Chatteris | |
---|---|
General information | |
Location | Chatteris, Fenland England |
Grid reference | TL387860 |
Platforms | 2 |
Other information | |
Status | Disused |
History | |
Original company | Eastern Counties Railway |
Pre-grouping | Great Northern and Great Eastern Joint Railway |
Post-grouping | London and North Eastern Railway |
Key dates | |
1 February 1848 | Opened |
18 April 1966 | Closed to freight |
6 March 1967 | Closed to passengers |
Chatteris railway station was a station in Chatteris, Cambridgeshire on the line between St Ives and March, which was built as a branch of the Great Eastern Railway in 1848 and was later incorporated (on 6 March 1882) into the Great Northern and Great Eastern Joint Railway, a more major route between Huntingdon and Doncaster via Lincoln, which included a new line between Spalding and Lincoln.
The railway through Chatteris was closed to passengers on 6 March 1967, in the wake of the Beeching Report, along with the joint line between March and St Ives. The part of the joint line between St Ives and Huntingdon had already closed to passengers on 15 June 1959, but St Ives retained the line to Cambridge until 1970. On 29 November 1982 the part of the joint line between March and Spalding was closed, but the route north of Spalding still exists, with services routed via Peterborough.
Chatteris station was demolished in the early 1970s and the station site and trackbed used for the new alignment of the A141 road.
Preceding station | Disused railways | Following station | ||
---|---|---|---|---|
Somersham | Great Eastern Railway St Ives to March Line | Wimblington |
52°27′15″N0°02′25″E / 52.4541°N 0.0404°E
The Great Northern Railway (GNR) was a British railway company incorporated in 1846 with the object of building a line from London to York. It quickly saw that seizing control of territory was key to development, and it acquired, or took leases of, many local railways, whether actually built or not. In so doing, it overextended itself financially.
The Midland and Great Northern Joint Railway (M&GNJR) was a railway network in England, in the area connecting southern Lincolnshire, the Isle of Ely and north Norfolk. It developed from several local independent concerns and was incorporated in 1893. It was jointly owned by the Midland Railway and the Great Northern Railway, and those companies had long sponsored and operated the predecessor companies.
The Wisbech and March line is a railway line between March and Wisbech in Cambridgeshire, England. A number of proposals are currently being investigated relating to the possible restoration of passenger services along the route.
Cambridge railway station is the principal station serving the city of Cambridge in the east of England. It stands at the end of Station Road, 1 mile (1.6 km) south-east of the city centre. It is the northern terminus of the West Anglia Main Line, 55 miles 52 chains (89.6 km) down the line from London Liverpool Street, the southern terminus.
Peterborough railway station serves the cathedral city of Peterborough, Cambridgeshire, England. It is sited 76 miles 29 chains (122.9 km) north of London King's Cross. The station is a major interchange serving both the north–south East Coast Main Line, as well as long-distance and local east–west services. The station is managed by London North Eastern Railway. Ticket gates came into use at the station in 2012.
The Ely–Peterborough line is a railway line in England, linking East Anglia to the Midlands. It is a part of the Network Rail Strategic Route 5, SRS 05.07 and is classified as a secondary line. It is used by a variety of inter-regional and local passenger services from East Anglia to the West Midlands and North West, as well as freight and infrastructure traffic; it also links with the busy East Coast Main Line at its western end. Fenland District council put forward their Rail Development Strategy for the route in 2012, which includes infrastructure upgrades for the intermediate stations, improved frequencies for the services using it and establishing a Community Rail Partnership for the line in 2013–14.
The Peterborough–Lincoln line is a railway line linking Peterborough and Lincoln, via Sleaford and Spalding. Between Lincoln and Spalding, the line follows the route of the former Great Northern and Great Eastern Joint Railway.
Spalding railway station serves the town of Spalding, Lincolnshire, England. It lies on the Peterborough–Lincoln line.
March railway station is a stop on the Ely–Peterborough line in the east of England and serves the market town of March, Cambridgeshire, England. It is 85 miles 76 chains (138.3 km) measured from London Liverpool Street via Ely and is situated between Manea and Whittlesea stations.
The Ely and St Ives Railway was a railway company that opened a line between those places in 1878. It was an extension of the privately promoted Ely, Haddenham & Sutton Railway that had opened in 1866. It was a standard gauge single track. The line was worked by the neighbouring Great Eastern Railway but it was never profitable. The development of road transport services in the 1920s caused a steep decline in use of the line, and the passenger service was withdrawn in 1931. A goods service continued, but the line closed completely in 1964. No railway activity takes place on the route now.
The Great Northern and Great Eastern Joint Railway, colloquially referred to as "the Joint Line" was a railway line connecting Doncaster and Lincoln with March and Huntingdon in the eastern counties of England. It was owned jointly by the Great Northern Railway (GNR) and the Great Eastern Railway (GER). It was formed by transferring certain route sections from the parent companies, and by the construction of a new route between Spalding and Lincoln, and a number of short spurs and connections. It was controlled by a Joint Committee, and the owning companies operated their own trains with their own rolling stock. The Joint Line amounted to nearly 123 miles (198 km) of route.
Murrow West railway station was a station on the Great Northern and Great Eastern Joint Railway in Murrow, Cambridgeshire between Spalding, England, and March. It opened in 1867 and was closed by the British Transport Commission in July 1953 due to low usage. The line itself survived until closure by British Rail in November 1982. The station has mostly been demolished although the signal box still survives, having been converted into a private dwelling after the closure of the line and subsequent removal of the track.
Twenty railway station served the village of Twenty in Lincolnshire, England. It was on the route of the Spalding and Bourne Railway, later part of the Midland and Eastern Railway and then part of the Midland and Great Northern Joint Railway main line between the Midlands and the Norfolk Coast.
Bourne was a railway station serving the town of Bourne in Lincolnshire, which opened in 1860 and closed to passengers in 1959.
Ramsey East railway station was a railway station in Ramsey, Cambridgeshire, which is now closed. It opened on 16 September 1889, and closed to passenger traffic on 22 September 1930, and to freight traffic on 17 September 1956. The site is now occupied by the west side of Bury Road Industrial Estate, and a new housing development aptly called Signal Road and The Sidings. It was the terminus of a branch line connected via Warboys railway station to Somersham, where it joined the Great Eastern Railway line between St Ives and March, which at its upper end towards March is now occupied by the route A141 between Chatteris and March.
The Lincolnshire loop line was a railway built by the Great Northern Railway, that linked Peterborough to Gainsborough via Spalding, Boston and Lincoln. It ran through the counties of Lincolnshire and Northamptonshire
Huntingdon East railway station served the town of Huntingdon, Cambridgeshire, England from 1883 to 1959.
The Kettering, Thrapston and Huntingdon Railway was an English railway line opened throughout in 1866. It connected the Midland Railway main line at Kettering to ironstone deposits to the south-east of the town, as well as opening up the agricultural district around Thrapston and reaching the regional centre of Huntingdon. The hoped-for expansion of agricultural was limited and local traffic did not develop; at the same time the difficult alignment and gradients of the line discouraged heavy use as a through line. A basic passenger service operated through from Kettering to Cambridge, by using running powers east of Huntingdon via St Ives.
The Werrington dive-under is a replacement dual track grade separated railway junction at Werrington Junction, 3 miles (5 km) north of Peterborough railway station in Cambridgeshire, England. The junction leads to the Great Northern/Great Eastern Joint line (GN/GE) which goes through Spalding to Lincoln and beyond. Completed and opened in December 2021, the dive under allows trains on the west side of the East Coast Main Line (ECML) to access the GN/GE line without conflicting with the faster passenger services on the ECML.
The Lincolnshire lines of the Great Northern Railway are the railways, past and present, in the English county built or operated by the Great Northern Railway.