Demonstration and Science Experiments

Last updated

DSX
Demonstration and Science Experiments (DSX).jpg
Artist rendering of the Air Force Research Laboratory Demonstration and Science Experiments (DSX) spacecraft on-orbit with its 80-meter and 16-meter antenna booms extended.
NamesDemonstration and Science Experiments
Deployable Structures Experiment
Mission type Technology demonstration
Operator Air Force Research Laboratory
COSPAR ID 2019-036F OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 44344
Website https://www.afrl.af.mil/
Mission duration1 year (planned)
1 year, 11 months and 6 days (achieved)
Spacecraft properties
Bus ESPA ring + 2 SN-200
Manufacturer Sierra Nevada Corporation
(formerly MicroSat Systems)
Start of mission
Launch date25 June 2019, 06:30:00 UTC
Rocket Falcon Heavy (No. 003)
Launch site Kennedy Space Center, LC-39A
Contractor SpaceX
End of mission
DisposalPassivated
Deactivated31 May 2021
Orbital parameters
Reference system Geocentric orbit [1]
Regime Medium Earth orbit
Perigee altitude 5,988 km (3,721 mi)
Apogee altitude 12,051 km (7,488 mi)
Inclination 42.3°
Period 316.9 minutes
Instruments
Wave Particle Interaction Experiment (WPIx)
Space Weather Experiment (SPx)
Space Environmental Effects Experiment (SFx)
Adaptive Controls Experiment (ACE)
 

Demonstration and Science Experiments (DSX) was a small spacecraft developed by the U.S. Air Force Research Laboratory's Space Vehicles Directorate to perform experiments to study the radiation environment in medium Earth orbit. [2] [3]

Contents

Spacecraft

The Air Force Research Laboratory (AFRL) is responsible for the development and execution of the DSX (originally Deployable Structures Experiment), now Demonstration & Science Experiments, also known as Space Science Technology Experiment (SSTE-4), a suite of four science payloads integrated onto a Evolved Expendable Launch Vehicle (EELV) EELV Secondary Payload Adapter (ESPA) ring based three axis stabilized satellite bus nominally slated for launch into a 6000 × 12000 km, 30° inclination, Medium Earth Orbit (MEO) in the 2019 timeframe with one year required and three year desired operational capability. [4]

Unlike the traditional ESPA approach, in DSX the experiments and host spacecraft stay attached and do not deploy. After the primary satellite in the EELV is deployed, the DSX ESPA separates from the EELV 2nd stage booster to become a free-flyer spacecraft. To address the space access aspect of the rapid-response problem, DSX will utilize an EELV Secondary Payload Adapter (ESPA) capability as a platform for highly-capable small and medium free-flying satellites (or ESPASats) that have plentiful and relatively inexpensive launch opportunities on EELV as secondary payloads. [4]

One deployable boom measured 80 meters and a second measured 16 meters, making DSX one of the largest deployable structures built to operate on orbit. [2]

Payload

DSX conducted four experiments:

Mission

AFRL kept the satellite in operation for nearly two years, rather than the one year planned, using it to conduct more than 1,300 experiments. [5] [2]

The DSX mission was successfully completed on 31 May 2021. The spacecraft was passivated rather than deorbited due to its high orbit. [2]

Related Research Articles

Orbital Sciences Corporation was an American company specializing in the design, manufacture and launch of small- and medium- class space and launch vehicle systems for commercial, military and other government customers. In 2014, Orbital merged with Alliant Techsystems to create a new company called Orbital ATK, Inc., which in turn was purchased by Northrop Grumman in 2018. The remnants of the former Orbital Sciences Corporation today are a subsidiary of Northrop Grumman known as Northrop Grumman Space Systems.

<span class="mw-page-title-main">MidSTAR-1</span>

MidSTAR-1 is an artificial satellite produced by the United States Naval Academy Small Satellite Program. It was sponsored by the United States Department of Defense (DoD) Space Test Program (STP), and was launched on March 9, 2007 at 03:10 UTC, aboard an Atlas V expendable launch vehicle from Cape Canaveral Air Force Station. MidSTAR-1 flew along with FalconSat 3, STPSat 1, and CFESat as secondary payloads; the primary payload was Orbital Express.

The Space Test Program (STP) is the primary provider of spaceflight for the United States Department of Defense (DoD) space science and technology community. STP is managed by a group within the Advanced Systems and Development Directorate, a directorate of the Space and Missile Systems Center of the United States Space Force. STP provides spaceflight via the International Space Station (ISS), piggybacks, secondary payloads and dedicated launch services.

<span class="mw-page-title-main">ACRIMSAT</span> Satellite of NASAs Earth Observing System program

The Active Cavity Radiometer Irradiance Monitor Satellite, or ACRIMSAT was a satellite carrying the ACRIM-3 instrument. It was one of the 21 observational components of NASA's Earth Observing System program. The instrument followed upon the ACRIM-1 and ACRIM-2 instruments that were launched on multi-instrument satellite platforms. ACRIMSAT was launched on 20 December 1999 from Vandenberg Air Force Base as the secondary payload on the Taurus launch vehicle that launched KOMPSAT. It was placed into a high inclination of 98.30°, at 720 km. Sun-synchronous orbit from which the ACRIM-3 instrument monitored total solar irradiance (TSI). Contact with the satellite was lost on 14 December 2013.

<span class="mw-page-title-main">ARGOS (satellite)</span>

The Advanced Research and Global Observation Satellite (ARGOS) was launched on 23 February 1999 carrying nine payloads for research and development missions by nine separate researchers. The mission terminated on 31 July 2003.

<span class="mw-page-title-main">TacSat-4</span>

TacSat-4 is the third in a series of U.S. military experimental technology and communication satellites. The United States Naval Research Laboratory (NRL) is the program manager. The Office of Naval Research (ONR) sponsored the development of the payload and funded the first year of operations. The Office of the Director of Defense Research and Engineering (DDR&E) funded the standardized spacecraft bus and the Operationally Responsive Space Office (ORS) funded the launch that will be performed by the Air Force's Space and Missile Systems Center (SMC).

Orbcomm is a family of low Earth orbit communications satellites, operated by the United States satellite communications company Orbcomm. As of July 2014, 51 such satellites have orbited Earth, with 50 still continuing to do so.

Sierra Nevada Corporation (SNC) is an American, privately held aerospace and national security contractor specializing in aircraft modification and integration, space components and systems, and related technology products for cybersecurity and health. The company contracts with the United States Armed Forces, NASA, and private spaceflight companies. SNC is headquartered in Sparks, Nevada and has 33 locations in 19 U.S. states, the United Kingdom, Germany, and Turkey.

<span class="mw-page-title-main">Orbiting Vehicle</span> American satellite family

Orbiting Vehicle or OV, originally designated SATAR, comprised five disparate series of standardized American satellites operated by the US Air Force, launched between 1965 and 1971. Forty seven satellites were built, of which forty three were launched and thirty seven reached orbit. With the exception of the OV3 series and OV4-3, they were launched as secondary payloads, using excess space on other missions. This resulted in extremely low launch costs and short proposal-to-orbit times. Typically, OV satellites carried scientific and/or technological experiments, 184 being successfully orbited through the lifespan of the program.

<span class="mw-page-title-main">O/OREOS</span> NASA nanosatellite with 2 astrobiology experiments on board

The O/OREOS is an NASA automated CubeSat nanosatellite laboratory approximately the size of a loaf of bread that contains two separate astrobiology experiments on board. Developed by the Small Spacecraft Division at NASA Ames Research Center, the spacecraft was successfully launched as a secondary payload on STP-S26 led by the Space Test Program of the United States Air Force on a Minotaur IV launch vehicle from Kodiak Island, Alaska on 20 November 2010, at 01:25:00 UTC.

<span class="mw-page-title-main">FASTSAT</span>

Fast, Affordable, Science and Technology Satellite-Huntsville 01 or FASTSAT-Huntsville 01 of the NASA. FASTSAT-HSV 01 was flying on the STP-S26 mission - a joint activity between NASA and the U.S. Department of Defense Space Test Program, or DoD STP. FASTSAT and all of its six experiments flying on the STP-S26 multi-spacecraft/payload mission have been approved by the Department of Defense Space and Experiments Review Board (USA-220).

<span class="mw-page-title-main">SpaceX CRS-1</span> 2012 American resupply spaceflight to the ISS

SpaceX CRS-1, also known as SpX-1, was SpaceX's first operational cargo mission to the International Space Station, under their Commercial Resupply Services (CRS-1) contract with NASA. It was the third flight for the uncrewed Dragon cargo spacecraft, and the fourth overall flight for the company's two-stage Falcon 9 launch vehicle. The launch occurred on 8 October 2012 at 00:34:07 UTC.

The Rocket City Space Pioneers (RCSP) was one of 29 teams from 17 different countries officially registered and in the competition for the Google Lunar X PRIZE (GLXP) during 2010–2012.

The EELV Secondary Payload Adapter (ESPA) is an adapter for launching secondary payloads on orbital launch vehicles.

<span class="mw-page-title-main">Laser Communications Relay Demonstration</span> NASA payload launched in 2021

The Laser Communications Relay Demonstration (LCRD) is a NASA mission that will test laser communication in space for extremely long distances, between Earth and geosynchronous orbit.

<span class="mw-page-title-main">Secondary payload</span> Launch of small spacecraft together with larger one

Secondary payload, also known as rideshare payload, is a smaller-sized payload transported to orbit on a launch vehicle that is mostly paid for—and with the date and time of launch and the orbital trajectory determined—by the entity that contracts and pays for the primary launch. As a result, the secondary payload typically obtains a substantially reduced price for transportation services to orbit, by accepting a trade off of the loss of control once the contract is signed and the payload is delivered to the launch vehicle supplier for integration to the launch vehicle. These tradeoffs typically include having little or no control over the launch date/time, the final orbital parameters, or the ability to halt the launch and remove the payload should a payload failure occur during ground processing prior to launch, as the primary payload typically purchases all of these launch property rights via contract with the launch services provider.

SHERPA is a commercial satellite dispenser developed by Andrews Space, a subsidiary of Spaceflight Industries, and was unveiled in 2012. The maiden flight was on 3 December 2018 on a Falcon 9 Block 5 rocket, and it consisted of two separate unpropelled variants of the dispenser.

ArgoMoon is a CubeSat that will launch into a heliocentric orbit on Artemis 1, the maiden flight of the Space Launch System. The objective of the ArgoMoon spacecraft is to take detailed images of the Interim Cryogenic Propulsion Stage following Orion separation, an operation that will demonstrate the ability of a cubesat to conduct precise proximity maneuvers in deep space.

<span class="mw-page-title-main">Interstellar Mapping and Acceleration Probe</span> Planned NASA heliophysics mission

The Interstellar Mapping and Acceleration Probe(IMAP) is a heliophysics mission that will simultaneously investigate two important and coupled science topics in the heliosphere: the acceleration of energetic particles and interaction of the solar wind with the local interstellar medium. These science topics are coupled because particles accelerated in the inner heliosphere play crucial roles in the outer heliospheric interaction. In 2018, NASA selected a team led by David J. McComas of Princeton University to implement the mission, which is currently planned to launch in February 2025. IMAP will be a Sun-tracking spin-stabilized satellite in orbit about the Sun–Earth L1 Lagrange point with a science payload of ten instruments. IMAP will also continuously broadcast real-time in-situ data that can be used for space weather prediction.

<span class="mw-page-title-main">Cygnus NG-16</span> 2021 American resupply spaceflight to the ISS

Cygnus NG-16, previously known as Cygnus OA-16, was the sixteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its fifteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-2) contract with NASA. The mission was launched on 10 August 2021 at 22:01:05 UTC, for a (planned) 90-day mission at the ISS. This was the fifth launch of Cygnus under the CRS-2 contract.

References

  1. Peat, Chris (14 July 2021). "DSX". Heavens Above. Retrieved 19 July 2021.
  2. 1 2 3 4 Erwin, Sandra (19 July 2021). "Air Force satellite completes two-year experiment to study the medium Earth orbit environment". SpaceNews. Retrieved 19 July 2021.
  3. "Sierra Nevada Science Missions". Sierra Nevada Corporation. Archived from the original on 14 February 2015. Retrieved 14 February 2015.
  4. 1 2 "Display: DSX 2019-036F". NASA. 27 April 2021. Retrieved 20 July 2021.PD-icon.svg This article incorporates text from this source, which is in the public domain .
  5. "AFRL conducts 1,300 experiments on record-breaking satellite". AFRL. 19 July 2021. Retrieved 20 July 2021.PD-icon.svg This article incorporates text from this source, which is in the public domain .