Barry Tourist Railway

Last updated

Barry Tourist Railway (formerly Barry Island Railway)
DMU Lab 19 Iris II, Barry Tourist Railway 3.6.2012 009 (10196706745).jpg
Barry Tourist Railway
LocaleBarry, Vale of Glamorgan, South Wales
Terminus Barry Island Railway Station
Commercial operations
NameBarry Island Branch
Built by Barry Railway Company
Original gauge4 ft 8+12 in (1,435 mm) standard gauge
Preserved operations
Operated by1997–2008 – Vale of Glamorgan Railway Company
2009–present – Cambrian Transport
Stations5
Length2.4 kilometres (1.5 mi) + 0.8 kilometres (0.50 mi) branch
Preserved gauge4 ft 8+12 in (1,435 mm) standard gauge
Commercial history
Opened1885
ClosedPier station 5 July 1976
Preservation history
1994Vale of Glamorgan Railway Company (VGR) formed
1996Butetown Historic Railway Society officially becomes the VGR
June 1997New base opened at Plymouth Road
April 1998First operations commenced
2002First operations across the Causeway
2005New high level line to Woodham Halt opened
Sep 2005Marketing name changed to Barry Island Railway
Aug 2007Extension to Gladstone Bridge complete
Mar 2008First passenger train to Gladstone Bridge
Nov 2008VoGC ceases VoGRC lease, chooses new operator (Cambrian Transport) by sealed bid process
Jan 2009December 2009 Cambrian Transport lease starts
August 2015Railway Gets 1st Owned Operational Steam Locomotive, Susan
2022Railway Ceases Operating Trains and Transport for Wales takes over land
Website
barrytouristrailway.co.uk OOjs UI icon edit-ltr-progressive.svg
GWR steam rail motor at Barry Tourist Railway GWR Steam Railmotor 93 at Barry Tourist Railway.jpg
GWR steam rail motor at Barry Tourist Railway
Barry Tourist Railway
BSicon CONTg@Gq-.svg
BSicon vSTR+l.svg
BSicon d-STR2+r.svg
BSicon dvSTRq.svg
BSicon lBHF-.svg
BSicon STRc3.svg
BSicon dvSTRq.svg
BSicon kvSTR2+r.svg
BSicon kvSTRc3.svg
Barry National Rail logo.svg
(
149 yd
136 m
) Barry Island Viaduct
BSicon vBRUCKE1.svg
BSicon dSTRc1.svg
BSicon STR+4.svg
BSicon lv-DST@G.svg
BSicon STRc4 white.svg
BSicon kvSTR-c1.svg
BSicon dSTR2+4-.svg
BSicon dSHI2+r.svg
BSicon kvSTR+4.svg
Barry Shed
Paget Road Bridge
BSicon vBRUCKE1.svg
BSicon KHSTe.svg
BSicon vUSTl.svg
BSicon dSTR.svg
Waterfront
National Rail logo.svg Barry Island
BSicon vKBHFxe-BHF.svg
BSicon dSTR.svg
BSicon vUSTxr.svg
connection to
Network Rail
BSicon evUSTxr.svg
BSicon dKBSTe.svg
BSicon vHST-STR.svg
Woodham Halt
Plymouth Road
BSicon vexSTR-HST.svg
BSicon vKHSTxe-STR.svg
Gladstone Bridge
Plymouth Road Shed
BSicon evSTR.svg
BSicon dKDSTa.svg
BSicon evSTR.svg
possible extension
possible extension
BSicon exdSTR.svg
BSicon SPLe.svg
BSicon vexKBHFe-BHF.svg
Barry Docks National Rail logo.svg
(
180 yd
165 m
) Barry Island Tunnel
BSicon exdTUNNEL1.svg
BSicon lENDE@G.svg
BSicon lCONTf2.svg
BSicon dSTR2.svg
Barry Pier
BSicon exdKBHFe.svg
BSicon numN090.svg

The Barry Tourist Railway (formerly the Barry Island Railway) is a railway developed to attract visitors to Barry in the Vale of Glamorgan, South Wales. It is a key element of the Barry Rail Centre which also includes engineering and training facilities.

Contents

An unusual aspect of the railway is that for several hundred yards across the Causeway from Barry to Barry Island, the trackbed used is directly alongside the Network Rail track which uses the original up line, with the Barry Tourist Railway using the down line. This continues from Barry to cross the Causeway and 149-yard (136 m) Barry Island viaduct after which the two lines diverge into separate platforms at Barry Island. The Railway does not consider itself a line but more of a network as it has two different routes. This is demonstrated in the map below, with Network Rail shown in red.

In November 2008, the landowner the Vale of Glamorgan Council, undertook a commercial tender exercise, which terminated the lease of previous operator the Vale of Glamorgan Railway in favour of a private operator, Cambrian Transport, under a 20-year-long lease. [1] Operations commenced in December 2009 and a full year's programme of services operated during 2010. Details are shown on the Council website. [2] Services have been operated by IRIS II DMU (Class 101 twin-set), Class 26 No. 26 038, Class 73s 73 118 & 73 133 with a former Gatwick Express coaching stock set in push-pull mode, Class 20 20 228, Class 08 08 503, 0-6-0 Pannier Tank locomotive No. 9466, Great Western Steam Rail Motor No.93, Metropolitan Tank No.1, Hunslet 0-6-0T Jessie and an 8F tender loco.

History

In 1979, the Butetown Historic Railway Society was formed in Cardiff, running a service along a short section of line from Cardiff Bute Road railway station northwards towards Queen St Station. Evicted by the Cardiff Bay Development Corporation, the company was offered a lease by the Vale of Glamorgan Council on Barry Island railway station, with financial aid from the Welsh Development Agency.

Following the December 2007 decision by landlords, the Vale of Glamorgan Council not to renew the £65,000 per annum funding of the Barry Island Railway, the society maintained its services but subsequently the Council decided to put the railway site out to tender under a long-term lease. There were three sealed bids submitted [1] with the successful bidder being the commercial company, Cambrian Transport, who had been the Council's railway adviser and contractor [3] since the Barry Railway Project started.

The other bidder NEWCO was submitted by Graham Lee – owner of the LH Plant, Hunslet Engine Company, Statfold Barn Railway – and Mike Thomson – owner of 'Arrowvale' who make "black boxes" for the rail industry. NEWCO had spoken to the VGR in advance and agreed a method of working together.

Cambrian Transport have operated the railway at Barry since December 2009. It currently operates the line over 30 days per annum and runs many special events. The biggest annual event for the last 3 years has been the "Barry at War" Weekend, which attracts many thousands of visitors to the town. In August 2014, Cambrian Transport sponsored a display by the Red Arrows and a fly-past by the Battle of Britain Memorial Flight during this event, bringing more people to Barry Island than for many years.

Santa Special trains are also popular during the Christmas period.

In 2022 the area was taken over by Transport for Wales and much of the rolling stock was moved. The line no longer runs trains.

Route

The Barry Tourist Railway is centred at Barry Island railway station and platforms, which is shared with Transport for Wales (TfW) services. 51°23′31″N3°16′31″W / 51.392°N 3.2753°W / 51.392; -3.2753 (Barry Island Railway) The station is maintained by Cambrian Transport and there is a shop, café and military museum as well as space for event displays and activities. At the west or 'Cardiff' end of the building, is the end of the Network Rail main platform 1 area. Access to the Barry Tourist Railway's used bay platform 4 and part of bay platform 3 (unused and having no track), is at the pier (east) end of the station. An unused section of Platform 1 and also having no track, runs to a point from the east end of the station building towards the Barry Island (or Pier) tunnel. The Barry Island Railway line exits the east end of the station and runs to Plymouth Road where a museum is to be developed. A short canopied platform at the museum building allows visitors to alight and see historic artefacts and exhibits when established whilst a DMU driver changes ends or steam-hauled trains have to run-around. In the past, certain trains ran through Barry Island station and a 280-yard tunnel to Barry Pier to connect with P&A Campbell's paddle steamer sailings in the Bristol Channel. At the moment the tunnel is blocked off and used as a shooting range. The former single track falling at 1 in 80 to the tunnel was lifted after 1976 and the inclined trackbed now serves as a metalled access road to the tunnel. The railway has long-term ambitions to reopen the tunnel and route to Barry Pier.

Heading west from Barry Island station, the Barry Tourist Railway's single line crosses the 149-yard (136 m) Barry Island double-line viaduct shared with Network Rail, before making a tight right-hand curve and splitting into two branches, one dropping down to Hood Road, (the Waterfront) the first section to be opened on a totally new inclined formation, the other heading past the former Barry Railway Co's steam shed and on to Woodham Halt and thence to the new terminus at Gladstone Bridge adjacent to Morrison's supermarket and a retail centre. It is intended to extend the line a further half mile to a site alongside Arriva Trains Wales’ Barry Docks Station, where an interchange will be provided and where by 2013, a Park & Ride facility had been provided.

The running line runs near to the site of the former Woodham Brothers scrapyard which by April 2015 was under intense development as a new housing complex and by 13 April 2015, a new ASDA superstore had been built and opened, all on the site of what was known in railway terms as 'West Pond' before being completely backfilled. The Waterfront terminus is alongside the old Barry Railway Co's Hood Road goods shed and also conveniently situated near a new Premier Inn and Brewers Fayre establishment opened in 2014 at the south-western end of Barry No.1 dock. The Waterfront platform and terminus also lies opposite the old Barry Railway Co's Hydraulic pumphouse and electrical generating building, now a listed structure and as at August 2015, was undergoing extensive internal and external refurbishment and bore vertically lettered identities placed on two sides of its taper square chimney, one face stating PUMPHOUSE and the other TY PWMP, but the correct circumflex above the letter Y has been omitted. The former Barry Railway Co's Loco shed at Barry, opened in 1888 and at the GWR 1922 grouping, stabled 148 engines, all re-numbered by the GWR. As at September 1947 and nationalisation of the railways, Barry shed had a complement of 85 steam locomotives. It closed to steam engines in September 1964. Before being taken over by the Vale of Glamorgan Council in the 1990s, the shed and outbuildings had finally served as an EWS wagon repair centre but is now the main running shed and is also used to store and repair rolling stock. This site has recently been renamed Barry Main Depôt by Cambrian Transport.

Some parts of the line, particularly around the Plymouth Road/Barry Island and Barry Town area, were used for several scenes in the Doctor Who episodes "The Empty Child" and "The Doctor Dances" in January 2005 and more recently for the episode "Flatline" screened in October 2014. Other recent filming includes Being Human , Ar-y-Tracs and "Stella (UK TV series)" – the last two featuring Ruth Jones.

By July 2014, the Network Rail connection to the BTR infrastructure at Barry was completely remodelled, coincident with the commissioning of the new Network Rail re-signalling project and closure of Barry signal box, the latter being demolished on the weekend of 28–29 March 2015.

Rolling stock

Stock marked with an asterisk (*) is located at the Barry Main Depot. On most running days, guided shed tours are offered by the railway.

Steam locomotives

The last locomotives to leave Dai Woodham's scrapyard, were the remains of the vast number of locomotives left when the yard closed – and as there were ten of them, were a group often called the Barry Ten. Most of them have been removed for use in heritage railway projects and for restoration elsewhere. Two of the Barry Ten steam locomotives remained on the railway, though they were rejoined by a third member in 2014, and are publicly viewable on most operating days. They comprise an 0-6-2 Collett tank engine and a 2-10-0 tender locomotive, both partly disassembled.

At the Barry New Works Building located adjacent to Woodham Halt are two locos undergoing restoration

Also on site are the following:

Diesel locomotives
Diesel Multiple Units

Other rolling stock includes:-

The plan is to acquire further wagons to make up two rakes of wagons – one vacuum-braked and one air-braked set.

Related Research Articles

<span class="mw-page-title-main">Steam locomotives of British Railways</span> Steam locomotives used under British Railways (1948 - 1968)

The steam locomotives of British Railways were used by British Railways over the period 1948–1968. The vast majority of these were inherited from its four constituent companies, the "Big Four".

<span class="mw-page-title-main">Woodham Brothers</span> Welsh scrapping company

Woodham Brothers Ltd is a trading business, based mainly around activities and premises located within Barry Docks, in Barry, South Wales. It is noted globally for its 1960s activity as a scrapyard, where 297 withdrawn British Railways steam locomotives were sent, from which 213 were rescued for the developing railway preservation movement.

<span class="mw-page-title-main">Barry Island railway station</span> Railway station in Vale of Glamorgan, Wales

Barry Island railway station is a railway station, 9+14 miles (14.9 km) south-west of Cardiff Central, serving Barry Island in South Wales. The station has been the terminus – and only remaining active station at the end of the Barry branch of the Cardiff Central to Barry Island line since the closure of Barry Pier station in 1976, the last passenger working through Barry Island tunnel to the Pier station being an enthusiasts' special in 1973. Previous to that year, only a few revenue-earning workings to meet up with the former P&A Campbell's paddle-steamer trips to Weston-super-Mare or other Somerset/Devon havens, were made following May 1964.

<span class="mw-page-title-main">GWR 7800 Class</span> Class of thirty 4-6-0 locomotives

The Great Western Railway (GWR) 7800 Class or Manor Class is a class of 4-6-0 steam locomotive. They were designed as a lighter version of the Grange Class, giving them a wider Route Availability. Like the 'Granges', the 'Manors' used parts from the GWR 4300 Class Moguls but just on the first batch of twenty. Twenty were built between 1938 and 1939, with British Railways adding a further 10 in 1950. They were named after Manors in the area covered by the Great Western Railway. Nine are preserved.

<span class="mw-page-title-main">GWR 2884 Class</span> Class of 2-8-0 steam locomotive

The Great Western Railway (GWR) 2884 Class is a class of 2-8-0 steam locomotive. They were Collett's development of Churchward's earlier 2800 Class and are sometimes regarded as belonging to that class.

<span class="mw-page-title-main">GWR 7200 Class</span> Class of 2-8-2 tank engines

The Great Western Railway (GWR) 7200 Class is a class of 2-8-2T steam locomotive. They were the only 2-8-2Ts built and used by a British railway, and the largest tank engines to run on the Great Western Railway.

<span class="mw-page-title-main">GWR 5600 Class</span> Steam locomotive

The GWR 5600 Class is a class of 0-6-2T steam locomotive built between 1924 and 1928. They were designed by Charles Collett for the Great Western Railway (GWR), and were introduced into traffic in 1924. After the 1923 grouping, Swindon inherited a large and variable collection of locomotives from historic Welsh railway companies, which did not fit into their standardisation programme. GWR boiler inspectors arrived en masse and either condemned the original locomotives or had them rebuilt. The systematic destruction of many examples of locomotives, most still in serviceable condition, followed, but various were worked alongside 5600 Class.

The Garw Valley Railway is the trading name of the Bridgend Valleys Railway Company Limited. It operates a short section of 4 ft 8+12 instandard gauge railway located in South Wales, which is being recreated as a heritage railway. Formerly part of the Llynvi and Ogmore Railway (L&OR) and built by the Great Western Railway (GWR), the line was used for freight and passenger services, with most of the track still in place between Brynmenyn and Pontycymer. The project currently has a train shed at Pontycymer, and hopes to initially offer brake van rides between Pontycymer and Pant-y-Gog, a distance of 0.5 miles (0.8 km).

GWR 4073 Class 5029 <i>Nunney Castle</i>

GWR 4073 Class 5029 Nunney Castle is a Great Western Railway Castle Class steam locomotive. It was built at the GWR's Swindon Works in 1934, being outshopped on 28 May and taking the name of Nunney Castle near Frome, Somerset. The locomotive was used in many publicity and "life on the railway" type of photographs. During the first day of the evacuation of civilians during World War II, the locomotive hauled trains carrying children being taken from London to the safety of the countryside. Nunney Castle was also used to haul the Royal Train in October 1957 from London Paddington station to Gloucester.

GWR 4073 Class 5080 <i>Defiant</i> Preserved British 4-6-0 locomotive

GWR 4073 Class 5080 Defiant is a GWR 4073 Class steam locomotive built for the Great Western Railway at Swindon Works in May 1939. It was originally named Ogmore Castle.

<span class="mw-page-title-main">GWR 2800 Class 2807</span>

GWR 2800 Class No. 2807 is one of the surviving members of the Great Western Railway's 2800 Class of 2-8-0 steam locomotives, also known as the 28XX class.

GWR 7800 Class 7821 <i>Ditcheat Manor</i>

Great Western Railway 7800 Class No. 7821 Ditcheat Manor is a preserved British steam locomotive.

<span class="mw-page-title-main">Barry Railway Company</span> Former railway and docks company in South Wales

The Barry Railway Company was a railway and docks company in South Wales, first incorporated as the Barry Dock and Railway Company in 1884. It arose out of frustration among Rhondda coal owners at congestion and high charges at Cardiff Docks as well the monopoly held by the Taff Vale Railway in transporting coal from the Rhondda. In addition, the Taff Vale did not have the required capacity for the mineral traffic using the route, leading to lengthy delays in getting to Cardiff.

<span class="mw-page-title-main">BR Standard Class 5 73129</span>

British Railways Standard Class 5 No. 73129 is a preserved British steam locomotive. It is the only surviving Standard Class 5 built by British Railways which was fitted with Caprotti valve gear.

<span class="mw-page-title-main">Barry Docks</span> Port in Wales

Barry Docks is a port facility in the town of Barry, Vale of Glamorgan, Wales, a few miles southwest of Cardiff on the north shore of the Bristol Channel. The docks were opened in 1889 by David Davies and John Cory as an alternative to the congested and expensive Cardiff Docks to ship coal carried by rail from the South Wales Coalfield. The principal engineer was John Wolfe Barry, assisted by Thomas Forster Brown and Henry Marc Brunel, son of the famous engineer Isambard Kingdom Brunel.

<span class="mw-page-title-main">GWR 4200 Class 4277</span>

Great Western Railway (GWR) 4200 Class No. 4277 is a preserved British steam locomotive. In preservation it has carried the name Hercules.

The Barry 10 was a collection of unsold scrapyard steam locomotives that were removed from Woodham Brothers in 1990 when Dai Woodham retired.

Carnforth MPD (Motive Power Depot) is a former London Midland and Scottish Railway railway depot located in the town of Carnforth, Lancashire, England.

References

  1. 1 2 "Barry Heritage Railway Project". Vale of Glamorgan Council. 5 November 2008. Archived from the original on 19 February 2012.
  2. Barry Tourist Railway (Glamorgan Council Website) Archived 1 August 2010 at the Wayback Machine
  3. Cambrian Transport. "Cambrian Transport".
  4. Barrow, Keith (November 2023). "Farewell to the CDAs: the end of a Cornish icon". Today's Railways. No. 261. Sheffield: Platform 5. p. 33. ISSN   1475-9713.