WaterSecure
Queensland Manufactured Water Authority
WSLogoTagline RGB LR.jpg
Statutory authority overview
Jurisdiction South East Queensland
HeadquartersLevel 2, 95 North Quay, Brisbane, Queensland, Australia
MottoA new source of pure water
Statutory authority executive
Parent department Department of Energy and Water Supply
Key document

WaterSecure, the trading name of the Queensland Manufactured Water Authority, was a statutory authority of the Government of Queensland that supplied water to the South East Queensland region of Australia through its desalination plant and a water recycling scheme, the Western Corridor Recycled Water scheme. WaterSecure was merged with Seqwater on 1 July 2011. [1]

Contents

Function and activities

The Gold Coast Desalination Plant was the first large-scale desalination plant on Australia's eastern seaboard. The plant has the capacity to supply up to 125 megalitres a day of drinking water (45 GL/year).

The Western Corridor Recycled Water scheme provides purified water to Swanbank Power Station and Tarong Power Station [2] with the capacity to supply industry and agriculture.

See also

Related Research Articles

Wivenhoe Dam Dam in South East Queensland

The Wivenhoe Dam is a rock and earth-fill embankment dam with a concrete spillway across the Brisbane River in South East Queensland, Australia. The dam wall is located about 80 kilometres (50 mi) by road from the centre of Brisbane. The primary purpose of the dam is the supply of potable water for the Brisbane and Ipswich regions. In addition, the dam also provides for flood mitigation control, hydroelectricity and for recreation. The impounded reservoir is called Lake Wivenhoe and the dam, the lake and a narrow strip of surrounding land forms a locality also called Lake Wivenhoe.

Moogerah Dam Dam in South East Queensland

The Moogerah Dam is a mass concrete double curvature arch dam with an un-gated spillway across the Reynolds Creek that is located in the South East region of Queensland, Australia. The main purposes of the dam are for irrigation of the Reynolds Creek and for supply of potable water to Warrill Creek and farmers in the Warrill Valley. The impounded reservoir is called Lake Moogerah.

Leslie Harrison Dam Dam in South East Queensland

The Leslie Harrison Dam is an earth-fill embankment dam across the Tingalpa Creek that is located in the South East region of Queensland, Australia. The main purpose of the dam is for potable water supply of the Redland City in Brisbane. The impounded reservoir is called Tingalpa Reservoir. The dam was named after Robert Leslie Harrison, a Queensland parliamentarian who died in April 1966.

Swanbank Power Station Power station complex in Queensland, Australia

The Swanbank Power Stations are located in Swanbank within South East Queensland, Australia. The original power station was coal fired, but the site has since moved to gas. By 2007 the site had consisted of the highly efficient 385 megawatts (516,000 hp) gas-fired Swanbank E Power Station and the smaller 28 megawatts (38,000 hp) gas-fired Swanbank C Power Station. Swanbank E was written off by the Queensland Audit Office as having no value, as it is uneconomical to run in 2021.

Little Nerang Dam Dam in South East Queensland

The Little Nerang Dam is a concrete gravity dam with an un-gated spillway across the Little Nerang Creek that is located in the South East region of Queensland, Australia. The main purpose of the dam is for potable water supply of the Gold Coast region. The impounded reservoir is also called Little Nerang Dam. The dam was closed to the public in 2013 due to safety concerns.

The Gold Coast Desalination Plant is a 125 ML/d reverse osmosis, water desalination plant located in Bilinga, a seaside suburb of the Gold Coast, in Queensland, Australia. It supplies water to the South East Queensland region via the South East Queensland Water Grid.

Water restrictions in Australia

Water restrictions have been enacted in many cities and regions in Australia, which is the Earth's driest inhabited continent, in response to chronic water shortages resulting from the widespread drought. Depending upon the location, these can include restrictions on watering lawns, using sprinkler systems, washing vehicles, hosing pavement, refilling swimming pools, etc. Overpopulation, evidence of drying climates, coupled with corresponding reductions in the supply of drinking water has led various state governments to consider alternative water sources to supplement existing sources, and to implement "water inspectors" who can issue penalties to those who waste water. Many states describe the different levels of water restrictions in terms of "stages": starting at Stage 1, for the least restrictive, going up as far as Stage 8. The highest level reached in the current drought has been stage 7 for Kingaroy. There are different definitions given to each "stage" in different States.

Enoggera Dam Dam in South East Queensland

The Enoggera Dam is a heritage-listed dam, which is located within the outer, western suburb of Enoggera Reservoir, in Brisbane, Queensland, Australia.

The Ewen Maddock Dam is an earth-fill embankment dam with an un-gated spillway across the Addlington Creek that is located in Landsborough in the South East region of Queensland, Australia. The main purpose of the dam is for potable water supply of the Sunshine Coast region.

The Bromelton Dam is an earth-fill embankment dam located off-stream at Gleneagle in the South East region of Queensland, Australia. The main purpose of the dam is for potable water supply of the Beaudesert area. The resultant reservoir is called Bromelton Offstream Storage.

Wyaralong Dam Dam in South East Queensland

The Wyaralong Dam is a mass concrete gravity dam with an un-gated spillway across the Teviot Brook that is located in the South East region of Queensland, Australia. The main purpose of the dam is for supply of potable water for the Scenic Rim region. The dam was initiated by the Queensland Government in 2006 as a result of the prolonged Millennium drought which saw the catchment areas of South East Queensland's dams receive record low rain. It was completed in 2011.

Seqwater

Seqwater is a statutory authority of the Government of Queensland that provides bulk water storage, transport and treatment, water grid management and planning, catchment management and flood mitigation services to the South East Queensland region of Australia. Seqwater also provides irrigation services to about 1,200 rural customers in the region that are not connected to the grid and provides recreation facilities.

Western Corridor Recycled Water Scheme

The Western Corridor Recycled Water Scheme, a recycled water project, is located in the South East region of Queensland in Australia. The scheme is managed by Seqwater and forms a key part of the SEQ Water Grid constructed by the Queensland Government in response to population growth, climate change and severe drought. The A$2.5 billion project is reported as the largest recycled water project in Australia. As of 2019, the scheme has been constructed and its performance has been validated. It remains in care and maintenance mode, and will commence operation after SEQ Water Grid dam levels reach 60%.

The Sydney Desalination Plant also known as the Kurnell Desalination Plant is a potable drinking water desalination plant that forms part of the water supply system of Greater Metropolitan Sydney. The plant is located in the Kurnell industrial estate, in Southern Sydney in the Australian state of New South Wales. The plant uses reverse osmosis filtration membranes to remove salt from seawater and is powered using renewable energy, supplied to the national power grid from the Infigen Energy–owned Capital Wind Farm located at Bungendore.

The Queensland Water Commission (QWC) is a defunct Queensland Government agency established to develop long term water supply strategies. The Commission was chaired by Mary Boydell and the chief executive officer was John Bradley.

As Australia's supply of freshwater is increasingly vulnerable to droughts, possibly as a result of climate change, there is an emphasis on water conservation and various regions have imposed restrictions on the use of water.

Water security in Australia became a major concern in Australia in the late 20th and early 21st century as a result of population growth, recurring severe droughts, effects of climate change on Australia, environmental degradation from reduced environmental flows, competition between competing interests such as grazing, irrigation and urban water supplies, and competition between upstream and downstream users. For example, there is competition for the resources of the Darling River system between Queensland, New South Wales and South Australia. Water reform was first placed on the national agenda at the 1994 Council of Australian Governments (COAG) meeting when a strategic framework was devised. As the knowledge of surface and groundwater systems grew and the awareness of the significance of sustainable water markets increased, further water reform was agreed to at the 2004 COAG meeting, under a national blueprint known as the National Water Initiative (NWI).

SEQ Water Grid

The SEQ Water Grid is a region-wide, long term, water supply scheme that provides a sustainable water infrastructure network for the South East region of Queensland, Australia. The project was the largest urban response to the drought in Australia, which severely affected water supplies in Brisbane and surrounds, particularly between 2004 and 2007. The basic component of the project was a 535-kilometre (332 mi) network of potable bulk water pipelines that connect areas that have an oversupply of water to those areas lacking water. The project went online in October 2008 and by November 2008 parts of the region were receiving a diversified supply of water for the first time.

LinkWater Trading Name

LinkWater, the trading name of the Queensland Bulk Water Transport Authority, a former statutory authority of the Government of Queensland was in operation between 2008 and 2012. During this period, the authority was responsible for the management, operation and maintenance of potable bulk water pipelines and related infrastructure throughout South East Queensland, in Australia.

SEQ Water Grid Manager

The SEQ Water Grid Manager, a former statutory authority of the Government of Queensland, was in operation between 2008 and 2012. During this period, the agency was responsible for managing the strategic operation of the SEQ Water Grid, including issues such as water security and water quality for the region in a cost-effective manner, while balancing the needs of the community and the environment.