Website | www |
---|---|
Spacecraft properties | |
Spacecraft | Beresheet 2 |
Spacecraft type | Lunar landers and orbiter |
Manufacturer | SpaceIL Firefly Aerospace (lander) |
Start of mission | |
Launch date | Mission suspended. Launch was planned for 2025 [1] |
Beresheet 2 is a proposed private space mission intended to land two spacecraft on the Moon. Upon reaching the Moon, the spacecraft would split into three: an orbiter and two landers that would be released for landing at different locations on the Moon. The orbiter would continue to orbit the Moon on a long-term multi-year mission. This would be the first-ever dual-lander deployment mission, with the smallest landers to ever soft-land on the Moon. [1] It would have a budget of US$100 million, similar to that of Beresheet , and would include more international collaboration, with the United Arab Emirates and Italy among countries expressing interest. [2] [3] The project was planned to include a substantial component of educational activities and an outreach program for the public in the partnering countries. As of 2025, the mission was suspended due to lack of funding. [4]
The mission was announced by the SpaceIL voluntary association, shortly after the conclusion of the first Beresheet mission in April 2019. [5] It was announced on 26 June 2019, that the mission will not target the Moon, and instead it will be to another undisclosed object. [6] [7] On 25 November 2019, it was simultaneously announced that the Moon would indeed be the target of Beresheet 2, and that SpaceIL plans to send another lander to Mars. [8] [9]
On 16 January 2020, SpaceIL announced that they have officially started to work on Beresheet 2, as they were given the first million-dollar funding for the spacecraft. On 5 February 2020, Shimon Sarid was appointed as CEO of SpaceIL. In this role, Sarid would lead the Beresheet 2 project. [10] In July 2020, engineer Yoav Heichal, former chief engineer of Better Place Ltd, has joined the program as a structural engineer. The program was officially launched by Israel's former president, Reuven Rivlin, on 9 December 2020 and announced that the Beresheet 2 Moon mission would launch in 2024, consisting of an orbiter and two landers. [11] SpacelL was leading the program with the support of the Israel Space Agency. [12]
In July 2021, the Beresheet2 program raised 70 million dollars from a group of donors: the Patrick & Lina Drahi family foundation, Morris Kahn, and the Moshal Space Foundation. [13] At World Space Week in Dubai in October 2021, Israel and the UAE ministers of science and technology announced plans for cooperation on the mission. [14] In January 2025, Israel Space Agency and Italian Space Agency signed a memorandum of understanding for collaboration on the mission, but any joint budget for the mission had not been decided. [3]
In April 2025, SpaceIL has suspended the work on the Beresheet 2 Moon mission after failing to secure funding. [4] [15]