Hobart Area Transportation Study

Last updated

Congestion on the Brooker Highway at Montrose during roadworks to upgrade the Elwick Rd and Howard Rd intersections between early 2016 and mid-2017. Morning-rushhour-brooker-hwy(extreme closeup).jpg
Congestion on the Brooker Highway at Montrose during roadworks to upgrade the Elwick Rd and Howard Rd intersections between early 2016 and mid-2017.

The Hobart Area Transportation Study was a comprehensive transport plan released in 1965 for the purpose of examining the transport needs of the Australian Hobart metropolitan area over the proceeding 20 years. The study predicted the majority of the proposed traffic corridors would need to be operational by the 1985 target year.

Contents

Ultimately, the majority of the study's recommendations were brought to fruition in some form or another. Sections of Hobart's three major radial highways—the Tasman Highway (Tasman Bridge to Airport), the Brooker Highway (North of Berriedale) and the Southern Outlet—were influenced in their construction by the study's recommendations for grade-separated, limited-access freeway designs.

History

From the advent of the Motor vehicle to the sixties, the number of vehicles registered had increased to almost 40,000 in the Hobart Area. The influx of motor vehicles in and around Hobart placed great Burdon on the road system as it then existed. [1]

In 1963, the Department of Public Works, the Transport Commission and Hobart City Council initiated the first urban transportation study conducted in Australia. The Study was undertaken by US transportation and infrastructure consulting firm Wilbur Smith and Associates [2] during the years 1963 and 1964, and the findings and suggestions were published in 1965. [1] [3]

Application

The Hobart Area Transport study area was to encompass Hobart's estimated metropolitan boundary in 1985 which extended as far as Granton in the north; Sorell to the east; Howrah to the south east; and Kingston to the south west. [1]

The study was engaged through detailed surveys from the public, analysing traffic statistics and analysing past traffic trends, in an attempt to predict traffic patterns in Hobart with a target year of 1985 – 20 years from the time of publication. [1]

Publication of the Study

The Hobart area Transportation Study proposed the construction of four Freeways and one Expressway, a significant upgrade and expansion of the Brooker Highway, a duplication of the Tasman Bridge, the possible creation of an additional crossing of the River Derwent and several smaller projects within the Hobart CBD. The study also encouraged greater use of roads through public and private transport and discouraged the use of Hobart's passenger train services as a primary mode of Transport in the city. [1] The study acknowledged the capital costs of the proposed Freeways would be too much for the Tasmanian government to undertake alone, but suggested the possibility of Australian Government assistance if pursued. [1] The study was composed of the following principle segments:

Proposals made by this study
Side of RiverNameImagePurposeStatusBuiltNotes
Western Shore Northside Freeway Inner city FreewayAbandonedA proposed Link north of the Hobart CBD extending from the Southern Outlet at Davey Street via the foothills of West Hobart, crossing the Brooker Highway between Melville and Brisbane Streets, and extending through the Queens Domain to the Tasman Highway. [4] Termed the Northside Freeway, its function was intended to relieve local streets of excess traffic. The Northside Freeway was proposed to be a fully grade separated Freeway. Momentum for this Freeway stalled which has resulted in other proposals for a Hobart Bypass. [4] [5]
Davey Street Part of Davey Street Hobart in November 2010.jpg Inner city couplet Complete1987A recommended connection to join the Southern Outlet with the Tasman Highway with the use of the then-proposed One-way couplet of Davey and Macquarie streets as complementary arterial roads. At the time, separate viaducts were proposed to be constructed over the rail lines east of Brooker Avenue to provide better access from the south side of the Hobart CBD to the Tasman Highway. At the time the study was released, Hobart CBD's roads were all two way with no direct way to get between the Tasman Highway/Brooker Highway and the Southern Outlet. The construction of the Sheraton was the catalyst for the new couplet road system. By this time the need for a viaduct over the rail yards had diminished as that section of the rail yards had fallen into disuse.
Macquarie Street Hobart Macquarie Street 02(closeup).jpg
Grosvenor ExpresswaySandy Bay LinkAbandonedThe Grosvenor Expressway was proposed to commence at Sandy Bay Road (Lord Street) and travel towards the Northside Freeway connecting with the Freeway near Liverpool Street. This bypass route was designed with the intention of alleviating traffic from Sandy Bay Road. [1]
Domain Freeway ? City Bypass Complete
(highway)
?This proposal was suggested to be a limited access route parallel to the River Derwent just east of the Queens Domain. This route was designed to connect the Tasman Bridge with the Brooker Highway as a six-lane divided highway. This Freeway was also intended to function as an alternative to the Brooker Highway and improve connections to the bridge over the River Derwent. [1] This route was constructed as a Single carriageway Limited-access highway, featuring At-grade intersections.
Brooker Highway Brooker at risdon rd7.jpg Northern RadialPartially Complete

(Only 4 lanes)

1954 onwardsAt the time of the study's release, parts of the Brooker Highway were already operational. This study proposed that the highway be expanded to a six-lane divided Highway extending from a connection with the Northside Freeway north to Elwick Road in Glenorchy. From this point to Berriedale, minor improvements would have been required to achieve complete four-lane freeway operation. From Berriedale, The continuation of the Highway to Granton would follow a new corridor bypassing the suburbs of Claremont and Austins Ferry. [1] Specific points for Grade separated Interchanges were suggested at Burnett Street, Cleary's Gates Road, New Town Road, Hopkins Street, Derwent Park Road, Elwick/Goodwood Roads, Main Road, Berriedale Road, Claremont Link Road, and Abbotsfield Roads. [1] The extension to Granton was completed as a four-lane divided Highway from Berriedale, however the grade separation proposal for the southern section of the Highway has not been addressed with several new traffic lights installed since this plan was released.
Southern Outlet Freeway Sth outlet from fitzroy gardens.jpg Southern RadialComplete
(highway)
1969 OnwardsSections of the Southern Outlet were already under construction as a two-lane expressway at the time of the study's release. The study recommended construction of a four-lane divided highway to connect to the Huon Highway and also proposed bypassing Kingston. [1] Today, the Southern Outlet is a grade-separated dual carriageway highway for its entire length between Davey Street, Hobart and the Kingston Interchange.

The Channel Highway reaching an 18,000 AADT was the catalyst to complete the remaining section of the transportation study – The Kingston Bypass. [6] [7] [8] Completed in 2011, the AU$41 million bypass was designed to relieve the road network within Kingston by diverting through traffic around the town. [6] While this bypass has only been constructed as a two-lane expressway, The transport corridor it passes through has been designed to cater for future expansion. [7]

Kingston Bypass Kingston Bypass middle2.jpg
Eastern ShoreSoutheastern FreewaySouthern RadialAbandonedThe Southeastern Freeway was proposed to travel from Rosny Hill To Howrah running Parallel to Clarence Street. [1] However, this Highway was deemed to be unrealistic in that it was too expensive and would have come in close proximity to Schools and other vital services. The idea of this Arterial road was a product of the "Hobart Transport Revision", released several years later. [3] This new proposal entailed construction of a Bellerive Bypass, [3] which was constructed to avoid already developed land.
Bellerive Bypass South-arm-highway4.jpg Complete1989
Eastern Outlet Freeway Tasman-hwy-warrane-close-up.jpg Eastern RadialComplete
to Airport
(highway)
1964 OnwardsThe Eastern Outlet (known today as the Tasman Highway) was proposed to extend as a Freeway from Rosny Hill to Sorell. [1] The construction of this Freeway was not believed to be warranted before 1985. [1] The Tasman Highway's construction has been influenced by this study with bypasses constructed at Warrane, Mornington and Cambridge since the publication of this study. Additionally the Tasman Highway has also been duplicated to the Hobart Airport since the study's release.
Tasman Bridge Tasman-bridge-east-shore.jpg CompleteUpon the release of this study, The Tasman Bridge had only recently replaced the Hobart Bridge as the primary River Derwent crossing, and it was perceived that more traffic would make use of the new bridge than first estimated. The study proposed the duplication of the Tasman bridge. [1] However the Tasman Bridge disaster occurred not long after this plan was released and it was then decided to upgrade the existing bridge rather than duplicate it. [3]
Lindisfarne Road E Derwnt HwySth.JPG Northern Radial (eastern shore)Complete1964 OnwardsLindisfarne Road (known today as the East Derwent Highway) was (at the time of this study) proposed to service the immediate suburbs on the eastern shore to North of the Tasman Bridge. The Tasman Bridge disaster made apparent the need for an alternate river crossing further North, [3] and thus this road was partially upgraded and in the southern sections constructed from scratch north of Geilston Bay. The northbound highway exists parallel to the river all the way to its conclusion at Bridgewater.

While not directly proposed at the time of this study's publication, further investigation of the area as a potential river crossing was suggested. The Bowen Bridge is a 4 Lane Bridge located 8 km upstream of the Tasman Bridge. [3] Due to the distance from the city and the lack of development on the eastern shore at this location, the bridge is currently underutilised. With this said when the bridge is relied upon due unforeseen circumstances on the Tasman Bridge it fails to live up to its expectations due to inadequate connecting road infrastructure of the eastern shore.

Bowen Bridge Bowen Bridge Dawn.png Complete1984
None of the proposals were completed as freeways

Estimates

The Hobart Area Transportation study was also released with estimates of daily Traffic of the proposals for the Target year of 1985. [1]

See also

Melbourne:

Adelaide:

Related Research Articles

<span class="mw-page-title-main">Highway</span> Public road or other public way on land

A highway is any public or private road or other public way on land. It is used for major roads, but also includes other public roads and public tracks. In the United States, it is used as an equivalent term to controlled-access highway, or a translation for Autobahn, autoroute, etc.

<span class="mw-page-title-main">Tasman Bridge</span> Highway bridge over the River Derwent in Hobart, Tasmania, Australia

The Tasman Bridge is a prestressed concrete girder bridge connecting the Tasman Highway over the River Derwent in Hobart, Tasmania, Australia. When it opened on 29 March 1965, the Tasman was the longest prestressed concrete bridge in Australia, with a total length measuring 1,396 metres (4,580 ft), including approaches. The bridge provides a vital link between Hobart's city centre on the western shore and the City of Clarence on the eastern shore. Averaging 73,029 vehicle crossings per day, the bridge is the highest volume road section in Tasmania. It features five lanes of traffic including a central lane equipped for tidal flow operations and separated shared-use walkways on both sides, with ramp upgrades for improved access and cyclists completed in 2010.

<span class="mw-page-title-main">Midland Highway (Tasmania)</span> Highway in Tasmania, Australia

The Midland Highway is one of Tasmania's major inter-city highways, running for 176 kilometres (109 mi) between Hobart and Launceston. It is part of the AusLink National Network and is a vital link for road freight to transport goods to and from the two cities. It represents a major north–south transportation corridor in Tasmania and has the route 1 designation as part of the National Highway. The highway consists of various traffic lane arrangements, the most common being two lanes – one in each direction, with overtaking options and at-grade intersections. At both the Launceston and Hobart sections of the highway there are small portions of grade-separated dual carriageway.

<span class="mw-page-title-main">Bass Highway, Tasmania</span> Highway in Tasmania, Australia

The Bass Highway is a highway in Tasmania, Australia. It connects the three cities across the north of the state – Burnie, Devonport and Launceston. The road was named due to its proximity to the Bass Strait. It is a part of the National Highway, designated as National Highway 1, together with the Midland and Brooker highways in Tasmania.

<span class="mw-page-title-main">Brooker Highway</span> Highway in Tasmania, Australia

The Brooker Highway is a highway in the Australian state of Tasmania. As one of Hobart's three major radials, the highway connects traffic from the city centre with the northern suburbs and is the major road connection to the cities and towns of northern Tasmania. With an annual average daily traffic of 48,000, the highway is one of the busiest in Tasmania. The Brooker Highway has recently been declared part of the National Highway.

<span class="mw-page-title-main">Tasman Highway</span> Highway in Tasmania, Australia

The Tasman Highway is a highway in Tasmania, Australia. Like the Midland Highway, it connects the major cities of Hobart and Launceston – however it takes a different route, via the north-eastern and eastern coasts of the state. The Highway also acts as a major commuter road to Hobart residents living on the eastern side of the Derwent River. The designation "Tasman Highway" arises from its location facing the Tasman Sea – named, like the state itself, after Abel Tasman. The highway is one of the longest in Tasmania – 410 km (250 mi), with an average travelling time of 412 hours.

<span class="mw-page-title-main">Davey Street, Hobart</span> Street in Hobart, Tasmania, Australia

Davey Street is a major one way street passing through the outskirts of the Hobart City Centre in Tasmania, Australia. Davey street is named after Thomas Davey, the first Governor of Van Diemen's Land. The street forms a one-way couplet with nearby Macquarie Street connecting traffic from the Southern Outlet in the south with traffic from the Tasman Highway to the east and the Brooker Highway to the north of the city. With annual average daily traffic of 37,200, the road is one of the busier streets in Hobart.

<span class="mw-page-title-main">Bridgewater Bridge (Tasmania)</span> Road and rail bridge in Tasmania, Australia

The Bridgewater Bridge is a combined road and rail bridge that carries the Midland Highway and South Railway Line across the Derwent River in Hobart, Tasmania, Australia. This steel truss vertical lift bridge and specially-built causeway connect the Hobart suburbs of Bridgewater and Granton. The bridge was completed in 1946 and accommodates a two-lane highway, a single track railway and a grade-separated footpath.

<span class="mw-page-title-main">Macquarie Street, Hobart</span> Street in Hobart, Tasmania, Australia

Macquarie Street a major one way street passing through the outskirts of the Hobart City Centre in Tasmania, Australia. Macquarie street is named after Lachlan Macquarie, who oversaw the planning of Hobart’s inner city grid layout. The street forms a One-way couplet with nearby Davey Street connecting traffic from the Southern Outlet in the south with traffic from the Tasman Highway to the east and the Brooker Highway to the north of the city. With annual average daily traffic of 28,500, the road is one of the busier streets in Hobart.

<span class="mw-page-title-main">Kingston Bypass</span>

The Kingston Bypass is a A$41 million, 2.8-kilometre-long (1.7 mi) highway bypassing the southern Hobart community of Kingston, Tasmania. The proposal of a bypass was originally published in the Hobart Area Transportation Study during 1965. The bypass was completed in 2011, after the need to such a road was realised several years earlier when the Channel Highway reached an 18,000 AADT. Construction of the Bypass was made possible by an A$15 million pledge for the project, made by the Australian Labor Party during the 2007 federal election campaign. During construction total cost of the bypass blew out from the original estimate of $30 million to over $41 million.

<span class="mw-page-title-main">South Arm Highway</span> Highway in Tasmania, Australia

The South Arm Highway is a highway serving the southern suburbs of Hobart, on the eastern shore of the River Derwent in Tasmania, Australia. The highway is a major trunk road that carries heavy commuter traffic south from the Eastern Outlet to Howrah and Rokeby. As one of the Tasman Highway's principle Feeders and one of the eastern shore's major transport corridors, The South Arm Highway facilitates the movement of traffic between the suburbs and satellite communities to the south with the city centre and ultimately, other major cross city highways. With annual average daily traffic (AADT) of 17,000, the highway is considered a major traffic corridor within Hobart. The designation "South Arm Highway" arises from its journey south to South Arm.

<span class="mw-page-title-main">Brighton Bypass</span> Highway in Tasmania, Australia

The Brighton Bypass is a A$191 million north/south bypass of the Midland Highway diverting traffic away from the northern Hobart satellite suburbs of Brighton and Pontville. Construction of the 9.5 km federally funded dual carriageway started in April 2009, and was opened on 12 November 2012.

<span class="mw-page-title-main">Southern Outlet, Hobart</span> Highway in Hobart, Tasmania, Australia

The Southern Outlet is a major highway in the Tasmanian capital of Hobart and acts as one of the city's 3 major radial highways, connecting traffic from the Hobart city centre with commuters from the southern suburbs as well as intrastate traffic from the south of the state. It is one of the busier commuter highways in Hobart, handling in excess of 31,000 traffic movements each day.

<span class="mw-page-title-main">1969 Melbourne Transportation Plan</span>

The 1969 Melbourne Transportation Plan was a road and rail transport plan for Melbourne, the state capital of Victoria, Australia, instituted by Henry Bolte's state government. Most prominently, the plan recommended the provision of an extensive freeway network, much of which has since been built.

The city of Hobart, Tasmania is served by a wide variety of transport. While the city's main form of transport is private transport on the road network, transport is also available by bus, ferry and aircraft. A suburban train service operated between Hobart and Brighton from the 1870s until 31 December 1974. There has been, however, talk in recent years of reinstating a train service in the northern suburbs.

<span class="mw-page-title-main">Southern Transport Investment Program</span> Transport plan in Tasmania, Australia

The Southern Transport Investment Program is a road and rail transport plan for the northern outskirts of Hobart instituted in 2007 by the Tasmanian state government. It outlines most prominently an extensive upgrade of the Midland Highway, including the Brighton Bypass, the Bagdad Bypass and the replacement of the Bridgewater Bridge. The plan also outlines the construction of the Brighton Transport Hub and various rail alignment improvements to the Main North/South Line.

<span class="mw-page-title-main">Hobart Bypass</span>

The Hobart Bypass is a proposed concept to bypass the Central Business District of Hobart, Tasmania. Currently, through traffic travels from the Tasman/Brooker Highways down the one-way Davey/Macquarie couplet to the Southern Outlet. As well as traffic concerns, there is also a call to build the bypass on the grounds that the current traffic arrangement cuts the central business district off from Hobart's waterfront.

<span class="mw-page-title-main">Riverline (Hobart)</span> Proposed light rail system in Hobart, Tasmania, Australia

Riverline, also known as the Northern Suburbs Railway, was a proposed light rail system that would have traversed the southernmost section of the South Railway Line, through the northern suburbs of Hobart, Tasmania.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Hobart Area Transportation Study. Hobart, Tasmania: Wilbur Smith and Associates. 1965.
  2. Freestone, Robert (2010). Urban Nation: Australia's Planning Heritage. ISBN   9780643096981.
  3. 1 2 3 4 5 6 Hobart Transport Revision. Hobart, Tasmania: Department of Public Works. 1970.
  4. 1 2 "The city bypass that stalled". The Mercury. 2010. Retrieved 17 October 2011.
  5. "Streets switch sparks divide". The Mercury. 2010. Retrieved 17 October 2011.
  6. 1 2 "Kingston bypass opens". The Mercury . 22 November 2011. Retrieved 17 March 2013.
  7. 1 2 "Channel Highway, Kingston Bypass" (PDF). Government of Tasmania. 2009. Retrieved 17 March 2013.
  8. "Kingston Bypass Bridges" (PDF). VEC Civil Engineering. 2012. Retrieved 17 October 2011.
  9. "Urban Traffic Planning in Hobart 2007". John Livermore Enterprises. 2007. Archived from the original on 29 March 2012. Retrieved 17 October 2011.
  10. "Kingston & Environs Transport Study" (PDF). Department of Infrastructure, Energy and Resources. 2006. Archived from the original (PDF) on 21 March 2012. Retrieved 18 October 2011.