Expressway 28 | |
---|---|
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) பினாங்கு இரண்டாவது பாலம் 槟威二桥 | |
Route information | |
Maintained by Jambatan Kedua Sdn Bhd (JKSB) | |
Length | 24 km (15 mi) |
Existed | 2006–present |
History | |
Major junctions | |
East end | Bandar Cassia (Batu Kawan), Seberang Perai |
West end | Batu Maung, Penang Island |
Location | |
Country | Malaysia |
Primary destinations | George Town, Bukit Tambun, Bandar Cassia, Batu Kawan, Simpang Ampat, Juru, Bayan Lepas, Bayan Baru, Batu Maung, Teluk Tempoyak, Permatang Laut, Serdang, Selama, Jelapang, Ipoh |
Highway system | |
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) Jambatan Sultan Abdul Halim Muadzam Shah (Jambatan Kedua Pulau Pinang) | |
---|---|
Coordinates | 5°14′59″N100°21′05″E / 5.249791°N 100.351353°E |
Carries | Motor vehicles |
Crosses | South Channel, Malaysia |
Locale | Sultan Abdul Halim Muadzam Shah Bridge Sultan Abdul Halim Muadzam Shah Bridge |
Official name | Sultan Abdul Halim Muadzam Shah Bridge |
Maintained by | Jambatan Kedua Sdn Bhd (JKSB) |
Characteristics | |
Design | |
Total length | 24 km |
Width | -- |
Longest span | 250 m |
History | |
Designer |
|
Constructed by |
|
Construction end | February 2014 [2] |
Opened | 2 March 2014 at 00:01 MST [2] |
Inaugurated | 1 March 2014 at 20:30 MST [2] |
Location | |
The Sultan Abdul Halim Muadzam Shah Bridge (Malay : Jambatan Sultan Abdul Halim Muadzam Shah), also known as the Penang Second Bridge (Jambatan Kedua Pulau Pinang), is a dual carriageway toll bridge in Penang, Malaysia. It connects Bandar Cassia (Batu Kawan) in Seberang Perai on mainland Peninsular Malaysia with Batu Maung on Penang Island. It is the second bridge to link the island to the mainland after the first Penang Bridge.
The total length of the bridge is 24 km (15 mi) with 16.9 km (10.5 mi) over water, making it the longest bridge in Malaysia and the second longest in Southeast Asia behind the 30 km (19 mi) Sultan Haji Omar Ali Saifuddien Bridge in Brunei. China Harbour Engineering Company (CHEC), a main contractor for the second bridge, was expected to start work on the second Penang bridge in November 2007 and complete the project in 2011, but the completion date was then postponed to May 2012, and later to February 2014. [1]
It originally was given route code E22 but later changed to E28, and E22 was used by Senai–Desaru Expressway. Construction started in November 2008. To reduce the cost of construction, its design was then modified to resemble the first cable stayed Penang Bridge. The bridge has been built with a large loan from the People's Republic of China to continue and maintain the economic relationship between China and Malaysia. [3] The bridge was officially opened on 1 March 2014 at 20:30 MST and was named after the fourteenth Yang di-Pertuan Agong, Sultan Tuanku Abdul Halim Muadzam Shah of Kedah, and was assigned with the route number E28.
The Sultan Abdul Halim Muadzam Shah Bridge is a High Impact Project launched under the Ninth Malaysia Plan. Being a High Impact Project, it was seen as a key catalyst in the socio-economic development of Malaysia's Northern Corridor Economic Region. The project was delivered by a special purpose concession company formed by the Government of Malaysia, Jambatan Kedua Sdn Bhd (JKSB). The bridge measuring a total of 24 km (15 mi) in length was constructed by UEM Builders Sdn Bhd, a subsidiary of the UEM Group Malaysia, as well as China Harbour Engineering Company (CHEC), a subsidiary of the China Communications Construction Company. Construction of the bridge, linking Batu Kawan on the mainland and Batu Maung on Penang Island, began in November 2008 and was completed in February 2014. The bridge opened to traffic on 2 March 2014. [4]
The E28 expressway consists of the bridge and a land expressway linking the bridge to the North–South Expressway Northern Route E1, the main expressway of Peninsular Malaysia.
The start of the expressway is located at its interchange with the North–South Expressway Northern Route E1. The westbound lanes towards the bridge feature a collector-express lanes system, where the collector lanes have an interchange at Exit 2801 to Bandar Cassia and Batu Kawan while the express lanes continue uninterrupted to the bridge. The bridge and expressway end in Batu Maung on Penang Island at the interchange with Tun Dr Lim Chong Eu Expressway.
The idea to build a second bridge linking Seberang Perai to Penang Island was suggested in 1995 by Prime Minister Mahathir Mohamad and Chief Minister of Penang Koh Tsu Koon. In August 2006, the Malaysian federal government unveiled a plan to build the Penang Second Bridge in the Ninth Malaysia Plan. On 12 November 2006, the groundbreaking ceremony for the new Penang Second Bridge was performed by Prime Minister Abdullah Ahmad Badawi.
After months of soil survey work and test piling work, CHEC and UEM announced that the project was on track for completion in 2011. Construction work was expected to begin in January 2008. [5]
In April 2008, the government announced that the project was to be delayed by 9 months due to land acquisition, design issues, and also the rising costs of building materials. [6] Newly elected Chief Minister of Penang, Lim Guan Eng proposed a toll discount for any delays on the project [7] and expressed disappointment regarding the construction delay. [8]
In July 2008, Jelutong MP Jeff Ooi reported that the loan for the bridge risked being withdrawn if the shareholder agreement between UEM Builders Berhad and its joint-venture partner CHEC was not inked by August 2008. It was reported that there were disagreements between the two parties on the apportionment of the cost of building the bridge although the issue was expected to be resolved quickly due to UEM having a variation on the price on its portion. [9]
On 8 November 2008, the construction of the Penang Second Bridge began. [10]
On 3 October 2012, media reports indicated that the bridge was 84% complete, and that the bridge was due to be completed approximately two months ahead of the deadline of September 2013. [11]
On 20 April 2013, the final closure of the cable stayed bridge at the main navigational span of the Penang Second Bridge was completed and thus signified the completion of the construction of the bridge and physically connecting Batu Maung on the Island and Batu Kawan on the Mainland.
The bridge had been planned for completion on 8 November 2013 and to be opened to the public by the end of November. [12] However, the opening day of 8 November 2013 was postponed. [4] [13]
The opening ceremony of the Penang Second Bridge was held at 20:30 MST on 1 March 2014. [14] The bridge was official named Sultan Abdul Halim Muadzam Shah Bridge after the fourteenth Yang di-Pertuan Agong, Sultan Tuanku Abdul Halim Muadzam Shah of Kedah. [13] [15] [16] At midnight on 2 March 2014, the bridge was opened to traffic at 00:01 MST after the official opening ceremony.
During the COVID-19 pandemic, the expressway experienced ramp closures several times. [17] Those ramps were:
On 6 June 2013, a ramp leading to the still under construction Penang Second Bridge at Batu Maung interchange collapsed at around 7:00 pm, burying a car and two motorcycles under the debris. One person was killed in the incident. The ramp which is part of the Package 3A of the bridge project was built by the contractor Cergas Murni Sdn Bhd and not UEM Builders Berhad.
The Sultan Abdul Halim Muadzam Shah Bridge is designed based on the double "S" curvy concept due to the geological reasons.[ citation needed ]The numerous "S"-like curves along the 24 km stretch are a requirement under the Road Safety Audit.
The Sultan Abdul Halim Muadzam Shah Bridge is the longest bridge in the world installed with High Damping Natural Rubber Bearing, an effective seismic isolation system that enables the bridge to withstand high intensity earthquakes. The bridge is the first in Malaysia to be installed with seismic expansion joints, which would allow movements during an earthquake.
The land expressway is the first in Malaysia to be designed based on an upgraded secondary consolidation criterion of 50-millimeter earth embankment settlement for every 20 years, as compared to the Penang Bridge whose 367-millimeter earth embankment has to be settled every five years. [18]
Penang Second Bridge Integrated Toll Plaza Bandar Cassia PLUS Toll Plaza (Gateway Arch Toll Plaza) | |
---|---|
Plaza Tol Bersepadu Jambatan Kedua Pulau Pinang Plaza Tol PLUS Bandar Cassia (Plaza Tol Pintu Gerbang) | |
General information | |
Architectural style | Structural expressionism |
Location | Sultan Abdul Halim Muadzam Shah Bridge Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge), Penang, Malaysia |
Construction started | 2011 |
Completed | February 2014 |
Opened | 2 March 2014 at 00:01 MST |
Inaugurated | 1 March 2014 at 20:30 MST |
Renovated | February 2014 |
Technical details | |
Floor count | 28 booths |
The bridge and the link road to the North–South Expressway are maintained by a private concession company, Jambatan Kedua Sdn Bhd (JKSB). The toll for the bridge is similar to the toll scheme for the Penang Bridge, where a fee is collected one way when crossing the bridge from the mainland to Penang Island, while no fee is imposed for mainland-bound motorists coming from the island. On the other hand, the toll for the link road between the bridge and the North–South Expressway is collected in both directions.
There was a toll-free trial period during the opening month from 2 March until 31 March 2014. Toll collection began on 1 April 2014 at 6am. [19] There are two toll plazas on the route: the Penang Second Bridge Integrated Toll Plaza (Bandar Cassia PLUS Toll Plaza) and the Penang Second Bridge Toll Plaza (JK2PP Toll Plaza).
The Penang Second Bridge Integrated Toll Plaza or Bandar Cassia PLUS Toll Plaza, also known as Gateway Arch Toll Plaza after its gateway arch design, is the main toll plaza for Sultan Abdul Halim Muadzam Shah Bridge. Upon completion in February 2014, it is the largest toll plaza in Malaysia, overtaking the Sungai Besi Toll Plaza of the North–South Expressway Southern Route E2. [20] The toll plaza is Malaysia's longest non-vehicular span steel arch structure. It is also the first in Malaysia to be awarded with a Platinum rating in the Green Building Index. [21]
Situated between the North–South Expressway (Exit 157) and Bandar Cassia (Exit 2801) interchanges, the Bandar Cassia PLUS Toll Plaza is managed by PLUS Expressways, the highway concessionaire of the North–South Expressway.
In the westbound direction towards the bridge, the toll plaza is the starting point of the collector-express lanes system with division into two sections: Plaza A for the express lanes to the bridge and Plaza B for the collector lanes to the Bandar Cassia interchange. [22] At Plaza A, three tolls are collected from motorists: the PLUS closed toll collection for the North–South Expressway, the toll for the link road and the toll for the bridge; the latter two are collected on behalf of JKSB. At Plaza B, only the first two tolls are collected without the bridge component, as it is intended for motorists heading towards Bandar Cassia and Batu Kawan without using the bridge.
In the eastbound direction towards the North–South Expressway, the toll plaza serves as the entry point into the PLUS closed toll system. The toll for the link road is collected together with the PLUS closed toll when the motorist exits the closed toll system.
Beginning 26 April 2017, only Touch 'n Go cards and SmartTAGs are accepted for toll payment. PLUS transit ticket is no longer issued for entry at Bandar Cassia toll plaza.
The Penang Second Bridge Toll Plaza or JK2PP Toll Plaza is located on the collector lanes after the Bandar Cassia interchange (Exit 2801), before merging with the express lanes towards the bridge. The toll plaza is managed by Jambatan Kedua Sdn Bhd (JKSB).
The toll for the bridge is collected from motorists going towards the bridge from the Bandar Cassia interchange, as well as from those who had used Plaza B at the Bandar Cassia PLUS Toll Plaza and travelled on the collector lanes to the bridge. Motorists travelling on the express lanes bypass the JK2PP Toll Plaza, as they had already paid the toll for the bridge at Plaza A of the Bandar Cassia PLUS Toll Plaza.
Motorcyclists used to pay a bridge toll of RM1.70 at the JK2PP Toll Plaza. However, since 1 January 2019, toll collection for motorcyclists was abolished for both Penang bridges. [23] [24] [25] To date, the toll plaza canopy for motorcyclists remain.
Since 1 June 2016, all electronic toll transactions have been conducted using Touch 'n Go cards and SmartTAGs. The SmartTAG and MyRFID lanes are for light vehicles only. Cash payment is no longer accepted.
(Since 1 February 2020) [26] [27]
Class | Types of vehicles | Rate (in Malaysian Ringgit (RM)) | |
---|---|---|---|
Bandar Cassia | JK2PP | ||
0 | Motorcycles (Vehicles with two axles and two wheels) | Free | |
1 | Private Cars (Vehicles with two axles and three or four wheels (excluding taxis and buses)) | 0.60 | 5.74 |
2 | Vans and other small goods vehicles (Vehicles with two axles and five or six wheels (excluding buses)) | 0.90 | 30.50 |
3 | Large Trucks (Vehicles with three or more axles (excluding buses)) | 1.20 | 70.10 |
4 | Taxis | 0.30 | 8.50 |
5 | Buses | 0.50 | 26.20 |
JKSB Ronda is the highway patrol unit that patrols along the Sultan Abdul Halim Muadzam Shah Bridge and land expressways and also provides assistance to commuters on the bridge. The current highway patrol vehicles are the Japanese made Toyota Hilux and the Mitsubishi i-MiEV, the four-seater electric vehicle, is able to travel 150 km after an eight-hour full charge. Seven charging stations were also set up at the toll plaza on the mainland, two of them being rapid chargers which are able to give an 80 percent charge in 30 minutes. [28]
Vehicle | Origin | Type | In service | Notes |
---|---|---|---|---|
Mitsubishi i-MiEV | Japan | Highway patrol vehicles | 2014–present | First highway patrol electric vehicles in Malaysia. |
Toyota Hilux | Japan | Highway patrol vehicles and tow truck | 2014–present |
Two future rest and service areas (R&R) are located at Batu Kawan on the mainland. They will be built in six months' time. The plan was to have a floating rest and service area on the middle of the bridge. However, the plan was scrapped due to high costs.[ needs update ]
This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table.(November 2021) |
Km | Exit | Interchange | To | Notes |
---|---|---|---|---|
Sultan Abdul Halim Muadzam Shah Bridge 0 | 157 | Penang Second Bridge-NSE Interchange | North–South Expressway Northern Route AH2 North-South Expressway Northern Route North North–South Expressway Northern Route AH2 Alor Star (Langkawi Island) Butterworth–Kulim Expressway AH140 Gerik North–South Expressway Northern Route AH2 Butterworth South North–South Expressway Northern Route AH2 Kuala Lumpur North–South Expressway Northern Route AH2 Ipoh North–South Expressway Northern Route AH2 Jawi Sungai Bakap Layby | Closed tolled trumpet expressway interchange |
0.1 | ||||
0.2 | Canal bridge | |||
0.3 | Sungai Tengah bridge | |||
0.4 | ||||
0.5 | Penang Second Bridge Integrated Toll Plaza Bound Exit | T Sultan Abdul Halim Muadzam Shah Bridge (Gateway Arch Toll Plaza) T PLAZA A Sultan Abdul Halim Muadzam Shah Bridge Penang Second Bridge Integrated Toll Plaza(Penang Second Bridge) FT 3113 George Town P10 Bayan Lepas P10 Batu Maung FT 3113 Bayan Lepas Free Industrial Zone FT 6 Penang International Airport T PLAZA B 2801 Bandar Cassia Interchange Bandar Cassia FT 149 Batu Kawan FT 149 Bukit Tambun FT 1 Simpang Ampat Changkat Nibong Tebal | West bound | |
Penang Second Bridge Integrated Toll Plaza (Gateway Arch Toll Plaza) JKP PLAZA A (Main Toll Plaza) PLUSTransit Touch 'n Go SmartTAG MyRFID SmartTAG Touch 'n Go RM (Cash) Closed toll system Collect PLUSTransit cards and pay a distance toll including toll for Penang Second Bridge (Enter bridge only) | ||||
Penang Second Bridge Integrated Toll Plaza (Gateway Arch Toll Plaza) JKP PLAZA B (To Bandar Cassia Interchange only) SmartTAG MyRFID Touch 'n Go RM (Cash) Closed toll system Pay a distance toll | ||||
0.7 | Penang Second Bridge Integrated Toll Plaza (Gateway Arch Toll Plaza) JKP | West bound To Bandar Cassia Interchange only | ||
0.8 | ||||
North–South Expressway Northern Route AH2 North–South Expressway Northern Route (Batu Kawan Expressway) PLUS Expressway border limit | ||||
Sultan Abdul Halim Muadzam Shah Bridge Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) (Batu Kawan Expressway) JKSB border limit | ||||
0.9 | ||||
Sultan Abdul Halim Muadzam Shah Bridge 1 | 2801 | Bandar Cassia Interchange | Lebuhraya Bandar Cassia (Bandar Cassia Avenue) North Bandar Cassia FT 149 Batu Kawan FT 149 Bukit Tambun FT 1 Simpang Ampat FT 149 Aman Island (Jetty) Batu Kawan Sports Complex Southeast Changkat Nibong Tebal | Cloverleaf interchange |
Penang Second Bridge Toll Plaza JKSB (From Bandar Cassia Interchange only) MyRFID SmartTAG Touch 'n Go RM (Cash) Opened toll system Pay toll | ||||
1.5 | Penang Second Bridge Toll Plaza JKSB | Penang Second Bridge Info Centre | West bound From Bandar Cassia Interchange only | |
Sultan Abdul Halim Muadzam Shah Bridge 2 | ||||
Sultan Abdul Halim Muadzam Shah Bridge Batu Kawan Expressway | ||||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) Length Over Water: 16.9 kilometres | Start/End of bridge | |||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) Batu Kawan Rest and Service Area | Eastern approach span East bound Future Rest and Service Area | |||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) Batu Kawan Rest and Service Area | Eastern approach span West bound Future Rest and Service Area | |||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | Eastern approach span | |||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | Eastern approach span | |||
Seberang Perai Selatan-Barat Daya district border | ||||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | Eastern approach span | |||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | Main navigational span Cable stayed bridge 250 m | |||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | Western approach span | |||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | Western approach span | |||
Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) Length Over Water: 16.9 kilometres | Start/End of bridge | |||
Sultan Abdul Halim Muadzam Shah Bridge 24 | 2802 | Batu Muang | Sultan Abdul Halim Muadzam Shah Bridge FT 3113 Batu Muang Expressway North FT 3113 Tun Dr Lim Chong Eu Expressway (Bayan Lepas Expressway) FT 3113 Bayan Lepas Free Industrial Zone FT 3113 George Town Jerejak Island (Jetty) Penang Hospital South P10 Batu Maung P10 Bayan Lepas FT 6 Penang International Airport | Elevated directional-Y interchange |
Persiaran Bayan Lepas | West Persiaran Bayan Lepas | Interchange | ||
Sungai Nipah bridge | ||||
Solok Bayan Lepas | West Solok Bayan Lepas | Interchange | ||
Sungai Batu Maung bridge | ||||
Penang Aquarium | ||||
Batu Muang Interchange | Northwest Jalan Pekan Batu Muang Batu Maung town centre MAS Complex Cargo Terminal Southeast P220 Jalan Permatang Damar Laut Permatang Damar Laut Penang War Museum | Diamond interchange | ||
Sultan Abdul Halim Muadzam Shah Bridge FT 3113 Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) | ||||
P10 Jalan Batu Muang JKR border limit | ||||
Southwest P10 Jalan Batu Maung P10 Bayan Lepas FT 6 Penang International Airport |
Lebuhraya Bandar Cassia | |
Major junctions | |
---|---|
North end | Jalan Bukit Tambun |
FT 149 Jalan Bukit Tambun Sultan Abdul Halim Muadzam Shah Bridge Penang Second Bridge | |
South end | Batu Kawan |
Location | |
Country | Malaysia |
Primary destinations | Bandar Cassia |
Highway system | |
Lebuhraya Bandar Cassia is a major road in Penang, Malaysia.
Km | Exit | Interchange | To | Notes |
---|---|---|---|---|
Batu Kawan | FT 149 Jalan Bukit Tambun West FT 149 Pengkalan Batu Kawan FT 149 Aman Island (Jetty) East FT 149 Bukit Tambun FT 149 Simpang Ampat FT 1 Sungai Bakap FT 1 Bukit Mertajam North–South Expressway Northern Route AH2 North-South Expressway Northern Route Alor Setar Kuala Lumpur Ipoh | Roundabout | ||
Lebuhraya Bandar Cassia (Bandar Cassia Avenue) Start/End of highway | ||||
Batu Kawan Batu Kawan Sports Complex | Batu Kawan Stadium | |||
Bandar Cassia | Lingkaran Cassia Timur | Junctions | ||
Bandar Cassia | ||||
Lebuhraya Bandar Cassia (Bandar Cassia Avenue) JKR border limit | ||||
Sultan Abdul Halim Muadzam Shah Bridge FT 3113 Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) (Batu Kawan Expressway) Start/End of expressway JKSB border limit | ||||
Bandar Cassia-JKPP | Sultan Abdul Halim Muadzam Shah Bridge Penang Second Bridge (Batu Kawan Expressway) West T Penang Secong Bridge Toll Plaza Sultan Abdul Halim Muadzam Shah Bridge Sultan Abdul Halim Muadzam Shah Bridge P10 Batu Maung P10 Bayan Lepas FT 6 Penang International Airport East T Penang Second Bridge Integrated (Gateway) North–South Expressway Northern Route AH2 North-South Expressway Northern Route North–South Expressway Northern Route AH2 Alor Setar North–South Expressway Northern Route AH2 Butterworth North–South Expressway Northern Route AH2 Kuala Lumpur North–South Expressway Northern Route AH2 Ipoh | Cloverleaf interchange | ||
Sultan Abdul Halim Muadzam Shah Bridge Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) (Batu Kawan Expressway) Start/End of expressway JKSB border limit | ||||
Lebuhraya Bandar Cassia (Bandar Cassia Avenue) JKR border limit | ||||
Bandar Cassia | ||||
Sungai Tengah bridge | ||||
Changkat |
The commemorative postage stamps to mark the opening of the Sultan Abdul Halim Muadzam Shah Bridge on 1 March 2014 was issued by Pos Malaysia on 31 December 2014. The denominations for these stamps were RM 1.20.
Al-Mu’tassimu Billahi Muhibbuddin Sultan Abdul Halim Mu'adzam Shah ibni Almarhum Sultan Badlishah was the 28th Sultan of Kedah from 1958 until his death in 2017, and served twice as the Yang di-Pertuan Agong from 1970 to 1975 and from 2011 to 2016. He was the first and only ruler to reign as Yang di-Pertuan Agong twice, as well as the oldest elected to the office. Prior to his death, he was the second longest-reigning living monarch in the world after Queen Elizabeth II of the United Kingdom.
Touch 'n Go is a contactless smart card system used for electronic payments in Malaysia. The system was introduced in 1997 and is widely used for toll payments on highways, public transportation, parking, and other services. The card is equipped with a radio-frequency identification (RFID) chip that allows users to make payments by simply tapping the card on a reader device. Touch 'n Go cards can be reloaded with funds either online or at designated reload kiosks. The system has become a popular and convenient way for Malaysians to make cashless transactions.
The North–South Expressway is a network of tolled controlled-access highways running through the west coast of Peninsular Malaysia. The expressway network consists of the northern and southern route, having a total length of 772 kilometres. Running through seven states and connecting the Thailand and Singapore borders, the North–South Expressway is an important thoroughfare for local, interstate and international traffic. The expressway is part of route AH2, a designation of the Asian Highway Network.
The Penang Bridge is a 13.5-kilometre (8.4-mile) dual carriageway toll bridge and controlled-access highway in the state of Penang, Malaysia. The bridge connects Perai on the mainland side of the state with Gelugor on the island, crossing the Penang Strait. The bridge was the first and, until 2014, the only road connection between the peninsula and the island. The bridge is the second-longest bridge over water in Malaysia, with a length over water of 8.4 kilometres.
The North–South Expressway Central LinkNorth–South Expressway Central Link also known as ELITE, is a 63-kilometre (39-mile) controlled-access highway in Malaysia, running between Shah Alam in Selangor and Nilai in Negeri Sembilan. The expressway joins the separated northern and southern sections of the North–South Expressway, allowing interstate traffic to bypass Kuala Lumpur. The expressway also serves as a primary access route to Putrajaya and Kuala Lumpur International Airport.
The Damansara–Puchong ExpresswayDamansara–Puchong Expressway, abbreviated as LDP, is a 40.0-kilometre (24.9-mile) major controlled-access highway in the Petaling District of Selangor, Malaysia. The expressway runs in a north–south direction between Bandar Sri Damansara and Putra Permai, near Putrajaya, forming a major thoroughfare in the cities of Petaling Jaya and Puchong. A short east–west spur of the expressway connects Pusat Bandar Puchong to the suburb of UEP Subang Jaya.
The North–South Expressway Southern RouteNorth–South Expressway Southern Route is an interstate controlled-access highway running parallel to the southwestern coast of Peninsular Malaysia. The expressway forms the south section of the North–South Expressway, connecting the states of Selangor, Negeri Sembilan, Malacca and Johor. It begins at Seri Kembangan, near the state/territory boundary between Selangor and Kuala Lumpur, and travels southwards to end at Pandan-Tebrau in Johor.
The North–South Expressway Northern Route is an interstate controlled-access highway running parallel to the northwestern coast of Peninsular Malaysia. The 460-kilometre (290-mile) expressway forms the north section of the North–South Expressway, passing through the northwestern states of Kedah, Penang, Perak and Selangor. The expressway begins at the Bukit Kayu Hitam checkpoint in Kedah, where the Malaysia–Thailand border lies, and ends at Bukit Lanjan in Selangor state where the expressway interchanges with the New Klang Valley Expressway. The expressway is operated by PLUS Expressways.
The Cheras–Kajang Expressway is an 11.5-kilometre (7.1-mile) controlled-access highway in the Klang Valley region of Peninsular Malaysia. It runs between the suburb of Cheras at the Kuala Lumpur–Selangor border and the township of Kajang in Selangor.
The Federal Route 1 is the first federal road in Malaysia, the oldest federal road in Malaysia, and among the nation's earliest public roadways ever constructed. The Federal Route 1 was the backbone of the road system in the western states of Peninsular Malaysia before being supplanted by the North–South Expressway.
The Federal Route 2 is a major east–west oriented federal highway in Malaysia. The 276.9 kilometres (172 mi) road connects Port Klang in Selangor to Kuantan Port in Pahang. The Federal Route 2 became the backbone of the road system linking the east and west coasts of Peninsula Malaysia before being surpassed by the East Coast Expressway E8.
Federal Route 5 is one of the three north–south oriented backbone federal roads running along the west coast of Peninsular Malaysia, Malaysia. The 655.85 kilometres (408 mi) federal highway runs from Jelapang, Perak in the north to Skudai, Johor in the south.
Tun Razak Highway, Federal Route 12(Lebuhraya Tun Razak), also known as Segamat-Kuantan Highway(Lebuhraya Segamat-Kuantan), Asian Highway Route 142, is a 146.8 kilometres (91 mi) federal highway running from the town of Segamat, Johor to Gambang before proceeding another 38 kilometres (24 mi) via Federal Route 2 to Gambang near Kuantan, Pahang. This two-lane federal road is named in honor of Tun Abdul Razak, Malaysia's second Prime Minister who was also known as Malaysia's Father of Development. The highway is part of the Asian Highway Network of route 142.
The Sultan Ismail Bridge is a bridge in Muar town across the Muar River in Johor, Malaysia. It was the first bridge built across a river that connects Bandar Maharani, Muar to Tanjung Agas which is now named as part of Tangkak district. The bridge replaced old ferry services in the 1960s. The bridge was originally a toll bridge making the second toll bridge in Malaysia after Sultan Yahya Petra Bridge in Kelantan.
Butterworth Outer Ring Road (BORR) is a coastal expressway located in Butterworth, Penang, Malaysia. This 14 km (8.7 mi) expressway connects Sungai Dua in the north until Perai in the south.
This article lists important figures and events in Malaysian public affairs during the year 1982, together with births and deaths of notable Malaysians.
Batu Kawan is an island and suburb of Seberang Perai in the Malaysian state of Penang. It is geographically separated from the rest of Seberang Perai by the Jawi and Tengah rivers. As of 2020, Batu Kawan contained a population of 11,409.
The Second Link ExpresswaySecond Link Expressway is a 47-kilometre (29-mile) controlled-access highway in Johor, Malaysia. It runs from Senai, Kulai District near the international airport to the Malaysia–Singapore Second Link at Tanjung Kupang, Johor Bahru District.
Teras Teknologi Sdn Bhd (TERAS), a subsidiary of PLUS Malaysia Berhad (PMB), is a Malaysian global corporation based in Petaling Jaya.
The Malaysian Expressway System is a network of national controlled-access expressways in Malaysia that forms the primary backbone network of Malaysian national highways. The network begins with the Tanjung Malim–Slim River tolled road which was opened to traffic on 16 March 1966, later North–South Expressway (NSE), and is being substantially developed. Malaysian toll road-expressways are built by private companies under the supervision of the government highway authority, Malaysian Highway Authority. While toll-free expressways are built by Malaysian Public Works Department or Jabatan Kerja Raya Malaysia (JKR) in Malay.