Tronador (Spanish for Thunderer) is a series of Argentine rockets, including the Tronador I and Tronador II vehicles, to develop a liquid-propellant rocket expendable launch system called ISCUL [1] (Inyector Satelital de Cargas Utiles Ligeras, Light-Payload Satellite Launcher).
The Tronador I is an unguided liquid-fueled rocket [2] used for sub-orbital test flights. Its development led to the larger VEx test rocket, testing technologies needed for the Tronador II, which has a guidance system and would be capable of reaching low Earth orbit. [2] Development of the satellite launch vehicle has cost more than 600 million dollars over several years.
The Tronador I is an unguided liquid-fueled rocket [2] used for sub-orbital test flights.
The Tronador I (T1) vehicle was flown successfully on June 6, 2007 [3] [4] from Puerto Belgrano Naval Base near Bahía Blanca, [3] [5] in the south east of the Buenos Aires Province. This was the first flight of a technology demonstrator vehicle for the program.
The Tronador Ib (T2) vehicle was flown successfully on August 5, 2008 [3] [4] from Puerto Belgrano Naval Base. [5] This was the second technology demonstrator vehicle flown for the program.
This was the first cooperative test flight between Comisión Nacional de Actividades Espaciales and Brazilian Space Agency; it was successfully flown in December 2007 (Operacion Angicos). [6] [7] [8] [9] The payload built by CONAE, carried several experiments to validate subsystems for the program such as: IMU (Inertial Measurements Unit, that used IFOG's), GPS receptor (for navigation), all integrated into the on-board computer, and an attitude control system via cold-gas thrusters. The payload unit completed a suborbital flight carried by an AEB-built VS-30 solid-propellant rocket booster, and was then recovered from the sea after landing with parachutes.
Function | Orbital launch vehicle |
---|---|
Manufacturer | CONAE |
Country of origin | Argentina |
Size | |
Height | 27 m (89 ft) |
Diameter | 2.5 m (8 ft 2 in) |
Mass | 72,000 kg (159,000 lb) (including propellant) |
Stages | 2 |
Capacity | |
Payload to Polar | |
Mass | 600 kg (1,300 lb) |
Launch history | |
Status | Under development |
Launch sites | Manuel Belgrano Space Center |
First flight | 2030 |
First stage | |
Powered by | 3 T30 |
Maximum thrust | 3 × 30,000 kg |
Propellant | LOX / RP-1 |
Second stage | |
Powered by | 1 other or T4R |
Maximum thrust | 1400 to 4000 kg |
Propellant | Monomethylhydrazine (MMH) / N2O4 |
As of 2020, Tronador II's maiden orbital launch is expected to fly in "the next 4 years", according to the National Commission for Space Activities. [10]
The initial proposal was for a 3-stage rocket. In early 2015, an evolved configuration [11] was presented at the 52nd Committee on Peaceful Uses of Ultra-Terrestrial Space meeting [12] and at the Punta Indio ( 35°31′25″S57°11′05″W / 35.523496°S 57.1846139°W ) test launch pad:
As of June 2016, the proposed Tronador II configuration was: [13]
In late 2022 Tronador II was named TII-250, with the launch site being indicated as Centro Espacial Manuel Belgrano (CEMB), in Bahía Blanca. [15] [16]
The T4000 (Tronador T4000 pathfinder rocket) test rocket is related to the project, as it is the basis of the 3rd stage of the Tronador II. [3] Specifically, it was intended to house the attitude control system (“Thrust Vector Control” - TVS). [17] The first launch attempt in 2011 failed. [18]
The recent strategy was to fly separately several suborbital experimental subsystems, called "VEx", before they are incorporated in the prototype of the Tronador II rocket. [2] [17] [20] [21] [22] [23] After a few launches, it was decided in 2017 to stop the experimental VEx series as enough data was obtained to go ahead with a prototype rocket. [24] However, in November 2021, it was announced that the program were reactivated again.
In March 2014, a suborbital prototype named VEx-1A failed during launch from Pipinas, Punta Indio Partido. [2] [23] [25] [26] It had only one stage, weigh 2.8 tonnes, thrust of 4 ton, with an expectation of 60 seconds mission duration and expected apogee of 2 km. VEx-1A first launch attempt was postponed in December 2013 due to ground support equipment fail. The second attempt failed on February 26, 2014. [27] [28] It was discovered that the failure was caused by interferences between the launch pad and the rocket, which prevented the vehicle from elevating more than 2m off the ground. The engine control mechanism shut off the fuel valve, preventing an explosion, and the rocket fell down next to the pad.
The first flight of this suborbital vehicle was on 15 August 2014 from Pipinas, Punta Indio Partido. [14] It successfully tested propulsion, control, and navigation subsystems. The mission concluded with 2,200 m apogee altitude and 27 seconds flight time. It landed in the sea assisted by the recovery parachutes. The vehicle was recovered and examined to determine whether further VEx-1 test rockets are required or if a VEx-2 flight should proceed.
VEx-5A was a two-stage suborbital rocket that was destroyed upon launch. The T-10 first stage is capable of producing 11t of thrust, while the T-4 second stage is capable of 4t of thrust. The rocket was 18 meters long and 1.5 meters diameter, with a total launch weight (including fuel) of 8500 kg. [29] [11] The rocket would have separated from the first stage (the propellants are liquid oxygen / RP-1) at 15 km altitude and the second stage would have continued, reaching up to 30 km altitude using hydrazine / nitric acid. [30] The vehicle would have tested several technologies, new fuels, and for the first time, the interstage separation (mechanical and automatic aspects), and the ignition of the second stage. The rocket was completed in mid 2015 and scheduled to launch in October 2015, but postponed to November 2016, before postponed again. [31] The test flight finally occurred on 21 April 2017, 18:00 local time from Pipinas, Punta Indio Partido. The rocket climbed up from its pad, but eight seconds later the first stage rocket engine shut down due to abrupt flow in its fuel lines. Several seconds later, the rocket fell and impacted the launch pad, causing a fiery explosion. The ill-fated launch was announced officially by CONAE several hours after the launch and footage from several angles were made available. [32] [33] [34] [35]
Test flight - single stage 30t thrust engine rocket - it was projected for a 2018 launch from Pipinas, Punta Indio Partido. The mission was cancelled in 2017, [24] before were announced in November 2021 that the mission were reactivated again.
Test flight - two stage test rocket. First stage 30t thrust engine, second stage VEx-1 engine - it was projected for a 2019 launch from Puerto Belgrano Naval Base. [36] [37] [38] [39] The mission was cancelled in 2017, [24] before were announced in November 2021 that the mission were reactivated again.
Test flight of the rocket. Investment of approximately $45 million in the Tronador SLV program was announced in 2022, including associated experimental rockets VEx-5 and VEx-6. [40]
In late 2022, two Tronador II prototypes, with the goal of engine testing were announced: [15]
The proposed Tronador III would have the same diameter as Tronador II, but would have a length of 34 metres (112 ft). The fueled rocket would weight 90 metric tons, and capable of delivering satellites with up to 750 kg to a 600 km orbit, or up to a ton if upper stages are used. [41] [42] [43] [44]
Proposed Tronador III configuration: [45] [46]
Tronador III will be preceded by the VLE (Vehículo Lanzador Espacial for Space Launch Vehicle) capable of placing a 80 kg payload on a 300 km orbit. [46] [47] [43] [44] This would be a two stage rocket, with the first stage using 5 or more Karut engines with 2.5 t of thrust and burning RP-1/LOX. [46] [47]
The Brazilian Space Agency is the civilian authority in Brazil responsible for the country's space program. It operates a spaceport at Alcântara, and a rocket launch site at Barreira do Inferno. It is the largest and most prominent space agency in Latin America.
Atlas II was a member of the Atlas family of launch vehicles, which evolved from the successful Atlas missile program of the 1950s. The Atlas II was a direct evolution of the Atlas I, featuring longer first-stage tanks, higher-performing engines, and the option for strap-on solid rocket boosters. It was designed to launch payloads into low Earth orbit, geosynchronous transfer orbit or geosynchronous orbit. Sixty-three launches of the Atlas II, IIA and IIAS models were carried out between 1991 and 2004; all sixty-three launches were successes, making the Atlas II a highly reliable space launch system. The Atlas line was continued by the Atlas III, used between 2000 and 2005, and the Atlas V, which is still in use as of 2024.
Orión was the designation of a sounding rocket of Argentina, which was launched between 1965 and 1971 at CELPA, CELPA, Tartagal and Wallops Island.
The INTA-255 was a Spanish sounding rocket developed by the Instituto Nacional de Tecnica Aerospacial.
The National Space Activities Commission is the civilian agency of the government of Argentina in charge of the national space programme.
The VLS-1 was the Brazilian Space Agency's main satellite launch vehicle. The launch vehicle would have been capable of launching satellites into orbit. The launch site was located at the Alcântara Launch Center due to its proximity to the equator.
VSB-30 - "Veículo de Sondagem Booster – 30" or "Foguete Suborbital VSB-30" is the designation of a Brazilian sounding rocket, which replaced the Skylark rocket at Esrange.
The VS-30 is a Brazilian sounding rocket, developed by the Instituto de Aeronáutica e Espaço and derived from the Sonda 3 sounding rocket first stage. It consists of a single, solid-fuelled stage, and has been launched from Alcântara, Maranhão and Barreira do Inferno, Rio Grande do Norte, in Brazil, and Andøya and Svalbard Rocket Range in Norway.
ARSAT-1 is a geostationary communications satellite operated by AR-SAT and built by the Argentine company INVAP. ARSAT-1 was launched into orbit on October 16, 2014, from French Guiana alongside Intelsat-30 satellite using an Ariane 5 rocket. It is expected to be located at 72° West longitude geostationary slot. ARSAT-1 is the first geostationary satellite built in Latin America. Total cost of the satellite is 270 million US dollars.
The Star is a family of US solid-propellant rocket motors originally developed by Thiokol and used by many space propulsion and launch vehicle stages. They are used almost exclusively as an upper stage, often as an apogee kick motor.
Capricornio was a Spanish satellite launch vehicle developed by the Instituto Nacional de Técnica Aeroespacial (INTA) in the 1990s. It was intended to be Spain's first launcher.
Fogtrein, is the name given to a family of Brazilian research rockets created jointly by the Air Force Command (COMAer) and Avibras.
Zero 2 Infinity is a private Spanish company developing high-altitude balloons intended to provide access to near space and low Earth orbit using a balloon-borne pod and a balloon-borne launcher.
A small-lift launch vehicle is a rocket orbital launch vehicle that is capable of lifting 2,000 kilograms (4,400 lb) or less or under 5,000 kilograms (11,000 lb) of payload into low Earth orbit (LEO). The next larger category consists of medium-lift launch vehicles.
Payload Aerospace S.L. is a Spanish company developing two partially-reusable launch vehicles called Miura 1 and Miura 5.
Miura 1 is a suborbital recoverable launch vehicle developed by the Spanish company PLD Space. It is planned to be the first recoverable launch vehicle in Europe. It was first launched successfully on October 7, 2023, at 00:19 UTC.
El Hierro Launch Centre is a proposed project by Instituto Nacional de Técnica Aeroespacial (INTA) to create a spaceport on the island of El Hierro, part of the Canary Islands. It would be located in the south of the island, in the area of Tacorón, 5 km from La Restinga. in the municipality of El Pinar, Canary Islands. It is being proposed as a center of civil use exclusively, for the launch of micro- and nanosatellites with scientific or commercial objectives, such as telecommunications or Earth observation.
The INTA-100 vehicle was a small 2-stage meteorological sounding rocket designed and developed between the 1980s and the 1990s by the Instituto Nacional de Técnica Aeroespacial (INTA). The final design was entirely produced in Spain to be used by the Instituto Nacional de Meteorología in conducting experiments on the atmosphere.
TEPREL is a family of rocket engines designed and built by the Spanish aerospace company PLD Space for their Miura 1 and Miura 5 launch vehicles. The TEPREL engine, named after the Spanish reusable engine program that is financing its development, uses kerosene and liquid oxygen as propellants. So far, several versions of this engine, intended to propel Miura 1, have been developed and tested on the company's own liquid propulsion test facilities located in Teruel, Spain.
The Centauro series is a family of Argentinian solid-fuel sounding rockets developed by the Instituto de Investigaciones Aeronauticas y Espaciales (IIAE). This family includes Alfa, Beta, and Gamma Centauro.
Decidimos interrumpir el desarrollo de los vehículos experimentales (la serie VEX) porque consideramos que con lo ya hecho no íbamos a aportar mucho más con otro experimental que lo que aportaría el modelo tecnológico.