General information | |||||
---|---|---|---|---|---|
Location | Beijingzhan Jie, Dongcheng District, Beijing China | ||||
Coordinates | 39°54′10″N116°25′41″E / 39.902896°N 116.42792°E | ||||
Operated by | CR Beijing Beijing Subway | ||||
Line(s) | |||||
Connections | Bus terminal | ||||
Other information | |||||
Station code |
| ||||
Classification | Top Class station | ||||
History | |||||
Opened | October 4, 1959 January 15, 1971 | ||||
|
Beijing railway station, or simply Beijing station, is a passenger railway station in Dongcheng District, Beijing. The station is located just southeast of the city centre inside the Second Ring Road with Beijing Station Street to the north and the remnants of the city wall between Chongwenmen and Dongbianmen to the south. The Beijing railway station opened in 1959 and was the largest train station in China at the time. Though superseded by the larger Beijing West and Beijing South stations, this station remains the only one located inside the old walled city. Trains entering and leaving the station pass by the Dongbianmen corner tower. With gilded eaves and soaring clock towers, the architecture of the railway blends traditional Chinese and socialist realist influence.
Generally, trains for northeast China (Shenyang, Dalian, Harbin) on the Beijing–Harbin railway, for Shandong (Jinan, Qingdao) and the Yangtze River Delta (Shanghai, Nanjing and Hangzhou) on the Beijing–Shanghai railway and some for Inner and the Republic of Mongolia depart from this station. Some international lines (notably the railway line linking Beijing to Moscow and to Pyongyang, North Korea (DPRK), amongst others), also depart from this station.
Beijing railway station used to be the eastern terminus of Beijing Subway's Line 1 until 1987, when the station became part of Line 2. More than 30 Beijing bus and trolleybus routes stop at or near the railway station.
In 1901, Zhengyangmen East Station was constructed south-east of Zhengyangmen, the gate south of Tiananmen Square. It was the terminus of the Beijing–Shanhaiguan Railway built by Imperial Railways of North China. Zhengyangmen East closed in 1959 with the opening of the Beijing railway station 2.5 km to the east, and eventually become part of the China Railway Museum.
To commemorate the Tenth Anniversary of the founding of the People's Republic of China, the Central Committee of the Chinese Communist Party in 1958 began the planning and construction of ten large-scale projects, known as the "Ten Great Buildings" to showcase the new outlook of the country and the Beijing railway station was amongst the projects undertaken.
In late October 1958, according to the early 1950 Beijing municipal government's construction and planning records, the design arrangements for the new railway station was commenced. The station's design was assigned to the Ministry of Railway Institute's third department (now the Third Railway Survey and Design Institute Group Co. Ltd) with the station house building chaired by then renowned architects Yang Tingbao (杨廷宝) and Chen Deng'ao (陈登鏊), the National Building and Industry Department and the Nanjing Institute of Architectural Design were to cooperate in the design tasks. The station's design progressed rapidly and by early December the same year, the whole design proposal was completed. On December 10, the design proposal was approved by the Central Committee. The then Premier Zhou Enlai was also very concerned about the design and construction of the new Beijing railway station, and dealt with aspects concerning the direction and positioning of station names to the layout of the VIP room environment. [1] In determining the design program proposal, Zhou Enlai proposed that turrets be built on each of the two wings of the main building and this suggestion was adopted. [2]
On January 20, 1959 the construction of the new station commenced with the number of construction workers reaching up to two million people during the peak stage and project investment amounted to 57.82 million yuan. Soviet experts were also hired to give technical guidance at the construction sites. In just over seven months, the project was completed on September 10, 1959. The new Beijing railway station covered an area of two hundred and fifty thousand square meters, the Station House Building site covered an area of 46,700 square meters (503,000 sq ft), the station plaza comprised an area of forty thousand square meters. Chairman Mao Zedong wrote the calligraphic characters in the station sign. [3]
The Beijing railway station was one of the largest construction projects in mainland China during that time with modern facilities and it was also China's first large modern railway terminal. At the time of completion, the station has a twelve tracks and six railway platforms with canopies attached to them. The Station house building faced south and the architecture included both a Chinese traditional style and the Soviet Stalinist architecture. [4] The twelve passenger waiting rooms comprised a total area of fourteen thousand square meters and was able to accommodate 14,000 waiting passengers. The inner complex of the Main Station Building contained a passenger waiting room, mother and child waiting room, movie theater, recreation hall, visitors' restaurants, post office, clinic and other facilities. The roof had two clock towers; bells marked 7 AM and 9 PM by playing "The East Is Red".
The Beijing station equipment was considered to be relatively advanced at its -time with four AC2-59 type escalators installed in the interior; the joint design and production of the escalators were coordinated by the Shanghai Jiao Tong University and Shanghai Elevator Company. [5] The four sets of escalators were replaced during the 1980 and again during 1990; the most recent replacement of the elevators occurred in early 2005 - the design being a product of Otis Company. [6]
General information | ||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Beijingzhan Jie, Dongcheng District, Beijing China | |||||||||||||||||||||||||||||||||||||||||||||||
Operated by | China Railway Beijing Group | |||||||||||||||||||||||||||||||||||||||||||||||
Line(s) | ||||||||||||||||||||||||||||||||||||||||||||||||
Platforms | 14 (6 island platforms, 2 side platforms) | |||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 1959 | |||||||||||||||||||||||||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||||||||||||||||||||||||
|
After the completion of the new Beijing railway station, its transport capacity far exceeded the formerly used East railway station and it played an increasing role in heavy transport tasks, and today it is still Beijing's most important passenger railway station, and has the largest station traffic in China. The number of trains and traffic has also increased year by year: In 1959 there were 33 train lines; in 1966 there were forty train lines; in 1978 there were sixty-one train lines; in 1985 there were seventy-eight train lines; and by 1993 there were eighty-two train lines. During the late 1950s, the number of passengers using the railway transportation system was six million people a year, in the late 1960 it was eight million people a year, in the late 1970 it reached fifteen million a year, and after the Chinese economic reform period, the usage soared to more than thirty million people. [2] To alleviate the transport pressure on the Beijing railway station, the Beijing Municipal Government and the Ministry of Railways in 1980 started the planning and construction of Beijing's second passenger station and hence the Beijing West railway station was completed in 1996, which provided transportation links for the Beijing–Guangzhou Railway and Beijing–Kowloon Railway helped alleviate pressure on the Beijing railway station - this led to a reduction in passenger traffic for the Beijing railway station to twenty million people. [2]
Since 1976, the Beijing railway station had begun a series of upgrades to the passenger service facilities, for example a computer system had been set up for processing tickets, a TV monitoring screen, wireless communication, automatic broadcasting system, and extensions made to the railway platform expanded its length from 497 to 603 meters (1,631 to 1,978 ft) in order to meet the needs of the expanding transportation flow. In 1988, the Shanghai Electric Clock Factory installed China's first large screen display system in the Beijing railway station square. [7] Between May 1998 and September 1999, the Ministry of Railways implemented a seismic strengthening project to the Beijing railway station and also introduced new passenger features such as a central air conditioning system, passenger guidance system, multi-functional radio broadcasting system. [8] Since June 18, 2003, the Beijing railway station began an expansion of two new sites, comprising an area of 20,513 square meters (220,800 sq ft) and includes a specialized large parcel luggage line, [9] renovations included the removal of the concrete canopy, alterations to the steel arch station poles, and alterations to the original site raised it from 1 to 1.2 meters. [10]
In June 2008, in order to meet the needs of the Beijing Olympic Games, bilingual signs were created at the Beijing railway station to facilitate an overall increase in foreign tourists travelling to the games, in addition to putting up the English name "Beijing Railway Station", several other signs were also erected at station entrances, exits and ticket booths. [11] [12]
On June 25, 2021, G902/903 and G907/908 trains will be extended to Beijing railway station, thus the Beijing-Shenyang high-speed railway has charted trains arriving and departing at Beijing railway station. [13] [14]
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Beijingzhan Jie, Dongcheng District, Beijing China | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | 210 | ||||||||||
History | |||||||||||
Opened | 15 January 1971 | ||||||||||
Services | |||||||||||
|
The Beijing railway station is a transportation hub in Beijing.
Bus route numbers in bold denotes bus terminus.
The station has an underground island platform.
There are four exits, lettered A, B, C, and D. Exit A is accessible.
京哈高铁哈尔滨西站始发的G902次高速动车组列车将首次图定停靠北京站
Guangshen railway or Guangzhou–Shenzhen railway, also known as the Chinese section of the Kowloon–Canton railway (广九铁路华段) in 1911–1949, is a railway in Guangdong province in the People's Republic of China, between Guangzhou and Shenzhen. It is operated by Guangshen Railway Co., Ltd., a publicly traded company.
Qinghe railway station is a railway station in Beijing. The old station began its construction in 1905 and opened in 1906. The station closed on October 31, 2016, to be rebuilt into a new high-speed railway station on the Beijing-Baotou Passenger-Dedicated Line opened on December 30, 2019.
Beijing Chaoyang railway station, formerly known as Xinghuo railway station, is a railway station in Chaoyang District, Beijing. This station is the main terminus of the Beijing–Harbin high-speed railway, and one of eight main passenger-service stations of the Beijing railway hub.
China Railway High-speed (CRH) is a high-speed rail service operated by China Railway.
Shenzhen East station, formerly Pu Kuut station and Buji station (布吉站), is located in Buji Subdistrict, Longgang District, Shenzhen, in Guangdong. It is a station on the Guangzhou–Shenzhen Railway.
Wuhan railway station is one of the three main passenger railway stations of Wuhan, the capital of China's Hubei Province. It is located northeast of Wuhan's East Lake, near a small lake called Yangchunhu, and is adjacent to the 3rd Ring Road. Administratively, the site is within the Wuhan's Hongshan District.
The Beijing–Harbin high-speed railway is an operational high-speed railway corridor, announced in 2008 as part of the "Four Verticals and Four Horizontals" master railway network plan. It is part of the CRH's system of passenger dedicated lines, connecting Beijing Chaoyang railway station in Beijing and Harbin railway station in Harbin.
Harbinxi (West) railway station is a railway station on the Jingha Railway and the Harbin–Dalian section of the Beijing–Harbin High-Speed Railway. It is located in Harbin, in the Heilongjiang province of China.
Wuxi railway station is a railway station of Jinghu railway and Shanghai-Nanjing Intercity Railway, located in Chong'an District, Wuxi, Jiangsu, is a special station under the jurisdiction of China Railway Shanghai Bureau Group Co., Ltd. The main lines are the Beijing-Shanghai Railway and the Shanghai-Nanjing Intercity Railway.
The CRH380A Hexie is a Chinese electric high-speed train that was developed by CSR Corporation Limited (CSR) and is currently manufactured by CRRC Qingdao Sifang. As a continuation of the CRH2-380 program it both replaces foreign (Japanese) technology in the CRH2 with Chinese developments and increases its top speed. The CRH380A is designed to operate at a cruise speed of 350 km/h (217 mph) and a maximum speed of 380 km/h (236 mph) in commercial service. The original 8-car train-set recorded a top speed of 416.6 km/h (258.9 mph) during a trial run. The longer 16-car train-set reached 486.1 km/h (302.0 mph).
Beijing–Shenyang high-speed railway is a 700-kilometer (430 mi)-long high-speed rail line of the China Railway High-speed between Beijing and Shenyang, the capital of Liaoning province. It is a section of the Beijing–Harbin high-speed railway.
Jiaozhou North is a railway station found on the boundary between Jiaodong Subdistrict and Jiaolai Town of Jiaozhou, Qingdao, Shandong, China. It currently is on the Qingdao–Jinan high-speed railway and Qingdao–Jinan passenger railway.
Jiaxing railway station is a railway station located in Nanhu District, Jiaxing, Zhejiang, People's Republic of China, on the Shanghai–Kunming railway. It handles all non-high-speed rail services for Jiaxing City. High-speed trains arrive at and depart from Jiaxing South railway station.
Beijing Fengtai railway station is a railway station located in the Fengtai District of Beijing. It was renamed from Fengtai railway station to Beijing Fengtai railway station in 2021. The new railway station opened on 20 June 2022.
Zhengzhou railway station is a passenger railway station in Erqi District, Zhengzhou, Henan. It is located in the city center, about 1 km southwest to the Erqi Memorial Tower. As the junction of the important Beijing-Guangzhou Railway and Longhai Railway, the station is one of the busiest in China, and is called as "the heart of Chinese railway network".
Fuxing is a series of high-speed and higher-speed EMU trains operated by China Railway High-speed (CRH) and developed by CRRC. They are the first successful high-speed trains to be fully designed and manufactured in China.
The Beijing–Shanghai high-speed train (京沪高速动车组列车) are high-speed train services operated by CR Beijing and CR Shanghai on Beijing–Shanghai HSR in China. The services provide high-speed train connections between Beijing, the capital of China, and Shanghai, the economic center and largest city of the country. Currently, 41 pairs of G-series trains are operated daily.
The Shanghai–Zhengzhou high-speed train (沪郑高速动车组列车) are high-speed train services between Shanghai and Zhengzhou, the capital of Henan Province. Trains are operated by CR Shanghai and CR Zhengzhou.
Shantou Railway Station is a railway station located in Longhu District, Shantou. It opened on 28 December 1995, situating on the eastern end of Guangzhou–Meizhou–Shantou railway, and later also branching off from Xiamen–Shenzhen railway.
The CR200J Fuxing is a Chinese higher-speed trainset consisting of a power car paired with unpowered passenger cars operated by China Railway. It is the slowest member of the Fuxing series. The train was jointly designed and produced by six companies under CRRC.