TRAX (light rail)

Last updated

TRAX (Transit Express)
UTA TRAX logo.svg
Green line Trax at Gallivan Plaza.jpg
TRAX Green Line train at Gallivan Plaza
Overview
Owner Utah Transit Authority (UTA)
Area served Salt Lake Valley
Locale Salt Lake County, Utah, U.S.
Transit type Light rail
Number of lines3
Number of stations51
Daily ridership43,800 (weekdays, Q3 2024) [1] [Note 1]
Annual ridership11,043,800 (2023) [2] [Note 1]
Headquarters3600 South 700 West
South Salt Lake, Utah [3]
Website rideuta.com
Operation
Began operationDecember 4, 1999;25 years ago (1999-12-04)
Number of vehicles117 (total): [4]
Technical
System length44.8 mi (72.1 km) [7]
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification Overhead line,  750 V DC
System map
Trax and FrontRunner c. 2013.png
A map of the entire UTA rail system by August 2013
Green Line
Airport   704  
BSicon uKINTa.svg
BSicon FLUG.svg
1940 W North Temple
BSicon uHST.svg
Power
BSicon uHST.svg
BSicon CONTg.svg
  750  
Fairpark
BSicon uHST.svg
BSicon STR.svg
Jackson/Euclid
BSicon uHST2.svg
BSicon uhSTRc3a.svg
BSicon STRc2.svg
BSicon STR3.svg
BSicon STRc2.svg
BSicon uhSTRc1a.svg
BSicon lCONTg@F.svg
BSicon uhINT2+4.svg
BSicon STR3+1.svg
BSicon uhSTRc3e.svg
BSicon STRc4.svg
BSicon ABZg+1.svg
BSicon uhSTRc1e.svg
BSicon STRc4.svg
BSicon uSTR+4.svg
BSicon STR.svg
BSicon gSTR+l.svg
BSicon gSTR+r.svg
BSicon uSTR.svg
Red Line
Planetarium
BSicon STR.svg
BSicon gHST.svg
BSicon gSTR.svg
BSicon uKHSTa.svg
  702    703  
University
Medical Center
Old GreekTown
BSicon STR.svg
BSicon gHST.svg
BSicon gSTR.svg
BSicon uHST.svg
Fort Douglas
BSicon TRAIN3.svg
Salt Lake
Central
  701    702  
BSicon INT-L.svg
BSicon gKINTe-R.svg
BSicon gSTR.svg
BSicon uHST.svg
University South Campus
Arena
BSicon STR.svg
BSicon gINT.svg
BSicon uHST.svg
Stadium
Temple Square
BSicon STR.svg
BSicon gHST.svg
BSicon uHST.svg
900 East
City Center
BSicon STR.svg
BSicon gHST.svg
BSicon uHST.svg
Trolley
Gallivan Plaza
BSicon STR.svg
BSicon gINT.svg
BSicon gKHSTa.svg
BSicon uKSTRe.svg
Library
BSicon STR.svg
BSicon gABZgl.svg
BSicon gSTRr.svg
BSicon STR2.svg
BSicon STRc3.svg
BSicon gKHSTe.svg
BSicon uKSTRa.svg
Courthouse
BSicon STRc1.svg
BSicon STR+4.svg
BSicon uHST.svg
600 South
BSicon STR.svg
BSicon uHST.svg
900 South
BSicon STR.svg
BSicon uHST.svg
Ballpark
BSicon STR.svg
BSicon uINT.svg
Central Pointe
Green Line
BSicon uSTR+l.svg
BSicon mKRZu.svg
BSicon uABZglr.svg
BSicon uCONTfq.svg
River Trail
BSicon uHST.svg
BSicon STR.svg
BSicon uHST.svg
Millcreek
Redwood Junction
BSicon uHST.svg
BSicon STR.svg
BSicon uHST.svg
Meadowbrook
Decker Lake
BSicon uHST.svg
BSicon STR.svg
BSicon uHST.svg
Murray North
BSicon uKHSTe.svg
BSicon INT-L.svg
BSicon uINT-R.svg
Murray Central
BSicon STR.svg
BSicon uINT.svg
Fashion Place West
Red Line
BSicon uSTR+l.svg
BSicon mKRZo.svg
BSicon uABZ2r.svg
BSicon uSTRc3.svg
Bingham Junction
BSicon uHST.svg
BSicon STR.svg
BSicon uSTRc1.svg
BSicon uSTR+4.svg
Blue Line
Historic Gardner
BSicon uHST.svg
BSicon STR2.svg
BSicon STRc3.svg
BSicon uHST.svg
Midvale Fort Union
West Jordan City Center
BSicon uHST.svg
BSicon STRc1.svg
BSicon STR+4.svg
BSicon uHST.svg
Midvale Center
2700 W Sugar Factory Rd
BSicon uHST.svg
BSicon STR.svg
BSicon uHST.svg
Historic Sandy
Jordan Valley
BSicon uHST.svg
BSicon STR.svg
BSicon uHST.svg
Sandy Expo
4800 W Old Bingham Hwy
BSicon uHST.svg
BSicon STR.svg
BSicon uHST.svg
Sandy Civic Center
5600 W Old Bingham Hwy
BSicon uHST.svg
BSicon STR.svg
BSicon uHST.svg
Crescent View
South Jordan Parkway
BSicon uHST.svg
BSicon STR.svg
BSicon uHST.svg
Kimballs Lane
BSicon uKHSTe.svg
BSicon STR.svg
BSicon uKHSTe.svg
BSicon CONTf.svg

  702   no longer operates
Wheelchair symbol.svg All stations are accessible

TRAX is a light rail system in the Salt Lake Valley of Utah, in the United States, serving Salt Lake City and many of its suburbs throughout Salt Lake County. The system's official name, Transit Express, [8] is rarely, if ever, used. The system is operated by the Utah Transit Authority (UTA). All TRAX trains are electric, receiving power from overhead wires. [9]

Contents

TRAX has 51 stations on three lines. The Blue Line provides service from Downtown Salt Lake City to Draper. The Red Line provides service from the University of Utah to the Daybreak Community of South Jordan. The Green Line provides service from Salt Lake City International Airport to West Valley City. In 2023, the system had a ridership of 11,043,800, or about 43,800 per weekday as of the third quarter of 2024. [Note 1]

Operations

Service characteristics

TRAX operates seven days a week, with the exception of some holidays. It operates Monday through Friday from approximately 4:30 a.m. to 11:30 p.m. with a 15-minute headway on each line during the entirety of operating hours. It operates weekends from approximately 5:00 am to nearly midnight, with a 15-minute headway on Saturdays and a 30-minute headway on Sundays. [10]

Lines and stations

TRAX Lines
LineOpened
(extensions)
StationsLengthTerminals
Blue Line
UTA Route701
1999
(2008, 2013)
2519.3 miles (31.1 km) [7] Downtown Salt Lake CityDraper
(Salt Lake CentralDraper Town Center)
Red Line
UTA Route703
2001
(2003, 2011)
2623.7 miles (38.1 km) [7] [ failed verification ] University of Utah (Salt Lake City) – Daybreak (South Jordan)
(University Medical CenterDaybreak Parkway)
Green Line
UTA Route704
2011
(2013)
1915.01 miles (24.16 km) [7] [ failed verification ] Salt Lake City International AirportWest Valley City
(AirportWest Valley Central)

Rolling stock

117 active railcars

29 UTDC LRVs (1041–1069) were purchased second-hand from the Santa Clara VTA in 2004 and refurbished for service on TRAX. [11] These were withdrawn from service in 2018.[ citation needed ]

To handle the increased crowds during the 2002 Winter Olympics, 29 Kinki Sharyo LRVs were borrowed from the Dallas Area Rapid Transit (DART) between 2001 and 2003. [12] [13]

In 2024, UTA ordered 20 Stadler Citylink vehicles, with upwards to 80 vehicles, to replace the Siemens SD-100 and SD-160 LRVs. They are expected to enter service in 2028. [14]

Varying based on projected ridership, the Blue Line typically operates 3-4 car trains, the Green Line 2-3 car trains, and the Red Line 2-4 car trains.

History

The first line, running from downtown Salt Lake City south to Sandy, was completed in 1999. The second line from downtown to the University of Utah was completed in 2001 and extended in 2003. An extension to the Salt Lake City Intermodal Hub was completed in April 2008. In August 2011, two extensions to South Jordan and West Valley City were completed. [15] With the opening of these two extensions in 2011, the TRAX lines were renamed as colors instead of destinations, with the Blue Line running from the Salt Lake City Intermodal Hub to Sandy, the Red Line running from the University of Utah Medical Center to the Daybreak community in South Jordan, and the Green Line running from the intermodal hub to the West Valley Intermodal Hub.

In 2013 the Green Line was realigned slightly north and away from the Salt Lake City Intermodal Hub, allowing for the opening of the extension to the Salt Lake City International Airport. Several months later, in August 2013, the Blue Line was extended further south to Draper (which opened August 18, 2013). [16] The extensions to South Jordan, West Valley City, Draper, and the Airport were funded in part by a Salt Lake County sales tax increase that would pay for all four of the proposed TRAX extensions. [17] A letter of intent signed with the Federal Transit Administration on September 24, 2007, secured the remaining funding for the light rail lines. [18]

Both the University Line and its extension to the University Medical Center were completed ahead of schedule. A daily ridership of 15,000 was expected for the initial 15-mile (24 km) line in 1999. By the beginning of 2008, the expanded system of 17.5 miles (28.2 km) served an estimated 40,000 passengers each day. [19] Ridership for the fourth quarter of 2012 was reported to be at 60,600, making it the ninth-busiest light rail system in the United States of America. [A 1]

Light rail in the Salt Lake Valley was first seriously discussed in the late 1980s to provide an alternative to traffic congestion on I-15, but the idea was met with criticism. On October 10, 1988, Congress approved $5 million in funds to preserve land along the proposed light rail corridor. [20] Funding for the light rail line, however, remained uncertain. After Salt Lake City won the bid for the 2002 Winter Olympics in 1995, UTA used the city's host status to accelerate obtaining funding through the Federal Transit Administration (FTA). Construction began in 1997. Protesters at the groundbreaking insisted light rail would be dangerous and a waste of money. Public opinion remained divided and businesses on Main Street in downtown Salt Lake City suffered during the construction period.

After the north–south line opened in late 1999 with sixteen stations, ridership expectations were quickly met. The system was enthusiastically embraced by valley residents, to the surprise of many, and once-skeptical communities soon began clamoring for extensions.

Funding for the University Line to Rice-Eccles Stadium allowed it to be completed in 2001 with four new stations, ahead of schedule and the Olympics. An extension to the University Medical Center that added three new stations was completed on September 29, 2003, fifteen months ahead of schedule. [21] An infill station at 900 South in Salt Lake City was constructed in 2005, and a second infill station, at 9400 South in Sandy (Sandy Expo), opened in August 2006. On December 13, 2006, UTA's board of trustees voted to change the name of the station next to the Delta Center to "Arena" in response to the renaming of the Delta Center to EnergySolutions Arena (which is once again known as the Delta Center. [22]

On February 23, 2006, plans for extending the main line westward to the current Salt Lake City Intermodal Hub near the Gateway were approved. Two stations were built near the Gateway, as well as one at the Salt Lake Central Station (Salt Lake Intermodal Hub). They opened in April 2008, [23] bringing the total number of stations to 28.

UTA has two service centers for TRAX maintenance: the Midvale Rail Service Center, which is just off the Red Line in Midvale, southwest of its junction with the Blue Line, and the Jordan River Service Center, which is just off the Green Line northeast of River Trail. The Jordan River building was originally an old warehouse for ZCMI, which had recently ceased operations and was renovated into a rail service center in 1999. The Midvale Center was similarly repurposed from a former warehouse around the time of the Red and Green lines opening in 2011, it was also built to handle UTA's brand new Siemens S70 LRV's. Utah Railway (under its subsidiary Salt Lake City Southern Railroad and with contracts from BNSF) and the Savage Bingham & Garfield Railroad both operate freight service over TRAX tracks via trackage rights. [24]

An additional infill station, 600 South Main Street in Salt Lake City, along all three lines, opened on July 26, 2022. [25] [26] The station was part of the initial plans for the system, but the demand was not at the level needed for a station until recently. [27]

FrontLines 2015

On September 21, 2006, a property tax hike proposal was replaced with a general transportation quarter-cent sales tax hike that was voted on and approved on November 7 of that year. On December 21, 2006, the Salt Lake County Council created a priority list for the sales tax, saying TRAX and commuter rail should take priority. [28] A letter of intent signed with the Federal Transit Administration on September 24, 2007, secured the remaining $500 million in funding for the light rail lines. [18] These funds were used to finance the FrontLines 2015 expansion project, which added four TRAX extensions by 2015 (as well as an expansion to FrontRunner commuter rail).

In order to support planned TRAX expansion, UTA ordered 77 Siemens S70 light rail vehicles from Siemens AG. It is the company's largest light rail contract in the United States to date. [6]

In 2008, construction began on two new extensions: one extension of 5.1 miles (8.2 km) through West Valley City (now part of the Green Line) and another extension of 10.6 miles (17.1 km) through the southwest portion of the Salt Lake Valley (now part of the Red Line). [7] Both extensions were debuted in ceremonial openings on August 2, 2011, [15] and permanently opened for regular service on August 7. Both extensions were completed ahead of schedule and under budget. [15] Upon completion of these expansions UTA adopted a color-code line names in place of their old destination-based line names.

After the first year of operation, ridership on these portions of the Green and Red lines was less than was projected by UTA. However, UTA has stated the projected ridership was for the year 2015. Since these lines were opened for service years earlier than originally planned, the anticipated growth on the west side of Salt Lake Valley has just not happened, yet. UTA affirms that by 2015 ridership will meet the original projections. [29]

Salt Lake International Airport station, prior to being relocated to the rebuilt terminal in 2021 Slc airport trax station.jpg
Salt Lake International Airport station, prior to being relocated to the rebuilt terminal in 2021

A line from Salt Lake City International Airport to the University of Utah was in the original plans for the system to be completed before the 2002 Winter Olympics, but funding shortages only allowed the eastern portion to be constructed. The airport line eventually came to fruition, however, and ground was broken on October 22, 2008. [30] The extension opened on April 14, 2013, [31] adding 6 miles (9.7 km) [7] and six additional stations to the Green Line, including a transfer station to the FrontRunner.

On November 14, 2006, the Draper City Council approved the TRAX extension into that city. [32] Neighbors in the area have continually fought the route suggested by UTA. The route follows an old rail line and UTA already owned the right of way. An alternative route that would run down the middle of State Street was also studied by UTA. [33] Use of the UTA right of way for the line was challenged in court and later approved by the Utah Supreme Court on July 12, 2008. [34] UTA published a draft Environmental Impact Statement for the new line that names the UTA right of way as the preferred route. The extension's first phase, which includes 3.5 miles (5.6 km) and three new stations, opened on August 18, 2013. [35]

FrontRunner

When FrontRunner (UTA's commuter rail train) started running on April 26, 2008, the only transfer station between the FrontRunner and TRAX was Salt Lake Central (Salt Lake Intermodal Hub), with the FrontRunner running north from that station to Ogden. However, with the opening of the FrontRunner South extension on December 10, 2012, [36] with service south to Provo, Murray station (adjacent to the Murray Central station was added as second transfer station which allowed for transfer to the Blue and Red lines. Although not part of the FrontRunner South extension, FrontRunner service at the new North Temple station also began on the same day. When the Airport extension of the Green Line opened for service on April 14, 2013, this station became the third transfer station between FrontRunner and TRAX at the North Temple Bridge/Guadalupe station. The FrontRunner portion of this station was built to provide a transfer station between FrontRunner and the Green Line, since the reroute of the Green Line for the Airport extension would have left the Green Line without any common station with FrontRunner.

S Line

For several years a TRAX spur into the Salt Lake City neighborhood of Sugar House had been contemplated. A series of community meetings were held in Sugar House as part of a larger transit study undertaken by UTA. Several transit alternatives were presented to the neighborhood, including bus rapid transit, light rail, and a streetcar. [37] The streetcar seemed to be the preferred alternative. [38] On October 20, 2010, the S Line (known then as Sugar House Streetcar) received a $26 million federal grant that allowed the street car to be completed in less than two years. [39] It used an existing rail line running along 2200 South from the Central Pointe TRAX station to approximately 1100 East, near the primary Sugar House shopping district. The first phase of the S Line opened on December 8, 2013. [40] [41]

A Blue Line train at Salt Lake Central station, August 2011 Blue line Trax at Central Station.jpg
A Blue Line train at Salt Lake Central station, August 2011
A sign at the Courthouse station indicates the terminus of each line heading north, August 2011. (Photo taken prior to the extension of the Green Line to the Salt Lake City International Airport). Red, blue, and green lines of Trax.jpg
A sign at the Courthouse station indicates the terminus of each line heading north, August 2011. (Photo taken prior to the extension of the Green Line to the Salt Lake City International Airport).

Planned expansion projects

In 2023, UTA published its Light Rail Strategic Plan, which highlighted plans by the agency to build new tracks along both 400 South and 400 West in Downtown Salt Lake City, connecting to the existing TRAX network at Ballpark to the south, Courthouse to the east, and either Salt Lake Central or Planetarium to the west. This expansion is also planned to include new stations at Pioneer Park and within the Granery District. [42] [43] Once completed, this infrastructure is planned to allow for:

Additionally, the Strategic Plan highlights expansion of the TRAX network to the University of Utah Research Park, splitting off from the current system at University South Campus station. This new service would be provided by the proposed Orange Line. UTA proposes that these expansions be completed prior to Salt Lake City's hosting of the 2034 Winter Olympics. [44] [45]

In conjunction with the Mountain View Corridor project, plans were made by UTA to build a new TRAX line on the west side of the Salt Lake Valley along 5600 West (in the same general area as the Mountain View Corridor). [46] The western line is anticipated to replace the yet-to-be-built 5600 West BRT bus rapid transit (BRT) line, which is currently stalled.

In 2015, UTA announced plans to eventually expand the Red Line south from Daybreak. Initial proposals would have the line travel south to Herriman before either turning eastbound and passing through Riverton before terminating in Draper, or continuing south through Herriman toward the Rosecrest neighborhood and Zions Bank Stadium. [47] [48] [49]

UTA has historically discussed proposals to extend the Blue Line from Draper to Lehi and eventually Orem, as well as creating a TRAX line to Davis County. [50] However, both projects are currently being pursued as BRT lines, with the potential for conversion to light rail in the future if needed. [51] [52]

Commercial advertising restrictions

UTA does not sell naming rights for its stations, nor does it allow stations to be named after commercial businesses. Commercial advertising on TRAX platforms is prohibited, in order for the passengers to be able to notice the safety information. [53] One exception to this rule occurred during the 2002 Winter Olympics. For the duration of the games, the Arena and Temple Square stations were closed for security reasons, and during this time UTA allowed Coca-Cola to use the area of the unused Arena Station as part of its pin-trading center. [54] The advertising restriction does not apply to the sides of the TRAX train cars or to UTA's buses. Not only does UTA have advertising signs on the sides and rear of many of its buses, it also has many buses where the painting scheme of the full rear or even the entire bus is an advertisement (bus wrap). [55]

Ridership

TRAX ridership
Average
weekday
boardings
Annual
percent
change
Reference
& notes
19998,600- - [A 2]
200019,100122.09% [A 3] [Note 2]
200121,30011.52% [A 4] [Note 3]
200231,40047.42% [A 5]
200338,00027.39% [A 6] [Note 4]
200439,1002.37% [A 7]
200553,40036.57% [A 8]
200649,700-6.93% [A 9]
200739,700-20.12% [A 10]
200844,80012.85% [A 11] [Note 5]
200943,400-3.12% [A 12]
201047,3008.99% [A 13]
201159,10024.95% [A 14] [Note 6]
201260,6002.54% [A 1] [Note 7]
201368,10012.38% [A 15] [Note 8]
201468,5000.59% [A 16] [Note 1]
201567,300-1.75% [A 17] [Note 1]
201664,300-4.46% [A 18] [Note 1]
201761,655-4.11% [B 1] [Note 1]
201858,454-5.19% [B 1] [Note 1]
201954,860-6.15% [B 1] [Note 1]
202026,724-51.29% [B 1] [Note 1]
202126,9840.86% [B 1] [Note 1]
202234,35427.31% [B 1] [Note 1]
202335,1812.41% [B 1] [Note 1]

See also

Notes

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 Ridership data for 2014 and beyond also includes UTA's streetcar (S Line) operations
  2. Data for THIRD quarter 2000, no ridership data reported by American Public Transportation Association (APTA) for UTA for fourth quarter
  3. Red Line (University extension) opened in December 2001
  4. Red Line (University Medical Center extension) opened in September 2003
  5. The FrontRunner opened in April 2008
  6. Red Line Mid-Jordan extension and Green Line West Valley extension both opened in August 2011
  7. The FrontRunner South extension opened in December 2012
  8. Green Line Airport extension opened in April 2013, Blue Line Draper extension opened in August 2013, and S Line opened in December 2013

Related Research Articles

<span class="mw-page-title-main">Utah Transit Authority</span> Public transportation operator northern Utah, United States

The Utah Transit Authority (UTA) is a special service district responsible for providing public transportation throughout the Wasatch Front of Utah, in the United States, which includes the metropolitan areas of Ogden, Park City, Provo, Salt Lake City and Tooele. It operates fixed route buses, flex route buses, express buses, ski buses, three light rail lines in Salt Lake County (TRAX), a streetcar line in Salt Lake City, and a commuter rail train (FrontRunner) from Ogden through Salt Lake City to Provo. UTA is headquartered in Salt Lake City with operations and garages in locations throughout the Wasatch Front, including Ogden, Midvale and Orem. Light rail vehicles are stored and maintained at yards at locations in South Salt Lake and Midvale. UTA's commuter rail equipment is stored and serviced at a facility in Salt Lake City. In 2023, the system had a ridership of 35,058,000, or about 134,600 per weekday as of the third quarter of 2024.

<span class="mw-page-title-main">Transportation in Salt Lake City</span>

Transportation in Salt Lake City consists of a wide network of roads, an extensive bus system, a light rail system, and a commuter rail line. Although Salt Lake City, Utah, is a traditionally car-oriented city, the rapidly growing public transit system has a high number of riders for a city of its size, and public transit is widely supported by its residents and businesses.

<span class="mw-page-title-main">Blue Line (TRAX)</span> Light rail line in the Salt Lake Valley of Utah

The Blue Line is a light rail line on the TRAX system in the Salt Lake Valley of Utah, in the United States, operated by the Utah Transit Authority (UTA). It is the first line of the TRAX system completed. The line opened on December 4, 1999, one year ahead of schedule after two years of construction. In addition to Salt Lake City, it also serves the communities of South Salt Lake, Murray, Midvale, Sandy and Draper. The line was known as the North/South Line or the Sandy/Salt Lake Line until color names were adopted for each TRAX line in August 2011. An extension of the line to Draper began service on August 18, 2013.

<i>FrontRunner</i> Commuter rail along the Wasatch Front in Utah, United States

FrontRunner is a commuter rail train operated by the Utah Transit Authority (UTA) that runs along the Wasatch Front in north-central Utah with service from the Ogden Central Station in central Weber County through Davis County, Salt Lake City, and Salt Lake County to Provo Central station in central Utah County. In 2023, the system had a ridership of 3,736,600, or about 15,000 per weekday as of the third quarter of 2024.

<span class="mw-page-title-main">Salt Lake City Intermodal Hub</span> Intermodal transit center in Utah, USA

The Salt Lake City Intermodal Hub, also called Salt Lake Central station by the Utah Transit Authority (UTA), is a multi-modal transportation hub in Salt Lake City, Utah, United States served by the Blue Line of UTA's TRAX light rail system that operates in Salt Lake County and by the FrontRunner, UTA's commuter rail train that operates along the Wasatch Front with service from Ogden in central Weber County through Davis County, Salt Lake City, and Salt Lake County to Provo in central Utah County. Service at the intermodal hub is also provided by Amtrak, and Greyhound Lines, as well as UTA local bus service.

<span class="mw-page-title-main">University Medical Center station</span> Light rail station in Salt Lake City, Utah, United States

University Medical Center station, often referred to as simply Medical Center station, is a light rail station on the campus of the University of Utah in Salt Lake City, Utah, in the United States, served by the Red Line of the Utah Transit Authority's (UTA) TRAX light rail system. The Red Line provides service from this station to the Daybreak community of South Jordan.

<span class="mw-page-title-main">Red Line (TRAX)</span> Light rail line in the Salt Lake Valley of Utah, United States

The Red Line is a light rail line on the TRAX system in the Salt Lake Valley of Utah operated by the Utah Transit Authority (UTA). It originally began operation in December 2001 as the peak-hour-only Sandy/University Line, running from the University of Utah south to Sandy Civic Center on the Blue Line. It was later rerouted to South Jordan and renamed the Red Line in August 2011, running as an all-day route. The current line runs from the University of Utah Medical Center in Salt Lake City through the south end of Downtown Salt Lake City, South Salt Lake, Murray, Midvale, West Jordan, and South Jordan to the University of Utah's South Jordan Medical Center in Daybreak.

<span class="mw-page-title-main">Arena station (Utah Transit Authority)</span> Rail station in Salt Lake City, Utah, US

Arena station is a light rail station in Downtown Salt Lake City, Utah, in the United States, served by the Blue Line and Green Line of the Utah Transit Authority's (UTA) TRAX system. The Blue Line has service from the Salt Lake Intermodal Hub in Downtown Salt Lake City to Draper. The Green Line has service from the Salt Lake City International Airport and to West Valley City via Downtown Salt Lake City.

<span class="mw-page-title-main">Central Pointe station</span> Light rail station in South Salt Lake, Utah, United States

Central Pointe station is a light rail station in South Salt Lake, Utah, in the United States, served by all three lines of the Utah Transit Authority's (UTA) TRAX light rail system. In December 2013, the station also became the western terminus for the S Line.

<span class="mw-page-title-main">Sandy Civic Center station</span> Light rail station in Sandy, Utah, United States

Sandy Civic Center station is a light rail station in Sandy, Utah, United States serviced by the Blue Line of Utah Transit Authority's TRAX light rail system. The Blue Line provides service from Downtown Salt Lake City to Draper. Prior to the opening of the Draper extension in 2013, this station was the southernmost on the Blue Line. The station opened on December 4, 1999, as part of the first operating segment of the TRAX system on the Sandy/University Line.

<span class="mw-page-title-main">Utah Transit Authority bus rapid transit</span> Bus rapid transit services operated by the Utah Transit Authority

The Utah Transit Authority (UTA) operates two bus rapid transit (BRT) services along the Wasatch Front in Utah, United States. It is described by UTA as "light rail on rubber tires." As of July 2024, an additional one is under construction, two are planned, and one has been discontinued.

<span class="mw-page-title-main">S Line (Utah Transit Authority)</span> Streetcar line in Salt Lake County, Utah, United States

The S Line, or S-Line, is a public transit streetcar line in northeastern Salt Lake County, Utah, in the United States, that connects the business district of the Sugar House neighborhood of Salt Lake City with the neighboring city of South Salt Lake, as well as the Utah Transit Authority's (UTA) TRAX light rail system. It is a joint project between UTA, Salt Lake City, and South Salt Lake. It opened for service on December 8, 2013. It is operated by UTA and is UTA's first streetcar line.

<span class="mw-page-title-main">Jordan Valley station</span> Light rail station in West Jordan, Utah, United States

Jordan Valley station is a light rail station in West Jordan, Utah, United States, served by the Red Line of the Utah Transit Authority's (UTA) TRAX light rail system. The Red Line provides service from the University of Utah to the Daybreak community of South Jordan.

<span class="mw-page-title-main">Draper Town Center station</span> Light rail station in Draper, Utah, United States

Draper Town Center station is a light rail station located in Draper, Utah, United States, served by the TRAX Blue Line of the Utah Transit Authority's (UTA) TRAX system. The Blue Line provides service north from this station to Downtown Salt Lake City.

<span class="mw-page-title-main">Ogden Central Station</span> Commuter rail station in Ogden, Utah, United States

Ogden Central Station is a commuter rail train and bus station in Ogden, Utah, United States. It is served by the FrontRunner, Utah Transit Authority's (UTA) commuter rail train, the Ogden Express, a UTA bus rapid transit service, as well as UTA local and commuter bus service, and Greyhound Lines long-distance bus service.

<span class="mw-page-title-main">Airport station (Utah Transit Authority)</span> Light rail station at Salt Lake International Airport in Salt Lake City, Utah, U.S.

Airport station is a light rail station located at the Salt Lake City International Airport in Salt Lake City, Utah, serviced by the Green Line of the Utah Transit Authority's (UTA) TRAX system. The Green Line has service to West Valley City via Downtown Salt Lake City, and connects with the rest of the TRAX system, as well as UTA's FrontRunner commuter rail and S Line streetcar.

<span class="mw-page-title-main">1940 West North Temple station</span> Light rail station in Salt Lake City, Utah, United States

1940 West North Temple station is a light rail station in Salt Lake City, Utah serviced by the Green Line of the Utah Transit Authority's (UTA) TRAX system. The Green Line provides service from the Salt Lake City International Airport to West Valley City, and connects with the rest of the TRAX system, as well as UTA's FrontRunner commuter rail and S Line streetcar.

<span class="mw-page-title-main">Kimballs Lane station</span> Light rail station in Draper, Utah, United States

Kimballs Lane station is a light rail station in Draper, Utah, United States, served by the Blue Line of Utah Transit Authority's TRAX light rail system. The Blue Line provides service from Downtown Salt Lake City to downtown Draper.

<span class="mw-page-title-main">Mount Timpanogos Transit Center</span> Bus transfer center in Orem, Utah, U.S.

The Mount Timpanogos Transit Center was a staffed, open air bus transfer station in southeast Orem, Utah, United States. It functioned as both the Utah Transit Authority's (UTA) customer service center for Utah County, as well as a bus transfer center for UTA's buses in east central Utah Valley. Prior to the opening of the FrontRunner commuter rail extension south to Provo in 2012), it was the busiest bus stop within the entire UTA bus system.

References

General

  1. "Transit Ridership Report Third Quarter 2024" (PDF). American Public Transportation Association. November 20, 2024. Retrieved November 23, 2024.
  2. "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved September 5, 2024.
  3. "Customer Service Locations". Utah Transit Authority. Retrieved March 6, 2013.
  4. "About UTA". rideuta.com. Utah Transit Authority . Retrieved August 6, 2014.
  5. 1 2 "UTA Fleet: Trax and FrontRunner" (PDF). rideuta.com. Utah Transit Authority. August 2008. Archived from the original (PDF) on February 15, 2012. Retrieved February 11, 2012.
  6. 1 2 "Siemens announces biggest US light rail order". Railway Gazette International . May 15, 2008. Archived from the original on June 16, 2011. Retrieved May 16, 2008.
  7. 1 2 3 4 5 6 "FrontLines 2015 Project" (PDF) (Map). rideuta.com. Utah Transit Authority. Archived from the original (PDF) on June 23, 2013. Retrieved March 5, 2013.
  8. "New Light-rail Line to Make TRAX Between Downtown S.L., Sandy". Deseret News. March 3, 1997. Retrieved January 10, 2022.
  9. "UTA Announces FrontRunner Grand Opening Date!". rideuta.com (Press release). Utah Transit Authority . Retrieved January 10, 2013.
  10. "TRAX" (PDF). rideuta.com. Utah Transit Authority. December 8, 2013. Archived from the original (PDF) on November 25, 2013. Retrieved February 10, 2014.
  11. Strack, Don. "UTA TRAX Light Rail Equipment". utahrails.net. Retrieved July 7, 2022.
  12. "From the Vault DART goes to Olympic lengths".
  13. "UTA Remembers the 2002 Winter Olympics".
  14. Wood, Benjamin. "Utah Transit Authority picks local train shop Stadler for next batch of Trax vehicles". Salt Lake City Weekly. Retrieved October 23, 2024.
  15. 1 2 3 Davidson, Lee (August 2, 2011). "TRAX lines opening a year early, 20% under budget". The Salt Lake Tribune . Salt Lake City: MediaNews Group . Retrieved August 3, 2011.
  16. "UTA setting end dates on TRAX construction". Deseret News . Salt Lake City: Deseret Digital Media. August 9, 2007. Archived from the original on July 31, 2012. Retrieved June 2, 2008.
  17. Warburton, Nicole (December 29, 2006). "Tax to build 3 rail lines, fix highway". Deseret News . Salt Lake City: Deseret Digital Media. Archived from the original on January 5, 2007. Retrieved June 3, 2008.
  18. 1 2 Warburton, Nicole (September 25, 2007). "UTA on track for U.S. funds". Deseret News . Salt Lake City: Deseret Digital Media. Archived from the original on February 19, 2021. Retrieved February 19, 2021.
  19. Warburton, Nicole (January 27, 2008). "New method of counting shows 'decline' in TRAX ridership". Deseret News . Salt Lake City: Deseret Digital Media. Archived from the original on January 30, 2008. Retrieved February 16, 2008.
  20. "$5 million OK'd for light rail". Deseret News . Salt Lake City: Deseret Digital Media. United Press International. October 10, 1988. Archived from the original on February 24, 2014. Retrieved March 5, 2013.
  21. Fattah, Geoffrey (September 30, 2003). "UTA extends TRAX line to U. med center". Deseret News . Salt Lake City: Deseret Digital Media. Archived from the original on February 24, 2014. Retrieved March 4, 2013.
  22. "UTA trustees OK nearly $239M budget". The Salt Lake Tribune . Salt Lake City: MediaNews Group. The Associated Press. December 14, 2006. Retrieved December 17, 2006.
  23. "UTA Projects/Programs > Salt Lake Intermodal Hub TRAX Extension". rideuta.com. Utah Transit Authority. Archived from the original on April 15, 2008.
  24. "Savage Bingham & Garfield Railroad".
  25. Williams, Carter; July 27, KSL com | Posted-; A.m, 2022 at 8:24. "Will UTA's newest TRAX fill a 'missing link' in Salt Lake's expanding downtown?". www.ksl.com. Retrieved July 28, 2022.{{cite web}}: CS1 maint: numeric names: authors list (link)
  26. KUTV, Kayla Winn (July 26, 2022). "GALLERY: UTA, Salt Lake City leaders open brand new downtown TRAX station". KUTV. Retrieved July 28, 2022.
  27. Davidson, Lee (December 16, 2020). "UTA moves forward with plans for new downtown TRAX station". Salt Lake Tribune .
  28. Warburton, Nicole; Dethman, Leigh (December 21, 2006). "Tax to build 3 rail lines, fix highway". Deseret Morning News . Salt Lake City: Deseret Digital Media. Archived from the original on January 5, 2007. Retrieved January 1, 2007.
  29. Davidson, Lee (December 13, 2012). "New TRAX lines still short of ridership projections". The Salt Lake Tribune . Salt Lake City: MediaNews Group . Retrieved March 7, 2013.
  30. Hancock, Laura (October 22, 2008). "UTA breaking ground today for airport TRAX line". Deseret News . Salt Lake City: Deseret Digital Media. Archived from the original on October 24, 2008. Retrieved June 28, 2009.
  31. "UTA FrontLines 2015: Airport Line" (PDF). rideuta.com. Utah Transit Authority . Retrieved January 4, 2013.
  32. Nielson-Stowell, Amelia (November 15, 2006). "Draper approves TRAX route". Deseret News . Salt Lake City: Deseret Digital Media. Archived from the original on September 30, 2007. Retrieved December 17, 2006.
  33. "Draper Transit Corridor Project: Alternatives Considered" (PDF). rideuta.com. Utah Transit Authority . Retrieved January 4, 2013.
  34. "Court says Draper TRAX route OK". ksl.com . Salt Lake City: Deseret Digital Media. Associated Press. July 12, 2008. Retrieved July 12, 2008.
  35. Reavy, Paul (June 4, 2013). "State, city and school officials stress safety on new Sandy-Draper TRAX line". Deseret News . Salt Lake City: Deseret Digital Media. Archived from the original on June 28, 2013. Retrieved June 26, 2013.
  36. Park, Shara (December 10, 2012). "FrontRunner South opens, brings changes to north line". ksl.com . Salt Lake City: Deseret Digital Media . Retrieved December 12, 2012.
  37. "Sugar House Transit Corridor – Alternatives Analysis- FINAL REPORT" (PDF). rideuta.com. Utah Transit Authority. July 2008. Retrieved August 17, 2013.
  38. "Sugar House Transit Corridor Alternatives Analysis Open House Summary" (PDF). utabus.com. Utah Transit Authority . Retrieved January 4, 2013.
  39. Page, Jared (October 20, 2010). "Salt Lake City receives $26 million for Sugar House streetcar project". Deseret News . Salt Lake City: Deseret Digital Media. Archived from the original on October 24, 2010. Retrieved October 20, 2010.
  40. Vo-Duc, Viviane (September 5, 2013). "New streetcar S-line set to open Dec. 8 in Sugar House". Deseret News . Salt Lake City: Deseret Digital Media. Archived from the original on September 21, 2013. Retrieved September 17, 2013.
  41. "Sugar House Streetcar: Project Updates". shstreetcar.com. Retrieved March 4, 2013.
  42. "UTA Light Rail Strategic Plan". rideuta.com. Utah Transit Authority . Retrieved October 28, 2024.
  43. "Maps: See what new TRAX line from Salt Lake City airport to the U. could look like". slbrib.com. The Salt Lake Tribune . Retrieved October 28, 2024.
  44. "UTA Light Rail Strategic Plan". rideuta.com. Utah Transit Authority . Retrieved October 28, 2024.
  45. "Here's the clearest picture yet of where new TRAX lines and stations may go in time for the Olympics". slbrib.com. The Salt Lake Tribune . Retrieved October 28, 2024.
  46. "Mountain View Corridor Environmental Impact Statement" (PDF). udot.utah.gov. Utah Department of Transportation . Retrieved January 4, 2013.
  47. Scott, Bryan (August 4, 2015). "Future TRAX Line Extensions". South Valley Journal. Retrieved June 1, 2022.
  48. "UTA board is exploring expanding TRAX, streetcar". The Salt Lake Tribune. January 30, 2020. Retrieved June 1, 2022.
  49. "2019 Herriman Transportation Master Plan" (PDF). City of Herriman. April 1, 2020. Retrieved October 28, 2024.
  50. Davidson, Lee (February 11, 2013). "What's next at UTA? More frequent service, and yet more building". Salt Lake Tribune . Salt Lake City: MediaNews Group . Retrieved March 10, 2013.
  51. "Davis-SLC Community Connector". rideuta.com. Utah Transit Authority . Retrieved October 28, 2024.
  52. "Point of the Mountain Transit Study". rideuta.com. Utah Transit Authority . Retrieved October 28, 2024.
  53. Henetz, Patty (November 22, 2006). "TRAX changes signs on northbound trains". The Salt Lake Tribune . Salt Lake City: MediaNews Group . Retrieved August 5, 2013.
  54. "Coca-Cola to use TRAX station". Deseret News . Salt Lake City: Deseret Digital Media. January 25, 2002. Archived from the original on February 24, 2014. Retrieved August 5, 2013.
  55. Stagg, Jennifer (October 13, 2010). "Controversial ads draw attention on UTA buses". ksl.com . Salt Lake City: Deseret Digital Media . Retrieved August 5, 2013.

APTA Statistics

  1. 1 2 "Public Transportation Ridership Report Fourth Quarter 2012" (PDF). www.apta.com. American Public Transportation Association. March 1, 2013. p. 27. Retrieved March 16, 2013.
  2. "Transit Ridership Report Fourth Quarter 1999" (PDF). American Public Transit Association. April 18, 2000. p. 26. Retrieved March 16, 2013.
  3. "Transit Ridership Report Third Quarter 2000" (PDF). American Public Transportation Association. December 29, 2000. p. 26. Retrieved March 16, 2013.
  4. "Transit Ridership Report Fourth Quarter 2001" (PDF). www.apta.com. American Public Transportation Association. April 12, 2002. p. 28. Retrieved March 16, 2013.
  5. "Transit Ridership Report Fourth Quarter 2002" (PDF). www.apta.com. American Public Transportation Association. April 24, 2003. p. 32. Retrieved March 16, 2013.
  6. "Transit Ridership Report Fourth Quarter 2003" (PDF). www.apta.com. American Public Transportation Association. August 3, 2004. p. 31. Retrieved March 16, 2013.
  7. "Transit Ridership Report Fourth Quarter 2004" (PDF). www.apta.com. American Public Transportation Association. March 15, 2005. p. 32. Retrieved March 16, 2013.
  8. "Transit Ridership Report Fourth Quarter 2005" (PDF). www.apta.com. American Public Transportation Association. April 4, 2006. p. 28. Retrieved March 16, 2013.
  9. "Public Transportation Ridership Report Fourth Quarter 2006" (PDF). www.apta.com. American Public Transportation Association. March 12, 2007. p. 28. Retrieved March 16, 2013.
  10. "Public Transportation Ridership Report Fourth Quarter 2007" (PDF). www.apta.com. American Public Transportation Association. March 5, 2008. p. 33. Retrieved March 16, 2013.
  11. "Public Transportation Ridership Report Fourth Quarter 2008" (PDF). www.apta.com. American Public Transportation Association. March 5, 2009. p. 30. Retrieved March 16, 2013.
  12. "Public Transportation Ridership Report Fourth Quarter 2009" (PDF). www.apta.com. American Public Transportation Association. March 2, 2010. p. 29. Retrieved March 16, 2013.
  13. "Public Transportation Ridership Report Fourth Quarter 2010" (PDF). www.apta.com. American Public Transportation Association. March 8, 2011. p. 28. Retrieved March 16, 2013.
  14. "Public Transportation Ridership Report Fourth Quarter 2011" (PDF). www.apta.com. American Public Transportation Association. February 24, 2012. p. 27. Retrieved March 16, 2013.
  15. "Public Transportation Ridership Report Fourth Quarter 2013" (PDF). www.apta.com. American Public Transportation Association. February 26, 2014. p. 28. Retrieved March 11, 2014.
  16. "Public Transportation Ridership Report Fourth Quarter 2014" (PDF). www.apta.com. American Public Transportation Association. March 3, 2015. p. 29. Retrieved September 15, 2015.
  17. "Public Transportation Ridership Report Fourth Quarter 2015" (PDF). www.apta.com. American Public Transportation Association. March 2, 2016. p. 29. Retrieved July 14, 2016.
  18. "Public Transportation Ridership Report Fourth Quarter 2016" (PDF). www.apta.com. American Public Transportation Association. March 2, 2016. p. 29. Retrieved July 14, 2016.

UTA Statistics

  1. 1 2 3 4 5 6 7 "UTA Mode-Level Boardings, Weekday Averages". data-rideuta.opendata.arcgis.com/. Utah Transit Authority. March 8, 2024. Retrieved March 16, 2024.
Template:Attached KML/TRAX (light rail)
KML is from Wikidata