Hinze Dam

Last updated

Hinze Dam
Hinze Dam - Spillway Tower (December 2011).png
Spillway tower of Hinze Dam following Stage 3 upgrade, 2011
Australia Queensland relief location map.jpg
Red pog.svg
Location of the Hinze Dam
in Queensland
CountryAustralia
Location South East Queensland
Coordinates 28°3′2″S153°17′2″E / 28.05056°S 153.28389°E / -28.05056; 153.28389
Purpose
StatusOperational
Opening date
  • 1976 (1976) (Stage 1)
  • 1989 (1989) (Stage 2)
  • 2011 (2011) (Stage 3)
Operator(s) SEQ Water
Dam and spillways
Type of dam Embankment dam
Impounds Nerang River
Height108 m (354 ft) [1]
Length1,850 m (6,070 ft) [2]
Dam volume4,261×10^3 m3 (150.5×10^6 cu ft) [1] [3]
Spillway type Uncontrolled
Spillway capacity550 m3/s (19,000 cu ft/s) [3]
Reservoir
CreatesAdvancetown Lake
Total capacity310,730 ML (6.835×1010 imp gal; 8.209×1010 US gal) [2] [4]
Catchment area 207 km2 (80 sq mi) [2]
Surface area1,500 ha (3,700 acres) [2]
Normal elevation82 metres (269 ft) AHD
Website
www.seqwater.com.au

The Hinze Dam is a rock and earth-fill embankment dam with an un-gated spillway across the Nerang River in the Gold Coast hinterland of South East, Queensland, Australia. The main purpose of the dam is for potable water supply of the Gold Coast region. [1] [5] The impounded reservoir is called Advancetown Lake. [6] [7]

Contents

Hinze Dam was named in honour of local pioneers Carl and Johanna Hinze (grandparents of Queensland politician Russ Hinze) who lived in the valley that was flooded by the dam. [8] [9] The dam is almost always full, reaching 96% of capacity even during dry spells. [10]

Location and features

Dam wall, 2016 Hinze Dam wall and park in Advancetown, Queensland.jpg
Dam wall, 2016

The dam is located in Advancetown, 15 kilometres (9.3 mi) south-west of Nerang immediately downstream of the confluence of the Nerang River and Little Nerang Creek. [5]

Open space, following completion of Stage 2 upgrade Hinze Dam - Open Space (December 2011).png
Open space, following completion of Stage 2 upgrade

The earthfill dam structure is 108 metres (354 ft) high and 1,850 metres (6,070 ft) long. The 4,261-thousand-cubic-metre (150.5×10^6 cu ft) dam wall holds back the 310,730-megalitre (6.835×1010 imp gal; 8.209×1010 US gal) reservoir when at full capacity. From a catchment area of 207 square kilometres (80 sq mi) that includes the Numinbah Valley and Springbrook Plateau, with most being contained within state forests and national parks, the dam creates Advancetown Lake, with a surface area of 1,500 hectares (3,700 acres). The uncontrolled un-gated spillway, located at 82 metres (269 ft) above sea level, has a discharge capacity of 550 cubic metres per second (19,000 cu ft/s). [1] [2] [3] Initially managed by the Gold Coast City Council up until 2008, the dam is now managed by Seqwater. [4]

The dam also provides the benefit of flood mitigation to populated areas along the Nerang River downstream of the dam. [3]

Construction

Hinze Dam spillway, following Stage 3 upgrade Hinze Dam (Queensland) - Spillway.png
Hinze Dam spillway, following Stage 3 upgrade

The Southport Town Council planned the dam in 1947. [11] It was completed in 1976 and expanded in 1989 and 2011.

Stage One was completed in 1976, and provided 42,400 megalitres (9.3×109 imp gal; 1.12×1010 US gal) of potable water storage and supply.

Stage Two was completed in 1989, when storage of potable water was increased to 161,070 megalitres (3.543×1010 imp gal; 4.255×1010 US gal). This stage was completed at a cost of A$42 million and involved raising the main embankment, spillway and intake towers by approximately 18 metres (59 ft) to create a surface area of 9.72 square kilometres (3.75 sq mi). [1]

In 2004 the Gold Coast City Council resolved to construct Stage 3 of the dam. When the dam reached full capacity, on 7 January 2008 work began on Stage 3 [12] and was completed on 19 December 2011. After nearly four years of construction the construction cost was A$395 million. [3] [4] The Stage 3 works increased the height of the dam wall from 93.5 metres (307 ft) to 108 metres (354 ft), and increased the reservoir capacity from 161,070 megalitres (3.543×1010 imp gal; 4.255×1010 US gal) to 310,730 megalitres (6.835×1010 imp gal; 8.209×1010 US gal), with the added purpose of flood mitigation, beyond water supply. [3] [4] [13] Stage 3 construction was completed by the Hinze Dam Alliance, a joint venture between Seqwater, with private sector partners URS Corporation, Sinclair Knight Merz and Thiess. The additional works with a higher dam wall provided 4,500 homes below the dam wall with flood protection from a 1974 Brisbanestyle flood event. [13]

The eastern boat ramp is located in Mudgeeraba and features a craft and paddle launching platform as well as toilets and bin facilities. The western boat ramp, located in Springbrook, contains the same amenities with a smaller car park. In 2012 a body was discovered by fishermen. [14]

Recreation

Advancetown Lake is a popular recreational facility for Gold Coast residents. Since the Stage 3 upgrade, recreational activities allowed include walking, electric or manual-powered boating, fishing, biking and horse riding. The facilities are open from 6 am to 6 pm daily. [4] No camping is permitted around the lake. [5] Dogs are also not permitted, while swimming has been strongly discouraged. [15] An interpretive centre was opened on 19 December 2011, along with new parking, walking trails, toilet facilities and barbecue areas. [4]

The Hinze Dam spillway overflows for the first time since the Stage 3 upgrade was completed, after heavy rain from Cyclone Oswald in January 2013 Hinze Dam Spillway overflows.jpg
The Hinze Dam spillway overflows for the first time since the Stage 3 upgrade was completed, after heavy rain from Cyclone Oswald in January 2013

The final design of the dam was criticised in the media and by residents and politicians, some describing it as a "concrete bunker". The criticism arose because of a reduction in playground, boating and barbecue facilities; the banning of dogs; the extensive use of concrete; and because many of the facilities are either far from the water's edge or below the dam wall with no water views. [15]

Advancetown Lake has two boat ramps, one on the western and another on the eastern side.

Fishing

The dam is stocked with Mary River cod, silver perch, golden perch, southern saratoga and bass, while spangled perch are also present naturally. [5] Banded grunter have been found in the lake and being illegally introduced, it is recommended that, if caught, they should be destroyed. [5] A Gold Coast City Council permit is required to fish in the dam. [16] A Queensland State Government Stocked Impoundment Permit is not required. [17]

From December 2018, Queensland Health advise not to consume fish from Hinze Dam due to elevated levels of mercury in recent fish samples. [18]

2018 Commonwealth Games

The Gold Coast hosted the 2018 Commonwealth Games. The area surrounding the Hinze Dam was originally proposed as the location for the mountain bike competition. A new course was constructed to meet international competition requirements. Some government representatives as well as some mountain bikers have sought to have the competition moved away to the unsecured trails at Nerang State Forest.[ citation needed ] The Gold Coast Mountain Bike Club maintain the course and sometimes host a race on the circuit the first Sunday of each month. [19]

See also

Related Research Articles

<span class="mw-page-title-main">Somerset Dam</span> Dam in South East Queensland

The Somerset Dam is a mass concrete gravity dam with a gated spillway across the Stanley River in Queensland, Australia. It is within the locality of Somerset Dam in the Somerset Region in South East Queensland. The main purpose of the dam is the supply of potable water for the Brisbane, Gold Coast and Logan City regions. Additionally, the dam provides for flood mitigation, recreation and for the generation of hydroelectricity. The impounded reservoir is called Lake Somerset.

<span class="mw-page-title-main">Wivenhoe Dam</span> Dam in South East Queensland

The Wivenhoe Dam is a rock and earth-fill embankment dam with a concrete spillway across the Brisbane River in South East Queensland, Australia. The dam takes it names from the local Wivenhoe Pocket rural community. The dam wall is located about 80 kilometres (50 mi) by road from the centre of Brisbane. The primary purpose of the dam is the supply of potable water for the Brisbane and Ipswich regions. The dam also provides for flood mitigation control, hydroelectricity, and recreation. The impounded reservoir is called Lake Wivenhoe and the dam, the lake and a narrow strip of surrounding land forms a locality also called Lake Wivenhoe.

<span class="mw-page-title-main">Moogerah Dam</span> Dam in South East Queensland

The Moogerah Dam is a mass concrete double curvature arch dam with an un-gated spillway across Reynolds Creek in South East Queensland, Australia, now within the locality of Moogerah in the Scenic Rim Region. The main purposes of the dam are for irrigation in the Reynolds Creek district and for supply of potable water to Warrill Creek and farmers in the Warrill Valley. The impounded reservoir is called Lake Moogerah.

<span class="mw-page-title-main">Leslie Harrison Dam</span> Dam in South East Queensland

The Leslie Harrison Dam is an earth-fill embankment dam across the Tingalpa Creek that is located in the South East region of Queensland, Australia. The main purpose of the dam is for potable water supply of the Redland City in Brisbane. The impounded reservoir is called Tingalpa Reservoir. The dam was named after Robert Leslie Harrison, a Queensland parliamentarian who died in April 1966.

<span class="mw-page-title-main">Maroon Dam</span> Dam in South East Queensland

The Maroon Dam is a rock and earth-fill embankment dam with an un-gated spillway across the Burnett Creek that is located in the South East region of Queensland, Australia. The main purpose of the dam is for irrigation of the Scenic Rim Regional Council region. The impounded reservoir is also called Maroon Dam.

<span class="mw-page-title-main">North Pine Dam</span> Dam in South East Queensland

The North Pine Dam is a mass concrete gravity dam with earth-fill embankments on abutments with a gated spillway across the North Pine River that is located in the South East region of Queensland, Australia. The main purpose of the dam is for supply of potable water for the Moreton Bay region and Brisbane's northern suburbs. The impounded reservoir is called Lake Samsonvale.

<span class="mw-page-title-main">Little Nerang Dam</span> Dam in South East Queensland

The Little Nerang Dam is a concrete gravity dam with an un-gated spillway across the Little Nerang Creek that is located in the South East region of Queensland, Australia. The main purpose of the dam is for potable water supply of the Gold Coast region. The impounded reservoir is also called Little Nerang Dam. The dam was closed to the public in 2013 due to safety concerns.

The Sideling Creek Dam is an earth-fill embankment dam with an un-gated spillway across the Sideling Creek in Kurwongbah, City of Moreton Bay, Queensland, Australia. The main purposes of the dam are for potable water supply of the City of Moreton Bay and for recreation. The impounded reservoir is called Lake Kurwongbah.

<span class="mw-page-title-main">Atkinson Dam</span> Dam in South East Queensland

The Atkinson Dam is an earth-fill embankment dam across the Buaraba Creek and a naturally forming lagoon, which is located near Lowood in the South East region of Queensland, Australia. The main purpose of the dam is for irrigation of farming land in the lower Lockyer Valley. The resultant reservoir is called Lake Atkinson.

<span class="mw-page-title-main">Wappa Dam</span> Dam in South East Queensland

The Wappa Dam is a mass concrete gravity arch dam with earth-fill abutments and an un-gated spillway across the South Maroochy River that is located in the South East region of Queensland, Australia. The main purpose of the dam is for supply of potable water for the Sunshine Coast region. The impounded reservoir is also called Wappa Dam. The dam and most of the reservoir are within Kiamba with the most northerly part of the reservoir in Cooloolabin, both in the Sunshine Coast Region.

<span class="mw-page-title-main">Bill Gunn Dam</span> Dam in South East Queensland

The Bill Gunn Dam is an earth-fill embankment dam with an un-gated spillway located off-stream in Laidley Heights in the South East region of Queensland, Australia. The main purpose of the dam is for irrigation of the Lockyer Valley. The resultant reservoir is called Lake Dyer.

The Poona Dam is an earth-fill embankment dam with a toe drain with an un-gated spillway across a tributary of the South Maroochy River in Kureelpa, Sunshine Coast Region, Queensland, Australia. The main purpose of the dam is for storage of potable water for the Sunshine Coast region. The impounded reservoir is also called Poona Dam.

The Lake Clarendon Dam is a rock and earth-fill embankment dam with an un-gated spillway located off-stream in the locality of Lake Clarendon in the Lockyer Valley Region, South East Queensland, Australia. The main purpose of the dam is for irrigation of the Lockyer Valley. The resultant impounded reservoir is called Lake Clarendon.

The Ewen Maddock Dam is an earth-fill embankment dam with an un-gated spillway across the Addlington Creek that is located in Landsborough in the South East region of Queensland, Australia. The main purpose of the dam is for potable water supply of the Sunshine Coast region.

<span class="mw-page-title-main">Baroon Pocket Dam</span> Dam in South East Queensland

The Baroon Pocket Dam is a rock and earth-fill embankment dam with an un-gated spillway across the Obi Obi Creek, in North Maleny, Sunshine Coast Region, in South East Queensland, Australia. The main purpose of the dam is for potable water supply. The impounded reservoir is called Lake Baroon.

Lake Manchester Dam is a concrete gravity dam with an un-gated spillway across Cabbage Tree Creek. It is also known as Cabbage Tree Creek Dam. It is in the locality of Lake Manchester, City of Brisbane, Queensland, Australia. The main purpose of the dam is for potable water supply of Brisbane. The impounded reservoir is called Lake Manchester.

<span class="mw-page-title-main">Six Mile Creek Dam</span> Dam in South East Queensland

The Six Mile Creek Dam is a rock and earth-fill embankment dam with an un-gated spillway across the Six Mile Creek that is located in the South East region of Queensland, Australia. The main purposes of the dam are for potable water supply of the Sunshine Coast region and for recreation. The impounded reservoir is called Lake Macdonald, named in memory of former Noosa Shire Council Chairman Ian MacDonald.

<span class="mw-page-title-main">Wyaralong Dam</span> Dam in South East Queensland

The Wyaralong Dam is a mass concrete gravity dam with an un-gated spillway across the Teviot Brook that is located in the South East region of Queensland, Australia. The main purpose of the dam is for supply of potable water for the Scenic Rim region. The dam was initiated by the Queensland Government in 2006 as a result of the prolonged Millennium drought which saw the catchment areas of South East Queensland's dams receive record low rain. It was completed in 2011.

<span class="mw-page-title-main">Advancetown, Queensland</span> Suburb of Gold Coast, Queensland, Australia

Advancetown is a rural outer locality in the City of Gold Coast, Queensland, Australia. In the 2016 census, Advancetown had a population of 482 people.

Nerang–Murwillumbah Road is a continuous 36.4 kilometres (22.6 mi) road route in the Gold Coast region of Queensland, Australia. The entire road is signed as State Route 97. Nerang–Murwillumbah Road is a state-controlled district road, rated as a local road of regional significance (LRRS).

References

  1. 1 2 3 4 5 "Register of Large Dams in Australia" (Excel (requires download)). Dams information. Australian National Committee on Large Dams. 2010. Archived from the original on 12 December 2013. Retrieved 23 June 2014.
  2. 1 2 3 4 5 "Hinze Dam". Water supply: Dams and weirs. Seqwater. 2014. Archived from the original on 14 April 2014. Retrieved 1 July 2014.
  3. 1 2 3 4 5 6 "Hinze Dam Stage 3 Information" (PDF). Fact sheet (PDF). SEQ Water. 2011. Archived from the original (PDF) on 2 April 2015. Retrieved 3 July 2014.
  4. 1 2 3 4 5 6 "Hinze Dam reopens to the public". Hinze Dam / Advancetown Lake. SEQ Water. 19 December 2011. Archived from the original on 7 January 2012. Retrieved 25 December 2011.
  5. 1 2 3 4 5 Harrison, Rod; James, Ernie; Sully, Chris; Classon, Bill; Eckermann, Joy (2008). Queensland Dams. Bayswater, Victoria: Australian Fishing Network. pp. 58–59. ISBN   978-1-86513-134-4.
  6. "Advancetown Lake – reservoir in the City of Gold Coast (entry 139)". Queensland Place Names. Queensland Government . Retrieved 11 September 2020.
  7. "Item ID3411743, Queensland Place Names Act 1988 – Approval of Place Name. Mr W.H. Glasson". Queensland State Archives . Retrieved 11 September 2020. – includes a map
  8. What's in a Name: Hinze Dam. Brisbane, Queensland: ABC Radio. 5 June 2012. Archived from the original (streaming audio) on 14 July 2014. Retrieved 2 July 2014.
  9. Thomson, Alister (25 July 2016). "Hinze dam at Advancetown reaches middle age". Gold Coast Bulletin . Retrieved 1 June 2019.
  10. Tehrani, Mahsa Jahandideh; Helfer, Fernanda; Jenkins, Graham (10 July 2021). "Impacts of climate change and sea level rise on catchment management: A multi-model ensemble analysis of the Nerang River catchment, Australia". Science of the Total Environment. 777: 146223. Bibcode:2021ScTEn.777n6223J. doi:10.1016/j.scitotenv.2021.146223. hdl: 10072/403479 . S2CID   233795843 . Retrieved 19 November 2022.
  11. "SOUTHPORT'S BIG WATER SCHEME". The Courier-Mail . Brisbane: National Library of Australia. 28 January 1947. p. 3. Retrieved 19 April 2014.
  12. "Heavy Gold Coast rains fill Hinze Dam". Australia: ABC News. 7 January 2008. Archived from the original on 9 February 2008. Retrieved 11 July 2011.
  13. 1 2 Lappeman, Suzanne (11 March 2011). "Upgrade of Hinze Dam wall finished". Gold Coast Bulletin . Archived from the original on 16 April 2011. Retrieved 11 July 2011.
  14. "Body of man found at Hinze Dam believed to be 58-year-old man missing for a week | Perth Now". 19 October 2012. Archived from the original on 27 March 2017. Retrieved 26 March 2017.
  15. 1 2 Tuttiett, Henry (19 December 2011). "Hinze Dam re-opens after $395m facelift". Gold Coast Bulletin . Archived from the original on 10 January 2012. Retrieved 25 December 2011.
  16. "Gold Coast City Council – Fishing". 23 November 2010. Archived from the original on 7 August 2011. Retrieved 12 August 2011.
  17. "Queensland Government Primary Industries and Fisheries – Do I need a permit to go fishing in a dam?". 1 July 2011. Archived from the original on 12 September 2011. Retrieved 12 August 2011.
  18. "Hinze Dam". Fish Stocked Dams and Weirs. Queensland Government. 11 December 2018. Archived from the original on 19 October 2019. Retrieved 18 October 2019.
  19. "Hinze Dam". Gold Coast Mountain Bike Inc. 2013. Archived from the original on 5 July 2014. Retrieved 2 July 2014.