. Fourteenth Southeast Asian Geotechnical Conference. Vol. 1. Hong Kong: A.A. Balkema. pp. 361–366. ISBN   9789058092502 . Retrieved 8 May 2016.
  10. "Construction of TYNCR Traffic Control and Surveillance System commences" (Press release). Hong Kong: Transport Department. Transport Department. 23 November 2000. Archived from the original on 31 December 2015. Retrieved 8 May 2016.
  11. "耗資七億七 青衣北公路今啟用 荃灣往機場省時八分鐘". 蘋果日報 (in Chinese). Hong Kong. 2 February 2002. Archived from the original on 2 June 2016. Retrieved 8 May 2016.
  12. "Government is committed to providing quality transport system" (Press release). Hong Kong: info.hk.gov. Government of Hong Kong Special Administrative Region. 1 February 2002. Archived from the original on 9 April 2016. Retrieved 8 May 2016.
  13. "Speed Limit of Tsing Yi North Coastal Road" (PDF). gld.hk.gov. Transport Department. 2 February 2002. Archived (PDF) from the original on 4 June 2016. Retrieved 8 May 2016.
Template:Attached KML/Tsing Yi North Coastal Road
KML is from Wikidata