Queensland Bulk Water Transport Authority
D 10 4124 LinkWater moving-water logo (JPEG).JPG
Statutory authority overview
Formed1 July 2008 (2008-07-01)
Dissolved31 December 2012 (2012-12-31)
Superseding agency
Jurisdiction South East Queensland, Australia
MottoMoving water to where it's needed most
Parent department Department of Energy and Water Supply
Key document

LinkWater, the trading name of the Queensland Bulk Water Transport Authority, a former statutory authority of the Government of Queensland was in operation between 2008 and 2012. During this period, the authority was responsible for the management, operation and maintenance of potable bulk water pipelines and related infrastructure throughout South East Queensland, in Australia.

Contents

Activities and functions

Linkwater was established on 2 May 2008 and began operations on 1 July 2008. [1] On the 31 December 2012 Linkwater ceased operations as it was merged into Seqwater. [2]

In 2008-2009, LinkWater established operational control for 535 kilometres (332 mi) of potable bulk water pipelines and related infrastructure that forms the backbone of the SEQ Water Grid. This infrastructure is made up of existing assets acquired from councils under the South East Queensland Water (Restructuring) Act 2007 (QLD), three new reverse-flow pipelines constructed by LinkWater projects and two connected pipelines constructed by other alliances. In addition to bulk water pipelines, related infrastructure under LinkWater's control comprises 28 reservoirs/balance tanks, 22 pump stations and six water quality facilities. As the network controller, LinkWater moved on average 600 megalitres (130,000×10^3 imp gal; 160,000×10^3 US gal) of water per day across the SEQ Water Grid, to where it is needed most.

See also

Related Research Articles

Somerset Dam Dam in South East Queensland

The Somerset Dam is a mass concrete gravity dam with a gated spillway across the Stanley River in Queensland, Australia. It is within the locality of Somerset Dam in the Somerset Region in South East Queensland. The main purpose of the dam is the supply of potable water for the Brisbane, Gold Coast and Logan City regions. Additionally, the dam provides for flood mitigation, recreation and for the generation of hydroelectricity. The impounded reservoir is called Lake Somerset.

Hinze Dam Dam in South East Queensland

The Hinze Dam is a rock and earth-fill embankment dam with an un-gated spillway across the Nerang River in the Gold Coast hinterland of South East, Queensland, Australia. The main purpose of the dam is for potable water supply of the Gold Coast region. The impounded reservoir is called Advancetown Lake.

Wivenhoe Dam Dam in South East Queensland

The Wivenhoe Dam is a rock and earth-fill embankment dam with a concrete spillway across the Brisbane River in South East Queensland, Australia. The dam wall is located about 80 kilometres (50 mi) by road from the centre of Brisbane. The primary purpose of the dam is the supply of potable water for the Brisbane and Ipswich regions. In addition, the dam also provides for flood mitigation control, hydroelectricity and for recreation. The impounded reservoir is called Lake Wivenhoe and the dam, the lake and a narrow strip of surrounding land forms a locality also called Lake Wivenhoe.

Leslie Harrison Dam Dam in South East Queensland

The Leslie Harrison Dam is an earth-fill embankment dam across the Tingalpa Creek that is located in the South East region of Queensland, Australia. The main purpose of the dam is for potable water supply of the Redland City in Brisbane. The impounded reservoir is called Tingalpa Reservoir. The dam was named after Robert Leslie Harrison, a Queensland parliamentarian who died in April 1966.

North Pine Dam Dam in South East Queensland

The North Pine Dam is a mass concrete gravity dam with earth-fill embankments on abutments with a gated spillway across the North Pine River that is located in the South East region of Queensland, Australia. The main purpose of the dam is for supply of potable water for the Moreton Bay region and Brisbane's northern suburbs. The impounded reservoir is called Lake Samsonvale.

Little Nerang Dam Dam in South East Queensland

The Little Nerang Dam is a concrete gravity dam with an un-gated spillway across the Little Nerang Creek that is located in the South East region of Queensland, Australia. The main purpose of the dam is for potable water supply of the Gold Coast region. The impounded reservoir is also called Little Nerang Dam. The dam was closed to the public in 2013 due to safety concerns.

The Sideling Creek Dam is an earth-fill embankment dam with an un-gated spillway across the Sideling Creek in Kurwongbah, Moreton Bay Region, Queensland, Australia. The main purposes of the dam are for potable water supply of the Moreton Bay Region and for recreation. The impounded reservoir is called Lake Kurwongbah.

Wappa Dam Dam in South East Queensland

The Wappa Dam is a mass concrete gravity arch dam with earth-fill abutments and an un-gated spillway across the South Maroochy River that is located in the South East region of Queensland, Australia. The main purpose of the dam is for supply of potable water for the Sunshine Coast region. The impounded reservoir is also called Wappa Dam. The dam and most of the reservoir are within Kiamba with the most northerly part of the reservoir in Cooloolabin, both in the Sunshine Coast Region.

The Poona Dam is an earth-fill embankment dam with a toe drain with an un-gated spillway across a tributary of the South Maroochy River in Kureelpa, Sunshine Coast Region, Queensland, Australia. The main purpose of the dam is for storage of potable water for the Sunshine Coast region. The impounded reservoir is also called Poona Dam.

The Ewen Maddock Dam is an earth-fill embankment dam with an un-gated spillway across the Addlington Creek that is located in Landsborough in the South East region of Queensland, Australia. The main purpose of the dam is for potable water supply of the Sunshine Coast region.

The Bromelton Dam is an earth-fill embankment dam located off-stream at Gleneagle in the South East region of Queensland, Australia. The main purpose of the dam is for potable water supply of the Beaudesert area. The resultant reservoir is called Bromelton Offstream Storage.

The Cedar Grove Weir is a weir located across the Logan River in the South East region of Queensland, Australia. The main purpose of the weir is for potable water storage.

Wyaralong Dam Dam in South East Queensland

The Wyaralong Dam is a mass concrete gravity dam with an un-gated spillway across the Teviot Brook that is located in the South East region of Queensland, Australia. The main purpose of the dam is for supply of potable water for the Scenic Rim region. The impounded reservoir is also called Wyaralong Dam. The dam was initiated by the Queensland Government in 2006 as a result of a prolonged drought which saw the catchment areas of South East Queensland's dams receive record low rain.

Seqwater

Seqwater is a statutory authority of the Government of Queensland that provides bulk water storage, transport and treatment, water grid management and planning, catchment management and flood mitigation services to the South East Queensland region of Australia. Seqwater also provides irrigation services to about 1,200 rural customers in the region that are not connected to the grid and provides recreation facilities.

SunWater Water company

SunWater, the trading name of SunWater Limited, is a statutory Queensland Government-owned corporation that supplies bulk water to over 5,000 customers and water consultancy services to a range of institutional clients in the Wide Bay–Burnett and North West regions of Queensland, Australia.

Western Corridor Recycled Water Scheme

The Western Corridor Recycled Water Scheme, a recycled water project, is located in the South East region of Queensland in Australia. The scheme is managed by Seqwater and forms a key part of the SEQ Water Grid constructed by the Queensland Government in response to population growth, climate change and severe drought. The A$2.5 billion project is reported as the largest recycled water project in Australia. As of 2019, the scheme has been constructed and its performance has been validated. It remains in care and maintenance mode, and will commence operation after SEQ Water Grid dam levels reach 60%.

The Queensland Water Commission (QWC) is a defunct Queensland Government agency established to develop long term water supply strategies. The Commission was chaired by Mary Boydell and the chief executive officer was John Bradley.

As Australia's supply of freshwater is increasingly vulnerable to droughts, possibly as a result of climate change, there is an emphasis on water conservation and various regions have imposed restrictions on the use of water.

SEQ Water Grid

The SEQ Water Grid is a region-wide, long term, water supply scheme that provides a sustainable water infrastructure network for the South East region of Queensland, Australia. The project was the largest urban response to the drought in Australia, which severely affected water supplies in Brisbane and surrounds, particularly between 2004 and 2007. The basic component of the project was a 535-kilometre (332 mi) network of potable bulk water pipelines that connect areas that have an oversupply of water to those areas lacking water. The project went online in October 2008 and by November 2008 parts of the region were receiving a diversified supply of water for the first time.

SEQ Water Grid Manager

The SEQ Water Grid Manager, a former statutory authority of the Government of Queensland, was in operation between 2008 and 2012. During this period, the agency was responsible for managing the strategic operation of the SEQ Water Grid, including issues such as water security and water quality for the region in a cost-effective manner, while balancing the needs of the community and the environment.

References

  1. "LinkWater and LinkWater Projects". Department of the Premier and Cabinet. 16 January 2009. Archived from the original on 17 May 2014. Retrieved 15 May 2014.
  2. Vogler, Sarah (18 June 2013). "Bosses at defunct Linkwater received cash splash of more than $640,000 in termination payments". The Courier-Mail . Retrieved 14 May 2014.