Gold Line (CapMetro)

Last updated

Gold Line
Overview
StatusIn planning
Locale Austin, Texas
Termini
Stations15
Service
Type Bus rapid transit
System CapMetro Rapid
Operator(s) Capital Metropolitan Transportation Authority
Technical
Line length9.5 mi (15.3 km)
Route diagram

BSicon STRc2.svg
BSicon CONTg+3.svg
      Red Line to Leander
BSicon STRc2.svg
BSicon BHF3+1.svg
BSicon exKHSTa.svg
BSicon STRc4.svg
Highland
BSicon STR2+1.svg
BSicon STRc34.svg
BSicon exBHF.svg
Clarkson
BSicon STRc1.svg
BSicon xKRZ2+4.svg
BSicon STRc3.svg
BSicon STRc1.svg
BSicon exBHF.svg
BSicon LSTR2+4.svg
Hancock
BSicon exBHF.svg
St. David's
BSicon exBHF.svg
UT East
BSicon exBHF.svg
Medical School
BSicon exBHF.svg
Capitol East
BSicon exBHF.svg
BSicon LSTR+l.svg
Trinity
BSicon HUBaq.svg
BSicon exBHF.svg
BSicon HUBlg.svg
BSicon KBHFe.svg
Downtown
BSicon exdSTR.svg
BSicon uextdSTR+l.svg
BSicon HUBe.svg
BSicon uexldBHF.svg
BSicon uextdSTRq.svg
BSicon uextCONTfq.svg
      Blue Line to AUS Arrow Blue Right 001.svg
BSicon uextCONTgq.svg
BSicon uextdSTRq.svg
BSicon exldINT.svg
BSicon exdSTR.svg
BSicon uextdSTR+r.svg
BSicon uextdSTRr.svg
Republic Square
BSicon exdSTR.svg
BSicon uextdSTRe@f.svg
Arrow Blue Left 001.svg      Orange Line to North Lamar
BSicon WASSERq.svg
BSicon exmvWBRUCKE1.svg
BSicon dWASSERq.svg
BSicon exdBHF-L.svg
BSicon uexdBHF-R.svg
Auditorium Shores
BSicon exdBHF-L.svg
BSicon uexdBHF-R.svg
SoCo
BSicon exdBHF-L.svg
BSicon uexdBHF-R.svg
Oltorf
BSicon exdBHF-L.svg
BSicon uexdBHF-R.svg
St. Edward's
BSicon exmvSKRZ-G4u.svg
BSicon exdKBHFe-L.svg
BSicon uexdBHF-R.svg
South Congress Transit Center
BSicon uexCONTf.svg
      Orange Line to Stassney

Wheelchair symbol.svg All stations are accessible

The Gold Line is a proposed transitway for connecting North Central Austin and the Downtown's Eastside to South Austin. It is in the planning stages as a part of Capital Metro's Project Connect. According to the plan, the line will be initially be operated as a bus rapid transit line prior to future conversion to light rail. [1] It is estimated to open in 2024. [1] [2]

The initial line is 9.5 miles (15.3 km) in length and would operate from ACC Highland to the South Congress Transit Center park-and-ride, and will travel on Airport, Red River, San Jacinto/Trinity, 7th/8th, Neches/Red River, 4th, Riverside, and South Congress. Stations will be ACC Highland, Clarkson, Hancock, St. David's, UT East, Medical School, Capitol East, Trinity, Downtown Station (where transfer to the Red, Green, or Blue Lines will be possible), Republic Square, Auditorium Shores, SoCo (South Congress), Oltorf, St. Edward's, and South Congress Transit Center. [3]

The line was originally envisioned as the northern section of the Blue Line light rail, which was part of the city's failed 2014 rail plan. [1] The line was there after planned to be built as lower-cost bus rapid transit. The project shifted planning in May 2020 to again construct it as light rail, citing a demographic that showed an increased projected ridership along the route. [4] In July 2020, to lower construction costs in response to the economic crisis caused by the COVID-19 pandemic, the plan was reverted to the line being constructed as a bus service. [5]

Related Research Articles

<span class="mw-page-title-main">Metro Blue Line (Minnesota)</span> Light rail line in Hennepin County, Minnesota

The Metro Blue Line is a 12-mile (19.3 km) light rail line in Hennepin County, Minnesota, that is part of the Metro network. It travels from downtown Minneapolis to Minneapolis–Saint Paul International Airport and the southern suburb of Bloomington. Formerly the Hiawatha Line prior to May 2013, the line was originally named after the Milwaukee Road's Hiawatha passenger train and Hiawatha Avenue, reusing infrastructure from the former and running parallel to the latter for a portion of the route. The line opened June 26, 2004, and was the first light rail service in Minnesota. An extension, Bottineau LRT, is planned to open in 2028.

Metro Transit is the primary public transportation operator in the Minneapolis–Saint Paul area of the U.S. state of Minnesota and the largest operator in the state. Although Metro Transit is one of the smallest transit systems for a large metropolitan area in the United States, it has previously been ranked as one of the best. In 2022, the system had a ridership of 38,794,700, or about 138,800 per weekday as of the third quarter of 2023.

The Urban Ring was a proposed project of the Massachusetts Bay Transportation Authority and the Massachusetts Department of Transportation, to develop new public transportation routes that would provide improved circumferential connections among many existing transit lines that project radially from downtown Boston. The Urban Ring Corridor is located roughly one to two miles from downtown Boston, passing through the Massachusetts cities of Boston, Chelsea, Everett, Medford, Somerville, Cambridge, and Brookline. The project was expected to convert 41,500 car trips to transit trips daily.

<span class="mw-page-title-main">A Line (Los Angeles Metro)</span> Light rail line

The A Line is a 48.5-mile (78.1 km) light rail line in Los Angeles County, California. The A Line runs east-west between Azusa and Pasadena, then north-south between Pasadena and Long Beach, via Downtown Los Angeles. The A Line is currently the longest light rail line in the world, surpassing the Coast Tram in Belgium.

The Capital Metropolitan Transportation Authority, officially stylized as CapMetro, is a public transportation provider located in Austin, Texas. It operates bus, paratransit services and a hybrid rail system known as CapMetro Rail in Austin and several suburbs in Travis and Williamson counties. In 2022, the system had a ridership of 21,145,300, or about 80,900 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">CapMetro Rail</span> Hybrid rail system in Austin, Texas

CapMetro Rail is a hybrid rail system that serves the Greater Austin area in Texas and is owned by CapMetro, Austin's primary public transportation provider. The Red Line is CapMetro's first and currently only rail line, and connects Downtown Austin with Austin's northwestern suburbs. The line operates on 32 miles (51 km) of existing freight tracks, and serves nine stations. After a series of delays, CapMetro Rail was inaugurated in March 2010. CapMetro added Friday evening and Saturday afternoon and evening regularly scheduled service on March 23, 2012. In 2022, the line had a ridership of 466,800, or about 1,500 per weekday as of the third quarter of 2023.

The Metro Purple Line, formerly known as the Rush Line Corridor, is a proposed bus rapid transit service that would run from Union Depot in downtown Saint Paul to the northeastern suburbs of Saint Paul. Along the corridor's 21 proposed stations there are 106,000 jobs within a 10-minute walk. The project is currently in an environmental analysis phase with further development, engineering, and construction expected to take at least six more years. Service would run 7-days a week with 10-minute headways in peak periods and 15-minute service at most other times. The corridor was named the Rush Line because it was originally planned to end in Rush City, Minnesota. After using the color purple since 2017, the route was officially named the Purple Line and became part of the Metro network on July 14, 2021.

<span class="mw-page-title-main">Metro Red Line (Minnesota)</span>

The Metro Red Line is a bus rapid transit line between the Twin Cities suburbs of Bloomington, Minnesota and Apple Valley, Minnesota. The Red Line travels primarily on Minnesota State Highway 77 and Cedar Avenue from the Apple Valley station in Apple Valley, north through Eagan, Minnesota, to the Mall of America station in Bloomington where it connects to the Metro Blue Line. The line has bus rapid transit elements including bus-only lanes, specially branded vehicles, transit signal priority, and dedicated stations.

The Minneapolis Streetcar System was a proposed streetcar system for the city of Minneapolis, Minnesota. Extensive studies and plans for the new system were completed in 2007 and presented to the Minneapolis City Council in January 2008; on April 2, 2010, the Council voted to approve the plans and seek funding. On December 21, 2010 the Federal Transit Administration granted $900,000 to further study the Nicollet and Central Avenue corridors. In June 2021, after no further development on the system, a bill authorized the Metropolitan Council to use funds collected for the Nicollet-Central line to be spent on bus rapid transit funding.

<span class="mw-page-title-main">MBTA subway</span> Boston region transit service

The Massachusetts Bay Transportation Authority (MBTA) operates rapid transit, light rail, and bus rapid transit services in the Boston metropolitan area, collectively referred to as the rapid transit, subway, or the T system.

<span class="mw-page-title-main">METRORapid Silver Line</span> Bus rapid transit line in Houston, Texas, U.S.

The METRORapid Silver Line is a bus rapid transit line in Houston, Texas operated by METRO. Opened August 23, 2020, the line connects the Uptown area of Houston, with dedicated lanes over nearly the entire length of the corridor. It serves the Northwest Transit Center, 8 stations along Post Oak Boulevard in Uptown, and the Westpark/Lower Uptown Transit Center. On internal METRO documents, the METRORapid Silver Line is designated as Route 433.

<span class="mw-page-title-main">RapidRide</span> Brand of bus routes in King County, Washington

RapidRide is a network of limited-stop bus routes with some bus rapid transit features in King County, Washington, operated by King County Metro. The network consists of seven routes totaling 76 miles (122 km) that carried riders on approximately 64,860 trips on an average weekday in 2016, comprising about 17 percent of King County Metro's total daily ridership.

<span class="mw-page-title-main">Metro (Minnesota)</span> Rapid transit network in the Minneapolis metropolitan area of the United States

Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with the Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.

<span class="mw-page-title-main">CapMetro Rapid</span> Bus rapid transit service in Austin, Texas

CapMetro Rapid is a bus rapid transit service in Austin, Texas, owned and operated by the Capital Metropolitan Transportation Authority (CapMetro). It currently consists of two routes which run north-south served by stations designed by McKinney York Architects.

The history of the Los Angeles Metro Rail and Busway system begins in the early 1970s, when the traffic-choked region began planning a rapid transit system. The first dedicated busway opened along I-10 in 1973, and the region's first light rail line, the Blue Line opened in 1990. Today the system includes over 160 miles (260 km) of heavy rail, light rail, and bus rapid transit lines, with multiple new lines under construction as of 2019.

The Blue Line is a planned light rail line for connecting Austin–Bergstrom International Airport with downtown Austin, Texas. It is still in the planning stages as a part of CapMetro's Project Connect. It is estimated to begin revenue service as early as 2029.

<span class="mw-page-title-main">Urban rail transit in Canada</span> List of Canadian passenger rail systems confined to urban areas

Urban rail transit in Canada encompasses a broad range of rail mass transit systems, including commuter rail, rapid transit, light rail, and streetcar systems.

<span class="mw-page-title-main">Project Connect</span> Ballot measure in Austin, Texas expanding the public transit system

Project Connect is a transit expansion program by the Capital Metropolitan Transportation Authority (CapMetro) in Austin, Texas, U.S. The program was approved by voters on November 3, 2020, in a local election concurrent with the 2020 presidential election.

The Orange Line is a proposed north-south light rail line that will serve the central spine of Austin from North Lamar to Stassney Lane. It is in the planning stages as a part of CapMetro's Project Connect. It is estimated to begin revenue service as early as 2029.

The Downtown Transit Tunnel was a planned light rail tunnel in Downtown Austin, Texas. It was a core feature of the proposed initial investment of Project Connect, the transit expansion plan being undertaken by the Capital Metropolitan Transportation Authority. The transit tunnel would have served the Orange, Blue, and (eventually) Gold light rail lines. The tunnel was eventually cut from Project Connect plans after unexpected cost increases and design challenges.

References

  1. 1 2 3 Clark-Madison, Mike (September 25, 2020). "From Light Rail to a Downtown Tunnel: The Parts of Project Connect". Austin Chronicle. Retrieved November 5, 2020.
  2. Flagler, Jack (January 28, 2021). "As Project Connect moves through early stages, bus lines could begin construction in fall". Austin Community Impact. Retrieved February 13, 2021.
  3. "Recommended System Plan" (PDF).
  4. Salazar, Daniel (May 11, 2020). "Third train line proposed in Project Connect mass transit plan for Austin" . Retrieved November 5, 2020.
  5. Willson, Bill (July 23, 2020). "Part of Cap Metro's show-stopping transit plan gets the hook". RT&S. Retrieved July 27, 2020.