First Lunar Outpost

Last updated
First Lunar Outpost
FLO Surface Outpost.jpg
Program overview
Country United States
Organization NASA
PurposeCrewed lunar exploration
StatusProposed and cancelled
Program history
CostCost Estimate (1992)

Total Development: US$12.8 billion

  • HLLV Development= $4.8 billion
  • Spacecraft & Facilities Development= $6 billion
  • Surface Systems Development= $0.5 billion
  • Surface Habitat= $1.5 billion

Total Production: $12.2 billion

  • HLLV Production (3 Vehicles)= $7.8 billion
  • Crewed Spacecraft Production (x 1)= $1.4 billion
  • Uncrewed Lander Production (x 2)= $1 billion
  • Cargo Production Cost (~68t)= $2 billion
DurationStudy: 1992-1993
First flight2011
Launch site(s) Kennedy Space Center
Vehicle information
Crewed vehicle(s)"Eagle" Direct Ascent Vehicle
Launch vehicle(s) Comet HLLV

First Lunar Outpost was a proposal for a crewed lunar mission that would have launched sometime in the 2010s. It was part of George H. W. Bush's Space Exploration Initiative. The main purpose of the proposal was to offer a much cheaper alternative to NASA's 90-day study from 1989 by a factor of US$30 billion. Although it did not gather much mainstream attention, NASA dedicated much time to assembling a very detailed and thorough proposal. However, the entire Space Exploration Initiative was cancelled soon after the proposal's completion, and NASA had to close the Office of Space Exploration in March 1993. [1]

Contents

Overview

The First Lunar Outpost (FLO) was the most comprehensive moonbase study under the Space Exploration Initiative (SEI). It was intended to be the flagship of the program from which other proposals such as ILREC would have to compete. The FLO concept incorporated many recommendations from the 1991 Stafford Synthesis report, mainly the use of a Nova class super heavy launch vehicle to minimize assembly and operations in LEO and on the surface of the Moon. FLO was a major change from previous SEI proposals as the vehicle was standalone and expendable rather than reusable and being staged off of Space Station Freedom. The design was based on of massive yet simple launchers to carry massive amounts of payloads at once rather than many small and complicated launches. This was to reduce cost and development time. The program would have almost completely consisted of existing technology such as the Saturn and Space Station with only the landing vehicle needing to be developed. [2]

The Comet HLV FLO Comet HLV Verticle.jpg
The Comet HLV
The Saturn V derived HLV "Comet" FLO Comet Layout.jpg
The Saturn V derived HLV "Comet"

Launch vehicle

Based on the recommendations of the Stafford Synthesis report, FLO would have relied on a massive Saturn-derived launch vehicle known as the Comet. The Comet would have been capable of injecting 254.4 tons into low Earth orbit and 97.6 tons on a TLI making it one of the most capable vehicles ever designed. NASA's Marshall Space Flight Center looked into the Comet rocket or a possible configuration of the then-in-development National Launch System with four F-1A boosters added to the basic 2-stage NLS vehicle. The Saturn V derived design consisted of a standard Saturn V but with a new third stage, stretched first and second stages, and new F-1 side boosters. The engines would be updated to the newer F-1A and J-2S variants. Development costs were expected to be low since most of it would just be resurrecting manufacturing hardware from Apollo.

Chemical lunar injection stage FLO Earth Departure Stage.png
Chemical lunar injection stage

A nuclear powered variant of the third stage was also considered. It would use two 222.5 KN-thrust engines and would have reduced the size and weight of the lunar injection stage and significantly reduced the size of the vehicle in general. The baseline study used the chemical engines instead due to the fact that they would cost $2 billion less to develop. The nuclear option would be developed later on to support crewed mars missions. Both Boeing's SEI contractor studies and the Stafford Synthesis report recommended that NASA invest in nuclear propulsion technology. NASA's Lewis Research Center established a Nuclear Systems Office to develop and test a fully functional engine by 2005. This along with the military's Timberwind project revived the U'S nuclear propulsion program for the first time since NERVA's cancellation in the 70s. [3]

Lander

The landing vehicle was designed to be as simple and easy to operate as possible. It would weigh 93,526 kg (103 tons) and be powered by four RL-10 engines. When fully deployed its landing legs would stretch to a massive 18.8 meters wide and would stand 14.1 meters tall. Each FLO crewed flight would only require one launch and one vehicle. The Comet would send the lander on a trajectory to the lunar surface where it would then use its engines to brake and land. From the surface, the ascent vehicle would carry the crew capsule directly back to Earth. This was similar to the early Apollo direct ascent. [4]

The lunar lander during final descent FLO Eagle lander.jpg
The lunar lander during final descent

Descent stage

It weighed 12,992 kg dry and 44,151 kg wet and would be able to carry 5,000 kg of equipment and cargo along with its 18,077 kg earth return stage. The descent stage would be used to break into lunar orbit and later deorbit the vehicle for landing. It would be self-guided and not require crewed piloting. [4]

The earth return stage taking off FLO Liftoff.jpg
The earth return stage taking off

Ascent stage

Astronauts would ride in a scaled-up Apollo capsule, it would be about 5% bigger. This would allow it to comfortably carry a crew of four on their four-day transit to the surface. The vehicle would land automatically because the astronauts had no view of the surface to pilot it. The earth return would use three engines and would utilize hypergolic fuels for safety reasons. Astronauts would have to descend from the crew capsule down a ladder to a platform before going down a stair ladder to the surface. [4]

Uncrewed cargo variant

The uncrewed cargo lander was just as important as the crewed vehicle. It would be used to transport massive amounts of material to the lunar surface in order to construct a surface outpost. It would carry the initial habitat module before the first crewed mission and would later be used to carry rovers and other habitats to the surface. The uncrewed version could deliver a 35,894 kg payload to the lunar surface. This would be helpful when delivering the station-derived habitat module. Later missions would bring ISRU equipment to test it on the lunar surface before sending the technology to Mars. [5]

Sketch of the surface habitat FLO Surface Habitat sketch.png
Sketch of the surface habitat

Station derived habitat

The habitat module would weigh 35.9 tons and cost $470 million to develop. It was a modified version of the standard Space Station Freedom habitat and laboratory design. It would not need any additional setup after landing and would be able to self-deploy its 20 KW solar array and perform its own system check. It would serve as a life science and soil analysis lab. It could be visited by crews for up to 45 days at intervals of every six months. Later expeditions could expand the base to accommodate more crew and eventually be permanently crewed or use the site as a proving ground for deep space technology. [6]

Surface operations

The landing site for FLO was to be Mare Smythii, near the equator on the eastern limb. This initial landing site was used as a design reference to demonstrate what an optimal mission would look like. The team evaluated other landing sites to see how flexible the design was. They concluded that: "except for some specialized sites, such as the lunar poles, the bottoms of craters or other unusual terrain, the mission science payload and the EVA activities would not change much from site to site. The actual landing site would be decided by a scientific committee over the course of many months." [7]

An earlier lunar base design from FLO's precursor in the 90-day study Entering a Lunar Outpost.jpg
An earlier lunar base design from FLO's precursor in the 90-day study

One on the surface, the crew would perform nine traverses using a 4-man unpressurized rover. Each traverse would drive out to a maximum range of 25 km and they would visit major geographical features and gathering data about the area. Each traverse was divided into segments suitable for one eight-hour EVA on the rover. Mission planners hoped five or six traverses could be completed each mission. The remaining uncompleted traverses would be left to a future mission.

Mission designers decided on four major disciplines that surface teams would focus on during the mission: astronomy, geophysics, life sciences, and space and solar systems physics. The astronauts would also deploy several "set and forget" standalone science payloads. These payloads were:

The heaviest of these payloads would be the In-Situ Resources Utilization (ISRU) Demonstration Package. It consisted of several experiments for the astronauts to demonstrate the use of resources on the Moon such as heating lunar regolith to extract oxygen, which would also be the main objective of the next proposed lunar mission ILREC. The main focus of this was to test the technology which would be vital for crewed missions to Mars.

Future EVA suits would match the requirements of the FLO space suits Constellation spacesuit.png
Future EVA suits would match the requirements of the FLO space suits

The second mission would focus less on exploration and more on setting up additional research equipment as well as tending to the outpost. The main focus of the crew would be drilling on the surface using a 10-meter drill to extract resources and samples. They would also begin deploying a radio telescope array and revisit the optical telescope site and switch detectors as an operational test.

The mission would require newer updated EVA suits that were more comfortable, had better mobility, and were easier to manage. The existing Shuttle EVA Suits required much maintenance and astronauts needed to pre-breathe oxygen in order to avoid the bends as a result of nitrogen bubbling in the bloodstream. This pre-breathing technique would be too time-consuming and would make things like emergency EVAs impossible. [7]

Early Lunar Access pathfinder program

A precursor program called Early Lunar Access would have run during the early 2000s and used Ariane rockets and Space Shuttles to operate a low-cost lunar exploration infrastructure. It would be a joint NASA and ESA mission and serve as a testing ground for FLO. It would use the same crew capsule but a smaller landing vehicle capable of supporting a crew of 2. The Space Shuttle would carry the Lunar Exploration Vehicle while the Ariane 5 (or Titan IV) would carry a wide bodied Centaur G rocket stage. Both payloads would rendezvous and dock in low Earth orbit. The Centaur would fire its engine to accelerate the craft on a trajectory to the lunar surface. To save fuel, the LEV would make a direct landing rather than entering a parking orbit. Once the surface mission is complete, the vehicle would separate two large spherical drop tanks and ascend directly to Earth, once again skipping low lunar orbit. [8]

In order to achieve the payload capacity required for this mission, the Ariane 5 would need an additional two SRBs and the Space Shuttle would need the lightweight Al-Li External Tank or Advanced Solid Rocket Motors (ASRMs) to carry 25,720-kg payloads to a 300-km orbit. The new external tank was eventually manufactured but the ASRMs were cancelled in 1994. The Centaur G would be modified to last 10 days in orbit rather than a few hours. The crew capsule would be the same upscaled Apollo capsule used on FLO but would only need to support a crew of two which meant it could carry extra supplies and payload. [9]

The Eagle Engineering reusable lander FLO Alternate Habitat.jpg
The Eagle Engineering reusable lander

Cancellation of SEI

On April 1, 1992 Dan Goldin became NASA Administrator, and during his tenure near-term human exploration beyond Earth orbit was abandoned, and the "faster, better, cheaper" strategy was applied to space science robotic exploration.

When the White House National Science and Technology Council released their revision of the National Space Policy in September 1996, it specifically lacked any mention of human space exploration beyond Earth's orbit. The next day, President Clinton stated on a campaigning trip through the Pacific Northwest that a human mission to Mars was too expensive and instead affirmed America's commitment to a series of less expensive probes, thus removing human exploration from the national agenda.

See also

Related Research Articles

<span class="mw-page-title-main">Apollo program</span> 1961–1972 American crewed lunar exploration program

The Apollo program, also known as Project Apollo, was the third United States human spaceflight program carried out by the National Aeronautics and Space Administration (NASA), which succeeded in preparing and landing the first humans on the Moon from 1968 to 1972. It was first conceived in 1960 during President Dwight D. Eisenhower's administration as a three-person spacecraft to follow the one-person Project Mercury, which put the first Americans in space. Apollo was later dedicated to President John F. Kennedy's national goal for the 1960s of "landing a man on the Moon and returning him safely to the Earth" in an address to Congress on May 25, 1961. It was the third US human spaceflight program to fly, preceded by the two-person Project Gemini conceived in 1961 to extend spaceflight capability in support of Apollo.

<span class="mw-page-title-main">Apollo 12</span> Second crewed Moon landing

Apollo 12 was the sixth crewed flight in the United States Apollo program and the second to land on the Moon. It was launched on November 14, 1969, by NASA from the Kennedy Space Center, Florida. Commander Charles "Pete" Conrad and Lunar Module Pilot Alan L. Bean performed just over one day and seven hours of lunar surface activity while Command Module Pilot Richard F. Gordon remained in lunar orbit.

<span class="mw-page-title-main">Apollo 17</span> Sixth and latest crewed Moon landing

Apollo 17 was the eleventh and final mission of NASA's Apollo program, the sixth and most recent time humans have set foot on the Moon or traveled beyond low Earth orbit. Commander Gene Cernan and Lunar Module Pilot Harrison Schmitt walked on the Moon, while Command Module Pilot Ronald Evans orbited above. Schmitt was the only professional geologist to land on the Moon; he was selected in place of Joe Engle, as NASA had been under pressure to send a scientist to the Moon. The mission's heavy emphasis on science meant the inclusion of a number of new experiments, including a biological experiment containing five mice that was carried in the command module.

<span class="mw-page-title-main">Apollo Lunar Module</span> NASA crewed Moon landing spacecraft (1969–1972)

The Apollo Lunar Module, originally designated the Lunar Excursion Module (LEM), was the lunar lander spacecraft that was flown between lunar orbit and the Moon's surface during the United States' Apollo program. It was the first crewed spacecraft to operate exclusively in the airless vacuum of space, and remains the only crewed vehicle to land anywhere beyond Earth.

<span class="mw-page-title-main">Constellation program</span> Cancelled 2005–2010 NASA human spaceflight program

The Constellation program was a crewed spaceflight program developed by NASA, the space agency of the United States, from 2005 to 2009. The major goals of the program were "completion of the International Space Station" and a "return to the Moon no later than 2020" with a crewed flight to the planet Mars as the ultimate goal. The program's logo reflected the three stages of the program: the Earth (ISS), the Moon, and finally Mars—while the Mars goal also found expression in the name given to the program's booster rockets: Ares. The technological aims of the program included the regaining of significant astronaut experience beyond low Earth orbit and the development of technologies necessary to enable sustained human presence on other planetary bodies.

<span class="mw-page-title-main">Space capsule</span> Type of spacecraft

A space capsule is a spacecraft designed to transport cargo, scientific experiments, and/or astronauts to and from space. Capsules are distinguished from other spacecraft by the ability to survive reentry and return a payload to the Earth's surface from orbit, and are distinguished from other types of recoverable spacecraft by their blunt shape, not having wings and often containing little fuel other than what is necessary for a safe return. Capsule-based crewed spacecraft such as Soyuz or Orion are often supported by a service or adapter module, and sometimes augmented with an extra module for extended space operations. Capsules make up the majority of crewed spacecraft designs, although one crewed spaceplane, the Space Shuttle, has flown in orbit.

The Apollo Applications Program (AAP) was created as early as 1966 by NASA headquarters to develop science-based human spaceflight missions using hardware developed for the Apollo program. AAP was the ultimate development of a number of official and unofficial Apollo follow-on projects studied at various NASA labs. However, the AAP's ambitious initial plans became an early casualty when the Johnson Administration declined to support it adequately, partly in order to implement its Great Society set of domestic programs while remaining within a $100 billion budget. Thus, Fiscal Year 1967 ultimately allocated $80 million to the AAP, compared to NASA's preliminary estimates of $450 million necessary to fund a full-scale AAP program for that year, with over $1 billion being required for FY 1968. The AAP eventually led to Skylab, which absorbed much of what had been developed under Apollo Applications.

<span class="mw-page-title-main">Moon landing</span> Arrival of a spacecraft on the Moons surface

A Moon landing or lunar landing is the arrival of a spacecraft on the surface of the Moon. This includes both crewed and robotic missions. The first human-made object to touch the Moon was the Soviet Union's Luna 2, on 13 September 1959.

<span class="mw-page-title-main">Lunar lander</span> Spacecraft intended to land on the surface of the Moon

A lunar lander or Moon lander is a spacecraft designed to land on the surface of the Moon. As of 2023, the Apollo Lunar Module is the only lunar lander to have ever been used in human spaceflight, completing six lunar landings from 1969 to 1972 during the United States' Apollo Program. Several robotic landers have reached the surface, and some have returned samples to Earth.

<span class="mw-page-title-main">Exploration Systems Architecture Study</span> NASA study

The Exploration Systems Architecture Study (ESAS) is the official title of a large-scale, system level study released by the National Aeronautics and Space Administration (NASA) in November 2005 of his goal of returning astronauts to the Moon and eventually Mars—known as the Vision for Space Exploration. The Constellation Program was cancelled in 2010 by the Obama Administration and replaced with the Space Launch System, later renamed as the Artemis Program in 2017 under the Trump Administration.

<span class="mw-page-title-main">Altair (spacecraft)</span> Planned lander spacecraft component of NASAs cancelled Project Constellation

The Altair spacecraft, previously known as the Lunar Surface Access Module or LSAM, was the planned lander spacecraft component of NASA's cancelled Constellation program. Astronauts would have used the spacecraft for landings on the Moon, which was intended to begin around 2019. The Altair spacecraft was planned to be used both for lunar sortie and lunar outpost missions. On February 1, 2010, U.S. President Barack Obama announced a proposal to cancel the Constellation program, to be replaced with a re-scoped program, effective with the U.S. 2011 fiscal year budget.

<span class="mw-page-title-main">Ares V</span> Canceled NASA rocket key to Project Constellation

The Ares V was the planned cargo launch component of the cancelled NASA Constellation program, which was to have replaced the Space Shuttle after its retirement in 2011. Ares V was also planned to carry supplies for a human presence on Mars. Ares V and the smaller Ares I were named after Ares, the Greek god of war.

<span class="mw-page-title-main">NASA lunar outpost concepts</span> Concepts for extended human presence on the Moon

NASA has proposed several concept moonbases for achieving a permanent presence of humans on the Moon since the late 1950s. Research and exploration of the Moon has been a large focus of the organization since the Apollo program. NASA's peak budget was in 1964-1965, when it comprised 4% of all federal spending in service of the Apollo Moon landing project. Though lunar landings ever since the conclusion of the Apollo program in 1972 have ceased, interest in establishing a permanent habitation on the lunar surface or beyond low Earth orbit has remained steady. Recently, renewed interest in lunar landing has led to increased funding and project planning. NASA requested an increase in the 2020 budget of $1.6 billion, in order to make another crewed mission to the Moon under the Artemis program by 2025, followed by a sustained presence on the Moon by 2028. A crew was selected for the planned manned mission, Artemis II, in April of 2023.

<span class="mw-page-title-main">Space Exploration Initiative</span> 1989-1993 program outlining NASAs long-term vision for crewed interplanetary missions

The Space Exploration Initiative was a 1989–1993 space public policy initiative of the George H. W. Bush administration.

<span class="mw-page-title-main">Artemis 2</span> Artemis programs second lunar flight

Artemis 2 is the second scheduled mission of NASA's Artemis program and the first scheduled crewed mission of NASA's Orion spacecraft, currently planned to be launched by the Space Launch System (SLS) in November 2024. Four astronauts are to perform a flyby of the Moon and return to Earth, being the first crewed mission beyond low Earth orbit since Apollo 17 in 1972. The mission is also planned to be the first crewed launch from Launch Complex 39B of the Kennedy Space Center since STS-116 in 2006.

Super heavy-lift launch vehicle Launch vehicle capable of lifting more than 50 tonnes of payload into low earth orbit

A super heavy-lift launch vehicle is a rocket that can lift to low Earth orbit a "super heavy payload", which is defined as more than 50 metric tons (110,000 lb) by the United States and as more than 100 metric tons (220,000 lb) by Russia. It is the most capable launch vehicle classification by mass to orbit, exceeding that of the heavy-lift launch vehicle classification.

<span class="mw-page-title-main">Blue Moon (spacecraft)</span> Lunar lander family developed by Blue Origin for the Artemis program

Blue Moon is a family of lunar landers and their associated infrastructure, intended to carry humans and cargo to the Moon, currently under development by a consortium led by Blue Origin and including Lockheed Martin, Draper, Boeing, Astrobotic, and Honeybee Robotics. Two versions of Blue Moon are under development: a robotic lander planned to land on the Moon in 2024, and a larger human lander planned to land a crew of four astronauts on the lunar surface for the NASA Artemis V mission in 2029.

<span class="mw-page-title-main">Artemis program</span> NASA-led lunar exploration program

The Artemis program is a robotic and human Moon exploration program led by the United States' National Aeronautics and Space Administration (NASA) along with six major partner agencies— the European Space Agency (ESA), the German Aerospace Center (DLR), the Japan Aerospace Exploration Agency (JAXA), the Canadian Space Agency (CSA), the Israel Space Agency (ISA), and the Italian Space Agency (ASI). The Artemis program is intended to reestablish a human presence on the Moon for the first time since the Apollo 17 mission in 1972. The main parts of the program are the Space Launch System (SLS), the Orion spacecraft, the Lunar Gateway space station, and the commercial Human Landing Systems. The program's long-term goal is to establish a permanent base on the Moon to facilitate the feasibility of human missions to Mars.

<span class="mw-page-title-main">Artemis 4</span> Fourth orbital flight of the Artemis program

Artemis 4 is the fourth planned mission of NASA's Artemis program. The mission will launch four astronauts on a Space Launch System rocket and an Orion to the Lunar Gateway and the second lunar landing of the Artemis program.

<span class="mw-page-title-main">International Lunar Resources Exploration Concept</span> Lunar exploration concept

The International Lunar Resources Exploration Concept (ILREC) was a proposed mission architecture under President George H. W. Bush's Space Exploration Initiative (SEI) by Kent Joosten, an engineer at Johnson Space Center. The plan would have used the help of international partners, mainly the Soviet Union, to assemble a lunar base and sustainable lunar transportation service.

References

  1. "First Lunar Outpost". www.astronautix.com. Archived from the original on August 20, 2016. Retrieved 2020-01-08.
  2. "The Space Review: The last lunar outpost (page 1)". www.thespacereview.com. Retrieved 2020-01-09.
  3. "First Lunar Outpost". www.astronautix.com. Archived from the original on August 20, 2016. Retrieved 2020-01-09.
  4. 1 2 3 "The Space Review: The last lunar outpost (page 2)". www.thespacereview.com. Retrieved 2020-01-09.
  5. "First Lunar Outpost Conceptual Surface Mission" (PDF).
  6. Burnham, Darren L. (1993). "First Lunar Outpost". SPFL. 35: 148–150. Bibcode:1993SpFl...35..148B. ISSN   0038-6340.
  7. 1 2 "The Space Review: The last lunar outpost (page 2)". www.thespacereview.com. Retrieved 2020-01-10.
  8. "Lunar Base Studies – 1993: Early Lunar Access (ELA)|National Space Society". 3 August 2017. Retrieved 2020-01-09.
  9. "Lunar Base Studies – 1993: Early Lunar Access (ELA)|National Space Society". 3 August 2017. Retrieved 2020-01-10.