StatusIn planning
Locale Austin, Texas
Termini
  • Colony Park (future extension to Elgin)
  • Downtown
Service
Type Commuter rail
System CapMetro Rail
Operator(s) Capital Metropolitan Transportation Authority
History
Planned opening2033
Technical
Track gauge 4 ft 8+12 in (1,435 mm) standard gauge
Route diagram

BSicon exKBHFa.svg
Elgin
BSicon exBHF.svg
Manor
BSicon exBHF.svg
Wildhorse
BSicon exSKRZ-G4u.svg
Texas 130.svg SH 130
BSicon exENDE.svg
Phase 2
Phase 1
BSicon exBHF.svg
Colony Park
BSicon exBHF.svg
Loyola/Johnny Morris
BSicon exCONTgq.svg
BSicon exABZgr+r.svg
MoKan Corridor
(planned)
BSicon exBHF.svg
US 183
BSicon exSKRZ-G4u.svg
US 183.svg US 183
BSicon exBHF.svg
Springdale
BSicon exBHF.svg
Pleasant Valley
BSicon CONTgq.svg
BSicon xABZgxr+r.svg
Red Line
to Leander
BSicon BHF.svg
Plaza Saltillo
BSicon SKRZ-G4u.svg
I-35.svg I-35
BSicon KBHFe.svg
Downtown

Wheelchair symbol.svg All stations are accessible

The Green Line is a proposed commuter rail line for connecting the Northeast Austin area of Colony Park with the downtown Austin, Texas area in the United States. It is still in the planning stages as a part of CapMetro's Project Connect. [1]

In September 2008, CapMetro evaluated the need for rail service to alleviate pressure from congestion downtown to Colony Park, with a potential extension to Elgin. To fix this problem, CapMetro initiated planning for a new rail line. The Green Line would operate the same as the Red Line, as it would run on an existing freight rail - the Austin Western Railroad - with adjustments made to them to allow for passenger rail service. In December 2008, a presentation, and then a follow-up, were given to the CAMPO Transit Work Group about the Green Line. In May 2018, the Travis County Commissioners Court voted 3–2 to move forward with a viability study of the Green Line. [2] The project's National Environmental Policy Act review is expected to begin in 2028, with revenue service possibly starting in 2033. [3]

Trains would depart the Red Line and head east in between the MLK Jr. and Plaza Saltillo stations, where the first stop would be Pleasant Valley; more new stations will be at Springdale, East US 183, Loyola/Johnny Morris, Colony Park. A potential future extension beyond Colony Park would feature new stations at Wildhorse, Manor, and Elgin. [4] The Green Line will be built from Downtown to Colony Park first, with the extension to Elgin considered at a later time.

Related Research Articles

<span class="mw-page-title-main">METRORail</span> Light rail system in Houston, Texas

METRORail is the 22.7-mile (36.5 km) light rail system in Houston, Texas. In 2023, the system had a ridership of 13,883,700, or about 42,900 per weekday as of the fourth quarter of 2023. METRORail ranks as the second most-traveled light rail system in the Southern United States and the 12th most-traveled light rail system in the United States, and has the highest ridership per mile for light rail systems in the Southern US. METRORail is operated by the Metropolitan Transit Authority of Harris County (METRO).

<span class="mw-page-title-main">Metro Blue Line (Minnesota)</span> Light rail line in Hennepin County, Minnesota

The Metro Blue Line is a 12-mile (19.3 km) light rail line in Hennepin County, Minnesota, that is part of the Metro network. It travels from downtown Minneapolis to Minneapolis–Saint Paul International Airport and the southern suburb of Bloomington. Formerly the Hiawatha Line prior to May 2013, the line was originally named after the Milwaukee Road's Hiawatha passenger train and Hiawatha Avenue, reusing infrastructure from the former and running parallel to the latter for a portion of the route. The line opened June 26, 2004, and was the first light rail service in Minnesota. An extension, Bottineau LRT, is planned to open in 2028.

<span class="mw-page-title-main">Blue Line (MBTA)</span> Rapid transit line in Boston

The Blue Line is a rapid transit line in the Greater Boston metropolitan area, one of four rapid transit lines operated by the Massachusetts Bay Transportation Authority (MBTA). It runs from Bowdoin station in downtown Boston under Boston Harbor to East Boston and Revere on the inner North Shore, where it terminates at Wonderland. The stop at Airport Station, by way of a free shuttle bus, is one of two rapid transit connections to Logan International Airport. In 1967, during a systemwide rebranding, the line was assigned the blue color because it passes under the Boston Harbor. With an end-to-end travel time of less than twenty minutes, the Blue Line is the shortest of Boston's heavy-rail lines and the only line to have both third rail and overhead catenary sections.

<span class="mw-page-title-main">Red Line (Washington Metro)</span> Washington Metro rapid transit line

The Red Line is a rapid transit line of the Washington Metro system, consisting of 27 stations in Montgomery County, Maryland, and Washington, D.C., in the United States. It is a primary line through downtown Washington and the oldest and busiest line in the system. It forms a long, narrow "U," capped by its terminal stations at Shady Grove and Glenmont.

<span class="mw-page-title-main">MetroLink (St. Louis)</span> Light rail system in Missouri, US

MetroLink is a light rail system that serves the Greater St. Louis area. Operated by Metro Transit in a shared fare system with MetroBus, the two-line, 38-station system runs from St. Louis Lambert International Airport and Shrewsbury in Missouri to Scott Air Force Base in Illinois. Intermediate destinations include downtown Clayton, Forest Park, and downtown St. Louis. It is the only U.S. light rail system to cross state lines.

<span class="mw-page-title-main">A Line (Los Angeles Metro)</span> Light rail line in Los Angeles County, California

The A Line is a 48.5-mile (78.1 km) light rail line in Los Angeles County, California. It is one of the six lines of the Los Angeles Metro Rail system, operated by the Los Angeles County Metropolitan Transportation Authority (Metro). The A Line serves 44 stations and runs east-west between Azusa and Pasadena, then north-south between Pasadena and Long Beach. It interlines and shares five stations with the E Line in Downtown Los Angeles. Service operates for approximately 19 hours with headways of up to 8 minutes during peak hours. The A Line is currently the longest light rail line in the world.

The Capital Metropolitan Transportation Authority, officially stylized as CapMetro, is a public transportation provider located in Austin, Texas. It operates bus, paratransit services and a hybrid rail system known as CapMetro Rail in Austin and several suburbs in Travis and Williamson counties. In 2023, the system had a ridership of 25,229,400, or about 81,500 per weekday as of the fourth quarter of 2023.

<span class="mw-page-title-main">D Line (Los Angeles Metro)</span> Rapid transit line in Los Angeles, California

The D Line is a fully underground 5.1-mile (8.2 km) rapid transit line operating in Los Angeles, running between Koreatown and Downtown Los Angeles. It is one of six lines on the Metro Rail system, operated by the Los Angeles County Metropolitan Transportation Authority.

<span class="mw-page-title-main">CapMetro Rail</span> Hybrid rail system in Austin, Texas

CapMetro Rail is a hybrid rail system that serves the Greater Austin area in Texas and is owned by CapMetro, Austin's primary public transportation provider. The Red Line is CapMetro's first and currently only rail line, and connects Downtown Austin with Austin's northwestern suburbs. The line operates on 32 miles (51 km) of existing freight tracks, and serves 10 stations. After a series of delays, CapMetro Rail was inaugurated in March 2010. CapMetro added Friday evening and Saturday afternoon and evening regularly scheduled service on March 23, 2012. In 2023, the line had a ridership of 485,400, or about 1,500 per weekday as of the fourth quarter of 2023.

<span class="mw-page-title-main">K Line (Los Angeles Metro)</span> Light rail line in Los Angeles County, California

The K Line is a 5.9-mile (9.5 km) light rail line running north–south between the Jefferson Park and Westchester neighborhoods of Los Angeles, California, passing through various South Los Angeles neighborhoods and the city of Inglewood. It is one of six lines in the Los Angeles Metro Rail system operated by the Los Angeles County Metropolitan Transportation Authority (LACMTA). It opened on October 7, 2022, making it the system's newest line.

<span class="mw-page-title-main">Downtown station (CapMetro Rail)</span> Hybrid rail station in Austin, Texas

Downtown station is a CapMetro Rail hybrid rail station in Austin, Texas. It is located in Downtown Austin at the corner of Fourth and Neches Street behind the Austin Convention Center. It is the current southern terminus of the Red Line. It was also the smallest, but busiest CapMetro Rail station, before it was rebuilt and expanded.

<span class="mw-page-title-main">Metro (Minnesota)</span> Rapid transit network in the Minneapolis metropolitan area of the United States

Metro is a transit network in Minnesota serving the cities of Minneapolis and Saint Paul. It also provides service to some suburban areas. As of 2022, the system consists of two light rail lines and five bus rapid transit (BRT) lines all of which are operated by the local public transit company: Metro Transit. The five lines connect Downtown Minneapolis and St Paul with the Bloomington, Minneapolis-St Paul International Airport, Roseville, Richfield, Burnsville and Brooklyn Center.

<span class="mw-page-title-main">CapMetro Rapid</span> Bus rapid transit service in Austin, Texas

CapMetro Rapid is a bus rapid transit service in Austin, Texas, owned and operated by the Capital Metropolitan Transportation Authority (CapMetro). It currently consists of two routes which run north-south served by stations designed by McKinney York Architects.

The history of the Los Angeles Metro Rail and Busway system begins in the early 1970s, when the traffic-choked region began planning a rapid transit system. The first dedicated busway opened along I-10 in 1973, and the region's first light rail line, the Blue Line opened in 1990. Today the system includes over 160 miles (260 km) of heavy rail, light rail, and bus rapid transit lines, with multiple new lines under construction as of 2019.

The Blue Line is a planned light rail line for connecting Austin–Bergstrom International Airport with downtown Austin, Texas. It is still in the planning stages as a part of CapMetro's Project Connect. It is estimated to begin revenue service as early as 2029.

<span class="mw-page-title-main">Urban rail transit in Canada</span> List of Canadian passenger rail systems confined to urban areas

Urban rail transit in Canada encompasses a broad range of rail mass transit systems, including commuter rail, rapid transit, light rail, and streetcar systems.

<span class="mw-page-title-main">Project Connect</span> Ballot measure in Austin, Texas expanding the public transit system

Project Connect is a transit expansion program by the Capital Metropolitan Transportation Authority (CapMetro) in Austin, Texas, U.S. The program was approved by voters on November 3, 2020, in a local election concurrent with the 2020 presidential election.

The Gold Line is a proposed transitway for connecting North Central Austin and the Downtown's Eastside to South Austin. It is in the planning stages as a part of Capital Metro's Project Connect. According to the plan, the line will be initially be operated as a bus rapid transit line prior to future conversion to light rail. It is estimated to open in 2024.

The Orange Line is a proposed north-south light rail line that will serve the central spine of Austin from North Lamar to Stassney Lane. It is in the planning stages as a part of CapMetro's Project Connect. It is estimated to begin revenue service as early as 2029.

The Downtown Transit Tunnel was a planned light rail tunnel in Downtown Austin, Texas. It was a core feature of the proposed initial investment of Project Connect, the transit expansion plan being undertaken by the Capital Metropolitan Transportation Authority. The transit tunnel would have served the Orange, Blue, and (eventually) Gold light rail lines. The tunnel was eventually cut from Project Connect plans after unexpected cost increases and design challenges.

References

  1. "Metro Project Connect Initial Investment System Plan" (PDF). July 30, 2020. Retrieved November 5, 2020.
  2. Pritchard, Caleb (May 29, 2018). "Commissioners Court goes for Green Line". Austin Monitor. Retrieved November 4, 2020.
  3. Clark-Madison, Mike (September 25, 2020). "From Light Rail to a Downtown Tunnel: The Parts of Project Connect". Austin Chronicle. Retrieved November 5, 2020.
  4. "Recommended System Plan" (PDF).