Northern Light (spacecraft)

Last updated
Northern Light
Northern Light Lander Mars1.jpg
Northern Light Lander on Mars (artist's impression)
Mission typeMars rover
OperatorNorthern Light Consortium
Website www.marsrocks.ca
Spacecraft properties
Manufacturer Thoth Technology
Landing mass35 kilograms (77 lb)
6 kilograms (13 lb) lander
Start of mission
Launch datecancelled
 

Northern Light was a concept mission for a robotic mission to Mars that would consist of a lander and a rover, being studied by a consortium of Canadian universities, companies and organisations. The primary contractor for the spacecraft was Thoth Technology Inc.

Contents

The spacecraft would consist of four parts: an apogee kick engine to provide orbital injection for a cruise vehicle that carries the Northern Light lander and the Beaver Rover to a direct rendezvous with Mars using a Hohmann transfer orbit. Atmospheric entry would be achieved by a heat shield, parachute and airbag deployment system. The lander would transfer the rover to the Martian surface. Once deployed on the Martian surface, the lander contacts Earth directly to the 46 m parabolic antenna located at the Algonquin Radio Observatory.

The Beaver Rover was proposed to have a maximum range of 1000 metres (0.62 mile) from the landing site. It would have operated under battery, utilizing tools and sensors to investigate surface rocks that may contain the presence of photosynthetic life.

History

The project officially started in 2001, and its project leader was Ben Quine, from York University, Canada. York University has participated in the Canadian Space Program and has designed several space research instruments and applications currently used by NASA, including the meteorological station on board the Phoenix Mars lander. [1] [2]

Partners in this Mars project were York University, University of Alberta, University of Toronto, University of Waterloo, University of Winnipeg, University of Western Ontario, University of Saskatchewan, University of New Brunswick, McGill University and Simon Fraser University. [3] The mission control for the period after it lands on Mars, would have been headquartered at York University. [4]

The cost was estimated at $20 million, or possibly less if another country shares the rocket. [4] The Canadian Space Agency confirmed it knows of the project, but has no involvement in it. [4] In 2014, a crowd sourcing campaign to support the mission was launched on Indiegogo and YouTube in order to raise $1.1 million Canadian dollars for development of the flight hardware, [5] [6] but the drive raised only $10,012. [7]

Scientific goals

There are four primary goals for the mission: [8]

  1. Search for life on Mars
  2. Search for water on Mars
  3. Investigate Martian electromagnetic radiation environment and atmospheric properties
  4. Prepare for the international effort of a Mars sample return mission and a human mission to Mars

Payload of the Beaver Rover

The rover system was required for geological surface exploration and for subsurface imaging. With a mass of approximately 6 kg (13.2 lb), the rover would operate under its own power and have a range of roughly 1 km (0.62 mi). The rover would be equipped with a visible camera for manoeuvering and surface exploration, as well as a Point Spectrometer and microscope camera for geological survey. A ground-penetrating radar would explore the Martian subsurface and look for water; an active vibrator and receiver would use short, sub-millisecond pulses to conduct an acoustic study of the subsurface. For immediate subsurface exploration, the rover would be equipped with a rock grinding tool.

MASSur Seismic Sensor

The MASSur Seismic Sensor, developed by the University of Calgary would have provided depth profiles of the Martian surface. Specifically, a seismometer would conduct tests to determine the rigidity and elasticity of the Martian topsoil as well as its rock properties. Sediments, permafrost, and water may all have distinct signatures. This seismic system would use a vibrational source and elastic-wave receivers (accelerometers) on both the lander and on the Beaver Rover. The redundancy of lander and rover apparatus, ensures that some primary science objectives can be met without rover deployment.

Ground Penetrating Radar

The Ground-Penetrating Radar (GPR) would have utilized a 200 MHz radar to provide fine-scale, sub-surface imaging to a depth of 20 m (65 ft) on loose aggregate and up to 100 m (328 ft) on permafrost or ice. The concept design shares several systems with the seismic instruments. [9]

TC Corer

The corer would be capable of drilling up to 10 mm into surface rocks. This tool would be used in conjunction with the Aurora spectrometer and microscope to examine the near-surface composition and to look for biosignatures of near-surface life. The core would have been contributed to the mission from Hong Kong. The flight model instrument has an estimated mass of 350 g.

Payload of the Northern Light Lander

Aurora Spectrometer

The proposed spectrometer has a wavelength coverage of 625 nm to 2500 nm and observes the whole sky. The instrument would measure variations in spectral irradiance which can be utilized to determine aerosol and atmospheric composition including the concentration of carbon dioxide, the major constituent of the Martian atmosphere. It would also carry out angular dependency of radiation influx in the atmosphere. The Aurora instrument has a mass of 450 g. [9]

Argus Spectrometer

Similar in design to the Argus 1000 spectrometer flown on CanX-2, the radiometer would be the primary equipment of the Northern Light lander making measurements of spectral rock reflectance. The spectrometer has a mass of 240 g. [9]

Camera systems

The camera systems on the lander would have the capability of narrow and wide field surveys. The narrow field survey would have provided a very high resolution, panoramic view of the landing site. Colour filters would perform some spectral mapping and mineral identification of the surrounding soil; the camera would also perform limited atmospheric and astronomical observations. [9] Colour images of Earth would have been obtained.

The wide field survey would provide an overall colour view of the lander's surroundings to help rover deployment and route planning.

MASSur Seismic Sensors

Similar specifications as those on the Beaver Rover.

Environmental sensors

Environmental sensors would monitor environmental conditions at the landing site. Various instruments would have measured UV rays, oxidising substances, air pressure, air temperature, dust impact, wind velocity, and ground vibration. These sensors would have a combined mass of 130 g. Flight models were previously developed for Britain's Beagle 2 lander.

Tracking

The entry system would have been tracked and targeted utilizing a combination of Doppler radar and very long baseline interferometry. This data would processed by a high-resolution orbital model that utilizes high-precision ephemeris to predict spacecraft location and trajectory.

Upon launch, tracking would commence at the Algonquin Radio Observatory. After orbital injection, the spacecraft would be contacted periodically to obtain system status and to determine trajectory. As the package reaches the Matrian thermosphere continuous tracking would commence in order to verify mechanism deployment during descent. [10]

Landing site

The landing site would have been determined from one of three options by crowd sourcing campaign. One option was a dry 'sea', within 5 km of a basin formation.

See also

Related Research Articles

<i>2001 Mars Odyssey</i> NASA orbiter for geology and hydrology

2001 Mars Odyssey is a robotic spacecraft orbiting the planet Mars. The project was developed by NASA, and contracted out to Lockheed Martin, with an expected cost for the entire mission of US$297 million. Its mission is to use spectrometers and a thermal imager to detect evidence of past or present water and ice, as well as study the planet's geology and radiation environment. It is hoped that the data Odyssey obtains will help answer the question of whether life existed on Mars and create a risk-assessment of the radiation that future astronauts on Mars might experience. It also acts as a relay for communications between the Curiosity rover, and previously the Mars Exploration Rovers and Phoenix lander, to Earth. The mission was named as a tribute to Arthur C. Clarke, evoking the name of his and Stanley Kubrick's 1968 film 2001: A Space Odyssey.

<i>Viking 1</i> Robotic spacecraft sent to Mars

Viking 1 was the first of two spacecraft, along with Viking 2, each consisting of an orbiter and a lander, sent to Mars as part of NASA's Viking program. The lander touched down on Mars on July 20, 1976, the first successful Mars lander in history. Viking 1 operated on Mars for 2,307 days or 2245 Martian solar days, the longest Mars surface mission until the record was broken by the Opportunity rover on May 19, 2010.

<i>Mars Express</i> European Mars orbiter

Mars Express is a space exploration mission being conducted by the European Space Agency (ESA). The Mars Express mission is exploring the planet Mars, and is the first planetary mission attempted by the agency. "Express" originally referred to the speed and efficiency with which the spacecraft was designed and built. However, "Express" also describes the spacecraft's relatively short interplanetary voyage, a result of being launched when the orbits of Earth and Mars brought them closer than they had been in about 60,000 years.

<i>Beagle 2</i> Failed Mars lander launched in 2003

The Beagle 2 is an inoperative British Mars lander that was transported by the European Space Agency's 2003 Mars Express mission. It was intended to conduct an astrobiology mission that would have looked for evidence of past life on Mars.

<span class="mw-page-title-main">Mars Exploration Rover</span> NASA mission to explore Mars via two rovers

NASA's Mars Exploration Rover (MER) mission was a robotic space mission involving two Mars rovers, Spirit and Opportunity, exploring the planet Mars. It began in 2003 with the launch of the two rovers to explore the Martian surface and geology; both landed on Mars at separate locations in January 2004. Both rovers far outlived their planned missions of 90 Martian solar days: MER-A Spirit was active until March 22, 2010, while MER-B Opportunity was active until June 10, 2018.

<span class="mw-page-title-main">Mars Polar Lander</span> Failed 1999 robotic Mars lander

The Mars Polar Lander, also known as the Mars Surveyor '98 Lander, was a 290-kilogram robotic spacecraft lander launched by NASA on January 3, 1999, to study the soil and climate of Planum Australe, a region near the south pole on Mars. It formed part of the Mars Surveyor '98 mission. On December 3, 1999, however, after the descent phase was expected to be complete, the lander failed to reestablish communication with Earth. A post-mortem analysis determined the most likely cause of the mishap was premature termination of the engine firing prior to the lander touching the surface, causing it to strike the planet at a high velocity.

<span class="mw-page-title-main">Phobos program</span> 1988 Soviet missions to Mars

The Phobos program was an unmanned space mission consisting of two probes launched by the Soviet Union to study Mars and its moons Phobos and Deimos. Phobos 1 was launched on 7 July 1988, and Phobos 2 on 12 July 1988, each aboard a Proton-K rocket.

<i>Nozomi</i> (spacecraft) Failed Mars orbiter

Nozomi was a Japanese Mars orbiter that failed to reach Mars due to electrical failure. It was constructed by the Institute of Space and Astronautical Science, University of Tokyo and launched on July 4, 1998, at 03:12 JST with an on-orbit dry mass of 258 kg and 282 kg of propellant. The Nozomi mission was terminated on December 31, 2003.

<span class="mw-page-title-main">Mars 96</span> Failed Mars mission

Mars 96 was a failed Mars mission launched in 1996 to investigate Mars by the Russian Space Forces and not directly related to the Soviet Mars probe program of the same name. After failure of the second fourth-stage burn, the probe assembly re-entered the Earth's atmosphere, breaking up over a 320 km (200 mi) long portion of the Pacific Ocean, Chile, and Bolivia. The Mars 96 spacecraft was based on the Phobos probes launched to Mars in 1988. They were of a new design at the time and both ultimately failed. For the Mars 96 mission the designers believed they had corrected the flaws of the Phobos probes, but the value of their improvements was never demonstrated due to the destruction of the probe during the launch phase.

<span class="mw-page-title-main">Mars Science Laboratory</span> Robotic mission that deployed the Curiosity rover to Mars in 2012

Mars Science Laboratory (MSL) is a robotic space probe mission to Mars launched by NASA on November 26, 2011, which successfully landed Curiosity, a Mars rover, in Gale Crater on August 6, 2012. The overall objectives include investigating Mars' habitability, studying its climate and geology, and collecting data for a human mission to Mars. The rover carries a variety of scientific instruments designed by an international team.

<i>Phoenix</i> (spacecraft) NASA Mars lander

Phoenix was an uncrewed space probe that landed on the surface of Mars on May 25, 2008, and operated until November 2, 2008. Phoenix was operational on Mars for 157 sols. Its instruments were used to assess the local habitability and to research the history of water on Mars. The mission was part of the Mars Scout Program; its total cost was $420 million, including the cost of launch.

<span class="mw-page-title-main">ExoMars</span> Astrobiology programme

ExoMars is an astrobiology programme of the European Space Agency (ESA) and the Russian space agency (Roscosmos).

<span class="mw-page-title-main">Mawrth Vallis</span> Valley on Mars

Mawrth Vallis is a valley on Mars, located in the Oxia Palus quadrangle at 22.3°N, 343.5°E with an elevation approximately two kilometers below datum. Situated between the southern highlands and northern lowlands, the valley is a channel formed by massive flooding which occurred in Mars’ ancient past. It is an ancient water outflow channel with light-colored clay-rich rocks.

<span class="mw-page-title-main">Trace Gas Orbiter</span> Mars orbiter, part of ExoMars programme

The ExoMars Trace Gas Orbiter is a collaborative project between the European Space Agency (ESA) and the Russian Roscosmos agency that sent an atmospheric research orbiter and the Schiaparelli demonstration lander to Mars in 2016 as part of the European-led ExoMars programme.

<span class="mw-page-title-main">Mars Astrobiology Explorer-Cacher</span> Cancelled NASA Mars rover concept

The Mars Astrobiology Explorer-Cacher (MAX-C), also known as Mars 2018 mission, was a NASA concept for a Mars rover mission, proposed to be launched in 2018 together with the European ExoMars rover. The MAX-C rover concept was cancelled in April 2011 due to budget cuts.

Rosalind Franklin, previously known as the ExoMars rover, is a planned robotic Mars rover, part of the international ExoMars programme led by the European Space Agency and the Russian Roscosmos State Corporation. The mission was scheduled to launch in July 2020, but was postponed to 2022. The Russian invasion of Ukraine has caused an indefinite delay of the programme, as the member states of the ESA voted to suspend the joint mission with Russia; in July 2022, ESA terminated its cooperation on the project with Russia. As of May 2022, the launch of the rover is not expected to occur before 2028 due to the need for a new non-Russian landing platform.

MELOS is a Japanese rover mission concept under study for an engineering demonstration of precision landing, and to look for possible biosignatures on Mars using a rover. JAXA has not published updates since 2015.

<i>Schiaparelli</i> EDM Mars landing demonstration system

Schiaparelli EDM was a failed Entry, Descent, and Landing Demonstrator Module (EDM) of the ExoMars programme—a joint mission of the European Space Agency (ESA) and the Russian Space Agency Roscosmos. It was built in Italy and was intended to test technology for future soft landings on the surface of Mars. It also had a limited but focused science payload that would have measured atmospheric electricity on Mars and local meteorological conditions.

<span class="mw-page-title-main">Tianwen-1</span> Interplanetary mission by China to place an orbiter, lander, and rover on Mars

Tianwen-1 Chinese: 天问一号 is an interplanetary mission by the China National Space Administration (CNSA) which sent a robotic spacecraft to Mars, consisting of 6 spacecraft: an orbiter, two deployable cameras, lander, remote camera, and the Zhurong rover. The spacecraft, with a total mass of nearly five tons, is one of the heaviest probes launched to Mars and carries 14 scientific instruments. It is the first in a series of planned missions undertaken by CNSA as part of its Planetary Exploration of China program.

<span class="mw-page-title-main">Martian Moons eXploration</span> Planned sample-return mission by Japan to Phobos

The Martian Moons eXploration (MMX) is a robotic space probe set for launch in 2026 to bring back the first samples from Mars' largest moon Phobos. Developed by the Japan Aerospace Exploration Agency (JAXA) and announced on 9 June 2015, MMX will land and collect samples from Phobos once or twice, along with conducting Deimos flyby observations and monitoring Mars's climate.

References

  1. Experiment aboard Space Shuttle Endeavour. York U press release. Retrieved 2008-05-22
  2. NASA Phoenix Mission to Mars. York U press release. Retrieved 2008-05-22.
  3. "University of Alberta joins mission to Mars". The Edmonton Journal. August 22, 2007. Archived from the original on November 6, 2012. Retrieved 2009-07-27.
  4. 1 2 3 "Mission to Mars to be 100% Canadian". The Ottawa Citizen. CanWest MediaWorks Publications Inc. August 22, 2007. Archived from the original on November 6, 2012. Retrieved 2009-08-01.
  5. . Mission video on YouTube
  6. "Northern Light Canadian Mars micro-rover and lander aim for launch". CBC News. November 4, 2014. Retrieved 2014-11-13.
  7. . Northern Light Indiegogo campaign
  8. "Four Science Themes". Thoth Technology Inc. 2009. Archived from the original on 2009-11-11. Retrieved 2009-07-29.
  9. 1 2 3 4 "Northern Light Instrumentation". Thoth Technology Inc. 2009. Archived from the original on 2009-11-11. Retrieved 2009-07-28.
  10. "The Algonquin Radio Observatory (ARO)". Thoth Technology Inc. 2009. Archived from the original on 2009-11-11. Retrieved 2009-07-28.