Andheri railway station

Last updated

Indian Railways Suburban Railway Logo.svg
Andheri
Mumbai Suburban Railway station
Andheri East.jpg
Andheri Station from the East
General information
Coordinates 19°07′09″N72°50′49″E / 19.119167°N 72.846944°E / 19.119167; 72.846944
Owned by Ministry of Railways, Indian Railways
Line(s)
Platforms9
Tracks9
Connections
Construction
Structure typeStandard on-ground station
AccessibleYes [1]
Other information
StatusActive
Station codeA (Western Line)
AD (Harbour Line)
ADH (Indian Railways)
Fare zone Western Railways
History
Rebuilt2015
ElectrifiedYes [2]
Previous namesSalsette–Trombay railway station
Passengers
2016–17Increase2.svg 99.6 million [3]
Rank1st on Western Line
Services
Preceding station Mumbai Suburban Railway Following station
Vile Parle
towards Churchgate
Western line Jogeshwari
towards Dahanu Road
Vile Parle Harbour line
Jogeshwari
towards Goregaon
Out-of-system interchange
Preceding station Logo of Mumbai Metro Line 1.svg Mumbai Metro One Following station
Azad Nagar
towards Versova
Line 1
transfer at Andheri
Western Express Highway
towards Ghatkopar
Location
Mumbai area locator map.svg
Red pog.svg
Andheri
Location within Mumbai
India location map.svg
Red pog.svg
Andheri
Andheri (India)

Andheri (station code: A (Western)/AD (Harbour)/ADH (Indian Railways)) is a passenger rail station located in the Andheri suburb of Mumbai, India. It serves the Western line and Harbour lines of the Mumbai Suburban Railway. It is also a stop for some express trains and August Kranti Rajdhani Express. The station also inter-connects Line 1 of the Andheri metro station. [4] Andheri station first gained prominence after the development of Salsette–Trombay Railway services in 1928. [5]

Contents

With a pre-eminent number of passengers boarding daily, it has been termed "one of the busiest stations" in Mumbai surpassing Ghatkopar station on the Central line. [6] In 2014, the station, along with Jogeshwari and Goregaon stations, was re-developed and expanded with the expenditure of 103 crore (US$12 million). [7] In addition, the station has two bus stations operating more than 30 bus routes. [8]

History

A station by the name of "Andaru" existed on the first regular suburban service of the BB&CI Railway (precursor to Western Railway), when the service started between Bombay Backbay and Viraur on 12th April 1867. [9] By the year 1900, there were three Andheri locals plying from the terminus at Colaba each day. [10]

The suburban section of BB&CI Railway was electrified, and was opened from Colaba to Borivali on 5th January 1928. Governor of Bombay Sir Leslie Wilson travelled on board the first electric local from Mahalaxmi (where the ceremony was held), up to Andheri station. [11]

The through lines between Bandra and Andheri were electrified by 15th April 1953. Through lines between Andheri and Borivali were electrified in the coming years as well. In April 1955, a cantilever type covering was provided along the entirety of the 580 foot island platform of the station, costing Rs. 80,000. The station was also painted and the footover bridge was provided a covering. On Mahashivratri day in 1955, around 1 lakh pilgrims were present for visiting temples. The railways ran extra locals, and certain trains halting at Andheri were extended till Borivali. [12]

A new goods shed and platform was opened on 14th April 1957, built at a cost of Rs 75,000. The platform was intended to allow quicker loading-unloading operations, and the shed was to provide greater storage space. This was especially for cattle fodder, which had considerable traffic. Around the same period, an overbridge was provided at Andheri to stop accidents at the level crossing. [13]

Salsette–Trombay railway service

In January 1928, Andheri was connected to Trombay by the Great Indian Peninsular Railway under the Bombay Improvement Trust as Salsette–Trombay Railway line with the objective of opening up a railway line running West to South-east and linking up Andheri and Kurla station. [14] [5] [15] However, in 1934 the line had shut down due to the development of Santacruz Airport. [16]

Proposed expansion and re-development

The Harbour line of the Andheri station towards Chhatrapati Shivaji Terminus and Panvel serves a total number of 55 trains per day, with 46 running to Chhatrapati Shivaji Maharaj Terminus and 9 towards Panvel. [17] The extension between Andheri and Goregaon of the Harbour Line was completed and had started to operate in 2018. [18]

The station was renovated in early 2015 with the establishment of automated escalators and new Automated Ticket Vending Machines (ATVM) for the ease of booking tickets to the daily passengers. [19] [20] [21] According to the statistics of April 2014 to January 2015, the number of passengers using vending machines was 6,933, whereas in April 2015 to January 2016 it had 18,316 passengers. [22] Due to the increasing number of passengers travelling on the rooftop of the train coaches, Commissioner of Railway Safety (CRS) electrified the train coaches rooftops containing 25,000 volts. [2] [23]

The station has nine platforms, with platform number 1 and 2 serving the Harbour line. Further, the Harbour lines now serves a 12-coach train services. [24] In 2012, it was proposed by the Mumbai Railway Vikas Corporation that the Harbour line trains may get an extension of 12-coaches for the ease of passengers boarding daily from the Western lines. [24] However the MRVC announced that extension of some stations has been completed and the services may start from 2016. [25]

In February 2016, it was reported that the main road of the eastern zone of the station will be re-constructed in according for development of a long delayed elevated auto-rickshaw terminal. The Bombay High Court had ordered to evict the stalls blocking the road. Counsel Anil Sakhare had stated to the court that the stall vendors blocked the construction and infrastructure development and most of the vendors opposed the eviction notice given to them. [26] The work was originally started in 2011 and was to complete in December 2013 but as the corporation was unable to evict the stalls, the work was kept on hold. However, the Brihanmumbai Municipal Corporation had removed the stalls from the road and the construction for the terminal had been started. [27] It has a two-lane terminal measuring the height of 60 metres (200 ft) and a width of 34 metres (112 ft) which connects the Andheri-Kurla road. [28] Under the second phase of MUTP, three escalators and 2 lifts will be installed. [29]

Platforms

Platform NumberTowards
1,2Harbour line for slow trains heading towards Chhatrapati Shivaji Terminus/Panvel/Goregaon
3Slow service terminating at Borivali, Virar
4Slow services terminating at Andheri (i.e trains from Churchgate-Andheri, or Virar railway station-Andheri) and returning to these destinations
5Slow services towards Churchgate
6Fast services towards Virar (and in some extremely rare cases, Dahanu Road), long distance trains from Mumbai Central railway station.
7Fast services towards Churchgate, long distance trains towards Mumbai Central railway station
8Fast services to Virar and Dahanu road, long distance trains from Bandra Terminus
9Mostly long distance trains to Bandra Terminus, local trains may arrive here in peak hours.

Traffic

Andheri is the busiest station on the Western Railway network. Over 99.6 million passengers' journeys originated at the station during the 2016–17 fiscal year. During the same period, the station sold 2.41 crore (US$290,000) worth of tickets (or 9% of all tickets sold on the Western Line) and 890,000 season passes, earning WR a total revenue of 59.50 crore (US$7.0 million). An average of 66,152 tickets and 2,441 season passes were sold at the station daily, and an average of 256,561 passengers began their journeys at Andheri per day contributing 1,632,994 (US$19,000) of average daily revenue. [3]

Station layout

The interior of Andheri station terminal Andher terminus interior.jpg
The interior of Andheri station terminal
StationsStations between platforms
Platforms
(HR)/(WR)
Direction (Harbour line)Harbour line towards Chhatrapati Shivaji Terminus or Panvel
Side platform, directions on the left
Direction (Western line)Western line towards Churchgate
Platforms
(WR)
Direction (Western line)Western line towards Dahanu
Side platform, directions on the right

The station consists of a 100 metres (330 ft)-long auto-rickshaw terminal at the eastern zone of Andheri. It has been built between the northern and middle foot-over bridges of the station and its connected to the northern bridge and continues down a road to the MV Road. In addition, the auto-rickshaw services are used for the passengers crossing through the Nityanand Road from the northern bridge to get down the road at the eastern bridge of the station. However, the designed structure was used for commuters serving as the only foot overbridge for the metro station as the terminal was kept unused. [30]

Transport

Metro–Local connection

In February 2014, It was proposed by the Mumbai Metropolitan Region Development Authority to integrate the Andheri metro station with the suburban station with the development of the skywalk and the same was proposed for the Ghatkopar metro station. [31]

After the establishment of Mumbai Metro services In June 2014, a skywalk of 12 metres (39 ft) has been developed by the MMRDA for the passengers traveling from local station to the metro station. [32] [33] The skywalk has been built opposite to the auto-rickshaw terminal of the station with an expenditure of 6.04 crore (US$710,000). [34]

Bus connections

The Oshiwara depot serves as a major hub and transfer point for Andheri bus routes serving the western area. All routes pull into the station's busway off Yari Road bus station, though some can be caught at Goregaon via the station's bus depot entrance as well. The eastern area is connected by buses between Agarkar Chowk Depot and Majas Depot, Ghatkopar Depot, Kurla Depot and Mulund Depot. But due to the increment of the Mumbai Metro service fare rates, the Ghatkopar-Andheri bus services proved to be a beneficial deal for the passengers. [35]


References

  1. Shwetaa Rahul (9 October 2009). "WESTERN RAILWAY PROVIDES 115 WHEELCHAIRS". Daily News and Analysis . Retrieved 20 January 2016.
  2. 1 2 "WR has 25,000 volts under its wings". Mid-Day. 6 February 2012. Retrieved 16 January 2016.
  3. 1 2 "Andheri remains WR's busiest station, accounts for 9% of tickets sold | Latest News & Updates at Daily News & Analysis". DNA. 8 April 2017. Retrieved 9 April 2017.
  4. "Mumbai's first metro may chug in March 2013". DNA India . 6 May 2012. Retrieved 12 June 2012.
  5. 1 2 "History Of Andheri". NF Desk. Nearfox. 9 December 2014. Archived from the original on 25 February 2016. Retrieved 5 March 2016.
  6. Richa Pinto and Manthan K Mehta (10 June 2014). "Andheri station zone is busiest transit point". Times of India . Retrieved 13 February 2016.
  7. Mehta, Manthan K (4 December 2011). "3 stations set for a 103-crore makeover". Times of India . Retrieved 3 September 2014.
  8. Naresh Kamath & Laxman Singh (25 November 2015). "Unclog Mumbai: Andheri station at breaking point". Hindustan Times . Retrieved 16 January 2016.
  9. "The Bombay Local and Suburban Train Service - BB&CI Annual, Dec 1923" (PDF). wr.indianrailways.gov.in.
  10. Rahul Mehrotra, Sharada Dwivedi (2000). Anchoring A City Line. Eminence Designs Pvt. Ltd. p. 83. ISBN   81-900602-4-4.
  11. Rahul Mehrotra, Sharada Dwivedi (2000). Anchoring A City Line. Eminence Designs Pvt. Ltd. pp. 106, 107. ISBN   81-900602-4-4.
  12. Rahul Mehrotra, Sharada Dwivedi (2000). Anchoring A City Line. Eminence Designs Pvt. Ltd. pp. 124–126. ISBN   81-900602-4-4.
  13. Rahul Mehrotra, Sharada Dwivedi (2000). Anchoring A City Line. Eminence Designs Pvt. Ltd. pp. 132, 134. ISBN   81-900602-4-4.
  14. Aklekar, Rajendra (2014). Halt Station India : The Dramatic Tale of the Nation's First Rail Lines. Rupa Publications. p. 188. ISBN   978-81-291-3497-4.
  15. "Report of the Bombay Development Committee". Government of Bombay, 1914. Retrieved 20 March 2012.
  16. "Railway Gauges in India". IRFCA. Retrieved 20 March 2012.
  17. Rajendra B Aklekar (21 September 2014). "WORK TO START IN JAN TO EXTEND CST'S HARBOUR PLATFORMS FOR 12 CARS". Mumbai Mirror . Retrieved 16 January 2016.
  18. "Mumbai: All harbour-WR trains set to run till Goregaon". www.mid-day.com. 17 November 2021. Retrieved 21 November 2021.
  19. "Highest number of mobile tickets booked in Andheri". Hindustan Times . 10 July 2015. Retrieved 21 January 2016.
  20. Shashank Rao (10 January 2015). "Rs 2,000-crore makeover for 20 Mumbai railway stations". Mid-Day . Retrieved 16 January 2016.
  21. "Mumbai railway stations set for redevelopment". The Indian Express . Express News Service. 18 July 2015. Retrieved 16 January 2016.
  22. Shashank Rao. "Mumbai: Andheri 'smartest' station on Western Railway". Mid-Day . Retrieved 10 March 2016.
  23. Mid Day (30 January 2012). "Mumbai: 25,000 volts to 'shock' rooftop travellers". CNN-IBN . Retrieved 18 January 2016.
  24. 1 2 Manthan Mehta (28 January 2012). "All Harbour line trains to get 12 coaches". The Times of India . Retrieved 18 January 2016.
  25. Aroosa Ahmad (22 January 2015). "Don't expect 12-coach trains on Harbour line before 2016". Afternoon . Retrieved 18 January 2016.
  26. Mustafa Plumber (7 February 2016). "Andheri station may soon get elevated auto deck". DNA India . Retrieved 12 February 2016.
  27. Geeta Desai (10 February 2016). "Finally, BMC removes stalls outside Andheri (E) station to make way for auto ramp". DNA India . Retrieved 12 February 2016.
  28. Binoo Nair (13 February 2016). "Demolition outside Andheri station gets BMC thumbs-up from commuters". DNA India . Retrieved 15 February 2016.
  29. "MUTP-I officially ends". Free Press Journal. 31 March 2016. Retrieved 16 April 2016.
  30. Shashank Rao (11 July 2015). "Mumbai: Hawkers look to take over Rs 8-crore Andheri auto deck". Mid-Day . Retrieved 18 January 2016.
  31. "Mumbai Metro-local integration awaits nod". DNA India . 5 February 2014. Retrieved 12 February 2016.
  32. Priyal Dave and Mansi Phadke (20 May 2014). "MMRDA, Railways work together to close gap between railway, Metro stations at Andheri & Ghatkopar". The Indian Express . Retrieved 16 January 2016.
  33. Saurabh Gupta (7 June 2014). "Mumbai Metro to be Thrown Open to the Public Tomorrow". NDTV . Retrieved 12 February 2016.
  34. Rajendra B. Aklekar (3 August 2015). "SKYWALK TO LINK ANDHERI RAILWAY, METRO STATIONS". Mumbai Mirror . Retrieved 13 February 2016.
  35. Mewati Sitaram (18 January 2015). "BEST route sees surge in commuters after Metro hikes fare". Daily News and Analysis . Retrieved 18 January 2016.