StatusNever built
LocationWellington Street, Leeds, West Yorkshire, England
Height
Roof172 metres (564 ft)
Technical details
Floor count55
Design and construction
Architect SimpsonHaugh and Partners
Developer KW Linfoot
Main contractor Carillion

Lumiere was a mixed-use skyscraper development in Leeds, West Yorkshire, England, intended to be completed in 2010. [1] The project was put on hold in 2008 and officially cancelled in 2010. [2]

Contents

Design and planning

The project represented the second phase of the redevelopment of a Royal Mail sorting office, which had already seen a 65 metres (213 ft) tall former Royal Mail office reclad to become apartments called West Point.

It was planned than Lumiere would consist of two towers of heights 54 storeys / 171 m (561 ft) and 32 storeys / 112 m (367 ft), both clad in glass, with the taller tower predominantly blue and the smaller tower of a reddish hue. The developers behind the project were KW Linfoot and Scarborough Development Group, and the designers were SimpsonHaugh and Partners and, for the structural design, WSP Group. The construction was being carried out by Carillion.

If construction had proceeded the building would have housed a mixture of apartments, offices, shops, cafés, restaurants and a winter garden. There would have been over 20,000 sq ft (2,000 m2) of retail space and 10,000 sq ft (1,000 m2) of usable office space in the development, and several restaurants and eating establishments. There would also have been around 650 apartments, communal areas and apartments designed by YOO designs.

If completed according to the original proposals, the tower would have become the tallest building in Leeds and Western Europe's tallest residential skyscraper. It would have exceeded the height of Beetham Tower Manchester, to become the tallest building in the United Kingdom outside London if completed before the Piccadilly Tower in Manchester. On 21 July 2006 councillors approved the proposals, with construction scheduled to begin in 2007.

Construction

Proposed height of the completed Lumiere, compared to the height of other existing and approved tall buildings in Leeds. Leeds building heights (Lumiere).svg
Proposed height of the completed Lumiere, compared to the height of other existing and approved tall buildings in Leeds.

Groundwork began with boreholes in spring 2007; throughout the late summer of 2007 the site was cleared. In September 2007 work commenced to excavate and remove the existing foundations and basement of the previous Royal Mail building. Substructure work began in early 2008, with the piling works by Cementation Skanska completed by June 2008.

Suspension

Picture taken of the Lumiere site on 1 August 2008 after work to construct the Simpson Haugh designed twin skyscraper scheme was put on hold Lumiere August 2008.jpg
Picture taken of the Lumiere site on 1 August 2008 after work to construct the Simpson Haugh designed twin skyscraper scheme was put on hold
Central Square was built instead on the site (pictured here in February 2020). Central Square, just off Wellington Street, Leeds (geograph 6384776).jpg
Central Square was built instead on the site (pictured here in February 2020).

However, on 9 July 2008, developers KW Linfoot announced that the project had been put on hold due to the credit crunch, and construction would not resume until the economy stabilised. [3] [4] Following the postponement of construction, it was announced that the developer had received approval from Leeds City Council to include an additional floor in each tower, the two towers now comprising 55 storeys and 33 storeys. [5] This increased the planned height of each tower by 1 m (3.3 ft). [6]

In February 2009 the developers of Lumiere, KW Linfoot, went into administration; the development was a joint venture and was taken over completely by KW Linfoot's joint venture partners. [7] In August 2010, the owners of the Lumiere development announced they would enter voluntary liquidation, [2] meaning the building will not now be built. [2] The investors will recover their money as they are covered by an insurance policy. [2]

See also

Related Research Articles

The Sapphire Tower was a proposed luxury hotel and condominium skyscraper in Toronto, Ontario, Canada, to be built by developer Harry Stinson. It was so named because all plans for it had deep blue glass curtain walls. This site had been involved in numerous other proposals, including Stinson's own Downtown Plaza concept, and an earlier proposal that would have incorporated the neighbouring Graphic Arts Building.

Bridgewater Place Building in Leeds, West Yorkshire, England

Bridgewater Place, nicknamed The Dalek, is an office and residential skyscraper in Leeds, West Yorkshire, England. It was the tallest building in Yorkshire at the time of being topped out in September 2005, but is now the second-tallest after another Leeds building, Altus House. Bridgewater Place is visible at up to 25 miles from most areas.

V Building

The V Building was a proposed 51-storey residential skyscraper that had been approved for construction on Broad Street on the Westside of the city centre of Birmingham, England, as part of the larger Arena Central development scheme on the former ATV / Central Television Studios which were closed in 1997. The entire development site covered an area of 7.6 acres (31,000 m2). On completion the development would have set to include offices, shops, restaurants, cafes, leisure/entertainment, fitness centre and hotel. It was to have been located next to Alpha Tower, one of the tallest buildings in Birmingham, on a place which was a multi-level underground car park in 2007. The total cost of the entire scheme was expected to be £400 million and of the tower, £150 million.

Criterion Place

Criterion Place was a proposed skyscraper development in Leeds, West Yorkshire, England. In July 2008 it was announced that the project is to be cancelled owing to the property market slump.

The Mercian

The Mercian is a 132-metre-tall residential skyscraper on Broad Street in Birmingham, England. It is designed by Glenn Howells Architects, the developer is Moda Living and the main contractor is John Sisk & Son.

Deansgate Square Skyscraper cluster on the southern edge of Manchester City Centre

Deansgate Square, formerly known as Owen Street, is a skyscraper cluster on the southern edge of Manchester City Centre, consisting of four towers, the tallest of which is 201 metres. The site is just south of Deansgate railway station and north of the Mancunian Way, bounded by Deansgate, Owen Street and the River Medlock.

AXIS (Manchester)

AXIS is a tower in Manchester city centre, Manchester, England. The tower has had two iterations, one as a stalled construction project which was cancelled due to the Great Recession in 2008, and the other as residential which was announced in 2014. When completed, Axis Tower became the seventh tallest building in Manchester until the completion of the Deansgate Square and Angel Gardens projects, the latter currently under construction.

Bay Pointe was a planned housing development site located in the western area of Cardiff Bay, Cardiff, Wales. The development was to be situated on the peninsula of Cardiff International Sports Village.

Plot 3a Princes Dock

Plot 3a Princes Dock was a 34-storey mixed use skyscraper approved for construction alongside Prince's Dock at the waterfront of Liverpool, England. It was to stand alongside the likes of 1 Princes Dock and Alexandra Tower. Planning permission was granted for the building on two occasions ; despite this, construction never commenced.

1 Spinningfields

No.1 Spinningfields is a 92-metre office tower in the Spinningfields district of Manchester city centre, Manchester in the United Kingdom.

River Street Tower

River Street Tower is a high-rise tower under construction in Manchester, England. The tower is situated immediately north of the Mancunian Way on land which was notably occupied by a concrete car park frame from 2005 to 2018.

Australia 108 Residential skyscraper in the Southbank precinct of Melbourne, Victoria, Australia

Australia 108 is a residential supertall skyscraper in the Southbank precinct of Melbourne, Victoria, Australia. Having topped out in November 2019, it became the tallest building in Australia by roof height, surpassing the Eureka Tower, and the second-tallest building in Australia by full height, surpassed by Q1 Tower.

6 & 8 Parramatta Square Skyscraper in New South Wales, Australia

6 & 8 Parramatta Square is a skyscraper currently under construction in Parramatta, New South Wales, Australia, a centrepiece of the Parramatta Square development. The building is a commercial skyscraper which will comprise 120,000 square metres (1,300,000 sq ft) of office space and be 230 metres (750 ft) in height. It is being built in the Parramatta Square Development on plot 8 called PSQ8.

Wardian London

Wardian London is a residential-led development under construction at Marsh Wall on the Isle of Dogs, London from Eco World-Ballymore and designed by architect firm Glenn Howells. The scheme consists of two skyscrapers and was approved by Tower Hamlets council in November 2014. Upon completion, expected to be early 2021, Wardian London will be one of the tallest residential developments in London and the United Kingdom.

Code Sheffield is an under construction skyscraper located at the junction of Wellington Street and Rockingham Street in Sheffield, South Yorkshire. Construction commenced in March 2022, as part of the Heart of the City 2 redevelopment of this area of the city centre. With a planned height of 117 metres (384 ft) once completed, Code Sheffield will overtake both the St Paul's Tower as the tallest building in Sheffield and Altus House in Leeds as the tallest building in Yorkshire.

References

  1. BBC News article on the proposed development
  2. 1 2 3 4 "Leeds Lumière is scrapped". Yorkshire Evening Post. 24 August 2010. Retrieved 31 August 2014.
  3. "City building project put on hold". BBC News. 9 July 2008. Retrieved 9 July 2008.
  4. "Leeds Lumiere Towers Put on Hold". Skyscrapernews.com. 9 July 2008.
  5. "Leeds Approves Revised Lumiere Proposals". Skyscrapernews.com. 24 July 2008.
  6. "Leeds Lumiere: Revised plan for city's tallest building". Yorkshire Evening Post. 24 July 2008. Retrieved 31 August 2014.
  7. "KW Linfoot in administration STATEMENT IN FULL". Yorkshire Evening Post. 25 February 2009. Retrieved 26 August 2014.