IM-1

Last updated

IM-1
(Odysseus)
Intuitive Machines' Nova-C lunar lander (IM 00309) (cropped).jpg
IM-1 (Odysseus) in preparation for launch
NamesTO2-IM [1]
CLPS-2 [2]
Mission type Lunar landing
Operator Intuitive Machines
COSPAR ID 2024-030A OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 58963
Mission duration14 days [3]
Spacecraft properties
SpacecraftOdysseus
Spacecraft type Nova-C
Manufacturer Intuitive Machines
Launch mass1,900 kg (4,200 lb)
Start of mission
Launch dateFebruary 15, 2024, 06:05:00 (2024-02-15UTC06:05Z)  UTC
Rocket Falcon 9 Block 5 (B1060.18) ♺
Launch site Kennedy, LC-39A
End of mission
DeclaredMarch 23, 2024 (2024-03-24) [4]
Last contactFebruary 29, 2024 (2024-03-01) [3]
Lunar lander
Landing dateFebruary 22, 2024, 23:23:00 UTC
Landing site Malapert A
80°08′S1°26′E / 80.13°S 1.44°E / -80.13; 1.44 [5]
IM-1 insignia.png
IM-1 mission insignia
Motto: ADTIGO PLANITIA LUNAE
(I touch the plains of the Moon)
(Stick The Landing) [6]
IM-2  

IM-1 was a robotic Moon landing mission conducted by Intuitive Machines (IM) in February 2024 using a Nova-C lunar lander. After contact with the lunar surface on February 22 the lander tipped to an unplanned 30 degree angle. All instrument payloads remained functional and the mission was deemed a success. [7] IM-1 was the first commercial mission to successfully soft-land on the Moon. [8] [9] NASA provided funding support for the mission through the Commercial Lunar Payload Services program. The lander, named Odysseus, carried six NASA-developed payloads and several others from commercial and educational customers. On February 29, Odysseus lost power and shut down with the start of the lunar night. [3]

Contents

IM-1 was the first soft lunar landing by a private company [10] [11] and Odysseus was the first American-made spacecraft to soft-land on the Moon since Apollo 17 in 1972. Steve Altemus, CEO of IM, says Nova-C is the first spacecraft to use liquid methane and liquid oxygen (methalox) propulsion beyond low-Earth orbit, and also the first methalox spacecraft to land on an off-world celestial body. [12]

Background and selection

In December 2017, Space Policy Directive 1 signaled an intention to return astronauts to the Moon. [13] Excerpts from NASA documents obtained by The New York Times suggested the agency would prioritize the private spaceflight sector. [14] [15] In November 2018, NASA announced the Commercial Lunar Payload Services program, selecting nine companies to deploy payloads for the agency. [16] In May 2019, NASA announced that Astrobotic Technology, Intuitive Machines, and Orbit Beyond would develop lunar landers, awarding Intuitive Machines US$77 million. [17] Intuitive Machines was paid US$118 million to develop the Odysseus lunar lander used in the IM-1 mission.

The IM-1 mission in February 2024 followed the Peregrine mission by Astrobotic Technology, which launched in January 2024. [18] [19] The Peregrine landing at Gruithuisen Domes was abandoned when a propellant leak was observed after launch, and the spacecraft was guided to re-enter Earth's atmosphere. [20]

Mission hardware

Artist conception of the planned upright landed IM-1 First U S Commercial Provider Just Days From Landing NASA Science And Technology Instruments on the Moon (SVS14529) (cropped).jpg
Artist conception of the planned upright landed IM-1

Odysseus was equipped with six instruments developed by NASA, including a laser retroreflector array, a lidar navigation device, a stereo camera, a low-frequency radio receiver, the Lunar Node-1 beacon, and an instrument to monitor propellant levels. Additionally, a camera built by students at Embry–Riddle Aeronautical University, Daytona Beach, a planned Moon telescope, and a Jeff Koons art project were also on board. [21] In total the payloads comprise six NASA scientific instruments and six commercial instruments (five of the latter being scientific and one cultural). [22]

Odysseus landed at the Malapert-A crater and stayed active there for about a week, before the Sun sets at the landing site. [23] The Odysseus lander is not designed to survive the lunar night, which lasts about two weeks. [24]

The lander has a chip with works of 200 artists, including works of Pablo Picasso, Michelangelo Buonarroti, Jeff Koons and Bram Reijnders. [25] [26] The lander carries the sculpture Moon Phases by Jeff Koons within its payload. This is the first sculpture installation to reach the Moon since Paul Van Hoeydonck's Fallen Astronaut sculpture was placed on the Moon by David Scott of Apollo 15 in 1971. [27] [28] Koons describes Moon Phases as, "125 miniature Moon sculptures, each approximately one inch in diameter." [29]

The lander also carries private disclosed and undisclosed payloads from commercial company's, educational institutions, and private citizens. One being the Lunaprise time capsule, which includes the Lunar Library compiled by the Arch Mission Foundation. [22] The Lunar Library includes content from the English Wikipedia and the Rosetta Project. [30] [31] Also included onboard is the AstroVault by Quantum Aerospace which includes an archive of musical recordings and photos, which features songs by Jimi Hendrix, Bob Marley, and Elvis Presley, among other musicians. [32] [33]

A Radio Frequency Mass Gauge (RFMG) on board estimated how much propellant was available during the IM-1 mission. This was the first long-duration test of an RFMG on a standalone spacecraft. [34] [35]

NameAgency/CompanyTypeDetails
Nova-C Odysseus Intuitive Machines Lunar landerThe Landing Component of the mission. It will also provide support to the equipment.
ILO-X [36] International Lunar Observatory InstrumentProof of concept wide and narrow field imagers
Laser Retro-Reflector Array [37] NASA InstrumentA passive optical instrument with eight laser retroreflectors that spacecraft could use for precision determination of their distance to the reflectors. The array provides a permanent location marker on the Moon. [35]
Navigation Doppler Lidar for Precise Velocity and Range Sensing [37] NASA InstrumentIncluded as a technology demonstration payload, NDL was used operationally by Odysseus when the primary mission lidar was discovered to be inoperable. [38]
Lunar Node 1 Navigation Demonstrator [37] NASA InstrumentA CubeSat-sized experiment to demonstrate autonomous navigation that could be used by landers, rovers, surface infrastructure and astronauts to confirm their relative positions on the Moon. [35]
Stereo Cameras for Lunar Plume-Surface Studies [37] NASA InstrumentA suite of four cameras to capture imagery showing how the Moon's surface changes from interactions with the spacecraft's engine plume during and after descent. [35]
Radiowave Observations at the Lunar Surface of the photoElectron Sheath (ROLSES) [39] NASA / University of Colorado Boulder InstrumentThe instrument will observe the Moon's surface environment in radio frequencies, to determine how natural and human-generated activity near the surface interacts with and could interfere with science conducted there. [35]
AstroVault [33] Quantum Aerospace Private Commercial CargoConfidential
EagleCam [40] Embry–Riddle Aeronautical University CubeSat A Cubesat that was planned to record the landing after ejecting from IM-1 about 30 m before touchdown. [35]
Moon Phases art cube [29] Pace Verso / 4Space / NFMoonSculpturePassive payload blocked after lander tilted to the side hosting this payload, post landing. [41]
Omni-Heat [22] Columbia Sportswear Space blanket
Independence [22] LonestarLunar data center test mission

Mission events

Prior to launch

In December 2023, Odysseus arrived at Kennedy Space Center for processing. [42] On January 31, 2024, the Odysseus spacecraft was encapsulated in the payload fairing of its Falcon 9 Block 5 launch vehicle. [43] On February 13, IM announced that two wet dress rehearsals loading Odysseus with propellants had been successful and they were ready for launch. [44] [45]

Launch

The Falcon 9 Block 5 launches from Kennedy Space Center Launch Complex 39A. NASA-SpaceX CLPS IM-1 Launch (KSC-20240215-PH-KLS01 0085).jpg
The Falcon 9 Block 5 launches from Kennedy Space Center Launch Complex 39A.

A Falcon 9 booster launched Odysseus from LC-39A in Florida at 06:05 UTC on February 15, 2024. The booster returned to LZ-1 and the expended Falcon 9 upper stage delivered the spacecraft to its translunar trajectory.

Originally planned to launch on February 13, SpaceX postponed the launch after reporting a technical issue with propellant loaded onto the lander. [21] [46]

Early operations

Nova-C lunar lander drifts away from Falcon 9's second stage after deployment in orbit IM-1 spacecraft separation, Feb 2024.jpg
Nova-C lunar lander drifts away from Falcon 9's second stage after deployment in orbit

After separation from the launch vehicle, the Nova Control operations center established communication with the lander and conducted initial checkouts. Images captured by the spacecraft after separation from the launch vehicle were released on February 17. [47]

Commissioning burn

The lander was scheduled to perform a main engine "commissioning burn" on February 15. Trent Martin, Intuitive Machines vice president of Space Systems, described this as a "critical step" for the mission. [48] After reporting issues with the IM-1 star tracker and adjustment of the liquid oxygen line cooling time IM reported a successful commissioning burn on February 16. [49] [50] The maneuver resulted in a 21 m/s (47 mph) change in the lander's velocity. [51]

Trajectory correction

Intuitive Machines planned for up to three trajectory adjustment maneuvers during the trans-lunar phase of the mission. [49] The first was completed on February 18, [51] and after the second maneuver on February 20, there was no need for a third. [52]

On February 20, Intuitive Machines reported that Odysseus had completed approximately 72% of its journey to the Moon's surface. [53]

Animations of IM-1 trajectories
Animation of IM-1 around Earth.gif
Around the Earth
Animation of IM-1 around Moon.gif
Around the Moon
   IM-1  ·   Earth  ·   Moon

Lunar orbit

Odysseus performed its lunar orbit insertion (LOI) on February 21, altering its velocity by 800 m/s (1,800 mph). Intuitive Machines reported the 408-second main engine LOI burn placed the lander in a 92 km (57 mi) lunar orbit. [54] [55] On February 22 IM indicated a "lunar correction maneuver" had raised the orbit. [56]

The lander spent approximately 24 hours orbiting the Moon before its descent to the lunar surface on February 22. [57] [58] [55] On February 21, while still in orbit, Odysseus sent back high-resolution images of the lunar surface.

Intuitive Machines adjusted the descent burn parameters based on data from the lunar orbit insertion burn. IM indicated the risks undertaken during the lunar landing phase of the mission would be a "challenge". [55] A later report indicated that, as the lander was being prepared for its descent to the surface, mission controllers determined a safety switch on the primary laser rangefinder system had not been activated during pre-launch preparations. [38] Teams on the ground worked around the issue by reprogramming Odysseus to use data from an experimental NASA payload, the Navigation Doppler Lidar for Precise Velocity and Range Sensing. [59]

Lunar landing

Map showing location of the Malapert "satellite craters" MalapertCraterSAT.jpg
Map showing location of the Malapert "satellite craters"

A favored landing site in 2020 was between the Sea of Serenity (Mare Serenitatis) and the Sea of Crises (Mare Crisium). [60] [61] Lunar maria are large plains formed when lava flowed into ancient impact basins. Later, a lunar highlands location near the south pole of the Moon was chosen for the landing, since that region is believed to have a source of water for a future lunar base. [62]

The Malapert-A crater area 300 km (190 mi) from the lunar south pole was chosen because it appeared to be a relatively flat and safe place near the pole to land, amongst other considerations. [62] [63]

After making a last-minute software patch to the lander's altitude monitoring systems, Odysseus began its landing sequence at 23:11 UTC (6:11 p.m. EST) on February 22 and landed near Malapert A—an area determined to contain water ice—at 23:23 UTC (6:23 p.m. EST). [64] Controllers confirmed that faint communications were received from the lander. [65] The lander was initially thought to be in a fully vertical orientation, [59] [66] based on stale telemetry. It was later determined to have landed at a 30 degree angle, with its solar panels and scientific instrumentation functionally oriented, but with its radio transmission rates somewhat reduced due to the unexpected angle of the lander's antennas.

The lander appeared to most probably have lost one or more of its 6 landing struts and to be resting on an externally mounted helium tank. [67] [68] (The only non-functional payload is a passive Moon Phases art sculpture, on the side facing towards the ground.) [41] Odysseus became the first American spacecraft Moon landing since the Apollo 17 mission in 1972 and the first commercial lunar lander. [69] The Lunar Crater Observation and Sensing Satellite made an intentional hard landing in 2009 following deorbit.

Reporting by Kenneth Chang in The New York Times [70] includes a detailed description of the landing anomaly:

Tim Crain, the company’s chief technology officer, said the spacecraft had been designed to stay upright when landing even on a slope of 10 degrees or more. The navigation software was programmed to look for a spot where the slope was five degrees or less. Because the laser instruments on Odysseus for measuring altitude were not working during descent, the spacecraft landed faster than planned on a 12-degree slope. That exceeded its design limits. Odysseus skidded along the surface, broke one of its six legs and tipped to its side.

IM-1 landing site imaged by LROC
Animated Before (M172936310) and After (M1463440322L) images of Intuitive Machines IM-1 Nova-C, known as Odysseus landing site captured by by Lunar Reconnaissance Orbiter Camera (LROC).gif
Before/After animation of landing site
Image (M1463440322L) of Intuitive Machines IM-1 Nova-C, known as Odysseus landing site captured by Lunar Reconnaissance Orbiter Camera (LROC) (with arrow).png
IM-1 landing site by Lunar Reconnaissance Orbiter Camera (LROC)

Surface operations

On February 23, Intuitive Machines reported that the IM-1 Odysseus lander was still "alive and well", and that IM was continuing to receive data on the vehicle's status [71] and whether the scientific payloads could still be deployed. [72] [68] Intuitive Machines executives said they were working to reconfigure antennas to increase downlink rates but did not estimate what sort of data rates they expected. [73]

On February 26, Intuitive Machines released the first images from the surface taken by the lunar probe. [74] Based on Earth and moon positioning, the IM team reported that flight controllers would continue to communicate with Odysseus until Tuesday (February 27) morning. [75] As of February 28, Odysseus was still receiving power, and all six NASA payloads were providing good data. [42] In a press conference the same day, Intuitive Machines said the lander was in its final hours of operation as the sun moved out of view of the one illuminated solar panel. [7] On February 29, Odysseus lost power and shut down with the start of the lunar night. [3] However, the company did not rule out bringing Odysseus back to life after the two-week lunar night. Executives said they would try contacting the lander in two to three weeks. [7]

About one month after Odysseus landed on the Moon, Intuitive Machines reported that they could not re-establish contact with the lander after the lunar night, bringing an end to the IM-1 mission. [4]

EagleCam

EagleCam
EagleCam CGI.png
The EagleCam CubeSat and its dispenser at deployment
Mission typeTechnology demonstration
OperatorEmbry-Riddle Aeronautical University
Intuitive Machines
COSPAR ID 2024-030A OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 58963 OOjs UI icon edit-ltr-progressive.svg
Website https://erau.edu/eaglecam
Mission durationLaunch to Landing: 13 days
On surface: 30 minutes (lifespan)
Spacecraft properties
SpacecraftEagleCam
Spacecraft typeCubeSat
Bus 1.5U CubeSat
Manufacturer ERAU Space Technologies Laboratory
Dimensions100 × 100 × 150 mm (3.9 × 3.9 × 5.9 in) [76]
Start of mission
Launch dateFebruary 15, 2024, 06:05:37 (2024-02-15UTC06:05:37)  UTC
Rocket Falcon 9 Block 5 F9-299
Launch site LC-39A
Contractor SpaceX
Deployed fromNova-C Odysseus lander
End of mission
DisposalDecommissioned
DeclaredMarch 31, 2024
Lunar lander
Landing dateFebruary 28, 2024
Landing site4 m (13 ft) away from Odysseus lander, near Malapert A crater

The EagleCam was a deployable CubeSat camera system designed especially to photograph the lunar landing of the Nova-C Odysseus lander on the Moon. Photographs taken during the lunar landing of the Odysseus lander may also have enabled a better understanding of the dynamics of lunar landings on the lunar regolith and rock surfaces in the vicinity of the Moon's south pole. Such a better understanding of the local lunar surface features would have assisted with preparations for upcoming scheduled additional landings at the lunar south pole. [40] [77] Designed and manufactured by staff and students working in the Space Technologies Laboratory at Embry–Riddle Aeronautical University, Daytona Beach, [40] [77] it was intended to deploy from Odysseus and take the first photographs of a spacecraft landing on the moon from a third-person perspective. It also planned to test an electrodynamic dust shield system in space for the first time and utilize a Wi-Fi connection to transmit data for the first time on the lunar surface.

Design and objectives

EagleCam's primary payload was its camera system, consisting of three fisheye-lens [78] :2 cameras which would take a total of nine images per second over six seconds as it was ejected from Odysseus shortly before landing. A fourth [79] camera was included to test another one of EagleCam's payloads, an electrodynamic dust shield (EDS), created by the Swamp Works facility at Kennedy Space Center. [80] The CubeSat was powered from a solar-powered battery with a lifetime of 30 minutes. [81]

Had EagleCam been successful, photographs and data taken during the lunar landing of the Odysseus lander may have enabled a better understanding of the dynamics of lunar landings on the lunar regolith and rock surfaces in the vicinity of the Moon's south pole. EagleCam would've assisted in the objectives of NASA's Commercial Lunar Payload Services (CLPS) program, such as gaining a better understanding of the local lunar surface features to assist with preparations for future manned and unmanned missions to the Moon's south pole, through NASA's Artemis program. [82] [83] However, while photos of Odysseus were never taken by EagleCam, it still recorded and transmitted other types of data to Intuitive Machines and the Space Technologies Lab via the IM-1 lander. [84] Through EagleCam, Embry-Riddle Aeronautical University became the world's first university to have a payload on the moon's surface solely developed by faculty and students. [80] [82] [a]

A prototype of the EagleCam CubeSat flew onboard the Blue Origin NS-24 return-to-flight mission on December 19, 2023. [89]

Mission summary

Concept of Operations Diagram for EagleCam near/on the lunar surface EagleCam-ConOps-lowres.jpg
Concept of Operations Diagram for EagleCam near/on the lunar surface

Just before landing, at approximately 30 m (98 ft) above the lunar surface, Odysseus was to eject this CubeSat. Once ejected, EagleCam was supposed to semi-hard land on the lunar surface somewhere near the lander at 10 m/s (33 ft/s). As it descended to the surface EagleCam was planned to capture the first third-person images of a lunar landing. [90] However, due to complications arising from a software patch which reconfigured the lander's sensors used during the final descent phase to the moon's surface, EagleCam was powered off and remained attached to Odysseus through landing. [91] [79] It was later ejected on February 28 but was a partial failure as it returned all types of data, except post IM-1 landing images that were the main aim of its mission. [92] [93] [94] [95] [84] “We reset the visual processing unit and powered up the EagleCam, and were able to eject it, and (we) ejected it about 4 meters away from the vehicle safely. However, either in camera or in the Wi-Fi signal back to the lander, something might not be working correctly. So, the Embry‑Riddle team is working on that and wrestling with that to see if there’s anything they can do,” Steve Altemus, CEO of Intuitive Machines commented on EagleCam in a NASA-IM mission update. [96] The EagleCam utilized a Wi-Fi connection with the Odysseus lander to relay its images back to Earth. [82]

In March 2024, the EagleCam team was recognized by U.S. Senator Rick Scott in the Congressional Record of the United States Senate for their achievements. [97]

See also

Notes

  1. Ranger 4, a lunar impactor launched in 1962, was developed by NASA's Jet Propulsion Laboratory, which has been managed by and included faculty and students from Caltech since the early 20th century. Many lunar missions since the space race have been developed or had onboard experiments under the leadership of government agencies and academic institutions (see List of artificial objects on the Moon). More recently, the LEV-2 rover launched aboard JAXA's SLIM mission which landed on January 19, 2024, was jointly developed by JAXA, Japanese companies Tomy and Sony, and Doshisha University. [85] Tiger Eye 1, a radiation experiment designed by LSU, was also manifested for the IM-1 mission as of November 2021. [86] However, it was pushed back to launch aboard the next Intuitive Machines lunar mission IM-2 by December 2022. [87] Had Astrobotic's Peregrine Mission One been successful, two of its payloads, Iris and MoonArk, both developed by students and faculty at Carnegie Mellon University, would have been the first university-developed robotic rover and museum to land on the Moon's surface respectively. Their planned landing date was February 23, 2024, one day after IM-1 and EagleCam's planned landing and deployment [88] .

Related Research Articles

<span class="mw-page-title-main">Lander (spacecraft)</span> Type of spacecraft

A lander is a spacecraft that descends towards, then comes to rest on the surface of an astronomical body other than Earth. In contrast to an impact probe, which makes a hard landing that damages or destroys the probe upon reaching the surface, a lander makes a soft landing after which the probe remains functional.

<span class="mw-page-title-main">Moon landing</span> Arrival of a spacecraft on the Moons surface

A Moon landing or lunar landing is the arrival of a spacecraft on the surface of the Moon, including both crewed and robotic missions. The first human-made object to touch the Moon was Luna 2 in 1959.

<span class="mw-page-title-main">Lunar lander</span> Spacecraft intended to land on the surface of the Moon

A lunar lander or Moon lander is a spacecraft designed to land on the surface of the Moon. As of 2024, the Apollo Lunar Module is the only lunar lander to have ever been used in human spaceflight, completing six lunar landings from 1969 to 1972 during the United States' Apollo Program. Several robotic landers have reached the surface, and some have returned samples to Earth.

<span class="mw-page-title-main">Astrobotic Technology</span> American space robotics company

Astrobotic Technology, Inc., commonly referred to as Astrobotic, is an American private company that is developing space robotics technology for lunar and planetary missions. It was founded in 2007 by Carnegie Mellon professor Red Whittaker and his associates with the goal of winning the Google Lunar X Prize. The company is based in Pittsburgh, Pennsylvania. Their first launch occurred on January 8, 2024, as part of NASA's Commercial Lunar Payload Services (CLPS) program. The launch carried the company's Peregrine lunar lander on board the first flight of the Vulcan Centaur rocket from Florida's Space Force Station LC-41. The mission was unable to reach the Moon for a soft or hard landing. On June 11, 2020, Astrobotic received a second contract for the CLPS program. NASA would pay Astrobotic US$199.5 million to take the VIPER rover to the Moon, targeting a landing in November 2024. In July 2024, NASA announced that VIPER had been cancelled.

<span class="mw-page-title-main">Lunar south pole</span> Southernmost point on the Moon

The lunar south pole is the southernmost point on the Moon. It is of interest to scientists because of the occurrence of water ice in permanently shadowed areas around it. The lunar south pole region features craters that are unique in that the near-constant sunlight does not reach their interior. Such craters are cold traps that contain fossil records of hydrogen, water ice, and other volatiles dating from the early Solar System. In contrast, the lunar north pole region exhibits a much lower quantity of similarly sheltered craters.

Moon Express is an American privately held company formed in 2010 by a group of Silicon Valley and space entrepreneurs. It had the goal of winning the $30 million Google Lunar X Prize, and of ultimately mining the Moon for natural resources of economic value. The company was not able to make a launch attempt to reach the Moon by March 31, 2018, the deadline for the prize.

<span class="mw-page-title-main">2024 in spaceflight</span>

For the fourth year in a row, new world records were set for both orbital launch attempts and successful orbital launches. The year featured successful maiden launches of Vulcan Centaur, Gravity-1, Long March 12, Ariane 6, and notably more developmental launches of SpaceX's Starship, including the first ever landing on Flight 5. Additionally, the final launch of a Delta family rocket occurred in April with a Delta IV Heavy. In May, China launched the Chang'e 6, the first sample return from the far side of the Moon. The Polaris Dawn mission conducted the first ever commercial spacewalk in September.

The International Lunar Observatory (ILO) is a private scientific and commercial lunar mission by the International Lunar Observatory Association of Kamuela, Hawaii to place a permanent observatory near the South Pole of the Moon to conduct astrophysical studies using an optical telescope and possibly an antenna dish. The mission aims to prove a conceptual design for a lunar observatory that would be reliable, low cost, and fast to implement. A precursor mission, ILO-X consisting of two small imagers, launched on 15 February 2024 aboard the Intuitive Machines IM-1 mission to the Moon south pole region. It is hoped to be a technology precursor to a future observatories on the Moon, and other commercial initiatives.

MoonLIGHT is a laser retroreflector developed as a collaboration primarily between the University of Maryland in the United States, and the Italian National Institute for Nuclear Physics - National Laboratories of Frascati (INFN-LNF) to complement and expand on the Lunar Laser Ranging experiment started with the Apollo Program in 1969. MoonLIGHT was planned to be launched in July 2020 as a secondary payload on the MX-1E lunar lander built by the private company Moon Express. However, as of February 2020, the launch of the MX-1E has been canceled. In 2018 INFN proposed to the European Space Agency (ESA) the MoonLIGHT Pointing Actuators (MPAc) project and was contracted by ESA to deliver it. MPAc is an INFN development for ESA, with auxiliary support by the Italian Space Agency (ASI) for prototyping work. In 2021, ESA agreed with NASA to launch MPAc with a Commercial Lunar Payload Services (CLPS) mission. Nova-C, the lander on which MPAc will be integrated, is designed by Intuitive Machines and the landing site is Reiner Gamma. The expected launch date of the Nova-C mission carrying the instrument, IM-3, is in 2025.

<span class="mw-page-title-main">Commercial Lunar Payload Services</span> NASA program contracting commercial transportation services to the Moon

Commercial Lunar Payload Services (CLPS) is a NASA program to hire companies to send small robotic landers and rovers to the Moon. Most landing sites are near the lunar south pole where they will scout for lunar resources, test in situ resource utilization (ISRU) concepts, and perform lunar science to support the Artemis lunar program. CLPS is intended to buy end-to-end payload services between Earth and the lunar surface using fixed-price contracts. The program achieved the first landing on the Moon by a commercial company in history with the IM-1 mission in 2024. The program was extended to add support for large payloads starting after 2025.

<span class="mw-page-title-main">Intuitive Machines Nova-C</span> Lunar lander developed by Intuitive Machines

The Intuitive Machines Nova-C, or simply Nova-C, is a class of lunar landers designed by Intuitive Machines (IM) to deliver small payloads to the surface of the Moon. Intuitive Machines was one of three service providers awarded task orders in 2019 for delivery of NASA science payloads to the Moon. The IM-1 lunar lander, named Odysseus, was launched by a SpaceX Falcon 9 rocket on 15 February 2024, reached lunar orbit on 21 February, and landed on the lunar surface on 22 February. This marked the inaugural Nova-C landing on the Moon and the first American spacecraft to perform a soft landing on the Moon in over 50 years. It is the first spacecraft to use methalox propulsion to navigate between the Earth and the Moon.

<span class="mw-page-title-main">Intuitive Machines</span> American aerospace company

Intuitive Machines, Inc. is an American space exploration company headquartered in Houston, Texas. It was founded in 2013 by Stephen Altemus, Kam Ghaffarian, and Tim Crain, to provide commercial and government exploration of the Moon. Today the Company offers lunar surface access for transportation and payload delivery, data transmission services, and infrastructure-as-a-service. Intuitive Machines holds three NASA contracts under the space agency's Commercial Lunar Payload Services (CLPS) initiative, to deliver payloads to the lunar surface. Intuitive Machines is one of three companies selected by NASA to advance Lunar Terrain Vehicle (LTV). capabilities.

<span class="mw-page-title-main">Artemis program</span> NASA-led lunar exploration program

The Artemis program is a Moon exploration program led by the United States' National Aeronautics and Space Administration (NASA), formally established in 2017 via Space Policy Directive 1. It is intended to reestablish a human presence on the Moon for the first time since the Apollo 17 mission in 1972. The program's stated long-term goal is to establish a permanent base on the Moon to facilitate human missions to Mars.

<span class="mw-page-title-main">Peregrine Mission One</span> Lunar lander built by Astrobotic Technology

Peregrine Lunar Lander flight 01, commonly referred to as Peregrine Mission One, was an unsuccessful American lunar lander mission. The lander, dubbed Peregrine, was built by Astrobotic Technology and carried payloads for the NASA Commercial Lunar Payload Services (CLPS) program. Peregrine Mission One launched on 8 January 2024, at 2:18 am EST, on the maiden flight of the Vulcan Centaur (Vulcan) rocket. The goal was to land the first U.S.-built lunar lander on the Moon since the crewed Apollo Lunar Module on Apollo 17 in 1972.

<span class="mw-page-title-main">Kam Ghaffarian</span> American businessman

Kamal "Kam" Ghaffarian is an Iranian-born American businessman who focuses on the space industry and new energies and is known as the co-founder of IBX, Axiom Space, Intuitive Machines, X-energy and Quantum Space.

<span class="mw-page-title-main">IM-2</span> 2025 lunar landing mission

IM-2 is an upcoming lunar mission that will be carried out in January 2025 by Intuitive Machines for NASA's CLPS program, using a Nova-C lunar lander. The company named this lander Athena. The mission aims to uncover the presence and amount of lunar water ice using PRIME-1, which consists of a drill and mass spectrometer. The lander will carry a Micro Nova Hopper, a drone that will utilize its neutron spectrometer in the PSR of the nearby Marston crater. If successful, this would provide the first measurement of hydrogen on the surface in the PSR, a key indicator of water.

<span class="mw-page-title-main">Small Innovative Missions for Planetary Exploration</span> NASA program

Small Innovative Missions for Planetary Exploration (SIMPLEx) is a planetary exploration program operated by NASA. The program funds small, low-cost spacecraft for stand-alone planetary exploration missions. These spacecraft are intended to launch as secondary payloads on other missions and are riskier than Discovery or New Frontiers missions.

References

  1. "TO2-IM - NASA". Archived from the original on February 22, 2024. Retrieved February 23, 2024.
  2. Monica Grady (December 29, 2023). "Six space missions to look forward to in 2024". uk.news.yahoo.com. Yahoo! News.
  3. 1 2 3 4 Joey Roulette; Steve Gorman (March 2, 2024). "US moon lander Odysseus goes dormant a week after lopsided landing". www.reuters.com. Reuters . Retrieved March 3, 2024.
  4. 1 2 Intuitive Machines [@Int_Machines] (March 23, 2024). "As of March 23rd at 1030 A.M. Central Standard Time, flight controllers decided their projections were correct, and Odie's power system would not complete another call home. This confirms that Odie has permanently faded after cementing its legacy into history as the first commercial lunar lander to land on the Moon. 3/3" (Tweet) via Twitter.
  5. Mark Robinson (February 26, 2024). "Intuitive Machines IM-1 On The Moon!". www.lroc.asu.edu. Retrieved February 26, 2024.
  6. Intuitive Machines [@Int_Machines] (May 10, 2023). "The IM-1 Mission Patch is a point of pride, a touchstone for everyone that's putting their effort into something bigger than themselves. The two stars represent two of our founders: @CrainTim and Steve Altemus. The Moon and the Earth, are brought together by Nova-C, and surrounded with a solid band representing our third founder, Kam Ghaffarian. Most importantly, the phrase 'Adtigo Planitia Lunae,' which (roughly) translates to 'Stick The Landing.'" (Tweet) via Twitter.
  7. 1 2 3 Jeff Foust (February 28, 2024). "Intuitive Machines and NASA call IM-1 lunar lander a success as mission winds down". spacenews.com. Retrieved March 14, 2024.
  8. Kenneth Chang (February 26, 2024). "Odysseus Sends Moon Landing Photos Home With Time Running Out - The privately built American spacecraft's ability to send home images and other data has been limited by its sideways landing. On another part of the moon, a Japanese spacecraft woke up". The New York Times . Archived from the original on February 26, 2024. Retrieved February 26, 2024.
  9. Kenneth Chang (February 22, 2024). "A U.S.-Built Spacecraft Lands on the Moon for the First Time Since 1972". The New York Times . Archived from the original on February 23, 2024. Retrieved February 23, 2024.
  10. Marcia Dunn (January 4, 2024). "Two companies will attempt the first US moon landings since the Apollo missions a half-century ago". www.apnews.com. Associated Press. Archived from the original on February 5, 2024. Retrieved February 5, 2024.
  11. "Falcon 9 Block 5 - Nova C (IM-1)". nextspaceflight.com. December 19, 2023. Archived from the original on January 19, 2023. Retrieved December 20, 2023.
  12. Steve Altemus (February 28, 2024). "Intuitive Machines Press Release" (PDF). Mindsviewpress.com. Archived from the original (PDF) on March 13, 2024. Retrieved February 29, 2024.
  13. Kenneth Chang (December 11, 2017). "Trump Announces That the Moon Is Astronauts' Next Destination". The New York Times . Archived from the original on April 4, 2023. Retrieved February 22, 2024.
  14. Kenneth Chang (February 11, 2018). "NASA Budgets for a Trip to the Moon, but Not While Trump Is President". The New York Times . Archived from the original on December 25, 2023. Retrieved February 22, 2024.
  15. Christian Davenport (February 11, 2018). "The Trump administration wants to turn the International Space Station into a commercially run venture, NASA document shows". The Washington Post . Archived from the original on November 21, 2023. Retrieved February 22, 2024.
  16. Kenneth Chang (November 29, 2018). "NASA Chooses Private Companies for Future Moon Landings". The New York Times . Archived from the original on December 1, 2018. Retrieved February 22, 2024.
  17. Kenneth Chang (May 31, 2019). "NASA Hires 3 Companies for Moon Science Deliveries". The New York Times . Archived from the original on January 17, 2024. Retrieved February 22, 2024.
  18. A. McCrea (January 8, 2024). "Vulcan successfully launches Peregrine lunar lander on inaugural flight". NASASpaceflight.con. Archived from the original on January 8, 2024. Retrieved January 8, 2024.
  19. Jeff Foust (February 2, 2023). "NASA changes landing site for Peregrine lunar lander". spacenews.com. Archived from the original on February 23, 2024. Retrieved February 5, 2023.
  20. Jackie Wattles; Kristin Fisher (January 8, 2024). "Peregrine mission abandons Moon landing attempt after suffering 'critical' fuel loss". www.cnn.com. CNN. Archived from the original on January 8, 2024. Retrieved January 9, 2024.
  21. 1 2 Kenneth Chang (February 13, 2024). "SpaceX Postpones Launch of Intuitive Machines Moon Mission". The New York Times . Archived from the original on February 22, 2024. Retrieved February 22, 2024.
  22. 1 2 3 4 Andrew Jones (February 22, 2024). "Here's what just landed on the moon aboard Intuitive Machines' Odysseus lander". Space.com. Archived from the original on February 23, 2024. Retrieved February 23, 2024.
  23. William Harwood (February 14, 2024). "Houston company aims to return America to moon's surface with robot lander". www.cbsnews.com. CBS News. Archived from the original on February 22, 2024. Retrieved February 22, 2024.
  24. William Harwood (February 15, 2024). "SpaceX launches private-sector lunar lander on trail-blazing flight to the moon". www.cbsnews.com. CBS News. Archived from the original on February 21, 2024. Retrieved February 22, 2024.
  25. "Werk van Limburgse kunstenaar is met Amerikaanse lander Odysseus mee naar maan". Algemeen Dagblad (in Dutch). February 22, 2024. Archived from the original on February 23, 2024. Retrieved February 23, 2024.
  26. "Het werk van deze Nederlander staat vanaf nu ook op de maan". NOS (in Dutch). February 22, 2024. Archived from the original on February 23, 2024. Retrieved February 23, 2024.
  27. Selen Ozturk (April 12, 2022). "Jeff Koons to Launch First NFT Project to the Moon". Whitewall. Archived from the original on February 7, 2024. Retrieved February 7, 2024.
  28. "Sculpture, Fallen Astronaut". Smithsonian National Air and Space Museum. Archived from the original on July 28, 2014. Retrieved July 17, 2014.
  29. 1 2 Jeff Koons (May 12, 2023). "Moon Phases". Pace. Archived from the original on February 16, 2024. Retrieved February 22, 2024.
  30. "Lunar Library". Archived from the original on February 23, 2024. Retrieved February 23, 2024.
  31. Taylor Mulligan (February 23, 2024). "NASA assists in sending Rochester-made Lunar Library to the moon". WROC-TV . Retrieved February 27, 2024.
  32. Joe Lynch (February 26, 2024). "The 2024 Moon Landing Placed Music By Jimi Hendrix, Bob Marley, Elvis & More on the Lunar Surface". Billboard. Retrieved February 27, 2024.
  33. 1 2 Hardy, Ben (February 28, 2024). "The Dawn of Commercial Lunar Exploration: How Odysseus Paved the Way for Future Moon Missions -" . Retrieved September 3, 2024.
  34. E. Bausback (February 6, 2024). "NASA Tests New Spacecraft Propellant Gauge on Lunar Lander". www.nasa.gov. NASA. Archived from the original on February 23, 2024. Retrieved February 22, 2024.
  35. 1 2 3 4 5 6 J. M. Dooren (February 23, 2024). "NASA Tech Contributes to Soft Moon Landing, Agency Science Underway". www.nasa.gov. NASA . Retrieved February 25, 2024.PD-icon.svg This article incorporates text from this source, which is in the public domain.
  36. "International Lunar Observatory Association, ILO-X Precursor Mission Details". International Lunar Observatory Association. September 21, 2023. Archived from the original on June 23, 2021. Retrieved November 12, 2020.
  37. 1 2 3 4 N. Riusech (February 13, 2024). "Six NASA Instruments Will Fly to Moon on Intuitive Machines Lander". www.nasa.gov. NASA. Archived from the original on February 22, 2024. Retrieved February 22, 2024.
  38. 1 2 Jeff Foust [@jeff_foust] (February 23, 2024). "The laser rangefinder did not work, Altemus said, because a safety switch was not flipped before flight (the equivalent of forgetting a "remove before flight" tag.)" (Tweet) via Twitter.
  39. "Radiowave Observations at the Lunar Surface of the photoElectron Sheath (ROLSES)". July 18, 2019. Archived from the original on January 11, 2024. Retrieved February 22, 2024.
  40. 1 2 3 "EagleCam CubeSat Camera System". Embry-Riddle Aeronautical University. February 1, 2024. Retrieved February 11, 2024.
  41. 1 2 Jonathan Amos (February 23, 2024). "Intuitive Machines: Odysseus Moon lander 'tipped over on touchdown'". www.bbc.com. BBC. Archived from the original on February 24, 2024. Retrieved February 24, 2024.
  42. 1 2 NASA, Intuitive Machines Moon Mission Update on YouTube
  43. Mike Wall (January 31, 2024). "SpaceX gearing up to launch private moon lander in February". Space.com. Archived from the original on February 19, 2024. Retrieved February 22, 2024.
  44. Will Robinson-Smith (October 27, 2023). "Intuitive Machines targets launch to the Moon in mid-January". Spaceflight Now. Archived from the original on October 28, 2023. Retrieved February 22, 2024.
  45. Jeff Foust (February 13, 2024). "Intuitive Machines ready for launch of its first lunar lander". spacenews.com. Archived from the original on February 23, 2024. Retrieved February 14, 2024.
  46. Kenneth Chang (February 14, 2024). "Odysseus, a Private Lunar Lander, Launches Toward the Moon". The New York Times . Archived from the original on February 21, 2024. Retrieved February 22, 2024.
  47. Intuitive Machines Transmits First IM-1 Mission Images In Space Archived February 23, 2024, at the Wayback Machine Intuitivemachines.com. February 17, 2024. Retrieved February 17, 2024.
  48. Will Robinson-Smith (February 13, 2024). "SpaceX, Intuitive Machines launches robotic lander to the Moon". Spaceflight Now. Archived from the original on February 16, 2024. Retrieved February 23, 2024.
  49. 1 2 Intuitive Machines [@Int_Machines] (February 17, 2024). "Intuitive Machines flight controllers successfully fired the first liquid methane and liquid oxygen engine in space, completing the IM-1 mission engine commissioning. This engine firing included a full thrust mainstage engine burn and throttle down-profile necessary to land on the Moon. 🧵(16FEB2024 2020 CST) 1/3" (Tweet) via Twitter.
  50. "IM-1 Mission Vehicle Health Update" (PDF). intuitivemachines.com. Intuitive Machines. Archived (PDF) from the original on February 16, 2024. Retrieved February 16, 2024.
  51. 1 2 "IM-1 Engine Maneuvers Update" (PDF). intuitivemachines.com. Intuitive Machines. February 19, 2024. Archived (PDF) from the original on February 21, 2024. Retrieved February 22, 2024.
  52. David Dickinson (February 22, 2024). "A Lunar Odyssey: "Odie" Lander Touches Down on the Moon". skyandtelescope.org. Sky & Telescope. Archived from the original on February 23, 2024. Retrieved February 22, 2024.
  53. "Planned Trajectory Correction Maneuvers Complete Ahead of Lunar Orbit Insertion". Intuitive Machines . February 20, 2024. Archived from the original on February 22, 2024. Retrieved February 20, 2024.
  54. Mike Wall (February 21, 2024). "Intuitive Machines' private Odysseus lander snaps 1st moon photo, enters lunar orbit". Space.com. Archived from the original on February 23, 2024. Retrieved February 22, 2024.
  55. 1 2 3 "IM-1 Mission Completes Lunar Orbit Insertion and Enters Lunar Orbit". Intuitive Machines . February 21, 2024. Archived from the original on February 22, 2024. Retrieved February 21, 2024.
  56. N. Ramji (February 22, 2024). "Intuitive Machines Updates IM-1 Landing Time, Carrying NASA Science". blogs.nasa.gov. Archived from the original on February 22, 2024. Retrieved February 22, 2024.
  57. Tariq Malik (February 11, 2024). "How to watch SpaceX launch the private Intuitive Machines moon lander IM-1 on Feb. 15 live online". Space.com. Archived from the original on February 16, 2024. Retrieved February 11, 2024.
  58. Jeff Foust (October 3, 2023). "First Intuitive Machines lunar lander ready for launch". spacenews.com. Archived from the original on February 23, 2024. Retrieved February 11, 2024.
  59. 1 2 Elise Hammond; Jackie Wattles (February 22, 2024). "Odysseus mission aims to make historic moon landing". www.cnn.com. CNN. Archived from the original on February 22, 2024. Retrieved February 22, 2024.
  60. C. Warner (January 22, 2020). "First Commercial Moon Delivery Assignments to Advance Artemis". www.nasa.gov. NASA. Archived from the original on June 21, 2023. Retrieved February 22, 2024.
  61. "Intuitive Machines-1 Orbital Debris Assessment Report (ODAR) Revision 1.1" (PDF). Federal Communications Commission. April 22, 2021. Archived (PDF) from the original on April 24, 2021. Retrieved April 24, 2021.PD-icon.svg This article incorporates text from this source, which is in the public domain.
  62. 1 2 "Intuitive Machines Lunar Landing Site Moves to South Pole". blogs.nasa.gov. May 25, 2023. Archived from the original on February 22, 2024. Retrieved February 23, 2024.
  63. Jeff Foust (February 7, 2023). "Intuitive Machines moves landing site of first mission to lunar south pole". spacenews.com. Archived from the original on February 23, 2024. Retrieved February 8, 2023.
  64. Kenneth Chang (February 22, 2024). "The Spacecraft Odysseus Has Landed on the Moon". The New York Times . Archived from the original on February 22, 2024. Retrieved February 22, 2024.
  65. Intuitive Machines-1 Lunar Landing (Official NASA Broadcast) on YouTube
  66. Jackie Wattles; Ashley Strickland (February 22, 2024). "Historic Odysseus moon mission marks a milestone in reaching the lunar surface". www.cnn.com. CNN. Archived from the original on February 23, 2024. Retrieved February 23, 2024.
  67. "Lunar Lander Feared to Have Tipped While Reaching the Moon". Yahoo Finance. Bloomberg. February 23, 2024. Archived from the original on February 23, 2024. Retrieved February 23, 2024.
  68. 1 2 LIVE! IM-1 Mission Update Press Conference on YouTube
  69. Greg Norman (February 15, 2024). "SpaceX rocket blasts off carrying Intuitive Machines' moon lander". Foxbusiness.com. Archived from the original on February 15, 2024. Retrieved February 15, 2024.
  70. Kenneth Chang (March 4, 2024). "Why It's So Challenging to Land Upright on the Moon". The New York Times .
  71. "Lunar Surface Day One Update". Intuitive Machines . February 23, 2024. Archived from the original on February 22, 2024. Retrieved February 23, 2024.
  72. Jackie Wattles (February 23, 2024). "Odysseus lunar lander is sideways on the moon after historic touchdown". CNN. Archived from the original on February 24, 2024. Retrieved February 24, 2024.
  73. Jeff Foust (February 26, 2024). "Intuitive Machines expects early end to IM-1 lunar lander mission". spacenews.com.
  74. "Odysseus Establishes Southernmost Landing Site, Maintains Communication with Earth, and Sends Additional Images" (PDF). Intuitive Machines .
  75. Monisha Ravisetti (February 27, 2024). "Intuitive Machines' Odysseus moon lander beams home 1st photos from lunar surface". Space.com. Retrieved February 28, 2024.
  76. D. C. Korczyk (May 2022). "Dynamic Analysis of CubeSat impact on Lunar Surface". Embry-Riddle Aeronautical University Scholarly Commons. p. ii. Retrieved March 2, 2024.
  77. 1 2 "Eagles Visit Intuitive Machines to Make Final Preparations on EagleCam CubeSat". Embry-Riddle Newsroom. January 25, 2024. Retrieved February 15, 2024.
  78. Posada, Daniel; Hays, Christopher W.; Jordan, Jarred; Lopez, Daniel; Yow, Taylor; Malik, Aryslan; Henderson, Troy (2023). EagleCam: a 1.5U Low-Cost CubeSat Mission for a Novel Third-Person View of a Lunar Landing. 2023 IEEE Aerospace Conference. Big Sky, Montana, United States: Institute of Electrical and Electronics Engineers (published May 15, 2023). ISBN   978-1-6654-9032-0. ISSN   1095-323X . Retrieved March 2, 2024 via IEEE Xplore.
  79. 1 2 Dunn, Marica (February 23, 2024). "Private US spacecraft is on its side on the moon with some antennas covered up, the company says". Associated Press. Retrieved March 2, 2024.
  80. 1 2 Leone, Anthony (February 21, 2024). "Learning about Embry-Riddle Aeronautical University's EagleCam". Spectrum News 13 Orlando. Spectrum News. Archived from the original on February 29, 2024. Retrieved March 2, 2024.
  81. Harper, Mark (February 22, 2024). "NASA, Intuitive Machines confirm Moon landing; ERAU awaits transmission of EagleCam images". Daytona Beach News-Journal. Archived from the original on March 1, 2024. Retrieved March 3, 2024.
  82. 1 2 3 Embry-Riddle Aeronautical University. "EagleCam". Archived from the original on February 24, 2024. Retrieved March 2, 2024.
  83. "Eagles Visit Intuitive Machines to Make Final Preparations on EagleCam CubeSat". Embry-Riddle Newsroom. Retrieved February 15, 2024.
  84. 1 2 Cavaliere, Mike (February 28, 2024). "EagleCam Updates: Public Comments by Intuitive Machines CEO Steve Altemus". Embry-Riddle Aeronautical University News. Retrieved March 2, 2024.
  85. Hirano, Daichi (October 7, 2022). "Palm-Sized Lunar Excursion Vehicle 2 (LEV-2)". JAXA . Archived from the original on October 3, 2022. Retrieved March 3, 2024.
  86. Ross, Corbin (November 3, 2021). "LSU slated to be first university to land technology on the moon as U.S. returns to lunar surface 50 years later". The Reveille. Louisiana State University. Retrieved March 3, 2024.
  87. "Tiger Eye 1". SpaRTAN Physics Lab. SpaRTAN Physics Group. Archived from the original on December 7, 2022. Retrieved March 3, 2024.
  88. Aupperlee, Aaron (January 8, 2024). "Carnegie Mellon University Payloads Iris, MoonArk Launch as Part of Historic Lunar Mission". Carnegie Mellon University. Retrieved March 4, 2024.
  89. Robinson-Smith, Will (December 19, 2023). "Blue Origin launches New Shepard rocket on return to flight mission". Spaceflight Now. Retrieved March 3, 2024.
  90. Greshko, Michael (February 9, 2024). "Second Private U.S. Moon Lander Readies for Launch". Scientific American.
  91. "NASA, Intuitive Machines Share Images from the Moon, Provide Science Updates – Artemis". blogs.nasa.gov. February 28, 2024. Retrieved February 29, 2024.
  92. Space Technologies Lab [@SpaceTechLab] (February 28, 2024). "2/3 mission plans and procedures in order to deploy its CubeSat camera system. Despite the team's strong effort, the technical complications ultimately resulted in an inability to capture images of the Odysseus lander" (Tweet) via Twitter.
  93. Jeff Foust (February 13, 2024). "Intuitive Machines ready for launch of its first lunar lander". spacenews.com. Retrieved February 14, 2024.
  94. Michael Greshko (February 9, 2024). "Second Private U.S. Moon Lander Readies for Launch". Scientific American .
  95. Will Robinson-Smith [@w_robinsonsmith] (February 23, 2024). "In an update from @SpaceTechLab/@EmbryRiddle, the university says the EagleCam instrument was not deployed prior to descent to capture the touchdown of Odysseus" (Tweet) via Twitter.
  96. Mike Cavaliere (February 28, 2024). "EagleCam Updates: Public Comments by Intuitive Machines CEO Steve Altemus". Embry-Riddle Newsroom. Retrieved February 29, 2024.
  97. "Congressional Record" (PDF). www.congress.gov. Washington, DC: Library of Congress. March 20, 2024. Retrieved April 29, 2024.