Line 9 | |
---|---|
Overview | |
Other name(s) | R4 (planned name) Shensong line (Chinese :申松线) |
Native name | 上海地铁9号线 |
Status | Operational |
Owner | Shanghai Rail Transit Shensong Line Development Co., Ltd. |
Locale | Pudong; Huangpu, Xuhui, Minhang and Songjiang districts, Shanghai, China |
Termini | |
Stations | 35 |
Service | |
Type | Rapid transit |
System | Shanghai Metro |
Services | Mainline: Songjiang South Railway Station ↔ Caolu AM Peak: Sheshan ↔ Jinji Road Partial Mainline: Sheshan ↔ Middle Yanggao Road |
Operator(s) | Shanghai No. 1 Metro Operation Co. Ltd. |
Depot(s) | Jiuting Depot; Jinqiao parking lot Caolu parking lot (planned) |
Rolling stock | 104 Class A 6-car trains |
Daily ridership | 1.288 million (2019 peak) [1] |
History | |
Commenced | October 31, 2002 |
Opened | December 29, 2007 |
Last extension | December 30, 2017 |
Technical | |
Line length | 63.8 km (39.64 mi) |
Number of tracks | 2 |
Character | Underground(Jiuting to Caolu), and Elevated(Songjiang South Railway Station to Sijing) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts) |
Operating speed | 80 km/h (50 mph) Average speed: 39.1 km/h (24 mph) |
Signalling | Thales’ SelTracTM CBTC |
Line 9 is a southwest-northeast line of the Shanghai Metro network. The line runs from Shanghai Songjiang Railway Station in Songjiang District to Caolu in Pudong. The line is colored light blue on system maps.
In the initial planning of Line 9, the entire line was from Fengjing to Chongming Island. Later, the plan to extend to Fengjing was cancelled, and the section to Chongming Island was changed to Chongming line.
The first phase of Line 9, from Songjiang Xincheng to Guilin Road stations, opened on December 29, 2007. It uses the Bombardier Movia trains which were lended to line 1.
Line 9 did not directly connect to the rest of the Shanghai Metro network until the opening of the Line 9 portion of the Yishan Road station on December 28, 2008. [2] The station is an interchange between lines 3 and 4. A shuttle bus conveyed passengers between Guilin Road and Yishan Road stations until construction was completed.
In December 2009, the second phase of line 9 (from Yishan Road to Century Avenue) was completed, providing passengers with a direct link from Songjiang District in the west to Pudong in the east without having to transfer to other lines.
On April 7, 2010, the extension to Middle Yanggao Road Station was completed.
On December 30, 2012, the extension from Songjiang New City to Songjiang South Railway Station was opened.
On December 30, 2017, the line's east extension, consisting of 9 stations from Middle Yanggao Road to Caolu, entered operation. [3]
Shanghai Metro Line 9 opening history | ||||||
---|---|---|---|---|---|---|
Segment | Commencement | Opened | Length | Station(s) | Name | Investment |
Songjiang Xincheng — Guilin Road | 31 Oct 2002 | 29 Dec 2007 | 29.013 km (18.03 mi) | 12 | Phase 1 (initial section) | ¥19 billion |
Guilin Road — Yishan Road | 31 Oct 2002 | 28 Dec 2008 | 1.687 km (1.05 mi) | 1 | Phase 1 (final section) | |
Yishan Road — Century Avenue | 31 Aug 2005 | 31 Dec 2009 | 11.491 km (7.14 mi) | 9 | Phase 2 (initial section) | ¥8.94 billion |
Century Avenue — Middle Yanggao Road | 31 Aug 2005 | 7 Apr 2010 | 2.435 km (1.51 mi) | 1 | Phase 2 (final section) | |
Songjiang South — Songjiang Xincheng | 15 Oct 2009 | 30 Dec 2012 | 6.474 km (4.02 mi) | 3 | Phase 3 (southern section) | ¥2.8 billion |
Middle Yanggao Road — Caolu | 11 Aug 2011 | 30 Dec 2017 | 14.099 km (8.76 mi) | 9 | Phase 3 (eastern section) | ¥12.713 billion |
Shanghai Metro Line 9 service routes | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||
Routes | Station name | Connections | Distance | Location | Open- ing | Plat- form [4] | |||||
M | AM | P | English | Chinese | km | min | |||||
● | Shanghai Songjiang Railway Station [i] | 上海松江站 | IMH | 0.00 | 0 | Songjiang | 30 Dec 2012 [5] | Underground Island | |||
● | Zuibaichi Park | 醉白池 | SAH | 1.79 | 3 | ||||||
● | Songjiang Sports Center | 松江体育中心 | T1 | 1.73 | 3.53 | 6 | |||||
● | Songjiang Xincheng | 松江新城 | 1.58 | 5.15 | 9 | 29 Dec 2007 [6] | |||||
● | Songjiang University Town | 松江大学城 | T2 | 2.64 | 7.75 | 12 | Elevated Side | ||||
● | Dongjing | 洞泾 | 3.38 | 11.13 | 17 | ||||||
● | ● | ● | Sheshan | 佘山 | 2.20 | 13.34 | 20 | Elevated Island | |||
● | ● | ● | Sijing | 泗泾 | 3.86 | 17.21 | 24 | Elevated Side | |||
● | ● | ● | Jiuting | 九亭 | 6.24 | 23.45 | 31 | Underground Island | |||
● | ● | ● | Zhongchun Road | 中春路 | 2.26 | 25.72 | 34 | Minhang | Underground Side & Island | ||
● | ● | ● | Qibao | 七宝 | 1.30 | 27.02 | 37 | Underground Island | |||
● | ● | ● | Xingzhong Road | 星中路 | 1.88 | 28.90 | 40 | ||||
● | ● | ● | Hechuan Road | 合川路 | 1.85 | 30.76 | 43 | ||||
● | ● | ● | Caohejing Hi-Tech Park | 漕河泾开发区 | 1.33 | 32.09 | 45 | Xuhui | |||
● | ● | ● | Guilin Road | 桂林路 | 15 | 2.03 | 34.12 | 48 | Underground Side & Island | ||
● | ● | ● | Yishan Road | 宜山路 | 3 4 | 1.68 | 35.81 | 51 | 28 Dec 2008 [7] | Underground Island | |
● | ● | ● | Xujiahui | 徐家汇 | 1 11 | 1.50 | 37.32 | 53 | 31 Dec 2009 [8] | ||
● | ● | ● | Zhaojiabang Road | 肇嘉浜路 | 7 | 1.38 | 38.70 | 56 | |||
● | ● | ● | Jiashan Road | 嘉善路 | 12 | 1.06 | 39.77 | 58 | |||
● | ● | ● | Dapuqiao | 打浦桥 | 0.87 | 40.64 | 60 | Huangpu | |||
● | ● | ● | Madang Road | 马当路 | 13 | 0.84 | 41.48 | 62 | Underground Side | ||
● | ● | ● | Lujiabang Road | 陆家浜路 | 8 | 0.94 | 42.43 | 64 | Underground Island | ||
● | ● | ● | Xiaonanmen | 小南门 | 1.47 | 43.90 | 66 | ||||
● | ● | ● | Shangcheng Road | 商城路 | 2.39 | 46.30 | 70 | Pudong | |||
● | ● | ● | Century Avenue | 世纪大道 | 2 4 6 | 0.97 | 47.28 | 72 | |||
● | ● | ● | Middle Yanggao Road | 杨高中路 | 18 | 2.43 | 49.72 | 75 | 7 April 2010 [9] | ||
● | ● | Fangdian Road | 芳甸路 | 1.06 | 50.78 | 77 | 30 Dec 2017 [10] | ||||
● | ● | Lantian Road | 蓝天路 | 14 | 2.12 | 52.90 | 80 | ||||
● | ● | Taierzhuang Road | 台儿庄路 | 2.30 | 55.21 | 84 | |||||
● | ● | Jinqiao | 金桥 | 1.54 | 56.75 | 86 | |||||
● | ● | Jinji Road | 金吉路 | 1.69 | 58.45 | 89 | |||||
● | Jinhai Road | 金海路 | 12 | 1.02 | 59.47 | 91 | |||||
● | Gutang Road | 顾唐路 | 1.71 | 61.19 | 93 | ||||||
● | Minlei Road | 民雷路 | 1.12 | 62.31 | 96 | ||||||
● | Caolu | 曹路 | 1.50 | 63.82 | 98 | ||||||
In the early hours of November 7, 2010, at around 1:50 AM, a pressurization incident occurred at Shanghai Jianhua Concrete Pile Co., Ltd., located at 2033 Husong Road. During the pressurization process, a component of the No. 1 autoclave in Workshop A suddenly broke loose. The part crashed through the outer wall and struck the southern pillar of the No. 51 bridge on Metro Line 9. Fortunately, the incident occurred during non-operational hours. However, train services between Jiuting station and Songjiang New Town station had to be temporarily suspended, and trains were limited to a speed of 10 km/h.
On February 23, 2024, at 6:25 AM, operations on the section of Line 9 between Songjiang South Station and Jiuting Station were suspended due to ice accumulation on the overhead contact line. A bus bridging plan was activated, and by 9:37 AM, normal operations resumed. This was the first time that such an issue had occurred on the Shanghai Metro.
On the morning of June 19, 2024, at 8:28 AM, an indiscriminate stabbing incident happened at the Hechuan Road Station on Shanghai Metro Line 9, near the station’s exit. The incident occurred during the busy rush hour, when the station was crowded with commuters going about their daily routines. The attacker, seemingly acting without any clear motive, began randomly attacking innocent passengers with a knife, causing chaos among the people in the vicinity. Three people were injured, and the attacker was apprehended by the police. Following the incident, Hechuan Road Station was temporarily closed to allow authorities to manage the situation, and normal operations resumed at 9:16 AM. In the aftermath, the security system of the Shanghai Metro was widely questioned. Some critics expressed concerns, arguing that the existing security measures may not be capable of preventing such a violent act. They pointed out that with millions of passengers using the metro daily, maintaining robust security should be the top priority to safeguard public safety.
On the other hand, others have acknowledged the challenges faced by the metro system in Shanghai, particularly during peak hours. They pointed out that while security is crucial, the sheer volume of commuters makes it difficult to implement thorough checks without causing significant delays. The Shanghai Metro is one of the busiest transit systems in the world, and balancing passenger safety with the need for efficiency is a complex issue. Stringent security measures could slow down operations, particularly during rush hour when the metro is operating at full capacity. This debate highlights the ongoing challenge for large urban transit systems like Shanghai’s Metro.
The east section is planned to extend one station to Caolu Railway station. [11]
Shanghai Metro Line 9 headway [12] | ||||||
---|---|---|---|---|---|---|
Time | Songjiang South Railway Station - Sheshan | Sheshan - Middle Yanggao Road (PM peak) / Jinji Road (AM peak) | Middle Yanggao Road (PM peak) / Jinji Road (AM peak) - Caolu | |||
Monday - Friday (Working Days) | ||||||
AM peak | 7:30–9:00 | Eastbound: [ii] Average 3 min 50 sec Westbound: [iii] About 5 min | Eastbound: [iv] Average 1 min and 50 sec Westbound: [v] About 2 min and 30 sec | Eastbound: [vi] About 5 min and 30 sec Westbound: [vii] About 5 min | ||
Off-peak | 9:00–17:00 | About 5 min and 30 sec | ||||
PM peak | 17:00–19:30 | Eastbound: [ii] About 5 min Westbound: [iii] About 4 min and 30 sec | Eastbound: [viii] About 3 min Westbound: [v] About 2 min and 30 sec | Both directions: [ix] About 5 min | ||
Other hours |
| About 8 - 10 min | ||||
Saturday and Sunday (Weekends) | ||||||
Peak | 8:00–20:00 | About 5 min | ||||
Other hours |
| About 6 - 10 min | ||||
Extended operation (Friday and Saturday) [x] | ||||||
After 22:55 | 15 - 20 minutes | |||||
| ||||||
Shanghai Metro Line 9 rolling stock | ||||||||
---|---|---|---|---|---|---|---|---|
Fleet numbers | Manufacturer | Time of manufac- turing | Class | No of car | Assembly [i] | Rolling stock | Number | Notes |
60 | Bombardier Movia 456 | 2004–2005 | A [ii] | 6 | Tc+Mp+M+M+Mp+Tc | 09A01 | 0901-0910 (090011-090601) | Seconded from line 1. Original name: AC04.; former number 011751-012341. |
246 | Bombardier Movia 456 | 2008–2010 | A [ii] | 6 | Tc+Mp+M+M+Mp+Tc | 09A02 | 0911-0951 (090611-093061) | 5 trains (numbers 0942–0945, 0948) used on the Expo line (trainset number 1301-1305) for the World Expo in 2010, returned to line 9 afterwards. Original name: AC09. Same as 07A01 and 12A01 (but different painting). |
216 | Bombardier Movia 456 | 2016–2018 | A [ii] | 6 | Tc+Mp+M+M+Mp+Tc | 09A03 | 0953-0988 (093131-095281) | Same as 07A02 (but different painting). |
102 | CNR Changchun Railway Vehicles Co., Ltd. | 2018–2020 | A [ii] | 6 | Tc+Mp+M+M+Mp+Tc | 09A04 | 09089-09105 (095291-096301) | |
Shanghai Metro Line 9 former rolling stock | ||||||||
---|---|---|---|---|---|---|---|---|
Fleet numbers | Manufacturer | Time of manufac- turing | Class | No of car | Assembly | Rolling stock | Number | Notes |
6 | Shanghai Electric | 2007 | A | 6 | Tc+Mp+M+M+Mp+Tc | 09ASY | 0952 (093071-093121) | On 20 December 2011, it was reassigned to be a special training vehicle. |
One train (0952) manufactured in 2007 was mainly debugged for experimental purposes. It began trial operation with passengers on April 25, 2009, and will no longer be operational in 2010. On December 20, 2011, the vehicle was retired from line 9 and became a special training vehicle. It was transferred to the original Zhangjiang Hi-Tech Park of line 2 to the newly built Longyang Road training line for subway staff training.
Line 2 is an east–west line in the Shanghai Metro network. With a length of nearly 64 km (40 mi), it is the second longest line in the metro system after line 11. Line 2 runs from National Exhibition and Convention Center in the west to Pudong Airport Terminal 1&2 in the east, passing Hongqiao Airport, the Huangpu river, and the Lujiazui Financial District in Pudong. With a daily ridership of over 1.9 million, it is the busiest line on the Shanghai Metro. The eastern portion of the line, Guanglan Road - Pudong International Airport section, was operated as an independent service route until April 19, 2019, when through service began. The line is colored light green on system maps.
Line 4 is a loop line of the Shanghai Metro network. The older rolling stock 04A01 carry a bright purple colour belt to differentiate them from Line 3 trains which share a portion of its route, while the newer 04A02 stock features a yellow and purple livery, which the exact line is labelled using sticker or screens saying "Line 3" or "Line 4". To determine the direction of travel, the line that travels counter-clockwise is called the Outer Loop (外环), while the other line is known as the Inner Loop (内环). Although it is a loop line, trains returning to the depot use Yishan Road as a terminal to let all passengers disembark. The first segment of the line between Damuqiao Road and Lancun Road opened on December 31, 2005. The remainder of the line opened on December 29, 2007. The line is colored purple on system maps.
Line 6 is an eastern north–south line of the Shanghai Metro network. It opened on December 29, 2007. The entire line is located in the Pudong New Area. A complete trip between the two end terminals, Gangcheng Road and Oriental Sports Center takes approximately 1 hour and 10 minutes. Line 6 has been dubbed the unofficial nickname “Hello Kitty Line” due to its lurid pink livery. The line is colored magenta on system maps.
Guilin Road is an interchange station between Line 9 and Line 15 of the Shanghai Metro.
Middle Yanggao Road is a station on Line 9 of the Shanghai Metro. It is located at the intersection of Middle Yanggao Road and Minsheng Road in the city's Pudong New Area. It served as the eastern terminus of the line from its opening on 7 April 2010, until 30 December 2017, when an eastern extension of Line 9 opened, extending the line further east to Caolu.
Hongqiao Railway Station is a Shanghai Metro station located within the Shanghai Hongqiao railway station complex in the city's Minhang District. As part of a major transportation hub, it serves as an interchange between Lines 2, 10, and 17. It additionally serves as the western terminus the mainline service of Line 10, as well as the eastern terminus of Line 17. The station first opened as a Line 2 station on 1 July 2010, with Line 10 operations commencing on 30 November 2010. More than seven years later, Line 17 service was introduced with the opening of that line on 30 December 2017. With three island platforms totaling six platforms, the station is one of the largest in the system and features a cross-platform interchange between Lines 2 and 17.
Line 7 is a northwest–southeast line of the Shanghai Metro network. It connects the Baoshan District of Shanghai with the downtown core as well as the Pudong New Area and the Expo 2010 site. It currently runs from Meilan Lake in Baoshan District to Huamu Road in Pudong, which is near Shanghai New International Expo Center. Qihua Road serves as a terminus for trains returning to Chentai Road depot. The line is colored orange on system maps.
Line 10 is a southwest–northeast line of the Shanghai Metro network that opened for service on April 10, 2010. The line runs from Jilong Road to Hongqiao Railway Station, with a branch line from Longxi Road to Hangzhong Road. It has been given the unofficial nickname “Golden Line” as it links many of the city's tourist attractions like Yuyuan and Xintiandi. It connects the Hongqiao International Airport with the downtown core of Shanghai, and also the dense residential districts of Yangpu and Hongkou. It is the only line in the system with numbered station codes. It is the first high-density and high-volume fully automatic subway line in mainland China, operating with GoA4 unattended train operation. The line is colored lilac on system maps.
Line 11 is a northwest–southeast line of the Shanghai Metro network. Since October 2013, Line 11 serves Kunshan city, making it is the second intercity metro in China after the Guangfo Metro and the first that crosses a provincial boundary. With a single-line mileage of 82.386 kilometres (51.192 mi), it is the third-longest single-line subway line in China, after Line 6 in Chongqing, which is 85.6 km (53.2 mi) long and Line 7 in Wuhan with a length of 83.6 km (51.9 mi). The line is colored brown on system maps.
Line 15 of the Shanghai Metro is a north-south metro line in the city of Shanghai that opened on 23 January 2021. The line begins at Gucun Park in Baoshan District at its northern end, and terminates at Zizhu Hi-tech Park in Minhang District at its southern end, via Shanghai West Railway Station and Shanghai South Railway Station. It will be 42.3 kilometres (26.3 mi) in length and have 30 stations. The line is one of Shanghai Metro's new batch of high capacity fully automated and driverless lines along with Lines 14 and 18. The line is colored ivory on system maps.
Line 17 of the Shanghai Metro, formerly known as the Qingpu line, is an east-west rapid transit line that runs between Hongqiao Railway Station in Minhang District and Xicen in Qingpu District. All stations are fully accessible. It is 41.6 kilometres (25.8 mi) in length with 14 stations. The line entered passenger trial operations on 30 December 2017.
Line 16 is a rapid transit line serving the south-eastern suburban areas of Shanghai. The line was formerly known as the Lingang line. It was originally designated as Line 21 and was planned as the south part of line 11. The line runs entirely in Pudong New Area, starting from Longyang Road, via Shanghai Wild Animal Park, Huinan Town, ending at Dishui Lake in Nanhui New City. The line is 59 km (37 mi) long and has 13 stations of which three are underground and the rest elevated. Construction begun in early 2009, and the line opened on 29 December 2013. The second phase was completed at the end of 2014.
Jinhai Road is a Shanghai Metro station in the Pudong New Area of Shanghai. Located at the intersection of Jinhai Road and Jinsui Road, it serves as an interchange station between Lines 9 and 12 and the current eastern terminus of Line 12.
The Pujiang line of Shanghai Metro is an automated, driverless, rubber-tired Shanghai Metro line in the town of Pujiang in the Shanghainese district of Minhang. It was originally conceived as phase 3 of Shanghai Metro line 8, but afterwards was constructed as a separate line, connecting with line 8 at its southern terminus, Shendu Highway. The line opened for passenger trial operations on March 31, 2018. It is the first automated, driverless people mover line in the Shanghai Metro, and has 6 stations with a total length of 6.689 kilometres (4.156 mi). The people mover was expected to carry 73,000 passengers a day. The line is colored gray on system maps.
Caoying Road is a station on Line 17 of the Shanghai Metro. The station is located at the intersection of Yinggang Road at Caoying Road in the city's Qingpu District, between Qingpu Xincheng and Dianshanhu Avenue. It opened with the rest of Line 17 on 30 December 2017.
Shanghai Songjiang Railway Station is a metro station on Line 9 of the Shanghai Metro, and also serves as the line's southern terminus. It began operation on 30 December 2012. It is adjacent to Shanghai Songjiang railway station. Formerly Songjiang South Railway Station, it was renamed to the current name in September 2024.
Jinghong Road, formerly West Huajing is a metro station on the Line 15 of the Shanghai Metro. Located along an unbuilt section of Jinghong Road near its intersection with an unbuilt section of Huaji Road and straddling the boundary between Minhang and Xuhui districts in the city of Shanghai, the station was scheduled to open with the rest of Line 15 in 2020. However, the station eventually opened on 23 January 2021 following a one-month postponement. Half-Trains terminated here and trains would have to switch tracks to return to northbound track towards Gucun Park, until the south terminal station of short-route trains was extended to Shuangbai Road station.
Shanghai Rail Transit includes all rail transit lines operating in Shanghai, mainly composed of High-volume railway system, Low-to-medium-volume railway system and Maglev system. The system was established on May 28, 1993, when Shanghai Metro Line 1 opened.
This article lists the openings of lines, line segments, stations and fare schemes of the Shanghai Metro, a rapid transit system serving Shanghai, China, and one of the fastest-growing metro systems in the world. The first section opened in 1993, and the system currently has 802 kilometres (498 mi) of track in operation, making it one of the world's largest rapid transit systems by route length and second largest by number of stations.